APPENDIX A NOTICE OF VIOLATION
- ri.;:;i' *15 '~ (.l
- ~~1': *.
\\.,,t.U Public Service Electric and Gas Company Docket No. 50-311 This refers to the inspection conducted by representatives of the Region I (Philadelphia) office at Salem Nuclear Generating Station, Unit 2, Hancocks Bridge, New Jersey, of activities authorized by NRC License No.
CPPR-53.
During this inspection conducted on November 20-22, 1978, the following apparent item of noncompliance was identified. This item is a deficiency.
10 CFR 50, Appendix B, Criterion V, states, in part, 11Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.
11 The Salem Unit 2 FSAR Section D.1.6.5 requires, 11Activities that affect quality are prescribed by PSE&G and its contractors by means of written procedures, instructions, drawings or checklists 11 PSE&G procedure DTP-30-SIT-l, Part 3-13 requires that instrumentation be 11checked-out and is ready for operation 11 as a prerequisite to the-containment structural integrity test.
PSE&G specification 69-7437 requires that 110ne month prior to proof test of building read and record all {strain} gages once each day with multichannel data acquisition system.
Measure and record realm of insulation resistance... - once each week.
11 Contrary to the above, on November 22, 1978, the daily/weekly checkout of strain gages had not yet commenced, although the scheduled date for the containment proof test was November 27, 1978, with probable delay to *December 9, 1978.