| | | Reporting criterion |
|---|
| 05000255/LER-1993-001-01, :on 930106,EDG 1-1 & 1-2 Simultaneously Inoperable When Overspeed Trip Device for DG 1-1 Tripped. Caused by Personnel Failing to Follow Switching & Tagging Order.Overspeed Trip Devices Labeled |
- on 930106,EDG 1-1 & 1-2 Simultaneously Inoperable When Overspeed Trip Device for DG 1-1 Tripped. Caused by Personnel Failing to Follow Switching & Tagging Order.Overspeed Trip Devices Labeled
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000255/LER-1993-002, :on 930306,determined Potential Loss of Containment Integrity Due to Failure of Emergency Escape Airlock Valve.Performed Maint on Escape Airlock Inner Door Equalizing Valve During 1993 Refueling Outage |
- on 930306,determined Potential Loss of Containment Integrity Due to Failure of Emergency Escape Airlock Valve.Performed Maint on Escape Airlock Inner Door Equalizing Valve During 1993 Refueling Outage
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000255/LER-1993-003, :on 930428,unusual Event Declared & Plant Shutdown Commenced Due to Primary Coolant Sys Unidentified Leakage in Excess of Ts.Leaking CRDM Mechanical Seal Packages Repaired |
- on 930428,unusual Event Declared & Plant Shutdown Commenced Due to Primary Coolant Sys Unidentified Leakage in Excess of Ts.Leaking CRDM Mechanical Seal Packages Repaired
| 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown |
| 05000255/LER-1993-004, :on 930630,fuel Rod Failed & Loss of SNM Discovered Following Refueling Operations.Caused by Core Shroud & Fuel Assembly Interface Problem.Fuel Assembly Insps Increased & Failed Fuel Response Plan Implemented |
- on 930630,fuel Rod Failed & Loss of SNM Discovered Following Refueling Operations.Caused by Core Shroud & Fuel Assembly Interface Problem.Fuel Assembly Insps Increased & Failed Fuel Response Plan Implemented
| |
| 05000255/LER-1993-004-01, Forwards LER 93-004-01.Suppl LER Includes Summary of Results of Root Cause Analysis Performed to Determine Reasons for Failure of Fuel Assembly I-024 & Subsequent Discharge of Nuclear Fuel Into Primary Coolant | Forwards LER 93-004-01.Suppl LER Includes Summary of Results of Root Cause Analysis Performed to Determine Reasons for Failure of Fuel Assembly I-024 & Subsequent Discharge of Nuclear Fuel Into Primary Coolant | |
| 05000255/LER-1993-005, :on 930720,discovered Both Emregency Diesel Generators Started After Receiving Undervoltage Signal Due to de-energization of Electrical Bus 1C.Caused by Lack of Vendor Information.Procedures Revised |
- on 930720,discovered Both Emregency Diesel Generators Started After Receiving Undervoltage Signal Due to de-energization of Electrical Bus 1C.Caused by Lack of Vendor Information.Procedures Revised
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000255/LER-1993-005-01, :on 930720,both EDGs Started After Receiving Undervoltage Signal Due to de-energization of Electrical Bus 1C.Caused by Inadequate Design Info.Sys Engineers Will Be Trained on Event |
- on 930720,both EDGs Started After Receiving Undervoltage Signal Due to de-energization of Electrical Bus 1C.Caused by Inadequate Design Info.Sys Engineers Will Be Trained on Event
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000255/LER-1993-006-01, :on 930804,determined That Reg Guide 1.97, Category 1,pressurizer Level Indicator Powered from non- Safety Related Power Supply.Caused by Personnel Error. Indicator LIA-0102A Powered from Ac Source |
- on 930804,determined That Reg Guide 1.97, Category 1,pressurizer Level Indicator Powered from non- Safety Related Power Supply.Caused by Personnel Error. Indicator LIA-0102A Powered from Ac Source
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition |
| 05000255/LER-1993-007-01, :on 930817,degradation of Boraflex Neutron Absorber in Surveillance Coupons Observed.Cause of Event Unknown.Temporary Requirement for Daily Sampling & Analysis of SFP Boron Discontinued |
- on 930817,degradation of Boraflex Neutron Absorber in Surveillance Coupons Observed.Cause of Event Unknown.Temporary Requirement for Daily Sampling & Analysis of SFP Boron Discontinued
| |
| 05000255/LER-1993-007, :on 930817,dark Debris Cloud Observed in SFP Around Edges of Boraflex Surveillance Coupon.Caused by Flow Induced Deterioration of Full Length Coupons Due to Inadequate Holding Canister.Neutron Attenuation Tests Done |
- on 930817,dark Debris Cloud Observed in SFP Around Edges of Boraflex Surveillance Coupon.Caused by Flow Induced Deterioration of Full Length Coupons Due to Inadequate Holding Canister.Neutron Attenuation Tests Done
| |
| 05000255/LER-1993-008, :on 930824,V-27D Safeguards Room Cooling Fan Motor Failed to Start Due to Improper Thermal Overload Protection Design.Addl Thermal Overload Setting Changes & Breakers Changes Made |
- on 930824,V-27D Safeguards Room Cooling Fan Motor Failed to Start Due to Improper Thermal Overload Protection Design.Addl Thermal Overload Setting Changes & Breakers Changes Made
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000255/LER-1993-008-01, :on 930824,fan Motor Tripped on Thermal Overload Due to Inadequate Design Control & post-maint Testing.Reanalyzed,Revised & Tested Fan Motor Thermal Overload Settings |
- on 930824,fan Motor Tripped on Thermal Overload Due to Inadequate Design Control & post-maint Testing.Reanalyzed,Revised & Tested Fan Motor Thermal Overload Settings
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000255/LER-1993-009, :on 930916,identified Pressurizer Penetration Safe End Crack Which Resulted in PCS Leakage.Crack Initiated Due to PWSCC in HAZ of PORV Inconnel 600 Safe End. Engineering Evaluation of Failure Conducted |
- on 930916,identified Pressurizer Penetration Safe End Crack Which Resulted in PCS Leakage.Crack Initiated Due to PWSCC in HAZ of PORV Inconnel 600 Safe End. Engineering Evaluation of Failure Conducted
| 10 CFR 50.73(a)(2) |
| 05000255/LER-1993-009-01, Forwards LER 93-009-01 Re Pressurizer Penetration Safe End Crack Resulting in PCS Leakage,Suppl Rept.Suppl Changes Event Date from 930919 to 930916 | Forwards LER 93-009-01 Re Pressurizer Penetration Safe End Crack Resulting in PCS Leakage,Suppl Rept.Suppl Changes Event Date from 930919 to 930916 | 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000255/LER-1993-010, :on 930917,primary Coolant Sys Cooldown Rate as Defined in TS Exceeded.Caused by Combination of Personnel Error & Inadequate Procedures.Proper Temp Monitoring Techniques Verified |
- on 930917,primary Coolant Sys Cooldown Rate as Defined in TS Exceeded.Caused by Combination of Personnel Error & Inadequate Procedures.Proper Temp Monitoring Techniques Verified
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(b)(2) |
| 05000255/LER-1993-011, :on 931009,insp of Pressurizer Upper Temp Nozzle Penetration Found to Be Leaking.Caused by Primary Water Stress Corrosion Cracking of Inconel 600 Nozzle Matl. Leaking Pressurizer Temp Penetrations Repaired |
- on 931009,insp of Pressurizer Upper Temp Nozzle Penetration Found to Be Leaking.Caused by Primary Water Stress Corrosion Cracking of Inconel 600 Nozzle Matl. Leaking Pressurizer Temp Penetrations Repaired
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000255/LER-1993-012, :on 931103,concluded That Seismic Qualification Did Not Exist for Relays Previously Installed in Chp & Chr Circuits Due to Undersized Relay Coils.Undersized Coils in Relays Replaced |
- on 931103,concluded That Seismic Qualification Did Not Exist for Relays Previously Installed in Chp & Chr Circuits Due to Undersized Relay Coils.Undersized Coils in Relays Replaced
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition |
| 05000255/LER-1993-013, :on 930427,loss of Onsite Ac Power Occurred Due to Both EDGs Being Simultaneously Inoperable.Rev Will Be Submitted to Electrical Section of TS Which Will Emulate NUREG-1432, STS for C-E Plants |
- on 930427,loss of Onsite Ac Power Occurred Due to Both EDGs Being Simultaneously Inoperable.Rev Will Be Submitted to Electrical Section of TS Which Will Emulate NUREG-1432, STS for C-E Plants
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000225/LER-1993-013, :on 930427,loss of Onsite AC Power Due to Both Emergency Diesel Generator Simutanously Inoperable.Caused by Electrical Distribution Grid.Corrective Actions:Electrical Section Revised |
- on 930427,loss of Onsite AC Power Due to Both Emergency Diesel Generator Simutanously Inoperable.Caused by Electrical Distribution Grid.Corrective Actions:Electrical Section Revised
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition |
| 05000255/LER-1993-014, :on 931207,determined That Containment Electrical Penetrations Did Not Meet Design Criteria Specified in FSAR & TS Due to Inadequate Design Control. Appropriate Remedial C/As Will Be Evaluated |
- on 931207,determined That Containment Electrical Penetrations Did Not Meet Design Criteria Specified in FSAR & TS Due to Inadequate Design Control. Appropriate Remedial C/As Will Be Evaluated
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition |