consumers Power -

POWERING MICHIGAN'S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 Document Control Desk - U.S.N.R.C.

Washington, D.C. 20555 To Whom It May Concern:

Please document receipt of the attached documents by signing, dating and returning the attached transmittal within two weeks. to Palisadel Plant

  • Document Control Center; Sincerely,

~~~**.*~z££~*.

Kathy Zielinski

~

Document Control Assistant 150069_

9306170230 930604 PDR ADOCK 05000255 :.

F PDR

  • r

)

A CMS' ENERGY COMPANY

.. A-Of~ I I

(

.f

  • .L -~ -* e TO: 145 USNRC/WASHINGTON/

PROCEDURE NUMBER: EI-6.13 Transmittal Date:

6/04/93 TITLE: PROTECTIVE ACTION RECOMMENDATIONS FOR OFFSITE POPULATIONS II TRANSMITTAL NUMBER:

53396711 TRANSMITTAL:

LISTED BELOW ARE NEW/REVISED PROCEDURES WHICH MUST BE IMMEDIATELY INSERTED INTO OR DISCARDED FROM YOUR PROCEDURE MANUAL.

Action Required Remove and Destroy Replace with EI 6.13 REV/5 COVERSHEET ATTACHMENT 1 EI 6.13 REV/5 COVERSHEET ATTACHMENT 1 (EDITORIAL & APPLICABILITY REVIEW)

SIGN, DATE AND RETURN THE ACKNOWLEDGEMENT FORM WITHIN 10 DAYS TO THE PALISADES PLANT DOCUMENT CONTROL.

SIGNATURE OR INITIALS DATE

  • .* f **

i\\'"'!_

PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE Procedure No EI 6.13 Revision 5 Issued Date 3/19/93 TITLE:

PROTECTIVE ACTION RECOMMENDATIONS FOR OFFSITE POPULATIONS Technical Reviewer User Reviewer Date

/
  • 9

)

CORE/ CONTAINMENT STATUS YES CONTAINMENT FAILURE (PRESSURE

> 70 PSIA OR HYDROGEN >4.0%)

IS IMMINENT OR RELEASE IS IN PROGRESS NO LARGE FISSION PRODUCT (HIGH RANGE MONITOR APPROACHING 1.0E + 06 REIWHR)

IN CONTAINMENT NO

... EVACUATE'"'

2 MILE RADIUS ALL SECTORS 5 Ml IN DOWNWIND SECTORS*

3 SECTORS MINIMUM EMERGENCY CLASSIFICATION N.U.E.

YES NO ALERT YES NO SITE YES AREA NO

~M*AA<

~~~ENDATION

.. 'SHELTER...

2 MILE RADIUS ALL SECTORS 5 MILES IN DOWNWIND SECTORS-3 SECTORS NO PROTECTIVE ACTIONS REQUIRED PERFORM MANDATORY ACTIONS PER El* 1 & El-2. 1 PERFORM MANDATORY ACTIONS PER El* 1 & El-2. 1 FOLLOW-UP RECOMMENDATION WITHIN 30 MINUTES MAJOR CORE DAMAGE (FUEL FAILURE OR GAP RELEASE >20% PER El-11 OR El-11.2)

IS IMMINENT OR NO OR UNKNOWN YES YES PROJECTED SHELTER All AREAS THAT CAN NOT BE EVACUATED PRIOR TO PLUME ARRIVAL. EVACUATE All OTHERS 0-10 MILES

... EVACUATE...

5 MILE RADIUS ALL SECTORS 10 Ml IN DOWNWIND SECTORS*

3 SECTORS

.PROC NO El-6.13 ATTACHMENT 1 REVISION 5 PAGE 1OF1 r

I

~

WB>lREM

~TH'(> 5 REM

"[OR BETWEEN 5& 10 MILES NO

~

W8>1 REM

'.THY> 5 REM I. OR BETWEEN 2&5 MILES NO

~

oNB>l REM tTHY>5REM 1 OR BETWEEN S.B. & 2 MILES SI APERTURE CARD Also Available On Aperture Card OFFSITE DOSE ST A TUS CALCULATED/ MEASURED UNDER ACTUAU SUSPECTED RELEASE CONDITIONS MAX DOSE WBDY > 1 REM OR NO THY> 5 REM YES NO MAX DOSE YES WBDY > 5 REM OR THY> 25 REM MANDATORY: SHELTER I 0 Ml RADIUS CONSIDER: EVAC 0-5 Ml RADIUS YES 5-10 Ml 3 SECTORS

'PERFORM EVA( UNLESS CONSTRAINTS EXIST MANDATORY: SHELTER 10 Ml RADIUS CONSIDER: EVAC 0-1 Ml RADIUS YES 1-10 Ml 3 SECTORS

  • PERFORM EVAC UNLESS CONSTRAINTS EXIST MANDATORY: SHELTER 5 Ml RADIUS CONSIDER: EVAC 0-1 Ml RADIUS YES 1-5 Ml 3 SECTORS
  • PERFORM EVAC UNLESS CONSTRAINTS EXIST STATE OF MICHIGAN RECOMMENDED PROT.A ACTIONS TO REDUCE WHOLEBODY AND THY"KO~J DOSE TO OFFSITE POPULATIO~ToM EXPOSURE TO A GASEOUS PLUME PROJECTED DOSE TO THE POPULATION WHOLEBODY < 1 REM THYROID < 5 REM WHOLEBODY 1 REM TO < 5 REM THYROID 5 REM TO < 25 REM WHOLEBODY 5 REM AND ABOVE THYROID 25 REM AND ABOVE WIND DIRECTION DEGREES

>5REM

<OR THY> 25 REM AT OR BETWEEN 5& 10 MILES NO WB>SREM

<::>R THY> 25 REM AT OR BETWEEN 2&5 MILES NO W8>5REM

  • JR THY > 25 REM AT OR BETWEEN S.B. & 1 MILES 169-191 192-213 214*236 237-258 259-281 282*303 304*326 327*348 349-11 12*B 34-56
57. 78 79-IOI 102*123 124*146 147*168 YES YES YES MANDATORY:

SECTOR*

s SSW SW WSW w

WWI tlW NtlW N

NNE NE ENE E

ESE SE SSE EVAC 0-10 Ml RADIUS MANDATORY: EVAC 0-S Ml RADIUS S-10 Ml 3 SECTORS CONSIDER: EVA( 0-10 Ml RADIUS MANDATORY: EVA( 0-1 Ml RADIUS 1*5 Ml 3 SE*'.TORS CONSIDER: EVA( 0-5 Ml RADIUS 5-10 Ml l SECTORS RECOMMENDED ACTIONS NO REQUIRED PROTECTIVE ACTIONS.

ST A TE MAY ISSUE AN ADVISORY TO SEEK SHELTER AND AWAIT FURTHER INSTRUCTION.

MONITOR ENVlRONMENTAL RADIATION LEVELS.

SEEK SHELTER AS A MINIMUM.

CONSIDER EVACUATION. EVACUATE UNLESS CONSTRAINTS MAKE IT IMPRACTICAL. MONITOR ENVlRONMENTAL RADIATION LEVELS.

CONTROL ACCESS.

CONDUCT MANDATORY EVACUATION.

MONITOR ENVlRONMENTAL RADIATION LEVELS AND ADJUST AREA FOR COMMENTS PREVIOUSLY RECOMMENDED PROTECTIVE ACTIONS MAY BE RECONSIDERED OR TERMINATED.

If CONSTRAINTS EXIST, SPECIAL CONSIDERATION SHOULD BE GIVEN FOR EVACUATION OF CHILDREN AND PREGNANT WOMEN.

SEEKING SHELTER WOULD BE AN Al TERNATIVE IF EVACUATION IS NOT MANDATORY EVACUATION BASED ON IMMEDIATELY POSSIBLE.

CONTROL ACCESS.

AFFECTED SECTORS CENTERLINE ADJACENT N

NNE NE ENE E

ESE SE SSE s

SSW SW WSW w

WWI NW NNW CONTROL OF FACILITY LOST TO INTRUDERS NO NNW N

NNE NE ENE E

ESE SE SSE s

SSW SW WSW w

WWI NW SECURITY STATUS NNE NE ENE E

ESE SE SSE s

SSW SW WSW w

WWI NW NNW N

NO PROTECTIVE ACTIONS

'1---YE-'S--of REQUIRED BEYOND INITIAL SHELTERING RECOMMENDATION CONSIDER: EVAC 0-1 Ml RADIUS

  • EXAMPLES OF CONSTRAINTS ARE: SEVERE WEATHER, DURATION OF RELEASE, TRAFFIC BACKUPS, CONSTRUCTION WORK, EVACUATION TIME ESTIMATES, ETC.

Jj i..

'.:.* 1 CORE/ CONTAINMENT STATUS MINIMUM EMERGENCY CLASSIFICATION

.. C~N:M.hOM

""'\\l-llQI***

,.._.~AitU:Clati

,.. IS"OOWNllWC>

MCIOltMSICTOl'S

... ODol~IOlll A(T~"*U*lall-11

... Oatril....,.,,.,IOllY

.Cl10NSNlll-l&ll-l I

!.HIHllAUAMASIHAICAH NOi

  • IYACUAllO,__ 10 "LMI ilillWM IYACUAll AU 01.. ltSOID..

U

""A(UAU***

S.. llACll.AAl.tSICICS\\

IOM.. ~\\l(l()lt\\*

HICTor; PROC NO El-6.13 ATTACHMENT 1 REVISION 5 PAGE 1OF1 OFFSITE DOSE STATUS CALCULATED/ MEASURED UNDER ACTUAU SUSPECTED RELEASE CONDITIONS

~ron

\\Hll.111 io... IU!Ol4 CCN'.CIUIY.1(0,Y~

\\*IOYl\\ICJOll\\

""*c::-uvac:u.1u C(Jrf\\llU<<\\la\\I M.tifCIAIOll "4\\lltlO.. UOU\\

(OINJtl (Y.tlCOIYIMll.l!o l*IOMll\\ICIOI\\

"ftllOllMIY.1(1,111,m CCJ6RMC"llllll

....at.IOI\\' Mt.IU\\.. &O.A CCl6Cll l"llllCO.J.. UOIA J.t.. JKCIOll

llfCIMllV.l(!oAl'1 C<Jr61MM\\lMI s1::.{ Li MKl*iG*N R((QMl.4fN0£0 PRt.:"{(Tl.i., *nom TO ll:fOUC( WHOl.UOOY AND THYWI> DOSE TO Of'fSfll POPlAAllON JROM lXPOSUJIE TO A GASEOUS P\\UMl WHCUIOO'fc 1 llM WHOtftoOT 1 1ttu 10 c ua..

IHYflOC)\\.. MIO <l5MM SICIOI IV.l(...... IMkft

....,.IOIT (V.1(0-S.. \\QI\\

\\.IO.. IK(IOI\\

(~I IV.1(*11.. -..0M tiWCrADflV.l(*l....cllli H.. IUC:oll c~*rwlll.*\\.. w.A t-IO.. IKCIO'\\

lfCcw.-INOlOA(IOf\\

HO*OJllDl"IOll(IM A(I'°"'

\\IAllUAYf!>\\UI.t.H"'°""°"YIO

\\lll\\Hl:llUAH)AW.t.lllUllltl*

..-.11UCTION MONIOl INll90JMNIAI. UOIAllON llYll\\

\\tll\\HllUIA\\A......._...

(Ofrr.o(l(llVA(utolOt IVAlUAll IMll\\\\CON\\1....,.l\\Mlll.~111

.......Ch:Al UCNIOll 1,.........NIAl~llCWUVU\\

(o.Q.1(1....,.,..IOllYIVA(UAllON

"'°""Ofll~Nl.lil~IOt uvus.u<<>AOMl.... AIOll

.....,..,..,Oh' IVACUAIOtlA\\IOON CONllOlACCIS\\

NIVIOllUY*CCIUMllClllO l'llOllCIMA(ll(W\\Mo\\Y*

llCON\\IDllltDOll IUtt*AllO l(CIJnll.AltflSlll\\I V'((IAl.((lrNDIU.10.

!oHOuD*CMNIOll IYACUAll(.. OfC.. OlllM

.u<<>Ptll(,IWll1~M Yl*..C.!oHllTllWOUlD

  • AMMll.... IM llYACUAllCINll..01

-..:OIAllU'°'\\al AHICllO\\ICIOllS

~ -

SECURITY STATUS

~. *-

~ -

NONOQCIM' AC.TIONS MOUMOllTOCINIW 5HllllU<<ilf.C(Jli.MllGAICIN

  • EXAMPLES OF CONSTRAINTS ARE: SEVERE WEATHER, DURATION OF RELEASE, TRAFFIC BACKUPS, CONSTRUCTION WORK, EVACUATION TIM: ESTIMATES, ETC.

B:

~

~

LL.:~

j :-r; ~

i*-1 l~

  • 1 v

1 I

I I~

r:..!

b

~

d i

. I I.

I I

f 1

6

~

I F:

. J I

I I

.l_ !

r-.

e I

I