ML18058B725

From kanterella
Jump to navigation Jump to search
Acknowledgement of Disputed Violation of NRC Inspection Report 05000255/2017007 (DRS-J. Gilliam)
ML18058B725
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/27/2018
From: Jeffers M
NRC/RGN-III/DRS/EB2
To: Arnone C
Entergy Nuclear Operations
References
EA-18-013 IR 2017007
Download: ML18058B725 (2)


See also: IR 05000255/2017007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

February 27, 2018

EA-18-013

Mr. Charles Arnone

Vice President, Operations

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant

27780 Blue Star Memorial Highway

Covert, MI 49043-9530

SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION

OF NRC INSPECTION REPORT 05000255/2017007

Dear Mr. Arnone:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated January 29, 2018, that provided a response to our Inspection Report issued on

December 29, 2017, concerning activities conducted at your Palisades Nuclear Plant. The

letter we received contested a Non-Cited Violation (NCV) documented in Palisades Inspection

Report 05000255/2017007. The contested NCV is Failure to Periodically Test the Emergency

Diesel Generators Capacity to Start and Accelerate Design Basis Sequenced Loads.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as

soon as we complete our evaluation.

This letter will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark Jeffers, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-255

License No. DPR-20

cc: Distribution via LISTSERV

Letter to Charles Arnone from Mark Jeffers dated February 27, 2018

SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION

OF NRC INSPECTION REPORT 05000255/2017007

DISTRIBUTION:

Jeremy Bowen

RidsNrrPMPalisades Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number ML: 18058B725

OFFICE RIII RIII RIII RIII

NAME JGilliam:cl RSkosowski MJeffers

DATE 02/26/18 02/26/18 02/27/18

OFFICIAL RECORD COPY