Forwards Minutes of Browns Ferry,Unit 3 Restart Panel 950623 Meeting
ML18038B423
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/17/1995
From: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18038B417 List:
References
NUDOCS 9509190204
Download: ML18038B423 (44)


Text

pe RECyC c<

0 4y w.

lait<<<<e UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIE1TASTREET, N.W.. SUITE 2900 ATLANTA.GEORGIA 303234199 July 17, 1995 MEMORANDUM TO:

F,ROM:

SUBJECT:

St wart D.

Eb eter, Regional Administrator J

o

son, Deputy Director

'sion Reactor Projects MINUTES OF BROWNS FERRY UNIT 3 RESTART PANEL HEETING JUNE 23, 1995 The Browns Ferry Unit 3 Restart Panel met in the Region II offices on June 23, 1995, to review the status of NRC and TVA activities for the restart of this unit.

The next meeting of the NRC panel will be held in the Regional

Office, DRS conference room on July 19,
1995, at 1:00 p.m., to 2:30 p.m.,

EDT and the followup meeting with the licensee will be in the Region II offices on July 20, 1995, at 10:30 to ll:30 a.m.,

EDT.

Attached are the Meeting 1

minutes.

A Unit 3 Task Checklist is provided as Appendix A and a Unit 3 Issues Checklist is provided as Appendix B.

Attachment:

Browns Ferry Unit 3 Restart Panel Meeting Minutes w/Appendix A and B

cc w/att:

L. A. Reyes E.

W. Merschoff A. F. Gibson B. S. Mallett T. A. Peebles C. Casto P. J. Kellogg J. J.

Blake M. B. Shymlock T. Decker W. H. Rankin M. S.

Lesser B; Uryc L. D. Wert J.

W. York R.

P.

Zimmerman cc w/att:

(Continued on page 2) 9509i90204 950822 PDR ADQCK 05000296 P

PDR Attachment 6

~

~

S.

Ebneter cc w/att:

(Continued)

K. P. Barr S.

A. Varga G.

H. Tracy F. J.

Hebdon J.

F. Williams P.

S. Koltay PUBLIC

~

~

BROWNS FERRY UNIT 3 RESTART PANEL MEETING MINUTES Meeting Date:

Meeting Location:

Members Present:

Others Present:

June 23, 1995 Region II Offices J.

R. Johnson,

Chairman, RII H. S. Lesser, RII C. A. Casto, RII K. P. Barr, RII J.

F. Williams, NRR L. D. Wert, SRI R. A. Husser,RI J.

W. York, RII Summary:

The chairman reviewed the minutes of the previous meeting and the status and results of the assigned action items.

The task checklist and selected items from the issues check list were discussed and updated. checklists are provided as Appendix A and B.

Previously assigned actions:

1.

DRP (Lesser)

Arrange for a special (separate) meeting for public comment on the restart of BF3 (September).

(Open)

No initiative taken on this item yet and none will be required until a later date.

2.

3.

DRS (Casto)

Discuss the restart test program next panel meeting.

(Open)

Shymlock taking responsibility for the restart test program.

Two inspectors (Wiseman/Whitner) are looking at procedures and design/configuration.

The resident, inspectors are looking at implementation.

DRS (Casto/Peebles)

Add inspections/

dates for inspections in TS surveillances and unit differiences training to the Master Inspection Plan.

(Open)

Shymlock to schedule an inspection to review TS surveillances.

Casto to ensure inspection gets on the HIP.

Peebles to schedule unit differencies training inspection.'

ORP (Lesser)

Evaluate the open allegation list and determine if any would impact the Unit 3 restart.

(Closed)

A review of all the allegations revealed that there are no technical issues that would prevent the restart of Unit 3.

This area will be reviewed again before the restart of the unit.

ORS,DRSS (All managers)

Examine the Issues Checklist and assign an inspector and date for his inspection for closing an item.

Give a pen-and-ink version to Lesser to update Checklist.

(Open) This is only partially complete.

ORS (Casto/Lesser)

Assign someone to inspect the Service Mater pipe replacement.

(Closed) J.

York will inspect this area during his July 10-14, 1995 inspection.

NRR (Hebdon)

Check with Hr. Russell to see when to schedule a visit to the Browns Ferry site (before the 7/12 Commission meeting).

(Closed)

Mr. Zimmerman and Chairman Jackson will visit the site on July 5,

1995.

ORP (Lesser)

Change the 0350 Task Checklist to show two items (instead of the current one) for FEHA.

One item will be for Headquarters and one for Region II.

(Closed)

The 0350 Task Checklist has been modified to show two items.

NRR, ORP (Williams/Lesser) Williams will pen-and-ink a copy of the Issues.Checklist indicating where to track completion of outstanding NRC Orders for Browns Ferry 3.

Lesser to update Checklist.

(Closed)

A copy of this list will be attached to the issues check list.

ORP (Lesser)

Arrange an inspection to review licensee's modification to the common accident signal.

(Open)

R. Bernhard has been assigned to do the inspection.

The inspection needs to be scheduled.

DRS (Casto)

Get the App.

R; inspection listed on the site activities schedule and HIP.

(Closed)

A two week team inspection has been scheduled.

One week at'egion II (July 10-14, 1995) and one week at the site (July 17-21, 1995).

~

~

r

Newly Assigned Action Items:

1.

ORP (Musser)

Obtain a copy of the Incident Investigation performed for the Eg problem on Browns Ferry 3

and give to H. Shymlock.

2.

DRP (Husser)

Arrange with the licensee to discuss the root cause for the Unit 3 Eg problem at the next meeting and why lessons learned from Unit 2 were apparently not applied.

Also, assure that other lessons learned are being reviewed.

3.

(All) Review the inspection, results for 1995 and provide the RIs with the number of drawings looked at and the number and type of problems identified.

4.

NRR (Williams) Review the multi-unit PRA by August for insights which might be considered for additional review.

5.

NRR (Williams) Supply a list of NRR dates for completing licensing actions.

6.

DRP (Musser)

Determine if any gA audits have been performed on the issues related to IR 95-15.

7.

DRP (Husser)

Determine what actions have to be taken to close Multi Plant Action item no. C-ll.

8.

DRP (Johnson/Lesser/Musser)

Have the licensee discuss their testing schedule.

Currently the schedule calls for a very large amount of testing in August.

The accuracy of the schedule will affect the scheduling of NRC inspectors.

9.

DRSS (Barr) Licensee has revised their harsh environment analysis.

A copy will be sent to M. Shymlock to determine if this would affect the Eg evaluations.

These actions shall be completed by the next oversight meeting on July 19, 1995

'hefollowing items were also discussed:

The panel commented that additional attention is needed in the scheduling of inspections to closeout civil issues and programs.

Based upon licensee identification of potential Eg problems on Unit 3, the planned Eg inspection should be moved forward.

The residents will open an IFI on EECW Radiation Monitor for O. Jones to followup and an IFI on the Eg problem for G. HcDonald to followup.'

L. Wert discussed results of DRP inspections (IR 95-31).

Examples were identified indicating a need for additional attention to detail by operations personnel, EECW valve not locked, inadvertent control rod actuation, inadvertent diesel start.

A violation was identified regarding the failure to correctly test Core Spray check valves.

4

~

C. Casto discussed DRS inspections including IR 95-27 which has favorable findings in the area of DCNs, design documents and drawings.

IR 95-25 found good gC followup to licensee identified hardware deficiencies in electrical cabling and splices.

IR 95-15 was discussed which had violations associated with structural modifications.

The licensee had denied one violation on corrective action, which DRS will address.

K Barr discussed findings from G.

Kuzo and W.

Loo inspection (IR 95-33).

Radiation monitor hardware inspected met design criteria.

One drawing error was found, a violation'as identified for failing to review

RWPs, and and NCV for unlocked high radiation doors.

Oete Printed: July 14, 1995 TASK Appendix A

BROWNS FERRY 3 TASK CHECKLIST RESP.

REFERENCE STATUS

'Es table sh'~Re'st'art'-;-'>a'nrem:'.;:~~.-':.'4-."..1';;.>',:,'-:<-.;-";.'kt

~iir:i:i '-"S,f: i'h i'll:.r2!.';;.", ',.""'

<<Dev'eTO ""'R'es'tla'rt:":ActXontP~l and%';:V-::",'1",::-;;!i;";:E'-:,>

<>++%i:.r>'>k'jkeÃC). $'"

< <<<>:.Q P'::@~:4$ n4P;:..@~:4~>>0

~Ree ':.i oenal::i'>Admi"n'i'stra%'o)';,.',,Ar'oves:-':'Pl.ari~k~

',Rl:VERR'~>'(R:I'I:"..:.'NRR'=-:~

FtRHF"NRR t9 52.,I:.95==SDESTtr.-.-..'-.::-.:

t2." 25'SOE47f tr':"'2:'l":,:95$

SOESliti:~t'":5

'AC%.'):P4e~>C) 4C4%4%4~(~)

IC~gcc

<>:R'(X@M.

,jig>,:Rj.~g+. >~.@'.~j<$>t>>'j<g%vg@y'><'g'<'><(>'t'~~~xj+.'Y4~>QC~pjy&>%'4eet%r>Aper>rA jap:t1@4"4A+~NS~gj

.-"NRRO.'AtssocfateKDirector,'"A"-'rove'sNPllan~4!

-..NRR~':::k~~>4":.8

. Not-:i',fi~it)on",:..'.Res>ta<r t-::,.'~Paiie1;=.;;~P,':.: '.':$!,:,:",':,';:!.:.;.::":;.4 5"'"t'b"-:-.h "='-'--""-.-"":'-'::::

'-""".":--.".';=;L'icensee-'.p'er'fo'rms;.root'"'caus'e,-;an'al yes'.i;s=;<I '.Li.cern'see<<.,";;,

'".'.and>".:devel.'o'"'s;:."corri ect':i:veRact'i>o'n~: "l~ii~Ãi:;:i".-',"3;:.."r',~~'.",;".'=-"-'.

.Q~~>~,<t< ~<.'x'<

~$. "': <>

>>.m

> '.<'>, pj p'y$ >

g1~g'.r

<< <)><

'>:NRC::'::;evi'I;ua'tes'.'fi;cen'see';-s'>iroo't'<'causa"""'-"-,",i

":dit'erii'nat),.'orijand'<.."corke'ct'iv'e'"';a'c'tionp,'""jj>~

I 1'an<<'V~<'~44$.">.'t'Pp".vx~nt$4M'2 <>'<%C;;+,.?,>- '+".6(

(g'ei'ji'8 '.":I!icens'ee,';"gen'era<ted':"":r'est'adr't'"-'."~.'-iti::;.'j:::'Paiielg~::,".!~~'.,',j

',:!Inde'ptendent,";! NRC';.'.i,dent~ f>ic'ati onPof,"~",,',>',,"".)

, ri:)ta'l:.0-"'i'temi:-":(:;cori'sj.der,,:;.exe'terna'1,'".,.@,:.:,.-.'jj$ N

'e>>r<";~@:,'<>>4<>:;<;.~go4'rt+h>i >~<><>>~<4 52'~I~.9.5'""'SOE"'"lit'.w4Fz::

~2'f24'P:95';".'RON:k509$.

'",3."I..;21/95":,",Pijief@$$

..mt '::.'m'k.neutesSXm~l

';:;3/2:1'/;95=-P.an el."::::,":P

$~g'-'j+g4$tr'<i(

L<c~~Jr:84~

~PRC/,Li',iens'e,'e."-".'ag<'re e'me'ii'4'"""oj"

'j4SSueS'l'1'"0Y<'~.

'0-N%R:s"".(>"'~~ ('"~P~'4~'-'"<k'4..< '4~<'@>'-'"+'~4<'8'r:

"i>

f;;~4/:

Obtain ublic comments; ress conf Obtain comments from State and Local Officials Obtain comments from applicable Federal a encies No restart objections from applicable Federal a encies Applicable Federal agencies notified of restart, authorization by NRR FEHA Applicable Federal agencies notified of restart authorization by RII (FEMA)

Lesser Barr Ed Fox; Barr Ed Fox Ed Fox Barr 3/21/95

((Sg(l5:"f95:-,.Fox~~g~gh

'iiietmo:-" < -,::k:>'.::-'::~:,::-'~i~

/'

TASK Evaluate licensee's readiness self assessment Conduct Operational Readiness Assessment Team Inspection (ORAT)

Restart issues closed Issue au mented restart covera e

ROI Obtain staff comments on restart Re-review MC 0350 generic restart checklist Prepare restart recommendation document and basis for restart to Re ional Administrator Restart meeting with licensee Restart Panel recommends restart Regional Administrator concurs in restart recommendation SECY paper NRR Associ ate Director concurs in restart recommendation (SECY paper EDO Concurs in restart recommendation SECY paper RESP..

RII Koltay Panel RI I

RII, NRR Panel RII Panel Panel RI I NRR NRR

NRR$~jz'-'~~,":.:

REFERENCE STATUS Submit Commission paper Commission briefin Commission restart authorization Notify Congressional Affairs of restart Notify ACRS of restart Notify FEMA of restart Notify Public Affairs of restart Notify State.

and Locals of restart Monitor restart NRR NRR, RII Comm NRR

RII, Ed Fox RII RI I RII

Appendix B

BROGANS FERRY 3 ISSUES CHECKLIST Date Printed: July 14, l995 ISS%

DESCRIPTION KRC lEAD IR/SER LICENSEE STATUS COMMENTS SIAIUS THI ACTIQI ITEMS (TI 2515/065)

I.D.2.2 I.D.2.3 II.B.3.2 II.B.3.3 I I.B.3 4 SPDS Installed TAC H74612; HPA F075 GL 89-06 TAC H73636 F072 SPDS Fully Implemented TAC H51225 HPA F009 PASS - Procedures TAC H74614; HPA F077; H83122 PASS - Hodifications TAC H44425 HPA F012

?".~4Nl;8

'4+3>>

.'".:.Rkvf

~>>INC:<R00003yg~~4g?gpI?4~%.

Post Accident Saapiing-Corrective Actions TAC H74613 HPA F076 Husser Husser Jones Jones Jones SE 2/5/92 IR 95-22 SE 2/5/92 SE 5/27/87 94-33 SE 5/27/877 TS anmend 6/21/94 SE 5/27/87

) Sfj5'i233Njjg~'jj field co?piete field coapietel testing 4/96 75X implement 4/95 Installation verified, open pending PMI I>S1HSircadyrif?I>jc(0$ urC"+~AVjg)g+F~~(w~~j"'"j::~j$?gg';c?~""?7':cW w.'"rgK '"""'"';"' "

<%?i.i '.

II.EA.2.1-4 Contaiwlcht lsolat

'ion Dependability - Diverse Isolation TAC II74615; HPA F078 SRI SE 1/6/95 IR 95-16 TVA to provide submittal In June installation verified, open pending

PHT, NRR to write SE

ISSUE DESCRIPTION NRC I.EAD IR/SER LICENSEE STATUS CINHENTS STATUS II.E.4.2.6 I I.F.1.1 II.F.1.2.A II.F.1.2.8 II.F.1.2.C II.F.1.2.0 I I.F.1.2.E Il.f.2.4 II.K.3.13.8 I I.K.3.18.C Contairrnent Isolation Dependability-Contaianent Purge Valves TAC H74616 F079 Accident Monitoring-Procedures TAC M74617; HPA F081 Accident Honitoring-Noble Gas Honitor TAC H44905; MPA F020 Iodine/Particulate Nonitor TAC H44976; MPA f021 Contairaent High Range Nonltor TAC H45047 HPA F022 Contatteent Pressure Monitor TAC N47584; NPA F023 Contairaent Mater Levet Monitor TAC H47655 HPA F024 Instrunentation for Detection of Inadequate Core Cooling GL 84-23 TAC N45'l18; HPA F026 HPCI/RCI C Initlat ion Levels TAC H45534 HPA f043 ADS Actuation Hodification TAC H45682; HPA f048 SRI Jones Jones Jones Loo SRI SR I Husser SRI SRI k"'~~j'~7/

SE 1/6/95 95-16 SER 8/17/90 94-33 SER 12/22/81 SER 12/22/81 SER 1/8/82 IR 94-28 95.

11'5-33 SER 6/16/83; IR 95 31 SER 6/t6/83; IR 95.31 SER 11/18/86 95-16 SER 9/19/83 90.23 SER 5/29/90 Licensee tracking with individual instrunents 4/18/95 4/18/95 field complete field complete field complete field conptete field complete installation verified, open pending PHT Listed in NUREG 1435; not on other lists hardware inspected, open pending calibration and procedures hardware inspected, open pending calibration and procedures open pending review of procedures, PMT, training II.K.3.28 Qualification of ADS Accanutators TAC H48262; HPA F055 SRt SER 7/24/85 fietd complete 4/95

k

IS%K II.K.3.57 DESCRIPTION Identify llater Sources Prior to Manual Actuation of ADS HPA F062 NRC LEAD IR/SER SR I LICENSEE STATUS COWENIS SIHS shows ready for closure 0

STAINS Pg'fP:,~Pgj+F><'~gg+

I"'iÃfiM'ws'kiAigg~'0+4~j< %'s

gggqgP)(<ge~4$ @$ (>g"gy~,)5~>~~;gpss Pggm~ZP~+
,~."A~~P$ g'~~P~%<<~4p>",'
:.;;."q~ ~+~~q'.T~ ~

c.

'...'g4gq,,:~'4>~',-,.'..-'.!j$ j@'::.';p '.;,8 IMS~gjojt's',,'re@,:-:,.for~clijur'e~","'clo'sed,.:.far,,';;.'a'I'l"3 Uni ts:;",";.',

C',"-'EHPNtART INSTRUCTIONS TI 2500/020

'%V+.a>~NS@ej:

'-,Yf+S55/089~.'.'.'

I 2515/095 T I 2515/099 AINS GL 83-28 TAC H07931; HPA 0001

Ãf&~p'~~$ :y.~~j%-"~'i'-"-4Q

,StresiigC'oiros [on
,Crsclcing'.":.

BllR Recirc Pump Trip Bl8 Power Oscillation IEB M-07 TAC H72769; HPA X807 SRI Husser Kellogg SER 1/22/90 IR90.29 IR90-33 95-22

."sc%$ '":~':k~>i:7@:

.'~JR90'l(93~j18)'.

':93,:-:;32~a%3'.,43l;;.':

.<<94':20:95 10!,"~~

95-22 SER 4/4/90 TS 179 5/31/94 field coeylete 6/95 6/2/95 pending field coopletion and testing

':s'IHs'",shows".ready.'. f'r.".'cl'o's'ure';;:: Tt~ for,."aL";:;:84'-:;i'1,"GL!88.':;:":;i

--Ql>',superceded,'84-.

I'.:an'd>$ 1~ cancet ted;1',~~issue~ tracked".

asunder: GL<88 Ql'>>

- 6"h~>>v" '""('4~>

'.c)8>~~'"5':~'tI:'l 2515/109 Tl 2515/111 HOV 'Testing GL 89-10 EDSFI followup llhitener 94-03 McDonald 75X Implement 9/95 sch Jut sch Oct 30 TI 2515/118 k~FSNfk[k5$

T I 2515/121 Service llater System TAC.H73972'PA L917 Installation of Hardened Metweti Vent GL 89-16 FLaii:.,'okgeflfg((~~ or~~j+

Peebles SRI SER 4/23/90; IR 95-23 SER 8/16/91 field coaplete 6/95 i!C. =

TI 2515/128 Plant Hardware Nods to Rx Vessel Mater Level Inst.

SRI SER 4/20/94 IR 93-201; 95-31 unit 2 mod walkdown complete IR 95-31; verify Installation on unit 3

ISQ%

DESCRIPTION NRC LEAD IR/SER LICENSEE STATUS CQOTENTS STATUS NRC BULLETINS g@yP> g?@PhgS~%9S>>>,

RYAC;N0MIjm:".'I"'-J';Fg~P~Ãg?.~i"

'(a""."f4'?<>(@@6?+7aA@"'P<<<<'44<<~%~<<

'"v<<+4?::>lH"

'(9>"'v<<

>,,".josef'e>rj>':,to'ii';at Be

<<Bo<<r'e:,grjj'I$B'."~,":.Suppojrt'sp'ro<'g'ram':":.'",'"'g':

IEB 79-12 Short Period Scrams at BMRs SRI 81-18 field complete 9/95 Project plan gg~g9 1<, 9PS yPXJ~@

<yym!W~@:(:<<<gk~i@:;~~~g'<'9mjgay

~$Kj<F,"?;:.:<,'.<<;.,";.j%9>>','.,',<<<<A,.",>:.';,+;;>Referiyto~L/arBa'.89)ei F I'prn'B'.".a(n'd':Supp'ortS'< Program,'".'~i?g~?

>:.+":-. ',; '-

Q<<<<<y)PA><(hl9>>@?j@

~>

+>>"kN~?<<gY':i

'Bar i';::~<<(t"(

1$VA',A(22/93",closed

.',letter for<U3:h.....,! h

TVA'.;.J0/h2'I/h94'-?cei t Iffed;thhit:,"IEB;Na~s', previ ous iy,",""'"~;-'(

'c<<ciael cthe<<dl ohn<<ai l~:3tgit 'tS9@"-"-"~8'"-">>"(-") "':'<'4:~"'"""-':?> ':=

C'

/(~<<.?>>w~m + og>>>Q ?m(y<<>i';:>>(@~>>'

~<<IEEFNMa<Y~>y'<<<<ES (gee'she1'?Corit'riti KP NK~~>k.

~WP~444%'4~

4$ÃLNrok:DJNFSB Pf Bfield'c I'ei'e"<<W!<<'.. 9'Prr'o<<je<<'ct Piiid

".?<<"<'<'?r~(r "?>&>>".h(K.;:.;~?+"",-.,'..~%~""'~'--'"'"?"

<C

'A

<<<<()( Q (( <<'

+Q' j/yg?N')'k?> g >><<?y'(? ()'(9<<>>9

(.Y

'<<> 'h h( r".~> r> ~ >'h IEB 84-02 Failures of GE HFA relays in 1E Safety systems SRI Project Plan

?rr'<<>>'.<.-,;

(~NB'kNNFÃe4

~+Bt'.t(89+~3ONÃk@Ã)'f:~Pk<4k:""

jg4+Y+~N@+ZK Br:>-'+j:""<'<<>>>%/V)"Tf<<9",la")HP~liPp<<

@NBA@'.l2'4%(>$84titj8>o".8fttgAk<<SN'ftchres~r

'<"?)<>".'>>k'><%<<<<4%<'"s <i"'"(y>>" 08K'4'ks?"'t<<>>>"!et'<<('PNX4"<<9'~i%".:K<<<<><~>'."..'>>>><M$!>4<, '.> <e>>"- >>rry.

'rr>> I '<<9 wfi'of die

'i'et'eR"'4".,?:Prro'J act'='P leri4~4sl4PA~~".5"',:""(Qkke~~<"""4,',':::=. ":,i<<C

<<'>>r<<>?<<4%':"',.!:,o,~...~E,.

,,r>>f

',,y',:=;HUREQ:";J435

'::"no/'a'n',I,'Tc sere:."L'Js<<t

NRg;ch)echk."',i'f,.'. i'snsuej';'.'

I <F<<el Sgg~v>>(")9 g> @y?>>,<>(<<<<<+<<(<<)

<<><<hk h(<<<<9/9~~

g I>>>$$<<<<.g<:

g Xhr ? w * <<<

9<<

~>ffe>'I'd<'c'a)pl~a't~e~(<~Q ~'-'Pt'O'jee't'-P'l>an'".>I'1. gp'l0'8jy~c'SSGed<bu't

nha'g'>re'jiiI red!(fo;-

'"'; C>., '

)"~kJ9~ ~g<<(~"~'g<<()~~"'"~:~ ""Bk""jet'osed'jfocr<".un J ts'TT?'an'd a3~g4

'mS""~g),"s>j""';~'::',?hQ)5"".'4,:> "@:!'"-'-.

y@&>CN@5Vgp+ ~y<<>,,'~>(.,y<<g@g4W~.gg@(<Ro><<':.$ <"~ppÃ@m$%S<<F'?<<".N;h':.i'i)<<l. ";+<<(S.

y

?

9

<<9 I)

( <<<<<<<<<<<<)

.P;,, >(:,,S:,~eg>>,:;:'-;. ";,,".".'-,F.y'>1.:,5.,>>?:,.",X,~,4,>>.,.+';;.',..",,.,',; ':,,; Q;;,,,:,:., <,+, ',,,".

IS%K DESCRIPT IDN NRC LEAD IR/SER LICENSEE STATUS COOIENTS STATUS Pf'E>BSP.

O)..'::~3~~A IEB 93 02 Debris Plugging of ECCS Suction Stralners TAC H86537; HPA X302 TAC H89279 HPA B124 Husser SER 6/28/93 7/19/94 field coaplete 8/95 ifr'efe<6r.';:;t'o? Tfj.'2515'f128 4$ ?6w'".j@':$ 6'g~!k%'mph"';<':-::-$<<"';.5>j:,':i"<$5'.:.",

NRC GENERIC LETTERS GL 82-33 GL 82-33 Inst to follow course of Accident; RG 1.97 TAC H51075 HPA A017 Rudisail Jones SER 2/8/90 IR90.32 93-201 94.33 June 95 Project Plan; TI 2515/087 closed IR 90-32

?6?5$ $~+g4"',%~/@'>> ';@'jap:g '"<<@uk'>>$$; ging>>;'~x>),","';

.'lilac,
,-A'~f-.:.;IgZ500/'020."?~.', "SRQi""I;, g< <<=~@@'~'? F<<~~<<>>'.<~~>>

'6'~>'Y6fp4~>."$6'<~~$> ~<> 5<<? r'efar. to 5 T1:;52500/020;;

~>>'~<<~ge>'~'grig<<>>? $<<'?%A'>>~>>"6'? -:"~:.:">>-

GL 88-01 IGSCC in BUR Aust SS Piping TAC H85296 pp~~~g"6~

(IIjIR'<<$<::('>f'<,".

Blake

+~~<X<<,'~45"-;4::;"(~6I

$':PASSRKNF~Ã~$$

SER 12/3/93 V6 x,h:,.

field coapiete V>"Mk5'$'%V:..=';:?$<....".P?';6j<<E<<

";;;,fS?."%II?en@?ants ~]98;~j':

'";2057762',::of>>'.,"I/8/93 <qj";:;i

~Sa<JS(fed0'Lg Project Plan s>?><</?<<<<;

A >6<56$ @c@+v>>>w wg><<>?@<<<>>..6<<@6< F</5$<<?p./dan~ <:m".>> (<

, IjU>>R>>E<<0
;-]435><<,:,:n<O@OII,:::( jmSee' fSti:,,";NRR?< to;;.review'.".for,',<;<'-"

, 5>

a GL 88-14 Instrunent Air Affecting SR Systems TAC H71633 HPA 8107 SRI SER 5/9/89 field coapiete 9/95 listed in NUREG 1435 and Project Plan

~~~+V~.,6%>$ 5>"q'ggj$ ~<<;,5>6')~~~.. P$ gg<>><PP&>>>$q?><<>><<6~+j~~<?.>>,'.@~>>~Q>><>>ill

"..SER::;::due';P3A/94,.'SefW'e"-'E9afiet, foII"'ReP'ort$due'5to::NRC'":=$

"i 6 '>'/oi",.;4'".".,z+Pg>?($ !
.$~6'<<a?:, c$P~I (fi?-':@@5?".>..?:?@>>,".~g::~56)

".'p~~>>.'.

g~P+~~~,~4gjg@@kg~Cgp$ <~p $~@dg,.;~y~~N+Q~@'.$ ~6na(p@<~,igjjpgj@y.gi:,".~$ jbgC,",.j;;~,"gW~

$!SER<?2/$ p2? <<%$ "'a "+'>"j'~~'0":>pi~<":.?-:~> ".:-"'R'efei'Yto~<<TII aktee~T.A';2<<:g>p::""!'>>,~64>~",'<4>':!::~~~i'~a~>6>".

),'w's+,'. /<>g:$g,6.

b~+4<> @p4

<>>$L>>Mg~$>6.(+'>>z 6>>>g a<gp$$$>>$:><<e '@6gg,$ +gp4@.. 66~.,

6.<<,4>~+@>~5$ :;: "jw.'wg,> $<$

ISQK GL 89-08 DESCRIPT lQl Erosion Corrosion aonltoring program TAC H73459; ISA L908 NRC LEAD Blake IR/SER SER 8/21/89 LlCENSEE STATUS 10/9/94 cQHIEHTs DRS to schedule module 49001; HUREG 1435 and Project Plan STATUS

"?ggPgg@3N'@Sf4..;F4%<+iCX44F~s:.,'"fXC-',Tf73N2"NPA<8)3P~,";,'.4~3

. <<Ais@AM<.w

~~)::,-:"gjpg',;a<

'.-.'KRL'64g$:""

~.~~I.":ggg@9":

',":SER;: 8/$6l9]Igg

'$W@P'k",j$g

."-:.:.TACIHX49PASPX.8113!:.:8'~@"":

"'(.tg4iP;:Z"'~~~).'gQ.?M>444$ x,

-'Rea'c'to'1,"!Qes'Sat'~Bt~~iL',";";:::.

~jERt4/(9/94 r,'..-.': -:T."::$

/2/93;,~!23.<94.':.,';;:7/28)94'j.18entj Iy>',P'bamt

$meh

',::,C'oapleti'on~ash;6/98,,".

-'s&'~i'.Ie4 QQ ~'":+<'%'k~%

I P iafIC'+speci fis':Review'S':.,:be In'g'",'pe'r'forme'd'on~'.al l>u'rji']S'; ','".,';

<ill'JRE'G )435M >e

<Q4~g'</g::: jQ<:('j>g<g~. z.'+ >) - I<<nY$(" )","

~JAIL+~~)j)>kjr'gS

'4NC~A8427$ %1iPA'5121:;4~.;=:

":S'ER;.3/25'/j3'~> )'1'j25'/94'P-.',":,',:-;P:."',":,wj~g fTT.'coaPleted@Fur frier'Al;evieIT:.o<f,': mo'ds"'. under.;ilEBi93':03g GL 92.08 GL 94.02

'p' pi em~

Thermolag Long Term Soln for Thermal Hydraulic instabilities Casto Peebles SE 5/11/94 94.11 TVA 3/22/95 TVA 12/22/94 procedures to be revised prior to restart.

r:I"<'%$7:"~<gQ<~.

sm'.< ~).

RHRSW cables use thermolag; and will be upgraded

'to configurations as tested at IS prior to rx vessel hydro;ampacity/coahustible analysis by 12/22/95 and abandoned material removed by 6/20/96 action 1.a closed; lFI 94.11-02 to review action 1.b; action 2 not required for restart (long term aeds due 3/97)

',maIit<ained',for,'a'c-;'feast:: I:,'cy'cle,"Hlth'a(it,.need," for<mod;;-

UNRESOLVED SAFETY lSStKS

0

IS%K OESCRIPTIOH NRC LEAD IR/SER LICENSEE STATUS CQtlENTS

!'~",;jtefer,',,"to"Lonilg'ei'O,Tar<usS)rjtegt,'i(y';,>Or'o<<g<<I,"am bTl><l~x".lj.'-

..2515/085( clos'ed 88':,'19,'".:9!",-':::4k::"". %:." S: '~"';: i'"~':.:i"'ki'."..",'"

STATUS 95eg,Q~~~%'i'TA'C ~)024 jI3':.>,-,NPA)8060$ 5N":, N

'>%~?FACADE

>1

~!Shyailock;:~

,"'~;Refoxr';~to.'Eq'.".P<<r'og'raxm

" Tl:2S 15 j076'.".ci'ose'd:88;11

',",-."".-','l'".

A-36 Control of Heavy Loads Near S

nt fuel Pool York 94-12 Project Plan

"42/~>~$~Z<, '.'.p'i~:".'Crgck@jn::.'SMRS,":j,',.~Q;:$

A-44 Station Blackout Salgado 95-16; 95-34

<<>:8 x <@g+? Ã<~,Fx

'.;: Selsmi'c:'E<<vai,:Rxpt/.'!~p, >'ldmtiffed'xnot'>to;"'b'e;;s'r'estartilltemfi'n! SE.":e g<'8,::j%$.>,'";:j~

kcorKk'i)1 -SUpp~ottf SE<3/20/92 "< I'"'Iq;-'x':,>~

'>> ".'I >:: -'.>>,".;";-

A-48 Hydrogen Control Heasures and Burn Effects TAC H55955'PA A019 SRI SER 9/9/86 Project Plan in MISP GENERIC SAFETT ISIS GSI 40 GSI 41 Safety Concerns Associated Mith Pipe Breakes in BUR Scram Syst TAC N43736 HPA 8065 BUR Scram Discharge Voiune System TAC H51014 HPA 8058 Blake Husser SER 1/7/86; IR 95-03 SER 6/24/83 TVA 4/27/95 to add scram pilot air ress Iou scram RUREG 1435 and Project Plan RUREG 1435; TI 2515/090 closed in 87-13; Project Plan GSI 75 Salem ATMS 4.5.2 and 4.5.3 RPS Test Alternatives TAC 53966; NPA 8093 Rudi sai l SER 8/17/90 licensee tracking under GL 83-28

v

ISSUE DESCRIPTION NRC LEAD IR/SER "SR f%iI~~FPP ~,89.'50',.9P))'g?'-,",.,"

LICENSEE STATUS GNHENTS STATUS URI 86-06-02 UR I 86-14-03 Rx Bldg control Bay HVAC inade ate design Overstress of Dryueil Beams Chou Blake 89.20 k~P@~t, $)r4'AX&@ @~!<i:QP;;,~~)gpss(.~+Pgp5g<y@

6~".:%~4~@4443"~<"'445MRF4&%5P%KCi~C@P4%~XN

'89~3$ '.,'94'.gZ:::'-'.":.

'C LER 86-10 Design Engineers identified connection of unqualified piping to containment sensing lines Sparks 88.28 URI 87.02.02 UR I 87-26-03 Limitorque gear ratio RHR pump suction and nozzle load aiiouances ssibiy exceeded

@4~ ~kg+

Chou 88.32 90.08 Nhitener 88-16 sch Jul 24 C

!c(<<@<+~4+pPPk'g<5g LER M.12 Battery failure concurrent uith LOP/LOCA prevent auto start Shymlock 89-35 EDSFI foliowup

ISSUE DESCRIPTION KRC LEAD mS[yml'orcit~

<<~~8""'~>>5:"+ 8 IR/SER LICENSEE STATUS CLIENTS STATIJS

C r<I LER 91-15
j'I/4<'4tc'rc<$

~w'<.

HPCI did not fulfill safety function from Iov suction pressure during fast start re r>>gPPg~<>>(~~)

SRI (S)t L,'sj5':~)

92-11 95-10 F<<e""<NMA':44@ N'vga::KgP~

~<c~~greI>>;,c.~>>'>>

'$:<j'<+<'%4<>>$8 <>>+>>y~'.4<8,<

rr c45r4t "(;r

S<%@kU>Ni<%<r N;k",.>><c

.-.< r~r<<IZzx:cr'r P~k j~;.cjoy~><<>>>P

,.9'4j-0f<'fj532'r,".'od
complete, post mod testing sch for 9/95

'C" *

<C Y~~g8'4@Si%5&%4':h~ÃAN".",,<<5~ ~~: <~ay<'.g >gp~p~

> $r.>>.jr>>jÃ<>>cac:. r>>re<<<'<25>>>>~rr.c::(Q>>>>.<'C.

'gkkg@@4@gp".-"gg gbes IIn=:fta jcfeievla(fwe~ef>>.'R I 93-11-01 Meld Differerences betueen the acids assigned in s rt Chou p>> 4P~$;1$4Pw)

",@4j':"'Fg4Ã4'R':,:i c,'S NkX8'%>V~M:;M

. '".r. ~QP,'~j',P'<~+aN~+'>>~~5'@,/rgb'Ã+ r';g;,~

. g+~gv(;:.PS

'"S:r 'p'<'"

C'-

IFI 94-07-04 IFI 94.11.02 System operat ional boundary test ident IfIcat ion

Response

to GL 94-02.'RR Pe'ebles IF! 94-18-02 Condition of Contalment Coa't Ing SRI 95-26

ISSUE IFI 94-29-01 IFI 94-29.02 DESCRIPTION Review of Conan Concrete Ca acit Design Methods for Anchor Location Tolerance NRC LEAD Lanahan Chou (Btaki'w); ~g IR/SER LICENSEE STATUS CNNENIS STAINS VIO 94-35-01 VIO 95-03.01 URI 95-10-01 VIO 95.15.01 URI 95.15.02 Failure'o maintain spacing in tou voltage cable tra Spring can installation Inadequate Second party check by foreman (Beta Ta

)

Failure to Complete Mod IAII work plan and Orauings Failure to Update Design DraMings to Reflect As-built conditions Shymtock Chou Shymlock Stake Blake 94.35; 95-14; 95-20 IF! 95-16-02 IFI 95-23-01 LER 95.01 VIO 95.31-01 I F I 95.31-04 IFI 95-31-06 ttork Plan Implementation deficiencies Service Nater self assessment findings dis EDG turbocharger failure Core Spray testable check valves Rad Monitor EECII Oisch Potential EG Program Deficiencies SRI Peebles Shymlock SRI Jones KcDonald IR 95-10; 95-16 95-21 Violation for unit 2, adequate testing to be verified on unit 3 LICENSE IIIKN)NENTS TS 359 Scree Pilot Air Mender NRR Pressure Suttches TAC sch Sep 30 12

J

TS 337 DESCRIPTION Appendix R License Amnendment TAC N87902 KRC LEAD NRR IR/SER LICENSEE STATUS COQIENIS sch Sep 15 STATUS

S."'

sc TS 318

'chk~itchehj s4'@:'N'89z47."-'nalog Transmitter/Trip Systems TAC N89250 NRR sch Jul 10 H-416-1 N-498-1 TS 361 i""rabjf'lt';TA'c,:%98K>C'k";

Pressure testing Relief Reqest Pressure testing Relief R

est RHR Service Mater Requirments for Standby coolant s

HRR HRR NRR sch Jul 30 sch Jul 30 sch Sep 30 NISC ISSUES NMNi~Ã4 HPP pg IV-17 NPP pg lll 57 Training. Unit differences TS Surveillances HPCI Controller I

rovements Shroud Head Bolts (IGSCC)

Peebles Shymlock

."-f'eeffes'~'.

SRI Chou i$'"'!::C~@w"""~i4@g~~ y>ggA' trig2/17/94 ~~@MA p":Qi~~K'%~i.".@~'i'+'~~4@CN~@+47'~~/~i:.,'.~k4i.:Z. dy @pip"."j'.:j:P'j"

":.",'SER2 App E HC0860270003 SSER2 Sec 3.6 HC0860326118 HPP pg II-94 NPP 11-58 online Chem Instrus Unresolved CAQs ERDS link to HQ operational Chou SRI Barr SSER2 Sec 4.10 SSER2 IR 95-30 NC0860326292 NC0860326143 riodic ins of PERs 1.3

ISQK DESCRIPTION Review licensee CATD closeout letter NRC LEAD IR/SER SRI LICENSEE STATUS CQOIENIS STATUS PROGRAIIS IHPLEHENTED IN ACCORDANCE NITN UNIT 2 PRECEDENT Nudlsai I'":.

.:"+'i;'~"" ':",-".""'-L a C tete.5/95-;.B,a

~

-"F"Ia"-' <~"-:I"':-"~<'SI'-~'C"."'i'tk"44'f'<'"':"."'-".+i~.i,""""'."",.'*"

Cable Tray supports H 80684 Component and Piece Parts Qualification H 83828 Blake Gibbs SER 12/17/91 SER 12/7/93 TVA ltr 3/27/91;

>90X iapl ament c

lete 2/95 TVA ltr 6/12/92 perform module 38703 on procurement CRD Insert and IfithdraMal Pi ing Blake 95-03 EQ TAC H42482 HPA 8060 flexible Conduits Fuses HVAC Duct Supports TAC R00300, H82127 HcDonald NRR Blake Fi llion Rudisail Blake 94-06 94-27 94-35 95.31 SER 13.6 93-02 93 F 08, 95

'2 SER 10/24/89 7/'I6/92 IR 93-201

<75X implement 50X iaplement 2/95 complete 5/95 TI 2515/076 closed 92-03 NRR to issue SE 8/30 sch Aug 7 Inspect as part of open item closure Large Bore Piping and Supports (IEB 79-02 t

'9.14)

TAC R0017 Hisc Steel frames TAC R00297 H80620 Hoderate Energy Line Break Blake Blake Blake SER 10/24/89 94.15 94-29 95-03 SER 10/24/89 94-15 94-29 SER 4/20/94 75X iapl ament 10/94 complete 7/95 i50X iaptement 75X taplement 11/94 coaptete 1/95 14

e

IS%K DESCRIPTION NRC LEAD IR/SER LICENSEE STATUS CINHENTS STATUS FkCgFi@':::

Platform Thermal Growth TAC R00297, M80620 PRA 0-List Seismic Class II/I TAC M80015 Spl ices Blake HRR SRI Blake Rudi sai l SER 10/24/89 4/20/94 IR 93-201 94.29 SER 12/17/91 SSER2 3.13 90.22 95.14 95 20 T 1/19/95 IVA ltr 2/27/91 50X Implement 12/94 75X implement 5/95 IVA to submit multi unit PRA 4/95, IPEEE 6/95, Internal fires IPEEE 120days after refueling; HRR to review multi-unit PRA for insights rior to restart sch Sep 18 NR EPART FROI THE UNIT 2 IMPLEMENTATION PRECEDENT PROGRANS MHICH D Cable Installation M80682 Conduit Support TAC R00024 M80690 Instruaent Tubing TAC M80036 instruaent Sensing Lines TAC M80017 Long Term Torus Integrity TAC M80686 Restart Test Program TAC M8179'I Small Bore Piping TAC M80013 R00306 Rudisail Blake

~INPjjg~'jP Blake SRI Blake

=

SRI Casto Blake SER 4/8/92 7/1/94 93-34 94-27 94-35 95.20 SER 10/24/89 3/30/92; IR 95-15

<~C%>+~M>~%

'<'94".,",07--.SEE:.::$":-'"'~

Y07y~9) 12Q'sg~r~c~

~:31k~)<~~~PMA~M'<

SER 2/4/92 95-03 SER 12/10/92 IR 94-24 SER 2/10/92 94-15 SER 8/30/94; IR 95.07 95-08 95-26 SER 10/24/89 2/4/92 95.03

~

>50X implement 75X isplement 10/94 c

lete 5/95 TVA2/27/91 IVA12/12/91 TVA itr 2/13/91 TVA ltr 4/29/91

>75X iaplement c

tete 5/95 IVA ltr 2/2/94 50X Ieplement 6/95 TVA2/27/91 TVA12/12/92 revised bend radius for medius voltage cables sch Aug 14 Licensee has combined inst tubing and small bore i ing rograms URI 94-15-01, Spring Can Settings SRI - Review adtalnistrative program; Casto - identify electrical/mechanical tests and inspector to review..

PROGRAMS MHICH DEPART FRNI UNIT 2 CRITERIA PRECEDENT 15

0

Browns Ferry Unit 3 Status of Orders Date

< T>y<:.x.

jy~>>>>>

'AKMN4&P.

Descri tion Date

Closed, Lifted, fulftiled Comncnts pkQ~g(@

.RP'~g. 4P'

~

%V 4$- <<

'Crikey iied)fj jc

'ejt'o.adrs:.,'.Tii)ireiifejkhf'el':kiilly~jesyp'onds::"to;)RC."~'.".:-.':"

". ('>9/.19/8d%'superse>>ded<by~iorder

":dated',9/19/80"~>":yp.-::~4.-<gt'='".n"~y%.'N"N".'-."~:<&~:.~~44":j),P~<

kM'Y@

WC1'~~, <>>

1/9/81

>>s x~y L'4~

5..~;".'>/10/81 Orders for Nodification of License Concerning BMR Scram Discharge Systems Orders for Nodification of License Concerning BNt Scree Discharge Systems

~)$

@gp%; rA<y PÃQ>>'~~y>@y>gryP':.%;:

';~>>r<g,"<>>>g+y~c:;..: >$+g'g s<

S.., >>,<... E,,".>>>>>,

~g,,g~~@,>>N Q ks..., Zga.yi;.<<>>

@>>.~ q~k Qg, ~.g...,-P~c,

>,k.:-,,y$~(y,, k~;.,;<,.~

>>p~9cx@>gpss;g~

'>>y<>>~4>>~+~.~~>>>K'< 'rye %45 kAi'.10j80$

(~2P23iSfj g3/1TPS'T>>."<::

Completion date modified April 10, 1982.

See TVA letters of August 17, 1993 and April 27, 1995.

Addition of scram air header pressure switches coaplete fulfillment of this order.

TVA considers requirements to be s~rscdcd by 6/24/83 Order.

Extends completion date of 1/9/81 Order to 5/1/81.

TVA considers requirements to be superseded by 6/24/83 Order.

To be coeplete before restart.

'>><TvA~F'r>> "r<ed>>t'ospyjov'i8o>"'",::fn'forMkjonj~irsf""'semi'itrgen>t's >,'.foar~>>:XjN>>

>>irA$ Qfi!

(pal,by;:iMg(il~>>of'gtqksted:)rigo'RIations>>tlo'rgb"':.)

f."g SQg"IWkgl'h'i'ted"fj~jal".go'f<'1'ICON'rjis(jccep>>t'+36y.-".'.tIIi;"g'",,',;.;

',.0f0ff~<)2/30/82)~)iijiiemclIA'%ion',.'.fs~n31T p'a>>jtIofrgljI sTordc'r,'(VAN"'pr'ovf'def,.'.tIIe"',1 jforiatfon+j.,erie'stadia'nd)'the:.<st'a'f fihasa~,',.,.~~

,"ic>ce'tedreffernatlves):d'or,,"a>ct'Ions<Y

'r'edy';"k458~~0e.""'.,'4"'".";-.M Legendt BOLD open; j7@N

  • c plat page 1

4.

5iv'