Forwards Minutes of Browns Ferry,Unit 3 Restart Panel 950321 Meeting
ML18038B420
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 03/29/1995
From: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18038B417 List:
References
NUDOCS 9509190188
Download: ML18038B420 (38)


Text

NITEO S: ATES NUCLEAR REGULATORY COMMISSlOiN

"-.EGION II

'01 '.IARIETTASTREET. N.W.. SuITE 2300

-'TLANTA.GEORGIA 30323 0109 Harcn 9,

995 MEMORANDUM TO:

ROM

SUBJECT:

Stuart D. =bnyter.

Regional Administrator

}WrL Ms J

R. John

n. Deputy Director ision efJReactor Projects MINUTES OF

""ROWNS FERRY 3

RESTART PANEL MEETING HARCH 21, 1995 The Browns Ferry Unit 3 Restart Panel met at Browns Ferry Nuclear Plant March 21,

1995, to review the status of NRC and TVA activities for the restart

>f this unit.

Ihe next meeting of the NRC panel will be held in the Region II office in Atlanta. Georgia, on April 18.

1995 at 1:OO p.m..

EST and the followup meeting with the licensee will be in the Region II office on April 19, at 10:30 a.m.,

EST.

Attached is the Meeting Minutes.

A Unit 3 Task Checklist is provided as Appendix A and a Unit 3 Issues Checklist is provided as Appendix B.

Attachment:

Browns Ferry Unit 3 Restart panel Meeting Minutes w/Appendix A and B

cc wiatt:

L. A. Reyes, RII E.

W. Merschoff, RII A. F. Gibson, RII J.

P. Stohr, RII W.

E. Cline, RII T. A. Peebles, RII C. Casto, RII J. J. Blake, RII H. B. Shymlock, RII T. Decker, RII W. H. Rankin,.RII P. J. Kellogg, RII Hi. S." LIiset, RII L. O. Wert, RII J.

W. York, RII R.

P.

Zimmerman, NRR cc w/att:

(Continued on next page) 9509l90188 950822 PDR ADOCK 05000296 P

PDR Attachment 3

cc w/att:

(Continued)

K.

P. Barr, RII S.

A. Varga, NRR G.

H. Tracy, OEDO F. '.

Hebdon, NRR J.

F. Williams, NRR P.

S. Koltay, NRR

g

~

BROWNS FERRY UNIT 3 RESTART PANEL HEETING MINUTES MARCH 2),

1995 Meeting Date:

, Meeting Location:

Members Present:

March 21, 1995 Browns Ferry Nuclear Plant J.

R ~

F. J.

H.

S.

C. A.

J.

F.

L. D.

Johnson, Chairman, RII
Hebdon, Vice Chairman, NRR
Lesser, RII Casto.

RII Cline. RII

Williams, NRR
Wert, SRI Additional Attendees:

S.

D. Ebneter R. A. Husser J.

W. York Summary:

The chairman reviewed the minutes of the previous meeting and the status and results of the assigned action items.

The task.checklist and selected items from the issues check list were discussed and updated checklists are provided as Appendix A and B.

Previously assigned actions:

DRP (York) Determine whether a

SALP has to be performed on a unit that has been shutdown for an extended period before its restart.

(Closed)

Per Management Directive 8.6 the SALP process is suspended for any plant that is shutdown and requires authorization by the Commission to restart.

2.

DRP (York) Set up a system to distribute the weekly one liner to panel members.

3.

(Closed)

York is Emailing one liner to panel members.

NRR (Hebdon)

Check to see if ACRS needs to be briefed before Unit 3 startup.

(Closed)

Hebdon determined that ACRS does not desire to be briefed.

Attachment

NRR (Hebdon)

Check to see if the Commission wants a briefing before the final briefing.

(Closed)

Hebdon determined that the Commission wants only a final briefing approximately I month prior to restart.

NRR (Williams) Review SERs for Unit 3 to identify any NRC commitments for inspection.

(Closed) Williams reported the following programs require inspections per the SER:

Instrument Sensing

Lines, Cable tray supports, Long term torus integrity, Components and Piece parts, Restart Test Program implementation.

DRP (Le'sser)

Supply 10 CFR 50.54(f) letter to committee members.

(Closed)

The letter was given to member who did not have it.

DRSS (Cline) Determine which Federal and Local agencies have to be notified before Unit 3 startup.

(Closed) Cline determined that Trojanowski wi 11 notify FEHA loca1 agencies as was done for Brunswick.

NRR (Hebdon)

Determine method to be used to obtain public comments before Unit 3 startup.

(Closed)

The panel determined that this task is being accomplished by having periodic public meetings with the licensee and a press briefing on Harch 21, 1995.

Lesser was tasked to arrange for a special public meeting sometime in September.

(Open)

NRR (Hebdon)

Schedule ORAT.

Peter Koltay has been identified as the ORAT team

leader, although the date and length of the inspection has not been determined.

DRP/DRS (Lesser/Casto)

Review proposed Region II inspection schedules in order to assure maximum efficiency while reviewing several related issues.

(Closed)

Casto reviewed scheduled inspections and merged or eliminated several.

DRP (York) Supply a copy of Unit 3's MIP for committee members.

(Closed)

York provided HIP to members.

Attachment

Newi y 2.

3.

Assigned actions:

ORP {Lesser) Arrange for a special

{separate) meeting for public comment on the restart of BF3 (September).

DRP (Wert) Give a status of the number of area turnovers.

ORP (Lesser)

Schedule Ron Gibbs to perform Hodule 38703 for replacement components and parts for BF3.

DRP (Lesser)

Copy of each of our meeting minutes to Peter Koltay to aid him in scheduling the ORAT inspection.

DRP (Johnson)

Arrange for a discussion of two unit operation with the licensees 6.

7.

~

8.

10.

12.

13.

These 1995.

ORP (Lesser)

Add CATD closeout letter to issues checklist.

NRR {Hebdon) Discuss with NRR reviewer the possibility for finishing his review of licensee's Appendix R submittal sooner so that inspection can be performea sooner than July.

DRP (Lesser/Wert)

Compare TIs 2512/015 and 2515/074 (employee concerns) to ensure that all applicable points for both are covered for BF3.

ORSS (Decker)

Schedule George Kuzo (because of his familiarity with the Watts Bar problems) to inspect or help Dan Jones with PASS or line sampling.

DRP (Lesser)

Add four items from NPP identified by the SRI to the list.

Also add Beta tape problem.

ORS (Casto)

Discuss the restart test program next panel meeting.

DRS (Casto/Peebles)

Add inspections/

dates for inspection in EOPs, procedures, maintenance, TSs, etc. to the Haster Inspection Plan.

ORS (Casto)

Check with Lenahan on a

NRR Hemo which apparently approved CONAN computer code and may provide information to close IFI, 94-12-01.

actions shall be completed by the next oversight meeting on April 18, The following items were completed on the Task Checklist:

Notification Restart Panel Established-This was accomplished by issuance of RON 509 on 2/24/95.

Review of licensee's generated restart issues-This has been completed by review of licensee's Project Plan and Schedule.

t

Independent NRC identification of restart items-This was completed by developing the Restart Issues Checklist using various sources including

IFS, SINS,
WISP, NUREG 1435, NUREG 1232, and BFNPP.

A copy of the Issue Checklist was provided to TVA {Machon and Stinson) at the end of the meeting.

ACRS briefing-This was determined to be not required when NRR interfaced with ACRS.

Notify OSHA of restart-This was deleted from the list as not required.

1 S

Ortte Pnntect: March 24. 1995 TASK Appendix A

BROMNS FERRY 3

TASK CHECKLIST Rssp.

DATE I

STATUS Estarb'H'sh~Restai.t="Pa'net':,.,"-":-

.:RI'I;. NRR'" '; ':2'" 95'~"":

Oevelo YC'a're="-S"eci f1"c:."';Checkl';is>'t':;":l~l':"

."-"".'<'- >RPI".'NRR';"'-""".: "'9" 22" 94'~"'.

.;9evel'0 "%Restai:4-A'cia:on.Plan".k~k::;"::,"5!'"'>'-" '<<.:%ATE RI::I",'",<<NRR'-%i.:i >2';1,95";-'.Fz-..9

."<<Re tona1%'Adminfitrator.'-'-A" i.ove's:::rrP3'an.'";.-k". '.RIF";""'-'k'"-"="';--':2-';I-'.9Ã>i.':-."--":

.'ERR%A'ssociaVe+~OIrectai@A""ro'v'esS!'Pl'an4!.-..".-;-,'.-.

=ARRI~".~%~>>~.":. "::;2.':1.",95;-:,".:.':-',4";.

<<r<<%>:+%@Fr.':,Q@ggjj>rgj'j~',j paw%~(4'>>'~~<<"~ip'-'>1'<<rg<<<<'jN@'jNpj"~$ 'p: p:p $Fgg.; ~>>Qe~ '%i>'<<r)Fc'.<W..ti <<<<>'~"sptp>>

<Notk'fi'cat':1'on'.";;Resort".P'asnel<j~e>stabIii shed

-'-", gLe'sse'r<m"~5 ~2/24f 95'."p>

4RON)5'pq45

<<@)>vg>."0(@$

4>v4'""c'gj>

~. ~ '+j

>gg)$ " )'jg>>p>

>> '+s '<<,;+.'~ ><< ~

>', ~jppj(,

Nm ]etik-.:

';C Iethh4 mc""l&k$

gk." s>)>y"(Qp'" > j>>u'rr<<> >,

gent<<<. <<>>>c

.;L'icens>ee~jier'fo>'rms-;.root'.;;cause

.analysis:;,,

.."::aridNdevel'o "s=:,"'.corrective:act1onr, Tin". -",=

,"4,. '4wZ>jx c<%8j<. k~~ ~ -<<<<," ><<>g'.>~P@g" >>i+p~~ <'r ggc,'."-,

NRC'eval'u'iles ~l"i:cr'en>s<<ere,"'s',"",.r'oat"ause:-".-':;::"-",.':i.'.-:.-,.

.-..'deteriihn'at')on~>and s'corr'e'c.'tisye~ict46n=:.";"'-'-:,'-',-t og'<'rK%c.."'r."r'" >~

w > 4,',:5 >>

."< Cs> t

',L'i'censee-..'

<';4'/.1'/92.:-w<'"""";

r

CompletiP.

+~.i'd%<<<<>Nz&Q~P

'C61tlpiktk "<j r>,gs>P,"

Pg."+>

s.:'.R>evj~wgfIi'cenrsee~gen erat'e'drest>ai;.t4;,,=;-..',",'-::":.

',:.Pinel::..':~;;:.~:;::.~,'":.,;:!>3/2l/95J-:,,"

p~+cSp+p. ~%cp~p/Ysm~<<~y

.>s('.<<,>+>p 'pm r',>( +)~,

. (9?.:

j3iide>j~nde<<n4."NRC;-iden>tifi;cati:an -of<"-",.-".".,,'..'"..'s><<<<~+~

>~+,c: ++

.C oink'i'~~~

NRC/Licensee agreement on restart issues Obtain ubl ic comments:

ress conf)

Obtain comments from State and Local Off ici al s Obtain comments from applicable Federal a encies Evaluate licensee's readiness self assessment Conduct Operational Readiness Assessment Team Ins ection ORAT Restart issues closed Issue au mented restart covera e

ROI Obtain staff comments on restart Re-review HC 035D generic restart checklist Panel Lesser Cline Cl ine RII Panel RII

RII, NRR Panel 3/21/95

Prepare restart

. ecommendation document and basis for restart to Regional Administrator Restart meetin with licensee Restart Panel recommends restart Regional Administrator concurs in restart recommendation

{SECY paper)

NRR Associate Oirector concurs in restart recommendation SECY oaper)

EOO Concurs in restart recommendation SECY pa er RII Panel Panel RII NRR NRR Submit Commission paper Commission briefin Commission restart authorization NRR NRR. RII Comm Notify Con ressional Affairs of restart NRR Notify ACRS of restart Notify FEMA of restart Notify Public Affairs of restart Notify State and Locals of restart Monitor restart NRR

RII, NRR RI I RII RII

~ j

Appendix B

BROWNS FERRY 3 ISSUES CHECKLIST Date Printed: March 24, 1995 DESCRIPT IIW TNI ACTIII ITENS (TI 2515/065>

NRC LEAD IR/SER LICENSEE STATUS kRC ACTIOk CQOIERTS STATUS

'~ sF'>>-,,",'10i29/pi>>k".,", !'Os'sent'I st')yj~j>..',',"~'q Asatisfactotgkiw44$ >>:.'"%~a 4'iv~""'"'+'5:"i"!.".i':""'".'4~~%:.~"->:

I.D.2.2 I.D.2.3 11.8.3.2 11.8.3.3 11.8.3.4 SPDS Installed TAC H74612; HPA F075 GL 89 06 TAC H73636 F072 SPDS Fully laplemented TAC H51225 HPA F009 Post Accident Saapling-Corrective Actions TAC H74613 HPA F076 PASS - Procedures TAC H746147 NPA F077; H83122 PASS - Nodificatlons TAC H44425; NPA F012 SRI SRI Decker Decker Decker SE 2/5/92 SE 2/5/92 SE 5/27/87 94-33 SE 5/27/87; TS aamend 6/21/94 SE 5/27/87 field coaplete field complete; testin 4/96 2/22/95 Design coaplete; 50X iaplement 12/94 75X i lement 4/95 P>>kfÃ~IQ4~~44i4 kfkt-II00tNb>>S%%$4~4>>%3%4'4 iAI.: ':

0~0%/

'4,,'I.E.4.2.1.4 Contaife>>nt Isolation Dapendabl llty - Diverse I so let ton TAC H74615 HPA F078 SRI SE 1/6/95 TVA to Provide coapletion status 8/95

DESCRIPT IQI Contafrerent isolation Oependabflfty-Contafrmrent Purge Valves TAC H74616 F079 Accident Nonftorlng.

Procedures TAC H74617.

HPA F081 Accident Honitoring-Noble Gas Honftor TAC N44905 MPA F020 Iodfne/Partfculate Monitor TAC H44976 HPA F021 Contafanent High Range Monitor TAC HC5047 HPA F022 Con'taffIAent Pressure Honltor TAC N47584 HPA F023 Contafrmrent Mater Level Monitor TAC N47655 HPA F024 Instrrsnentat ion for Detection of Inadequate Core Cooling GL 84-23 TAC N45118 HPA F026 HPCI/RCIC Initiation Levels TAC H45534 HPA F043 ADS Actuation Hodfffcatfon TAC N45682 NPA F048 Carrron Reference Level TAC H457781 NPA F054 Oualiffcatlon of ADS Accrmtators TAC N48262 HPA F055 NRC LEAD SRI Decker Decker Decker Rankin SRI SRI SRI SRI SRI SRI IR/SER SE 1/6/95 SER 8/17/90 94-33 SER 12/22/81 SER i2/22/81 SER 1/8/82 IR 9C-28 95.

11 SER 6/16/83 SER 6/16/83 SER 11/18/86 SER 9/19/83 SER 5/29/90 SER 12/3/82 SER 7/24/85 LICENSEE STASIS Licensee tracking rrfth fndividuai fnstrrmrents 4/18/95 4/18/95 Hay 95 field corpf etc 7/95 field complete 5/95 field complete 2/95 field complete 1/95 field corpfete I'2/3/82 stated licensee to track under CROR ss alternate method; field c lete 2/95 field coopfete 4/95 NRC ACTION CQ%ENTS Listed in NJREG 1435; not on other lists SThillS

g 4

o

IS%K DESCRIPT IQI NRC LEAD IR/SER LICENSEE STATUS NRC ACTIINI CQNIENTS

.)."Refer,'.:,tO",L'afge;:: Be j'iggF~'::~:0

'";:P,.f'p'I'ngi'ar'id~Siiijiort's".;Progri'w$,,

SIATUS "X)

)j$Pq4s '-

IEB 79-12 Short Period Scrams at BMRs SRI 81-18 field complete 9/95 Project plan INN+'

ass IEB 80-06 IEB S3-08 IEB 84 02 ESF Reset Controls Elect Circuit Bkrs Nith W Trip Feature in SR applications other than RPS Failures of GE HFA relays in 1E Safet s stems SRI p~fg<~gjjp;)

SRI SRI

~~@';~4~QP&a~~gp I p~;.'c 'gM r>p'P>~~/>:~N>~

'R83 55 >R86:.,

~ 03>; ~t,"g+~P$',~g) s

.'Pih":4Ã2Z/9.$)'Closed".;:~

~ for-.;U2t~",:LlCansta~to.,"'.,

lit'ter,.:::forItI3~z"..'-.'.".".i::.'.,".

field complete pitg'PY 'AY@gggg) >w ~ Kr gQ+ fNS'g. p'hY~s>g+gj~ '

~Frg+P~g>

~p')p'fng<andYSuppo'rhea'rogram,'"':

LIVE"$0/2)/94,ct'rt3$ fe'd'.tliatp

>lEB'Nag~~priori eussy'~~1':.',"".,~.,":,,';2..

'.<<o$yfet'ej"'.'in~el'I;"'.3",iejt's:",;'"';.,'.-

Prolect Plan Project Plan Project Plan Mg)v (i wg

'jr,"95%@r",."gcj;H~>~:~j

@%~~4Ã~.-'R@~Ã~:>>:.%I~d4W<T":~>',~~Fjgp') j.<,:))g.~;,

IEB 86-02 IEB 88-03 IEB 8&.04 Static 0 Ring OP Switches Inadequate Latch Engagement in HFA relays by GE TAC 1173854; HPA X803 SR Pump Loss TAC H69890'PA XS07

ggjdo,

/'

Casto NRR SRI

)N f4(,

94-31 SER 8/2/90 SER 4/4/90 field conplete TVA 4/11/94 reported complet ion of requirements; inspections conplete for U3; no roblems found field conplete 6/95 Project Plan NUREG 1435; not on licensee list; NRR check if issue is closed Project Plan; Tl 2515/087 issued but not required for BF "jP!~Rj1ergg'Pfsla9t i:.!ti!::

~

t

~

~

~

~

~

~

ISQK DESCRIPT IINI NRC LEAD IR/SER LICENSEE STATUS NRC ACTION CQQENTS O.

SIATUS Hj39jjc'RIIPA'%if.jj~,

.",".i:ll cfear'."'ti'g 1'6 2S) 5/121'">:~~)'>

+:gK.wQ'USE/'/28/94'1.~4

)AE."9j22'29/~~ '~~

-C.

GL 92-01 Reactor Vessel Structural Integrity TAC H83440; HPA 8120 NRR SER 4/19/94 T 9/2/93 5/23/94 7/28/94 identify cojjmitments; licensee to add to Project Plan Plant specific reviews being performed on all units NUREG 1435 NR GL 92-08 GL 94.02 GL 94-03 47AGQQ4Zf1' A>QTRf44'+f'+-.""'.

Thermolag Long Term Soln for Thermal Hydraulic Instabilities IGSCC of Core Shroud TAC H90083 Casto Lawyer Blake SE 5/11/94 94-11 94-16

<<) +25/94'?~"i~gg~gK o )M'.

.TVA 12/22/94 procedures to be revised prior to restart Licensee inspections performed June and July 1994; TVA 9/23/9C concludes U3 can be operated for at least 1

cycle

',Ig f,;cecale'tod;"~: fu'r'th'er.-".;(;-"j:.- '-'-Cg;;."-.

<<ri'vfFst.:":of)aiods",.unfferilEB ~:;--',-:~;:.',

~93'03';<:~ ~75?PA<,,~>."s "458 RHRSU cables use thermolag; and will be ijpgraded to configurations as tested at MB action I.a closed SE 1/13/95 concluded structural integrity will be maintained for at least 1 cycle without need for mod; IVA to reinspect OG QBIESOLVED SAFETT ISIS c,tv,/

'P. URN<?"."vT "" 8 4@gpypgjjg t?ljj/j@%%+jsj

~

4

~

~

ISQK A-36 DESCRIPTION Control of Heavy Loads Neer S

nt Fuel Pool KRC LEAD SRI IR/SER 94.12 LICENSEE STATUS NRC ACTION GHIENTS Project Plan SIAIUS f~kWA+~i~~~~: j!>i!WW~;.:.!><>>?I!IYP@k p,,a:

~~~ '7!>xÃ~R"+gQs' (41/fw(j~<Q<<+~/@~.

@', i'<>q'>>?>p FB f'jik'4.~~rgb'p:.~NgÃ4-.":

eS ym

': livmlock~.-

.~.<:>'>>>'m?:?.

4RRÃgg~:;:Vf

~I%<>-"...WnP"'~7<~~~"t;:~ NP.'.~~~>>Vm~@Ci~";:",'<<>~4~<<4 '~e; ffetet<>tto< GL"';,88~0!pg".'.~?.

"'.,>:"::.:.:-~:"'~;,

?'@%N&j>':Ngig<y":~+@j+: p'i+pz><"??pÃgp~>apex&~~'R R~N%M<y?cN~4~%! N'v, v';":<0<'>>">"'cia>M."<>

4:""'p<":.g.'+~>pW(+."L~~<". g"+:"~~: s<<v:" '<Pp'"',;,:.:rgg~g ':>?

.JIa e'er'<tg.,""Tf( 2515/IR0~<j g'?I'".

<:, >~+RA<

,:,.l<<tent ff le'<<j"riot',:to,".he":a":,,". >'.,~-.

~'eondiiff~at'?ppogtISE)3 j20/9g:;,.',:

Q.<g?:p~?jQ>,'g~,g@~<.<>

'>.: S<j~i R<.>< <>~~" <5"

"..~~"AS~<<~+A<).'Con<'t'i.'ol4'a'toms?NMF~<<'"".~C A-48 Hydrogen Control Heasures end Burn Effects TAC H55955; NPA A019 SRI SER 9/9/86 Project Plan in WISP GENERIC SAFETy ISIS GSI 40 GSI 41 Safety Concerns Associated fifth Pfpe Breakes fn BMR Scram Syst TAC H43736'PA B065 BMR Scram Discharge Vol?see System TAC H51014 ~ NPA 8058 Blake SRI SER I///86 SER 6/24/83 field cocpfete 6/95 NUREG 1435 ond Project Plan HUREG 1435; TI 2515/090 closed fn 87 13; Project Plan W/P'%4%Kw~>'

f'<<'mRWKk '..-';NNZk$VMM!

<~A~"Qe+~

~ "F~:-".:: k".'O':;;: '::O'.""'::":-;:"-:-.',"'.""..-?

~

.R f

'~444+4%"$~$P. <<Ifonf'tVRf"'%k0",$%ff744~4"Y<'B".:~',:

'g< "

i>.

~~.,sp ~ w j %p.~?

'<..852:i;."

rSI 75 GSI 75 Salem ATllS 4.5.2 and 4.5.3 RPS Test Alternatives TAC 53966 HPA 8093 Salem ATllS 1.2 Data Cepabf IIty TAC H53573'PA 8085.

Shymlock SRI SER 8/17/90 SER 6/12/85 licensee tracking under GL 83-28 licensee tracking under GL 8'8 IER.Tl PtANT ACTIM ITENS Appendix J Cont Leak Teat fng N08717 Casto SER 10/24/84

~

c

~

~

8

HPA B41 HPA C.10 DESCR IPTIISI Fire Protection Final TS N48136 Heavy Loads Phase I NRC LEAD NRR NRR IR/SER SER 10/12/83 SER 6/6/84 LICENSEE STATUS NRC ACTION cQa<<ENTs Removal of TS complete, NRR reviewing fire Protection Plan submittal Project Plan 9 SSI II9

>>Is? K, -...

'R'>>""

93>

INSPECT% FKLIIAN'YSTEII NRR SER 6/27/85 6/13/94 Project Plan

~URTY@$%$

4FP&8KVÃ.

c~

.< ":j<<~-.e<~%<<<<%m':"?">.'4':::%g::A 3'.";

'"::0+., 'Ur'+i er~)Wfjpp<<,..:;;eRI,'-,',:;<~~<"

ter<<nK AN'i'eMf

@SPA'",m4":> <<'?";@4<<%"pi "IR'94": j8@""4"'

)8'~':~"i'-" "'~4<~:8s '

C'.;4?>>;

? ">>>.'.--

IF I 84-32-02 I F I 84.41-04 IFI 85 09.02 Torus Level Instrrirrentation Relocation of HPCI Emerg Control Boxes Bolts Inadequate on Limltor motors SRI SRI Casto 94-2J field complete 5/95 HAPP>>9.; 3."

VID 85.41-01 Cable Tray Supports Blake IFI 85.51-01 Cable Tray Support Criteria Seismic Blake Cr LER 85.32 LER 85-33 Reevaluation of Design Criteria for FSAR 8.6.2.1 Nonstandard 4" pipe penetrations thru sec cont Shyml ock SRI 91 ~ 06 88.28 URI 86-06.02 URI 86.14.03 Rx Bldg control Bay HVAC te desi Overstress of DryNall Beans Blake Blake 89-20

DESCRIPTION NRC LEAD IR/SER LICENSEE STATUS NRC ACTION CLIENTS STATUS

>3++~.."-;+/)'(p~pP( pc+64~p?+rg)$ $NÃ~'@~"@>>)>+@<'f",; EY+4j

. "~ir?.4?.'.~)c~p

~v'M,..'.,,"........e;.:.",;,~

":&ftj'al?".0EECQggg,':>j<~@"," (SR il>~p@>:; '-942f.>>'.j v$::j-"'.<~

Ride+val@i":,t:,.',)NM~N'~ i'4'~~V~""44 ?)~T@'?'"4~~:::::~~

~89~3S;9C.'-?3P,@.

NAg~e~".R~r+~~%5'4%~4/4<~'; <<X%%4~N LER 86-10 LER 86 16 Design Engineers identified connection of unqualified piping to containment sensing lines Fluid leakage problem Nlth large bore snubbers for Torus restraint SRI Blake 88-28 88-28

,;:\\'R(Ã4~L15~g/

?Pgg)g>4>p4@i@."g8k+~+84'8'~if'gagj+.'jfi.

Xi~?>>%4VNSCPg i.N outgo'. ew~j/tor",,i'>>itic,%is't.'0 jSRI;;"='.';~>>>j; "-'88;33 94;36":-"."'-":

"-.,dt's fc'Ienet<SA:.<44<.-,'>> +~4@ -'-8 "~?-'

-~'<r'> 'P '>-

UR I 87-02.02 Limitorque gear ratio Casto 88-16 URI 87.26-03 IFI 87.33.02 IF I 87-37.03 RHR pump suction and not?le load aliouances ssibl exceeded Failure of dryweii control air isol valves to feil closed on air loss Reactor llater Level Sensing lines Blake SRI SRI 88-32 90.08 89-35 89-35 field coapiete 2/95 field coepiete 1/95 VIO 88.0/?.03 Failure to Correctly translate design requ into drauings SRI 91-02 91-16 field conplete 4/95

. LER 88 12 Battery failure concurrent Mith LOP/LOCA revent auto start Shymlock 89-35 LER 88 16 Unplanned manual start of ESF due to rs error SRI 89-50 a <)?>>.??4<+.

?'w"pvv'lacard mod>> needed LER 88-32 Elect sep requ violated due to design controls Shymlock 90-25

~

~

~

~

IS%K DESCRIPT IQI NRC LEAD IRISER LICENSEE STATUS NRC ACTION CQaIENTS STAINS

~>ff'P)92+$2

. $+~i P!~$:~igIi~

~~~~<<Y~XPk@g.":.>4@4'~~"/Ms:;.;:~$

':Coorcf Inatl On 4'<:<Fkii<gk<dk>x$

<';ALIIfthm'):"".:"'"",.

".pyy>><<<>>);e><<"">> <<p~;.)A'>)>g.","'<4'.<<<'<)'N".>q,

.W>>q:<<>v.~ >>>>,)>

Y",) ',>>> ~ Q,'< Q.)<

'<>><)>

F94 <<Qf'j94><<32 )<'))i<<.'g~~j~'".>'>'?Pj):;<>'.";:~~~4j;.)P>> iv

>?<<<>>w

"iER"'92'0>>3'"""::"-'g-'-<""'9"-"""'CY-"'-'.

~)<<gApl+~<.'<,~P'Pg:~~a@F+%i

~~~~@ ~~/:@@~~w+@'~;) ~p-:::w-':ap~y,

@4+.".~~pipF~gjR<@P~A~Ng F>CF<'.'::):>4@

'<<$4>q,<<<<<s~p~>,j'g>j~

'j."> >>".HzÃ. "<)>Ii).">>)" "'5 Z94C32+g>%<;)

P

. >><<+>c($ $<<4 ~ 'Q>>$ I p~'.~);N<>p >@~cj<<'>>>>><~>aN~Re<<',:::;,>>>>'s)';F.'+

URI 93-11-01 IFI 94-04-02 IF! 94-07-03 Iield Dfffererences betueen the Nefds assigned in s rt Verify }iethod used to install kedge anchors Verfffcation of SBO Ftactfonal R

irements Blake Blake NRR I F I 94-07-03 System operational boundary test identification NRR IFl 94-11-02 IFI 94-12-01 VI0 94-17-01

Response

to GL 94-02 Rosemont Transmitter Drfft Problems Instrunentatfon Calibration Deficiencies Lair Shynf ock SRI IFI 94-10-02 IFl 94-29-01 IFl 94.29-02 URl 94-29-03 Condition of Contafrment Coating Revfew of Conan Concrete Ca cit Design Nethods for Anchor Location Tolerance Correctfw Action Cover late desfgn SRI Blake Blake Blake

IS%K UR I 94-29-04 VIO 94-35-01 VIO 95-03-01 UR I 95-10-01 DESCRIPT IINI Amplification factors for anchor toads Failure to maintain spacing ln tou voltage cable tra Spring can instatlation Inadequate Second party check by foreman (Beta Ta

)

NRC LEAD Blake Shymlock Stake Shymtock IR/SER 94.35 LICENSEE STATUS NRC ACTION.

cQetENls US LICENSE AIIKNXKHTS TS 359 TS 33T Scram Pilot Air Header Pressure SNitchs TAC Appendix R License Asmenctnent TAC HBT902 HRR NRR I

sfS 318

$CPCIRCi0-"P

"";e'xf+j4~~~

'a+a'@ Cfi~~T@~ll89gT".

Analog Transmi tter/Trip S stems TAC H89250 sHSV HRR

.?."r??

?.g.

Relief R

st Relief R

st N416-1 Pressure testing H 4-98-1 Pressure testing HRR HRR IIISC ISIS Procedures Upgrades Kellogg 93-36 12

~

4 I

DESCRIPT IQI NRC LEAD IR/SER LICENSEE STATUS KRC ACTION CQRIENTS STATUS SRI

.,y@r~<f<"..~+~to<"t@$p. g<gg~'gg'"(t<<jam<%4'@i~@@

>I<",:,.~:,""'y~>~~g>>i!L~g~~~,;":<y<-'i~~., ~

'V)'attra12/17/91>,::gg

'>+~.":.'> ~'-@QY"O'N(>g<44s

! l<iM<"-'i"~"'~>RPg'4;:!~><."(-::<'>~'<~:",~i

)hWp PROGRAIIS IIPLEIHlED IN ACCNIDANCE QITN INIIT Cable Aapac Ity Cable Tray supports N 80684 Coaponent and Piece Parts Oust ification lt 83828 Conte iraaent Coatings CRD insert and Mlthdrauat Pi Ing Design Cele Revieu EO TAC H42482 IIPA 8060 Flexible Conduits Fuses HVAC Duct Supports TAC R00300, II82127 2 PRECEDENT Shymtock Blake Blake SRI Blake Casto Shymlock Blake Shymlock Blake 94.35 SFR 12/17/91 SER 12/7/93 94.01 94.09 94.18 94.27 95.03 94-31 94.06 94-27 94-35 SER 13.6 93-02 93.08 SER 10/24/89 7/16/92 IR 93-201

> 50X iaplement 75X implement 4/95 comptete 5/95 TVA ltr 3/27/91;

>90X iaplement c

lete 2/95 TVA ttr 6/12/92

<75X iaplement 50X iaptement 2/95 coaptete 5/95 IF! 94.18-02 opened to track re airs to U3 Inspect as part of open Item closure NUREG 1232 V3 S2 reviewed program and NRC ltr of 6/23/93 revieved folio<<up items Prograni has changed; possibly perform module 38703 on rocurea>ant TI 2515/076 closed 92-03 Large Bore Piping and Supports (IEB 79-02 8 79-14)

TAC R0017 IIIsc Steel Frames TAC R00297 it80620 Blake Blake SER 10/24/89 94-15 94-29 95.03 SER 10/24/89 94-15 94 29

><:.y,'.~~><..@"'>>Ir>>g::<y. p? (>>?'C'<y,".'kr<.'9$$>+;~@+

'>t+~

.<~>e',q~3<>>%>p&%<?>'".>>

4'Ngw+<'".x"i%'A<4 's+><<>'dg>:~>.'.>85..<@@i>g%P'.

'rfound>aces ta6la>~~+~+<'..>>>4+~~~'"

75X iapleeent 10/94 coaptete 7/95

>50X iapleeent 75X Iapl ement 11/94 c

late 1/95 13

~

~

J Cl

DESCRIPT IINI Hoderate Energy Line Break Platform Thermal Grouth TAC R00297, H80620 PRA O.LIst NRC LEAD Blake Blake NRR SRI IR/SER SER 4/20/94 SER 10/24/89 4/20/94 IR 93.?01 94-29 LICENSEE STATUS T 1/19/95 NRC ACTION cQRIENTs IVA to submit multi unit PRA 4/95, IPEEE 6/95

'nternal fires IPEEE 120days atter refueling SIRIUS NR Seismic Class II/I TAC K80015 Splices Thermal Overloads Blake Shymlock Shymlock SER 12/17/91 90-22 SER 13.4 TVA ltr 2/27/91 50X implement 12/9C 75X i lement 5/95 SSER2 3.13 found program acceptable and IR satisfactory for all units CEDENT NTATION PRE DEPART FRQI TNE UNIT 2 IHPLBK Cable installation H80682 Conduit Support TAC R00024 H80690 Configuration Kgmt/Design Baseline H80688 Instrunent Tubing TAC HBOO36 Instrunent Sensing Lines TAC H80017 Long Term Torus Integrity TAC H80686 Restart Test Program TAC H81791 Shymlock Blake Casto Blake SRI Slake SRI caste SER'C/8/92 7/1/9C 93-34 94.27 94-35 SER 10/2C/89 3/30/92 94.07 SER 11/21/91 94.

07 94-20 94-31 SER 2/4/92 95.03 SER 12/10/92 IR 94-24 SER 2/10/92 94-15 SER 8/30/94

>50X implement 75X implement 10/94 c

lete 5/95 TVAZ/27/91 IVA12/12/91 TVA ltr Z/13/91 TVA ltr C/29/91

>75X replant c

tete 5/95 TVA ltr 2/2/94 50X fmpleeent 6/95 revised bend radius for eediun voltage cables l.iccnsee has coebined inst tubing a<xi small bore i ing rograms URI 9C-15-01, Spring Can Settings SRI - RevieM achinfstrative program; Casto - identity electrical/mechanical tests and inspector to reviem.

14

I 0

ISQK DESCRIPT IOI Small Bore Piping TAC H80013 R00306 NRC LEAD Blake IR/SER SER 10/24/89 2/4/92 95-03 LICENSEE STATUS TVA2/27/91 IVA12/12/92 NRC ACTIQI CQKENTS STATUS ART FROI INIIT 2 CRITERIA PRECEDENT fire Protection; App R.

TAC H85254 Lower Drywall, Platforms and Ilisc Steel TAC 1180620 R00303 M ALI. THREE QIITS Heat Code Traceabillty Secondary Conte irsaent Pena t rat Iona Melding Program Pipe Mall Thinning (GL 87 OI) caste Blake Blake Blake Blake Blake 94-27 95-04 95-07 SER 7/26/88 10/24/89 3/19/92 4/20/94 IR94-15, 93.201 94.29 SER 5/31/90 SER 4/11/88 SER 5/31/90 SER 8/31/88 Licensee submittal of 12/20/94, status

>> 50X implement 75K I lement 4/95 IVA 6/12/91

<<90X implement conpi ate 1/95 NRR to write SER by 7/95 Long term design criteria Implements 1978 AISC spec NURUG 'l232 V3 S1 sec 2.3 and NRC SER of Nay 31, 1990 reviewed program for all 3 units.

Program evaluated by April 11, 1988 addressed all 3 units Melding concerns adequately addressed per NUGEG 1232 V3 SI SER addressed all 3 units Sources for issues include:

IFS, SIMS, HISP, NUREG 1435 {Status of Safety Issues at Licensed Power Plants),
BFNPP, NUREG 1232 (SER for Browns Ferry NPP)