Forwards Minutes of Browns Ferry,Unit 3 Restart Panel 950209 Meeting
ML18038B419
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/17/1995
From: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Casto C, Hebdon F, Lesser M
NRC (Affiliation Not Assigned)
Shared Package
ML18038B417 List:
References
NUDOCS 9509190181
Download: ML18038B419 (34)


Text

gV gpss AEr(in I

p w~.'(

t.~

QX

~*~sr+

MEMORANDUM TO:

FROM:

SUBJECT:

VNITEO STATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTASTREET, N.W.. SUITE 2900 ATLANTA,GEORGIA 30323.0199 February 17, 1995 Fredrick J.

Hebdon, Director Project Directorate II-4 Office of Nuclear Reactor Regulation Hark S.

Lesser, Acting Chief Reactor Projects, Branch 4A Division of Reactor Projects Charles A. Casto, Chief Engineering Branch Division of Reactor Safety William E. Cline, Chief Radiological Protection and Emergency Preparation Branch Division of Radiation Safety and Safeguards Joseph F. Williams, Project Manager Project Directorate II-4 Office of Nuclear Reactor Regulation Leonard D. Wert, Senior Resident Inspector Reactor Projects, Section 4A D'vision o R actor Projects N lP.

o R. John n, Deputy Director vision o Reactor Projects MINUTES OF BROWNS FERRY UNIT 3 RESTART PANEL MEETING FEBRUARY 9, 1995 The Browns Ferry Unit 3 Restart Panel met in the Region II Office on February 9, 1995, to review the status of NRC and TVA activities for the restart of this unit.

Attached is a copy of the Heeting minutes.

A Unit 3 Task Checklist is provided as Appendix A and a Unit 3 Issues Checklist is provided as Appendix B.

Attachment/w Appendix A and B:

Browns Ferry Unit 3 Restart Panel Meeting Minutes cc w/att:

(See page 2) 9509190181 950822 PDR ADQCK 05000296 PDR Attachment 2

cc w/att:

S.

D. Ebneter, RII L. A. Reyes, RII A. F. Gibson, RII J.

P. Stohr, RII E.

W. Herschoff, RII J. J. Blake, RII H. B. Shymlock, RII J.

W. York, RII G. H. Tracy, OEDO S. A. Varga, NRR R.

P.

Zimmerman, NRR

BROWNS F

RRY UNIT 3 RESTART PAN ME TING MINUTES FEBRUARY 9 1995 Meeting Date:

Meeting Location:

Members Present:

Summary:

February 9,

1995 Region II Office J.

R. Johnson,

Chairman, RII F. J.
Hebdon, Vice Chairman, NRR M. S. Lesser, RII C. A. Casto, RII W.

E. Cline, RII J.

F. Williams, NRR L. D. Wert, SRI Since this was the first meeting of the panel, the Chairman gave an overview of the panel's charter.

The requirements of MC 0350 were stated and the Task Checklist was discussed.

The responsibility for each is delineated in the checklist in Appendix A.

Selected items from the Issues Checklist were discussed and an updated checklist is provided as Appendix B.

The next meeting of the panel will be at the Browns Ferry Nuclear Plant on March 21, 1995.

The meeting will begin at 9:00 a.m.,

CST in the Resident Inspector's offices.

Assigned actions:

I 1.

DRP (York) Determine whether a SALP has to be performed on a unit that has been shutdown for an extended period before its restart.

2.

DRP (York) Set up a system to distribute the weekly one liner to panel members.

3.

5.

6.

NRR (Hebdon)

Check to see if ACRS needs to be briefed before Unit 3

startup.

NRR (Hebdon)

Check to see if the Commission wants a briefing before the final briefing.

NRR (Williams) Review SERs for Unit 3 to identify any NRC commitments for inspection.

DRP (Lesser)

Supply 10 CFR 50.54(f) letter to committee members.

Attachment

0

7.

8.

9.

10.

2 DRSS (Cline)

Determine which Federal and Local agencies have to be notified before Unit 3 startup.

NRR (Hebdon)

Determine method to be used to obtain public comments before Unit 3 startup.

NRR (Hebdon)

Schedule ORAT.

DRP/DRS (Lesser/Casto)

Review proposed Region II inspection schedules in order to assure maximum efficiency while reviewing several related issues.

ll.

DRP (York) Supply a copy of Unit 3's MIP for committee members.

These actions should be completed by the next oversight meeting on March 21, 1995.

Oste Printed: Februav 10. 1996 TASK Appendix A BRO'WS FERRY 3 TASK CHECKLIST RESP.

OATE STATUS "pig,w,."" @@gripy~~>~>gW>cy

.cy.>C,C>gy>c>ccc;~>,~~"p~a..

>>s >c. xc;;y>'":cap;q

"~P)&jqghj(

>>>>> 'AA~5'

'>A]jj~?A."g'>c,>y".c'P'Q>4g. Ncj5>'y.

>;:g. >,c >.@Ac'@M~~~. g I3: '=NRR:::"-.a; I2'.4'.:95~~:aR

$jj

'"Ycyc'Ãy y)Mc('

"yj+Alg/&P~&Ag),g':, v@4 py.',P>cog

'9'.'22c 94@.~;~~

"-Rl-"--':HRR~< k

.'m

'I~I%

"'cgev840

~".K9~~.o:;AGBon~)R186%y4~@i'~a."<wA'avp>.'~.

i'~i;-

. ice~'uie'rives".,", an~;-".

t, Py y@c. y>~AcC'~$c4 pc y>y> 4g>%>,. /go~c~~~c.

c. + 4gga~ccggi~p, Notification Restart Panel established

> '"P!~4%4YK~%%%+!yi8">%%)%Ocr~'%%+XF~eW'"ycS~~P@'".g

-:.'Lice>nseV@gii',fo~j;oot""causa'=-analyst'i@g

$yec:. ~:~q."..~~;:>>>y'cg>yc>>y x<<yacc yy"':>Cy'.yy@C'>>y~+..

y > wo'

."andxd8vR:$.

si~corcBcUY8~48GMonl.f.aSM~~

~~@'M~i~g'4YASS++> <<4NPXNR>""~>> ~

')~~'&n%%Fs~~~>~p4g~<'@

4RG~evaIuatea@Bcensee=':0-"root-.:cause~~~@4 "p ~NR gQ>c>

~RA,IHRR'"'~%

RRR~~:a.&4 Lesser

P.~g
N+P3g<4

'.-,$"scens'i'm:>$

wP"-

'A?~~>>cga>P ~~

mg::,,)::.'. ggugcg~~ g

~-'2':P 95~;Kk5 X c:yÃg~~c. Fav~&:'yVQ 82'95~

F-

'.7)40'I9g:"gg Review licensee generated restart issues Independent NRC identification of restart items (consider external sources NRC/Licensee agreement on restart issues I

Obtain ublic comments Obtain coaments from State and Local Officials Obtain comments from applicable Federal a encies Evaluate licensee's readiness sel f assessment Conduct Operational Readiness Assessment Team Ins ection ORAT Restart issues closed Issue au mented restart covera e

ROI Obtain staff comments on restart Re-review HC 0350 generic restart checklist Panel Panel Panel NRR Cline Cl ine RII NRR Panel RII

RII, NRR Panel

Prepare restart recommendation document and basis for restart to Regional Administrator Restart meetina with licensee Restart Panel recommends restar t Regional Administrator concurs in restart recommendation SECY a er NRR Associate Director concurs in restart recommendation

{SECY a er)

EDO Concurs in restart recommendation SECY a er ACRS briefino Submit Commission a er Comnission briefin Commission restart authorization RII Panel Panel RII NRR NRR NRR NRR NRR. RII Conm Notif Con ress'ional Affairs of restart NRR Notif ACRS of restart Notify FEHA of restart Notify OSHA of restart NRR

RII, NRR Cl ine Notify Public Affairs of restart 'II

'otif State and Locals of restart Honitor restart RII RII

0 S

lt

Appendix B

BROWNS FERRY 3 ISSUES CHECKLIST Date Printed: february 14, 1995 ISSIK DESCRIPTION RRC I.EAD IR/SER lICENSEE STATUS NRC ACTINI CQtKNTS STATUS IMI ACTIIRI ITEMS (TI 2515/065)

<<:<<"I >"'"".'1YoAFH>%A"4'0.'.@pk4 'A '.<<>v'6('a j>4ri~>:sc";>'res>>

"s<<xVN~( r..f ~>+%%4i~<<..s'<<>A 794 "84@5;:>>k("..>

@~:c4It<< ~ic:;SQ~ZhYA'>4'.>>issue:

'(9Pkji.'iy~)el'rar'f(p>>r'agric<<rr"-.P,:

"@"Zggr'5.

I.D.2.2 I.D.2.3 II.B.3.2 I I.B.3.3 II.B.3.4 I I.E.4. 1. 2 I I.E.4. 1.3 I I.E.4.2.1 4

SPDS Installed TAC H74612; HPA F075 GL 89-06 TAC H73636 f072 SPDS Fully Irrpiemented TAC H51225 HPA F009 Post Accident Saspling-Corrective Actions TAC M74613 MPA F076 PASS

- Procedures IAC M746141 HPA F077; H83 122 PASS - Modifications TAC M44425I MPA F012 Dedicated Hydrogen Penetrations

- Rev3eir and Revise H2 Control Proc TAC ROODD3 Dedicated Hydrogen Penetration

- Install TAC 844763 HPA'018 Conte iwrent Isolation Dependsbl I Ity - Diverse Isolat lon TAC H746151 HPA f078 SRI SRI Decker Decker Decker SRI SRI SRI SE 2/5/92 SE 2/5/92 SE 5/27/87 94-33 SE 5/27/87'S errmend 6/21/94 SE 5/27/87 SE 5/23/88 SE 12/22/81 SE 1/6/95 field corrpiete field coirpiate; testin 4/96 2/22/95 Design corplete; 50X isplement

'l2/94 75X In lement 4/95 Corrpiete; ready for closure Crlpiete; ready for closure IVA to provide coaptation sta'tus 8/95 SIHS ready for closure SIHS shorrs ready for closure

ISSUE DESCRIPT IDN NRC I.EAD IR/SER l

E STATUS NRC ACTION CQPKMTS STATUS II.E.4.2.6 II.F.1.1 I I.F.1.2.A II.F.1.2.B II.F.1.2.C II.F.1.2.0 II.F.1.2.E II.F.2.4 II.K.3.13.B II.K.3.18.C II.K.3.27 II.K.3.28 Contaicvaent Isolation Dependabillty-Contaicvaent Purge Valves TAC H74616'079 Accident Konltorlng-Procedures TAC H74617I NPA FOBI Accident Honitoring-Noble Gas Konltor TAC H44905 KPA F020 Iodine/Particulate Honltor TAC H44976 KPA F021 Contaicvaent High Range Konltor TAC H45D47 HPA F022 Contaireent Pressure Nonitor TAC K47584; HPA f023 Contaiceent Uater Level Honltor TAC N47655 KPA F024 Instrunentation for Detection of Inadeqccote Core Cooling Gl 84-23 TAC H45118; HPA F026 KPCI IRCIC Initiation Levels TAC N45534 KPA F043 ADS Actuation Nodificatlon TAC H45682; HPA F048 Coacnon Reference level TAC H45778I HPA F054 Qual IfIcation of ADS Acccosjlators TAC H48262; HPA F055 SRI Decker Decker Decker Decker SRI SRI SR I SRI SRI SRI SE I/6/95 SER 8/17/90 94-33 SER 12/22/81 SER 12/22/81 SER I/8/82 IR 94.28 SER 6/16/83 SER 6/ I6/83 SER 11/18/86 SER '9/19/83 SER 5/29/90 SER 12/3/82 SER 7/24/85 Licensee tracking Mlth individual Instrunents 4/18/95 4/18/95 9/3/94 field coaplete 7/95 field coaplete 5/95 field coaplete 2/95 field coapiete 1/95 field coaplete I 12/3/82 stated licensee to track undel CRDR as alternate caethod; field c late 2/95 field caaplete 4/95 Listect ln NUREG 'f435; not on other lists

IS%K I I.K.3.57 OESCR IPIIINI Identify Mater Sources Prior to Henual Actuation of ADS MPA F062 NRC LEAD IR/SER SRI LI E STATUS NRC ACTIQI SIHS shows ready for closure

~NTS STATUS III.D.3.4.3 Control Room Habitability

- I lement Nods SRI SER 8/30/82 90-37 SIHS shows ready for closure CI I~IINsTRUclllsrs Tr Z5OO/OZO II 2515/07C II 2515/D89 II 2515/095

'I I 2515/099 T I 2515/10'9 I I 2515/111 AIMS GL S3-28 TAC H07931'PA D001 Errptoyee Conc~ms Resolution Stress Corrosion Cracking In BMR Piping BMR Recirc Prmp Irfp BMR Power Oscillation IEB 88.07 TAC H72769; NPA X807 NOV Testfng GL 89-10 EDSFI fottowup SRI SRI Blake SRI Ket logg Cesto Shymlock SER I/22/90 IR90-29 IR9D.

33 IR90-31 93-18 93-32 93.C3 9C-20 SER C/4/90 IS 179 5/31/94 94.03 design corrptete; 5DX frrptement 12/94 75X I tement 3/95 field corptete 6/95 6/2/95 50X implement 6/95 75X l lement 9/95 SIMS shows reedy for ctosure II for GL S4.11; GL BS-01 superceded BC-11 erd Il cancel led

- I":e'st%'rr@rrf"~g 1%%Is 4"4%$$~~4rru%N4%5"'4y II 2515/118 Service Mater System TAC,H73972; KPA L917 H44@4>'-'V@NW)% ~Ac%8;ykIlgc>s"c5@%s,~gg%I3yP.sos~

fsll@fijfq 'Is..Mj~4j'+we Kello99 SER 4/23/90

>rc4<~Q+a>,'~Qsgp".""'.i@4>44~>~z~

'san>'ave)

II 2515/120 Station Blackout TAC H68519:

HPA A022 Shymlock SER 9/'I6/92

> 75X isptement c

lett 2/95 II 25'15/121 II 2515/122 Installation of Hardened Metwelt Vent GL'89-16 Loss of Fttl Oil for Rosemont Transmitter IEB 90.01 TAC H85363 NPAB122 SRI Shlmtock SER 8/16/9l fietd coaplete 6/95 NRR to issue SER early

'l995 NRC BULLETINS

IS%K OESCR IP TltÃI I')IIILr~yirelf!;'rt"fy'g

" !!Is+'gs!rgrg~tri!V!

'rrr!tisrNrltNloiiisai a S!Q

,:.:tilrirfiiioiiii<<N~4%%tNtirS!s NRC LEAD IR/SER LI E STATUS NRC ACTIQI COOLANT S STATUS IEB T9.12 Short Period Scrarns at BMRs SRI 81-18 field conplete 9/95 Project plan

'/r";+K'fg>'-<4)3!p)MPR'">jj8<~qy!/HA<<$$$<~gp IEB 80 06 ESF Reset Controls SRI

, rYNIW%<gj~@g~<@f.

KAID;6)22/9$ ctosedl::(

tsubrsf tlclosuri'.:,,'.,->>,;,-

"'lhiei'.)foiIuj8~>:-';.,:~>'.':

field carplete

>Peg~@% P+%grj.:jk+~r,m<j~%4>> 4~1%)~Br'rÃF44$:",'":wgjgINC:,"~"j".Z

,conlrtated on.'all,3 tallt>>.'.,'-'"

'4>'>V>'~~9r~%>"~"

Ph%r!cs"hY+4'roject Plan IEB 83.08 IEB 84-02 Elect Circuit Bkrs with UV Trip Feature in SR applications other than RPS Failures of GE IIFA relays In 1E Safet s stems SRI SRI Project Plan Project Plan IEB 86.02 IEB 88.03 Inadequate Latch Engagement in IIFA relays by GE TAr. HT3854; HPA X803 NRR Static 0 Ring 0P Switches Casto 94.31 SER 8/2/'90 field carplete TVA 4/1'I/9C reported canpietion of requlrenrents; inspections carlrtete for U3; rro i:oblerns found Project Plan NJREG 1435; not on licensee list; NRR check if issue is closed IEB 88-04 SR Pmlr Loss TAC H69890; HPA XBOT SRI SER 4/4/90 field carptete 6/95 Project Plan; TI 2515/OBT issued but not required for BF I'rimmeIN%%is)~<+!

NYetBPpfrrigvgi pW:-pRRN~M Y~pF&2:r@d~@~5p~'PIP +I'>'.8 ~~;jR5l~!Z>W%Qj&~

IS%K DESCR IPTllNI NRC LEAD IR/SER L

E STATUS NRC ACTION CQtKNIS STATUS IEB 93-02 IEB 93-03 Debris Plugging of ECCS Suet Ion Stra lnet s TAC N86537; NPA X302 TAC H89279'PA 8124 Issues related to Reactor Vessel Mater Level Inst.

TAC H86884 HPA X303 SRI Shfaii ock SER 6/28/93 7/19/94 SER 4/20/94 IR 93-201 field coaplete 8/95 751, iapi eoent 11/94 coaplete 3/95 neM Tl aediffcatlons MRC GENERIC LETTERS GI. 82-33 Inst to foilou course of Accident; RG 1.97 TAC H51075'PA A017 Shymiock Decker SER 2/8/90 IR90 32 93-201 94.33 June 95 Project Plan; Tl 2515/087 closed IR 90-32 v)qg'Pgi~@@i~~(~3

'A'$V:;IT'.",.Bi%a!PTPÃa@A'jFiAjjPr( p~@Pgcggdg

, SprgS'S)SQ?q c~ppjy a@<)egg. 's GI 88-01 GI 88 11 CL 88-14 IGSCC in BMR Aust SS Piping TAC H85296 Radiation Eakrfttiefaent of Reactor Vessel; RG 1.99 IAC H71469'PA A023 Instr@nant Air, Affecting SR Systeas TAC N7I633'PA 8107 Blake KRR SRI

$3Q~Wgdgrp

=MRft~=-;,;,.;,.-

SER 12/3/93 SER 6/29/89 SER 5/9/89-field coaplete licensee states that TS aiaaerxkacnts

190, 205 162 of 1/8/93 satisfied CL field coapl ate 9/95

-4I%a:~pii=xg~~

"fxp'w'"detj,'tltAYA',10'g X~iWVÃ%~i~~$NNF~~$55.~%'X4 Project Plan NUREG 1435; not on licensee list; NRR.to review for closure listed ln MUREC 1435 and Project Plan GL 89-08 Erosion Corrosfon aenltoring prograat TAC H73459 IIPA l.908 Blake j~k~<<NI:"AN'gMgf~

ASEL<gg9/92,.:

.".":.;-.'P@gy~&p~@$

SER 8/21/89 P~'4r'"j(lY:~j~~4@jFPP3 ID/9/94 DRS to schedule aiodule 49D01

~s!447$$P%4'8>>'~':lÃ~%'"~';"W;-'g~%

NUREC 1435 and Project Plan

r 0

ISQ%

DESCRIPTION

<BCe'<k'>>g~'"'< '>'>'p'@A

. -4 4:

't)t6itifMl2

".Iigk@VVSW'"~.s IR/SER lI SEE S'TATUS NRC ACTIQI

~NTS 6

STATUS

~iSAPM<l (f<+@>v<.f.q,g>>@>> v'Tgg~<>>>:m" g~>>>>gg>1 lfjigif.Sfj4~

('~!+g<gj9PPhilgj!!>T,"~PPgg Lg~+A'p$4~y~~ggaMM

~Bgg+P'l 92-01 Reactor Vessel Structural Integrity TAC HB3C40; HPA 8120 NRR SER 4/19/94 T 9!ZI93 5/23/94 7/2B/94 identify coemftments; licensee to edd to Prefect Plan Plant speciffc reviews being performed on ell unl ts NUREG TC35 g'!(4~:.,h'g<".

GL 92-08 GL 9C-02 Ihermol sg long Term goin fot Thermal Kydreul ic Instsbilftles Caste Kellogg

.+:V<>> >< < 'j'>> <<.~PC:;<<>~<;~

'"',t>>:4g Itt> >y>>~qN<<'<$)<:Q',Qg~<@

SE 5/11/94 TVA 12/22/9C procedures to be revised prior to restart

~'4':4>>'f'P"" '4' RKRSM cables use thermoleg; snd will be upgraded to configurations es tested at MB Gl 9C.03 IGSCC of Core Shroud TAC H900B3 Blake 94-16 Licensee inspections performed June snd July 1994I TVA 9/23/9C concludes U3 can be operated for at least 1

cycle SE I/'l3/95 concluded structural integrity will be maintained for at least 1 cycle without need for mod; TVA to reinspect OG V ISIS UNREQX.VED SlfEl g <zjg+j+j@AA

>>f>j<

m>t

<>gA

ls A-36 DESCRlPT1tN Control of Heavy Loads Near S

t Fuel Pool

<<j<<j:"f-.w4 N.<<

RRC LEAD SRI IR/SER 9C.12 mjX4rAM

@tiki< kT STATUS RRC ACTI(N CQtKNTS ProJect Plan STATUS 4BsRL44Rt jotiC

'j4%Qjjje~g>><<<iP

~AA546%&

PY@QIQ+%P<

N /gal x~f..

'BejgfsfeY' p<<Egg>@pm

<ii";<<S,<<",':A i",'.p',< ;",

aigjkj

<le A<$0>>

'4;P+<<<<<g7;

<<..P.'4.. ~<,.<<

A-48 Hydrogen Control Neesures end Burn Effects TAC H55955; NPA A019 SER 9/9/86 Project Plan In MISP GENERIC SAFETY lSSIKS csl 40 csl C1 TT<<S~@PÃ Safety Concerns Associated Qfth Pipe Breekes in BHR Scram Syst TAC HC3736 NPA B065 BMR Scram Dfscharge Votm>> System TAC N5101C'PA 8058 (g~<:$')!~Bc<<fj.c.g(j(Q)<"'b@)~P(~~~ps~@

Stake SRI SER 1/7/86 SER 6/2C/83 field con@tete 6/95 HUREG 1435 ard Project Plan HUREG 'f435; Tl 2515/090 closed fn 87-13; ProJect Plan

@'k'N):""Pgg@PP"

~'"">>

~N"""'I>>':A csl 75 csl 75 Salem ATIIS C.5.2 ard C.5.3 RPS Test Atternatfves TAC 53966 NPA B093 Salem AIMS 1.2 Data Cepebitfty TAC H53573 NPA. 8085 Shymlock SRI 64>>@4,:9'4'<5 S~s'4~%<<"w~x%4s~>

SER 8/17/90 SER 6/12/85 I<<gi~<<8g')jj<~~<j+.~<<$ %I@>e<<eW~s4<gggjj~~

gspyw< ~gpj( ~@~~<.,&$

Ngs>~<~.e&','icensee trackfng under CL 83-28 lfcensee treckfng under CL 83-28 i~4+5Ã WLTI PLANT ACTlIN TTENS NPA AOOC Appendfx 4 Cont Leek Testing N08717 Casto SER 10/24/84

ISQK OESCRI P1IQI

~NPAjI~ILy,

.;: <<gPEXSitteejt'(em)>>+jI";Q'. NW IR/SER I.ICE>>SEE STATUS HRC ACTION

~%'kQAKfwÃw COUNTS STATUS NPA 841 NPA C.10 Fire Protection Flnat TS N48136 Heavy Loads Phase I

HRR HRR SER 10/12/83 SER 6/6/84 Reeevat of TS coeplete, HRR revlegtng Fire Protection Pten subalttal ProJect Pten NPA C011 RPS Poser Supply N08931 SER 6/21/85 6/13/94 ProJect Plan IHSPECTIHI EOLLMH STSTEN (Through 1992)

IHtt"
;84,'I 0)~<~f. ~f>>~J. uri"-xe~~t~IyÃ3'~'<

~.:5",4~4R<5i44 ~~confr'oL~>gaddi"'<~1<4844~ 'Rt$%ÃP@~ N)R'".Pe.,'I8$

<gII,"'FI 84.32-02 IFI 84-41-04 IFI 85-09.02 URI 85-26.03 VIO S5-41.0'I IFI 85-51-01 Torus Level Instrunentation Relocation of HPCI Emerg Control Boxes Bolts inadequate on Llmltor e motors Interim Acceptability of Plant Operation for IEB 79.02 Cable Tray Supports Cable Tray Support Ctltel ia Seismic SRI SRI Casto Blake Blake Blake 94.27 field coeptete 5/95 lttiifiiii~"".~~!":"aI'"jtt~j':j')I~4t'fbjhQi>~)

4iNkg@e@p~ Nep~e%$@wc,k'4 NSP" ""'-q<~~~"s>A@'~-Wg LER 85-32 Reevatuation of Oesign Criteria for FSAR 8.6.2.1 Shyml ock 91-06 IFR 85-33 Nonstandard 4" pipe penetratlons thru sec cont SRI 88.28 URI 86-06-02 UR I 86-14.03 Rx Bldg control Bay HVAC I

te design Overstress of Orywett Beams Blake Stake 89.20

ISQK DESCRIPT IQI IR/SER L

E STATUS

'0:)N:))a:., %

kRC ACTIQI

~BTS STATUS

$$ +j5:t("-

r I.ER 86 10 LER 86.16 URI 87.02-02 URI 87.26-03 IF I 87-33-02 IFI 87-37.03 Design Engineers fdentfffed connectfon of unqualified piping to conteitvnent sensing lines Fluid leakage problem ufth large bore snubbers for Torus restraint Limitorque gear ratio RHR putp suction end noztfe load allowances ssfbl exceeded Failure of dryttefl control air isol valves to feil closed on eir loss Reactor lister Level Sensing lines g)Skip'Jf'.4$ %~+~~X+)S~~ttgi SRI Blake jkii)YP@j CI540 Blake SRI SRI 8&-2&

88.28 88.16 M-32 90.08 89-35 89-35 field complete 2/95 field conpfete 1/95 vlo 88.0/)-03 LER 8&-12 LER M-16 Failure to Correctly translate design requ into drawings Battery failure concurrent ttfth LOP/LOCA revent auto stat t Unplanned manual start of ESF due to rs error SRI Shymlock SRI 91-02 91-16 89.35 89-50 field cottpf etc 4/95 Placard mods needed LER 88-32 Elect sep requ violated due to design controls Shymlock 90-25

~

~

y 4

159%

LER 88.37 I.ER 88-40 DESCRI PTINI Inadequate design control process dlscrep ln HVAC duct uork tnadequa te des Ign controls results ln backup control system not meeting design r RRC SD IR/SER Stake Shymtock 91-16 STATijS NRC ACTION CMKNTS STATUS IFI 89-11-03 IFI 89-20.02 Deteriorated CE cables CRD seismic anatysis SRI Btake 90-03

,"'dpi'IPwfiii'.,'0!'e') 'ft>!~l rilINQF!'

'i<'i:wfiR"

'i>~4~'.ER 89.03 LER 89-11 I.ER 89-Or Design of suppress'lon poot vaclsss relief system not provide single faiture roof Design error in EECll anti s

on check valves Cable deterioration causes inoperable neutron monitoring SRI SRI SRI 91-10 91.02 fleM coaptete 4/95 LER 89-25 Design errors In 250VDC results In unanalyzed cond Shymlock 90-03 IFI 90-33-06 IF I 9D.40.01 DEV 91.41-01 RPS/ARI diversity Def I c I enc les ldent Ifled during Integrated ESF test Controt of. Contruct ton SRI SRI SRI 93.32 PER 82r LER 91 01 Falture of Too trains of Starxhy poser system to toad s e

Shymlock 91-10 tER 9) 15 uRI 92-or-OI RPCI did not fulftlt safety flection frlxs tou suction pressure during feet start Large bore uatkdoun insp 8 docu checkfng robtems SRI Stake 92-11 92.19 93-29

~

~

p 4'

IS gk>".~" Bb:i~

E IPTlON NRC LEAD M%

IR/SER II<<il~eWP<1I L

-E STATUS NRC ACTIOI w4(<wA~(~

COIKNIS 4a<<

STATUS.

Q'aug 0 klkQ~aÃt')ià s

'S

,. M4 CfSPY"

+O'0:,

q'$

ilk'i'~

LER 92-05 Iiriiw-

@SR 8<4

  • H<<'@

>A"'af 4¹,"of>tee:t Design Deficiency elloMed secondary contaltsnent atm to be released thru RCM SRI

~4i%%6>~31 ~~~kg'"g 'F~Qg <<s

. WPR<<~'lVÃySN~P:. ~ y~"'"

.v[6',92@<<N~4i i

LlCENSE NNKIRWKNTS TS 312 IS 337 IS 320 IS 340 IS 319 IS 318 IS 339 Scram Pilot Alr Header Pressure Sultchs TAC 1181896 Appendix R License Amnendnent IAC N87902 RMCU Ieeperature Sul tches IAC II88085 Diesel Cenerator Load Sheddin TAC N892CS HP lC/RCIC leap and Channel Checks IAC H89247 Analog Transmitter/Trip S stems'IAC }$9250 Extended Load Line Limit and Revised RBN rablllty TAC ii89253 NRR NRR NRR NRR KRR NRR NRR IllSC TSQk$

Procedures Upgrades TS Changes Kellogg SRl 93-36

S 0

ISSUE DESCRTPTllN TR/SER L

STATUS RRC ACTTQI CQBKNTS STATUS i%iP~!:,~ttflBNi&%~/~440++ $FiMMMfk~3~ikt4iI+

PRtKRANS TIB)LEPKNTED 1 B ACCtbtDABCE VTTN LMIT Cable Aspacfty Cable Tray supports N BD684 Cooponcnt and Piece Parts Ouatfffcatfon N 83828 Containment Coatings CRD insert and Qfthdrsuat Pf fng Design Cele Revfcu EO TAC N42482 NPA 8060 Flexible Condufts Fuses RVAC Duct Sorts TAC R00300, K82127 Shymlock Stake Blake SRI Sly'ke Casto Shymtock Blake Shymlock Stake SER 12/17/91 SER 12/7/93 94.01 94-09 94.18 94-27 SER 13.6 93.

02 93.08 SER 10/24/89 7/16/92 IR 93.201 i 50X tsplcment 75Z fnptement C/95 caopl ate 5/95 TVA ttr 3/27/91;

>90X faptemcnt c

lete 2/95

<<75X fsplement 50X faptement 2/95 coaptete 5/95 if! 94-1S-02 opened to track re fra to U3 tnspect as part of open ltea closure ffUREO 1232 V3 S2 revfcucd program and NRC ltr of 6/23/93 rcvfcucd follow ftcms Program has changed; possibly perform sodule 38703 on rocurement

'fl 2515/076 closed 92.03 I$%$ O'%~AM(<Nj@Q '4~Pc~>r'r,i+~j<~P~).<".Pgi)(~r.

)

":."I"",PV'P%%g",$ %%W:.. 4:. 'i",":":N%)%@VI'W+"'>'"'::>W<

a%i'%, ":,"jIIIII':,ci $i;I'Ilg.,)dlj%4It\\),t'dfI/IIkjISIIIaIg Large bore Piping and Supports tlEB 79-02 B 79-14)

TAC ROD17 Nisc Steel Frames TAC R00297 N80620 Noderate Energy Line Brcak Blake blake Slake SER 10/24/89 94-15 SER 10/2C/89 SER C/20/94 75X fsptemcnt 10/94 cooptete 7/95 i50X tsptcmcnt 75X fsptement 11/94 c

late 1/95 j 7.

~

~

S 0

ISSLK DESCRIPT IM Platform Thermal Grouth TAC R0029r, H80620 PRA 0-List Seismic Class II/I TAC HBOO'l5 Stake KRR SRI Blake IR/SER SER 10/24/89 4/20/94 IR 93.201 SER 12/17/91 LI STATUS T 1/19/95 TVA ttr 2/27/91 SOX tsptement 12/94 75X I lement 5/95 NRC ACTIQI CUIKNTS TVA to submit mttt unit PRA 4/95, IPEEE 6/95, Internal fires IPEEE 120ds after refueling STATUS Spl lees Thermal Overloads Shyml ock Shymlock 90.22 SER 13.4 SSER2 3.13 found program acctp'table end IR

~

satlsfector for atl units PRMNHS MKICN DEPART PROI THE QIIT 2 IlPLBHllATItgl PRE Cable Installation HB0682 Conduit Support TAC R00024 H80690 Configuration Hgmt/Design Baseline H80688 instriant Tubing TAC HB0036 Instrwent Sensing Lines TAC H80017 Long Term Torus integrity TAC H80686 Restart Test Program TAC H81791 Smatl Bore Piping TAC I$0013 R00306 Shymtock Blake Cesto Blake SRI Stake SRI Costa Blake SER 4/8/'92 r/1/9C SER 10/24/89 3/30/92 94.0r SER 11/21/91 SER 2/C/92 SER 12/10/92 IR 94 2C SER 2/10/92 94-15 SER 8/30/9C SER 10/24/89 2/4/92

>50X leptcment

?5X implement 10/94 c

tete 5/95 TVA2/2r/91 TVA'l2/l2/'O'I TVA Itr 2/13/9'I

'IVA ttr 4/29/91

>75X implement c

late 5/95 TVA ttr 2/2/94 50X tsptement 6/95 TVA2/2r/91 TVA12/12/92 revtsed bend radius for medi@a volte e cables Licensee hes coebtned inst tubing and smell bore l lng rograms URI 94-15-01, Spring Can Settings SRI - Revteu adslntstrettve program; Cesto - identify electrical/mechanical tests and fns tor to revlcu.

PROGRAMS INIICN DEPART FRQI LMIT 2 CRITERIA PRECEDENT 13

ISS%

bESCRlPTTM Ffre Protectfon; App R.

TAC II85254 Lcnter Drywall Ptatforws and Iffac Steel TAC 880620 R00303 Casto Slake TR/SER SER F/26/88 10/24/89 3/19/92 C/20/9C IR94-15 93.201 Ll STATUS Lfcensee subslttal of 12/20/9C, status i 50K fepfeeent 75K f fement 4/95 TVA 6/12/9'1 i90X feptesent coo@fete 1/95 KRC ACTIQI KRR to urfte SER by T/95 Long tare dea(yn crlterfa flpfeeents 1'9T8 AlSC spec TATUS PROGRAIIS COVETED tw A!.L TINEE fwfTS Heat Code Traceabflfty Secondary Conte fAocflt Penetratfons Meldfny Progrwe Pipe Mell 'fhfnnfny lGL 87.01)

Blake Slake Blake Slake SER 5/31/90 SER C/11/88 SER 5/31/90 SER 8/31/88 KURUG 1232 V3 51 sec 2.3 and KRC SER of Ray 31, 1990 revisited progran for all 3 units.

Prograa evaluated by April 11, 1988 addressed all 3 units Melding concerns adequately addressed.per NlCEG 1232 V3 Sl SER addressed all 3 thefts Sources for issues include:

IFS, SIMS, NISP, NUREG 1435 (Status of Safety Issues at Licensed Power Plants),
BFHPP, NUREG 1232 (SER for Browns Ferry NPP) 14