MONTHYEARML23335A0672023-10-31031 October 2023 Updated Final Safety Analysis Report (Fsar), Amendment 30, Public Use Redacted ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML22049B3242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix N, Unit 1 Cycle 14 Reload Analysis (July 2020) - Redacted ML21286A5542021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Unacceptable Safety Results for Abnormal Operational Transients ML21286A5582021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section, 14.12 Analysis of the Primary Containment Response ML21286A5402021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.3, Training Programs ML21286A5442021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Preoperational Test Program ML21286A5362021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents ML21286A5312021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.9, Refueling Operations ML21286A5502021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4, Approach to Safety Analysis ML21286A5372021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Analytical Methods ML21286A5482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.6, Iodine-131 Activity (Ci) by Location as Function of Time for CRDA ML21286A5262021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.2, Organization and Responsibility ML21286A5242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.20, Auxiliary Boiler System ML21286A5292021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.5, Startup and Power Test Program ML21286A5522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.5, Analyses of Abnormal Operational Transients ML21286A5352021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.8, Analytical Methods, ML21286A5332021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.2, Organization and Responsibility ML21286A5462021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Analysis of Design Basis Accidents ML21286A5672021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.11-1 Through Table 14.11-9 (Deleted) ML21286A5692021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11 Analyses of Design Basis Accidents (Deleted) ML22049B3192021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix 2.4A, Probable Maximum Flood (PMF) - Redacted ML21286A5652021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of Contents ML21286A5602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.10-1 Through 14.10-20 Deleted by Amendment 28 ML21286A5622021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.8, Fuel Rod and Fuel Bundle Details ML21286A5662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.13-1, Results of BFN Atwsi Evaluation ML22049B3212021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.6, Instrument and Controls DC and AC Power System - Redacted ML21286A5592021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Deleted ML21286A5552021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Analyses of Abnormal Operational Transients ML21286A5472021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Approach to Safety Analysis ML22049B3222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.12, Heating, Ventilation, and Air Conditioning Systems - Redacted ML21286A5302021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5, Startup and Power Test Program ML21286A5382021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.10, Refueling Test Program ML22047A1602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2, Site Description - Redacted ML21286A5562021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.6, Normal Operations ML21286A5392021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.6, Normal Operations ML21286A5222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.25, Emergency High Pressure Makeup (Ehpm) System ML21286A5232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.18, Plant Communications System ML21286A5492021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Analytical Objective ML21286A5642021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Deleted ML21286A5682021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Anticipated Transients Without Scram with Instability (Atwsi) ML21286A5532021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.4, Typical Preoperational Test Sequence ML21286A5452021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.8, Operational Review and Audits ML21286A5322021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.6, Analysis of Design Basis Accidents ML21286A5422021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.5, Analyses of Abnormal Operational Transients ML21286A5432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table 13.5, Startup and Power Test Program ML21286A5342021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.3, Unacceptable Safety Results for Accidents ML21286A5512021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.7, Records (Deleted) ML21286A5272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Section 13.1, Organizational Structure of the Conduct of Operations ML21286A5282021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4, Approach to Safety Analysis 2023-10-05
[Table view] |
Text
BFN-19 10.17 PROCESS SAMPLING SYSTEMS 10.17.1 Power Generation Objective The objective in sampling process liquids and gases is to provide representative samples for testing to obtain data from which the performance of the plant, items of equipment, and systems may be determined.
10.17.2 Power Generation Design Basis
- 1. Sampling points shall be located so as to provide information needed for plant operation as well as for special tests.
- 2. The sampling systems shall be designed to provide samples which are representative of the fluids being sampled.
10.17.3 Description 10.17.3.1 Liquid Sampling Systems Table 10.17-1 gives a list of liquid samples taken (additional samples may be obtained as warranted by plant conditions), the location of the sample connection, and the primary purpose for which the sample is taken. Figures 10.17-1a, 10.17-1b, 10.17-1c sheets 1 and 2, 10.17-1d, 10.17-1e, and 10.17-1f provide diagrams of the systems.
Normally, liquid grab samples which could contain radioactivity in excess of background are taken within sampling hoods. Most hoods have doors which are normally kept closed except when sample bottles are being inserted or removed.
Handles of most sample valves are located outside the hood. The hoods have windows for observation of the sampling. Most sample points have a method of flushing to ensure representative samples.
Hoods are located close to sample points to minimize the lengths of sample lines.
Sampling hoods are located in various locations throughout the plant including the Reactor Building, Turbine Building, and Radwaste Building.
10.17.3.1.1 Reactor Water Cleanup System When the Reactor Water Cleanup System is in operation, reactor water quality is monitored by means of a sample connection located upstream of the two cleanup filter/demineralizers.
Performance of the individual filter/demineralizers can be assessed on a comparison of samples taken downstream of each filter/demineralizer to those samples taken 10.17-1
BFN-19 upstream. At each of these sample points, a continuously flowing stream is passed through a cooling system and then through a conductivity cell. The streams from the three sample points are combined and routed back into the cleanup system or to radwaste. Grab samples can be taken at each of the three sample points for determination of radiochemical constituents of interest.
When the Reactor Water Cleanup System is not in operation, grab samples of recirculation system reactor water can be taken at a sample connection located on Recirculation Loop A. The reactor water recirculation system sample is cooled by a cooler which is supplied with cooling water from the Reactor Building Closed Cooling Water System.
10.17.3.1.2 Main Steam System Reactor steam may be sampled for determination of radioactivity and content of noncondensables. Samples may be withdrawn from each of the four steam lines at points upstream of the respective stop valves.
10.17.3.1.3 Condensate System Inleakage of condenser cooling water is indicated by an increase in conductivity of the condensate or reactor water. With the waterbox out-of-service, condenser leaks may be located by use of a Helium leak detection system.
Continuously flowing sample streams from the filter/demineralizer inlet and outlet sample points and from the outlets of filter/demineralizer units are monitored for conductivity with values being recorded. Exhaustion of the ion exchange capacity of a demineralizer results in an increase in conductivity in the outlet of that demineralizer.
Grab samples can be taken from each of the continuously flowing stream samples.
10.17.3.1.4 Feedwater Samples may be taken from the combined flow from the No. 1 heaters before the feedwater line penetrates the primary containment. A portion of the combined-flow sample can be passed continuously through particulate filters and ion exchange papers with another portion being passed through a conductivity cell. A sample cooler is used for cooling samples at the feedwater sampling point.
Grab samples can be taken from the feedwater sample point.
10.17.3.1.5 Radwaste and Fuel Pool Systems 10.17-2
BFN-19 Samples used for monitoring the Radwaste and Fuel Pool Cooling and Cleanup Systems are piped to a hooded sink located in the Radwaste Building. All liquids to be released to the river, from the Radwaste System, are sampled and analyzed before release. Water to be returned to process is checked for quality before it is sent to condensate storage. Samples can also be taken of liquids before and during processing.
When any of the fuel pool filter/demineralizers, the waste demineralizer, or the floor drain filter is in operation, continuously flowing samples of the effluents can be passed through inline conductivity cells. Conductivity readings are recorded.
High-conductivity alarms are provided for the demineralizer.
10.17.3.1.6 Other Liquid Systems The Reactor Building Closed Cooling Water Systems are provided with grab sample connections which are used to determine whether inleakage of radioactive liquid is taking place.
Raw water used in cooling the Residual Heat Removal System heat exchangers is monitored continuously for radioactivity while the system is in operation. The monitor is supplemented by grab sampling and analysis. Grab sample points are located downstream of each RHR heat exchanger.
Auxiliary systems such as the water treatment plant, the various raw water cooling systems, and the auxiliary boilers, are provided with sampling connections needed for their proper operation.
10.17.3.1.7 Recorders and Alarms Recorders/Displays giving the readouts of conductivity and other analytical instrumentation, and associated alarms, are located on local panels, in the Main Control Room, or for Units 2 and 3 in the radio-chemical laboratory.
10.17.3.2 Gas Sampling Systems Table 10.17-2 gives a list of gas samples taken, the location of the sample connection, and the primary purpose for which the sample is taken.
10.17.3.2.1 Air Ejector Offgas A sample is withdrawn from the offgas line at a point downstream of the air ejector after-condenser. A diagram of the air ejector offgas sampler is shown in Figure 10.17-2. This sampler supplies the gas sample for the Air Ejector Offgas Radiation Monitoring System (see Subsection 7.12) and also provides a grab sample of the 10.17-3
BFN-19 offgas for laboratory analysis. Determination of radioactive constituents can be made as desired.
10.17.3.2.2 Modified Offgas Filters Sample connections are provided upstream and downstream of the prefilters and after filters. These connections may be used for taking grab samples and for conducting DOP (dioctyl phthalate) smoke tests to determine filter efficiency (see Subsection 9.5) as appropriate. The differential pressure across each set of filters is monitored and annunciated in the Main Control Room.
10.17.3.2.3 Stack A sample is withdrawn from the stack at a point where offgas and dilution air are well mixed. The sample is delivered to the Stack Radiation Monitoring System (see Subsection 7.12).
10.17.4 Inspections and Tests No special inspections or tests are required for the sampling systems.
10.17.5 Power Generation Evaluation The sampling systems, as designed, meet the objective and design bases stated in paragraphs 10.17.1 and 10.17.2.