ML18005A819
| ML18005A819 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/03/1989 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18005A821 | List: |
| References | |
| NUDOCS 8903270393 | |
| Download: ML18005A819 (3) | |
See also: IR 05000400/1988040
Text
gC CE1Z RATED
DISTRIBUTION
DEMONSTRATI0.'i
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
l,
ACCESSION NBR'8903270393
DOC'DATE'9/03/03
NOTARIZED'O
FACIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
REYES,L.A.
Region
2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEYiE.E.
Carolina
Power
& Light Co.
DOCKET
05000400
SUBJECT:
Forwards
Insp Rept 50-400/88-40
on 881121-890120
a notice of
violation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR J
ENCL ~
SIZE:
'k I
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
05000400
c
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
AEOD/DEIIB
NRR SHANKMANIS
NRR/DLPQ/PEB
11
NRR/DOEA DZR ll
NRR/DREP/RPB
10
NRR/PMAS/ZLRB12
0
B.E
J
EXTERNAL: LPDR
NSZC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BECKERID
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDSl
RGN2
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
R
I
MrE lO ALL RIDS
RZCIPIENZS.
PEEASE HELP US 'ZO REDUCE HASTE!
CONI'ACT 'IHE DOCUMENZ CONZBOL DESK,
RDCN Pl-37
(EXT. 20079) K) EKiOGMQR KUR NAME ESCA DISTBIBUTIQN
LISTS PDR DOCUHEMZS YOU DON'T NEEDt
S
,h
D
D
S
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
MAR 0 ~
SSg
Docket No. 50-400
License
No.
Carolina
Power
and Light Company
ATTN:
Nr.
E.
E. Utley
Senior
Executive Vice President
Power Supply and Engineering
and Construction
P.
O.
Box 1551
Raleigh,
NC
27602
Gentlemen
SUBJECT:
(NRC
INSPECTION
REPORT
NO. 50-400/88-40)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
W.
H. Bradford
on
November
21,
1988
January
20,
1989.
The
inspection
included
a review of activities authorized
for your Harris facility.
At the
conclusion. of the inspection,
the findings were discussed
with those
members
of your staff identified in the enclosed
Inspection
Report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
The inspection
findings indicate that certain activities
appeared
to violate
NRC requirements.
The violations,
references
to pertinent
requirements,
and
elements
to
be
included
in your response
are described
in the enclosed
Notice
of Violation.
In addition to the
need for corrective
action
regarding
the specific matters
identified
in the
enclosed
Notice,
we
are
concerned
about
the
inadequate
control of safety related
maintenance
activities that
resulted
in violation
50-400/88-40-01.
Our
specific
concerns
relate
to
the
lack
of
proper
assurance/verification
that
safety
related
equipment
is
restored
during
maintenance
(i.e.,
motor leads
reconnected,
etc.),
as well
as
the
assurance
that
post
maintenance
testing
is
adequate
and
properly
performed.
Consequently,
your response
to this violation should describe
those particular
actions
taken or planned to improve the effectiveness
of your program.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part
2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosures
will be placed
in the
NRC Public Document
Room.
3Q3
~qQ3Q7 Q
y
Q+QQ
393
~~Q3Q4QQ
pQR
6
~o<
Carolina
Power
and Light Company
2'AR 0~
1969
The responses
directed
by this letter and its enclosure
are not subject to the
clearance
procedures
of the Office of management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
Pub.
L. No.96-511.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Luis A. Reyes,
Director
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
R. A. Watson,
Vice President
Harris Nuclear Project
C.
S. Hinnant, Plant General
Manager
State of North Carolina
bcc w/encls:
C. Barth,
NRC Resident
Inspector
A. Upchurch,
Chairman,
Triangle J
Council of Governments
DRS Technical Assistant
Document Control
Desk
RII
B arro
02/(6/89
RII
/+.D
HDance
02/ii /89
,(l1 )
RII
J
DVe relli
02/i1 /89
RI~I
BHehl
02/'11/89
RI I
E:H
G e
ins
JLieberman
Og/Q /89
3/
/89 i