ML17354A989
| ML17354A989 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 06/12/1998 |
| From: | Gleaves W NRC (Affiliation Not Assigned) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| References | |
| TAC-M82809, NUDOCS 9806250066 | |
| Download: ML17354A989 (8) | |
Text
C 4
V Mr. T. F. Plunkett President - Nuclear Division Florida Power and Light Company P.O. 'Box 14000 Juno Beach, Florida 33408-0420 dune 12, 1998
SUBJECT:
ST. LUCIE UNITS 1 AND 2, TURKEYPOINT UNITS 3 AND 4 - CORRECTION TO FOLLOWUP REQUEST FOR ADDITIONALINFORMATION(TAC NO. M82809)
Dear Mr. Plunkett:
I On April23, 1998, the Nuclear Regulatory Commission (NRC) issued a followup request for additional information (RAI) related to Thermo-Lag 330-1 Fire Barriers for both the St. Lucie and Turkey Point plants.
at Due to an administrative error, reference 1 in Section 3;0, "REFERENCES," on page 4 of the RAI, indicates incorrectly that C. Lance Terry is from FPL. A corrected page is enclosed for your use.
Please retain a copy of the corrected page with NRC letter dated April 23, 1998.
Ifthere are any questions regarding this matter, please contact me at (301) 415-1479.
Sincerely,
/s/
William C. Gleaves, Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos.
50-335 and 50-389 50-250 and 50-251
Enclosure:
As stated cc w/enclosure:
See next page
~Dis iibu io:
Docket Files PUBLIC" L. Plisco, Rll J. Zwolinski (A)
W. Gleaves St. Lucie r/f OGC ACRS AKugler Turkey Point r/f KJabbour RE II;HIM~y TO GET a copy of this document, indicate in the box:
"C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE PDII-3/PM E
PDII-3/PM E
PDII-3/LA E
P DII-3/PD NAME DATE
- KJabbour, 6/ g/98 W
es:c 6/
8 BClayto 6/ M98 FHebdon 6/ I~98 OFFICIALRECORD COPY 9806250066 9806i2 PDR ADOCK 05000250 F
PDR DOCUMENT NAME: G:'ISTLUCIE>CORRECTO.520 I
'I J
C 1
I ~ ~FOE+
~O
~o tg Op
+o'o
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 3une 12, 1998 Mr. T. F. Plunkett President - Nuclear Division Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
'T. LUCIE UNITS 1 AND 2, TURKEYPOINT UNITS 3 AND4-CORRECTION TO FOLLOWUP REQUEST FOR ADDITIONALINFORMATION(TAC NO. M82809)
Dear Mr. Plunkett:
On April23, 1998, the Nuclear Regulatory Commission (NRC) issued a followup request for additional information (RAI) related to Thermo-Lag 330-1 Fire Barriers for both the St. Lucie and Turkey Point plants.
Due to an administrative error, reference 1 in Section 3.0, "REFERENCES," on page 4 of the RAI, indicates incorrectly that C. Lance Terry is from FPL. A corrected page is enclosed for your use.
Please retain a copy of the corrected page with NRC letter dated April23, 1998.
Ifthere are any questions regarding this matter, please contact me at (301) 415-1479.
Sincerely, Docket Nos.
50-335 and 50-389 50-250 and 50-251
Enclosure:
As stated William C. Glea es, Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc w/enclosure:
See next page
Mr. T. F. Plunkett Florida Power and Light Company ST. LUCIE PLANT CC:
Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S. Hwy A1A Jensen Beach, Florida 34957 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 John T. Butler, Esquire Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Regional Administrator Region II U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW., Suite 23T85 Atlanta, GA 30303-3415 H. N. Paduano, Manager Licensing & Special Programs Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 J. A. Stall, Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Mr. J. Scarola Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957 Mr. Robert P. Schin U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW., Suite 23T85 Atlanta, GA 30303-3415 E. J. Weinkam Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957
\\
P'
3.0 NRC Letter from T. Polich to C. Lance Terry, TUE, dated June 14, 1995
[w/enclosed "Safety Evaluation of Ampacity Issues Related to Thermo-Lag Fire
- Barriers at Comanche Peak Steam Electric Station, Unit 2 (TAC NO. 85999)"].
Florida Power Corporation Ampacity Derating Tests for Crystal River Unit 3 as documented in "Ampacity Test Investigation of Raceway Fire Barriers For Conduit and Cable Tray Systems," Underwriters Laboratory Report No.
95NK17030NC1973, May 7, 1996.
Enclosur
~
~
~
~
~ I.
~l Ir
(('