Email Submitting Responses to Comments on Springville Dam SAP
ML17347A142
Person / Time
Site: West Valley Demonstration Project
Issue date: 07/18/2017
From: Frederick W
US Dept of the Army, Corps of Engineers, Buffalo District
To: Amy Snyder
NRC/NMSS/DDUWP/MDB
AMSnyder NMSS/DUWP/MDB 5th floor
Shared Package
ML17347A124 List:
References
Download: ML17347A142 (2)


Text

From: Frederick, William T CIV USARMY CELRB (US)

To: Snyder, Amy; Papura, Thomas R (DEC)

Cc: Hintz, Geoffrey K CIV USARMY CELRB (US); Smith, Theodore; Martin, Kenneth G (DEC); Butler, William E CIV USARMY CELRB (US)

Subject:

[External_Sender] RE: NRC Comments on Springville Dam SAP Date: Tuesday, July 18, 2017 10:09:31 AM Attachments: Springville Dam BUD SAP 2016 R3 Red-line Full.pdf Springville Dam Sampling Comments NYSDEC - USACE Responses.docx USNRC Comments and USACE Responses re Springfield Dam SAP JUL-2017.docx Amy and Tom, The USACE compiled the attached responses to your comments/input on the Springville Dam SAP. This email was sent to a smaller cadre since most of the Comments were technical in nature and thus more resolvable at this level.

Please distribute as you see fit.

A red-line PDF of our SAP edits is attached and shows the recommended changes to the text and tables. Note the Tables were updated with your input, but we chose not to clutter them with red-line edits.

I also attached two Word documents that contain USACE responses to the USNRC and NYSDEC; hopefully we correctly interpreted your comments and updated the text properly.

Please assess the responses and back check the SAP to ensure we addressed the comments and met your needs. If not, we can verbally discuss and insert the proper wording or direction into the SAP.

I would like to note that this or the next version (pending your back check) will be used to get the Contracting (driller/lab) action started. The SAP is a basis for a scope of work (task order) used to solicit bids from our pre-approved drilling Contractor pool. I plan to compile the SOW through August to keep slightly ahead of the PPA and allow drilling action this fall while summer-like flows are still in the creek (knock on wood).

I will be on vacation 02- to 11-AUG, so request any feedback either before the 2nd (if you are eager) or by 14-AUG-2017; this will provide me with input that can get into the drilling SOW if applicable.

Let me know if anything odd jumps out at you right away so I can fix it for the balance of the back check.

Thank you for your time and input to this project, especially during the summer when our minds want to be elsewhere.

Sincerely, Bill Frederick William T. Frederick, P.G.

Hydrogeologist Buffalo District - U.S. Army Corps of Engineers Innovative Approaches, Sustainable Solutions 716.879.4243 v 716.361.3039 bb william.t.frederick@usace.army.mil http://www.lrb.usace.army.mil/

FOR OFFICIAL USE ONLY. NOT FOR PUBLIC RELEASE WITHOUT WRITTEN APPROVAL FROM U.S. ARMY CORPS OF ENGINEERS


Original Message-----

From: Snyder, Amy [1]

Sent: Wednesday, March 01, 2017 9:37 AM To: Frederick, William T CIV USARMY CELRB (US) <William.T.Frederick@usace.army.mil>

Cc: Hintz, Geoffrey K CIV USARMY CELRB (US) <Geoffrey.K.Hintz@usace.army.mil>; Smith, Theodore

<Theodore.Smith@nrc.gov>

Subject:

[EXTERNAL] NRC Comments on Springville Dam SAP Hi Bill, Please see attached PDF file.

If you have any questions, please contact me.

Thank you A