INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE UIREMENTS SECTION 3/4.6 CONTAINMENT SYSTEMS 3/4.6. 1 PRIMARY CONTAINMENT CONTAINMENT INTEGRITY..................-....-
~ ~ ~ ~ ~
CONTAINMENT LEAKAGE...............-.----.---....-. ~ ~
CONTAINMENT AIR LOCKS.......
~. ~ ~ ~ ~ ~
~ ~ - ~ - ~ - ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
INTERNAL PRESSURE....................................
AIR TEMPERATURE......................-....-....-...-.
PAGE 3/4 6-1 3/4 6-2 3/4 6-4 3/4 6-6 3/4 6-7 CONTAINMENT VESSEL STRUCTURAL INTEGRITY..............
3/4 6-8 CONTAINMENT VENTILATIONSYSTEM.......................
3/4 6-14 3/4.6. 2 DEPRESSURIZATION AND COOLING SYSTEHS CONTAINMENT SPRAY SYSTEM.............................
3/4 6-15 3/4. 6. 3 CONTAINMENT ISOLATION VALVES............................
3/4 6-19 3/4. 6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS;...................................
3/4 6-36 ELECTRIC HYDROGEN RECOMBINERS........................
3/4 6-37 HYDROGEN PURGE CLEANUP SYSTEM........................
3/4 6-38 PALO VERDE - UNIT 1 9803%90080 9803%i PDR ADOCK 05000528 P
PDR VII AMENDMENT NO. 64
INDEX II 3/4.7. 10 SEALED SOURCE CONTAMINATION 3/4.7. 11 SHUTDOWN COOLING SYSTEM.
3/4.7-. 12 CONTROL ROOM,AIR TIEHPERATURE
~
n
~
h LIMITING CONDITIONS FOR OPERATION AND SURVE LLAN E RE UIREMENTS SECTION 3/4.7 PLANT SYSTEMS 3/4.7. 1 TURBINE CYCLE SAFETY VALVES.
AUXILIARYFEEDWATER SYSTEM..
CONDENSATE STORAGE TANK.......
ACTIVIT'II..
HAIN STEAM LI.NE ISOLATION VALVES......,.....'...
ATMOSPHERIC DUMP VALVES 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION..
3/4.7.3 ESSENTIAL (;OOLING WATER SYSTEM..
3/4.7.4 ESSENTIAL SPRAY POND SYSTEM.
'/4.7.5 ULTIMATE HEAT SINK..
3/4.7.6 ESSENTIAL CHILLED WATER SYSTEM 3/4.7.7 CONTROL ROOM ESSENTIAL I=ILTRATION'SYSTEM.,'.'...'.'.....
3/4.7.8 ESF PUMP ROOM AIR EXHAUST CLEANUP SYSTEM.
3/4.7.9 SNUBBERS PAGE 3/4 7-1 3/4 7-4 3/4 7-6 3/4 7-7 3/4 7-9 3/4 7-10 3/4 7-11 3/4 7-12 3/4 7-13 3/4 7-14 3/4 7-15 3/4 '7-16
'/4
'7-19
'/4 7-21 3/4 7-27 3/4 7-29 3/4 7-30 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C.
SOURCES OPERATING.
SHUTDOWN DIESEL FUEL OIL STORAGE SYSTEM - DIESEL FUEL OIL REQUIREHE'NTS.
CATHODIC PROTECTION............'. '...'. '........
3/4 8-IL 3/4 8-7 3/4 8-8 3/4 8-8a PALO VERDE - UNIT 1 VIII Amendment No. Z2,114
BASES
'NDEX SECTION 3/4.7 PLANT SYSTEMS 3/4.7. 1 TURBINE CYCLE 3/4.7. 2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION...
3/4.7.3 ESSENTIAL COOLING WATER SYSTEM.
3/4.7.4 ESSENTIAL SPRAY POND SYSTEM..
3/4.7.5 ULTIMATE HEAT SINK..
3/4 7.6 ESSENTIAL CHILLED WATER SYSTEM.
3/4.7.7 CONTROL ROOM ESSENTIAL FILTRATION SYSTEM.
3/4.7.8 ESF PUMP ROON AIR EXHAUST CLEANUP SYSTEM.
3/4.7.9 SNUBBERS 3/4.7.10 SEALED SOURCE CONTAMINATION 3/4.7.11 SHUTDOWN COOLING SYSTEM.
3/4.7.12 CONTROL ROOM AIR TEMPERATURE 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8. 1, 3/4.8.2, and 3/4.8.3 A.C.
- SOURCES, D.C.
- SOURCES, and ONSITE POWER DISTRIBUTION SYSTEMS 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES 3/4. 9 REFUELING OPERATIONS 3/4.9. 1 BORON CONCENTRATION.
3/4.9.2 INSTRUMENTATION.
3/4.9 '
DECAY TINE 3/4.9. 4 CONTAINMENT BUILDING PENETRATIONS 3/4.9. 5 COMMUNICATIONS 3/4.9. 6 REFUELING MACHINE PAGE B 3/4 7-1 B 3/4 7-3 B 3/4 7-3 B 3/4 7-4
'B 3/4 7-4 B 3/4 7-4 B 3/4 7-5 B 3/4 7-5 B 3/4 7-5 B 3/4 7-7 B 3/4 7-7 B 3/4 7-7 B 3/4 8-1 B 3/4'-23 B 3/4 9-1 B 3/4 9-1 B 3/4 9-1 B 3/4 9-1' 3/4 9-1 B 3/4 9-2 PALO VERDE - UNIT 1 XIII Amendment No. 23,114
ASES
~CT ON MX.
3/4.9.7 CRANE TRAVEL - SPENT FUEI. STORAGE POOL BUILDING.....,.;.
B 3/¹ 942 3/4.9.8 SHUTDOWN COOLING AND COOIANT CIRCULATION...............
B 3/¹ 9 2 3/4.9.9 CONTAINMENT PURGE VALVE ISOLATION SYSTEM.'...............
B 3/¹ 9-3 3/4.9.10 and 3/4.9.11 WATER LEVEL - REACTOR VESSEL and TORAGE POOL
~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ L ~ ~
~ a ~ ~ ~ ~
~ ~ ~ ~
S B 3/4 9-3 3/4.9.12 FUEL BUILDIh!G ESSENTIAL VENTILATIONSYSTEM,i....*........
B 3/4-3
'/4.9.13-BORON CONCEhlTRATION - SPENT FUEL STORAGE POOL...,.........
B 3/4 9"3 4.10 SPEC TEST~~EPT ONS 3/4.10.1 SHUTDOWN MARGIN AND K,.i - CEA WORTH TESTS...............
B 3/¹ 10-1 3/4.10.2 MODERATOR TEMPERATURE COEFFICI.ENT, GROUP HEIGHT INSERTION, AND PClWER DISTRIBUTION LIMITS..................
3/4.10.3 REACTOR COOLANT LOOPS....,............,.....,......,........
3/4.10.4 CEA POSITION, REGULATING CEA INSERTION LIMITS AND REACTOR COOLANT COLD LEiG TEMPERATIJRE.........,.........
B 3/4 16-I B 3/4 10-1 B 3/4 10-1 3/4.10.5 MINIMUM TEMPERATURE AND PRESSURE FOR CRITICALITY........, B 3/4 10-1'/4.10.6 SAFETY INJECTION TANKS...,.....
B 3/4 10-2 3/4;10.7 3/4.10.8 3/4.10.9 SPENT FUEL POOL LEVEL....,............,.....,......,........
SAFETY IN3ECTION TANK PRESSURE...........,...............
SHUTDOWN MARGIN AND K,.i -
CEDMS TESTING.................
B 3/4 10-2 B 3/4 10-2 B '3/4 10-2 3 4
. RADIOACTIVE~F~IJ~N~T 3/4. 11. I LIQUID HOLDUP TANKS.......,............ 3.... s..'...'........
3/4.11.2 EXPLOSIVE,GAS MIXTURE....,...;........ 2.... t..'...l........
3/4.11.3 GAS STORAGE TANKS...,............,.....,..........,........
B 3/4 11-1 B 3/4 11-1 B 3/4 11,-1 PALO VERDE - UNIT 1 XIV AMENDMENT NO. 83--68, 82
ELECTRICAL POWER SYSTEMS BASES 3/4.8.4 ELECTRICAL E UIPMENT PROTECTIVE DEVICES Containment electrical penetrations and penetration conductors are protected by either deenergizing circuits not required during reactor operation or by demonstrating the OPERABILITY of primary and backup oyercurrent protection circuit breakers during periodic surveillance.
The circuit breakers will be tested in accordance with NEMA Standard Publication No. AB-2-1980.
For a frame size of 250 amperes or less, the field tolerances of the high and low setting of the injected current will be within +40K/-25K of the setpoint (pickup) value.
For a frame size of 400 amperes or greater, the field tolerances will be +25K of the setpoint (pickup) value.
The circuit breakers should not be affected when tested within these tolerances.
The surveillance requirements applicable to lower voltage circuit breakers provide assurance of breaker reliability by testing at least one representative sample of each manufacturer's brand of circuit breaker.
Each manufacturer's molded case and metal case circuit breakers are grouped into representative samples which are then tested on a rotating basis to ensure
~that all breakers are tested.
If a wide variety exists within any manufacturer's br and of circuit breakers it=is necessary to divide that manufacturer's breakers into groups and treat each group as a separate type of breaker for surveillance purposes.
There are no surveillance requirements on fuses.
For in-line fuses, the applicable surveillance would require removing the fuses from the circuit which would destroy the fuse.
The test data for surveillance on the other fuses would not indicate whether the fuse was degrading which has been stated by the fuse manufacturer and Idaho National Engineering Laboratory.
. The OPERABILITY of the motor-operated valves thermal overload protection and/or bypass devices ensures that these devices will not prevent safety related valves from performing their function.
The surveillance requirements for demonstrating the OPERABILITY of these devices are in accordance with Regulatory Guide 1. 106, "Thermal Overload. Protection for: Electric Motors on Motor Operated Valves." Revision 1, March 1977.
PALO VERDE - UNIT 1 B 3/4 8-23 Amendment No. 402,114
4l
~
~
INDEX LIHITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE UIREMENTS SEDIIDN 3/4. 6 CONTAINMENT SYSTEMS 3/4.6. 1 PRIMARY CONTAINMENT CONTAINMENT INTEGRITY......................-....-.
CONTAINMENT LEAKAGE...................-..............
'AGE 3/4 6-1 3/4 6-2 CONTAINMENT AIR LOCKS..................;,.............
3/4 6-4 INTERNAL PRESSURE..................-.--.-...--.--....
AIR TEHPERATURE......................................
3/4 6-6 3/4 6-7 CONTAINMENT VESSEL STRUCTURAL INTEGRITY..............
3/4 6-8 CONTAINMENT VENTILATIONSYSTEH........................
3/4 6-14 3/4. 6. 2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM.............................
3/4 6-15 3/4. 6. 3 CONTAINMENT ISOLATION VALVES............................
3/4 6-19 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN HONITOR5....................................
3/4 6-36 ELECTRIC HYDROGEN RECOMBINERS........................
3/4 6-37 HYDROGEN PURGE CLEANUP SYSTEM........................
3/4 6-38 PALO VERDE - UNIT 2 VII AHENDHENT NO. 5O
II INDEX 3/4.7.2 3/4.7.3 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION..
C ESSENTIAL COO'LING WATER SYSTEM...................
3/4.7.4 ESSENTIAL SPRAY POND SYSTEM..
3/4.7.5 ULTIMATE HEAT SINK..
3/4.7.6 ESSENTIAL (:HILLED WATER SYSTEM.................
3/4.7.7 CONTROL ROOM ESSENTIAL FILTRATION SYSTEM.........
3/4.7.8 ESF PUMP ROOM AIR EXHAUST CLEANUP SYSTEM....
3/4.7.9 SNUBBERS 3/4.7. 10 SEALED SOURCE CONTAMINATION..
3/4.7. 11 SHUTDOWN COOLING SYSTEM, 3/4.7. 12 CONTROL ROOM AIR TEMPERATURE..
LIMITING CONDITIONS FOR OPERATION AND SURVEILLANGE RE UIREMENTS SECTION 3/4. 7 PLANT.SYSTEMS 3/4.7. 1 TURBINE CYCLE SAFETY VAL'UES..
AUXILIARY FEEDWATER SYSTEM.
CONDENSATE STORAGE TANK.
.........l.......'...'.....
ACTIVITY MAIN STEAM LINE ISOLATION VALVES ATMOSPHERIC DUMP VALVES PAGE 3/4 7-1 3/4 7-4 3/4 7-6 3/4 7-7 3/4 7-9 3/4 7-10
'/4
?-11 3/4 ?-12 3/4 7-13 3/4 7-14 3/4 7-15 3/4 7-16 3/4 7-19 3/4 7-21 3/4 '7-27 3/4 7-29 3/4 7-30 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8. 1 A.C.
SOURCES OPERATING.
SHUTDOWN.
DIESEL FUEL ClIL STORAGE SYSTEM - DIESEL FUEL OIL REQUIREHEINTS CATHODI(: PROTECTION...............
3/4 8-1 3/4 8-7 3/4 8-8 3/4 8-Ba PALO VERDE - UNIT 2 VIII Amendment No. 8.107
BASES INDEX 0
SECTION 3/4.7 PLANT SYSTEMS 3/4.7.1
'URBINE CYCLE 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION..
3/4.7.3 ESSENTIAL COOLING WATER SYSTEM.
3/4.7.4 ESSENTIAL SPRAY POND SYSTEM.
3/4.7.5 ULTIMATE HEAT SINK...
3/4 7.6 ESSENTIAL CHILLED WATER SYSTEM.
3/4.7.7 CONTROL ROOM ESSENTIAL FILTRATION SYSTEM.
3/4.7.8 ESF PUMP ROOM AIR EXHAUST CLEANUP SYSTEM 3/4.7.9 SNUBBERS 3/4.7. 10 SEALED SOURCE CONTAMINATION.
3/'4.7. 11 SHUTDOWN COOLING SYSTEM.
3/4.7.12 CONTROL ROOM AIR TEMPERATURE 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8. 1, 3/4.8.2, and 3/4.8.3 A.C.
- SOURCES, D.C.
- SOURCES, and ONSITE POWER DISTRIBUTION SYSTEMS 3/4.8. 4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES 3/4. 9 REFUELING OPERATIONS 3/4.9. 1 BORON CONCENTRATION..
3/4.9.2 INSTRUMENTATION.
3/4.9.3 DECAY TIME 3/4.9. 4 CONTAINMENT BUILDING PENETRATIONS..
3/4.9. 5 COMMUNICATIONS.
3/4.9. 6 REFUELING MACHINE PAGE B 3/4 7-1 B 3/4 7-3 B 3/4 7-3 B 3/4.7-4 B 3/4 7-4 B 3/4 7-4 B 3/4 7-5 B 3/4 7-5 B 3/4.7-5 B 3/4 7-7 B 3/4 7-7 B 3/4 7-7 B 3/4 8-1 B 3/4 8-23 B 3/4 9-1 B 3/4 9-1 B 3/4 9-1 B 3/4 9-1 B -3/4.9-1 B 3/4 9-2 PALO VERDE - UNIT 2 XIII Amendment No. 43,107
BASES
~CT~N IHKK 3/4.9.7 CRANE TRAVEL.- SIPENIT I=UEL STORAGE POOL BUILDING'..~......
B 3/4 9I-2 3/4.9.8 SHUTDOWN COOLING AND COOLANT CIRCUILATION...........
3/4.9.9 CONTAINHENT Pl'IRGIE VALVE ISOLA'TION SYSTEH....>>....o.
B 3/4 9-2 B 3/4 9 3 3/4.9.10 and 3/4.9>>11 MATIER LEVEL - REACTOR,'VESSEL and STORAGE fOOL..." ~ ~... ~......
~ <<"- ~ ---- ~ ---- ~ - ~ -- ~ ~ ~ --.
B 3/4 9-3 3/4 9.12 FUEL BUILDING ESSENITIAL VEt'fTILATIONSYSTEH -."-..-.-...
B 3/4.9.13 BORON CONCENTRATIONI - SPENT FUEL STORAGE POOL...........
B 3/4 9i-3
'/4 91 3 4.
0 SP CIA T ST EXC~P'l~ONS 3/4. 10.1 SHUTDOWN HARGIN AND KN CEA WORTH 'TESTS...'...'...',.
3/4.10.2 HODERATOR TEHPERATU'RE COEFFICIENT, GROUP HEIGHT, INSERTION, AND POWER DISTRIBUTION ILIPJIT$........,....
B 3/4 10-1 B 3/4 10-II 3/4.10.3 REACTOR COOLANT ILOOiPS>>....o.............................
B 3/4 10-1 3/4.10.4 CEA POSI1I ION, REGULATING CEA INSERTION t.IHITS AND REAC1I'OR COOLANT C()LD LEG 'TEHPERATURE.................
B 3/4 1'0-1 3/4>>10.5 HINIHUH TEHPERATURE AND PRESSURE FOR CRITI,CALITY........
B 3/4 10-1 3/4.10.6 SAFETY INJECTION TANK!i....o..:..........................
B 3/4 10-2 3/4.10.7 SPENT FUEL POOL ILEVEL>>....o..........,.....,.
3/4.10.8 SAFETY INJECTION TANK PRESSURE....'....'..
~ o ~ ~ ~ ~ >> ~ ~ ~ >> o ~
B
~ >> ~ ~ ~ ~ o ~ ~ ~ ~ e o B
3/4 10-2 3/4 10-2 3/4.10.9 SHUTDOWN HARGIN ANDi KN CEDHS TESTING.........,......
B 3/4 10-2 4.. RAD OACT V ~F~F~UI~I 3/4.11.1 LI(UID HOLDUP TAI'lKS..o.... o.......'...,'...'................
B 3/4 11-1 3/4.11.2 EXPLOSIVE GAS HIXTURE'o....o............o....o....o......
B 3/4 11-1 3/4>>ll>>3 GAS STORAGE TANKS>> ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~
~ o ~ ~ ~ ~
>> ~ ~ ~ oo ~ o ~ ~ ~ o B 3/4 ll-l PALO VERDE UNIT 2 XIV AHENDHEN'T NO. 48Mj8, 69
ELECTRICAL POWER SYSTEMS BASES 3/4.8.4 ELECTRICAL E UIPMENT PROTECTIVE DEVICES Containment electrical penetrations and penetration conductors are protected by either deenergizing circuits not required during'eactor operation or by demonstrating the OPERABILITY of primary and backup oyercurrent protection circuit breakers during periodic surveillance.
The circuit breakers will be tested in accordance with NEMA Standard Publication No. AB-2-1980.
For a frame size of 250.amperes or less.
the field. tolerances of the high and low setting of the injected current will be within +40K/-25K of the setpoint (pickup) value.
For a frame size of'00 amperes or greater, the field tolerances will be +25K of the setpoint (pickup) value.
The circuit breakers should not be affected when tested within these tolerances.
The surveillance requirements applicable to lower voltage circuit breakers provide assurance of breaker reliability by testing at least one representative sample of each manufacturer's brand of circuit breaker.
Each manufacturer's molded case and metal case circuit breakers are grouped into representative samples which are then tested on a rotating basis to ensure that all breakers are tested.
If a wide variety exists within any manufacturer's brand of circuit breakers it is necessary to divide that manufacturer's breakers into groups and treat each group as a separate type of breaker for surveillance purposes.
There are no surveillance requirements on fuses.
For in-line fuses, the applicable surveillance would require removing the fuses from the circuit which would destroy the fuse.
The test data for surveillance on the other fuses would not indicate whether the fuse was degrading which has been stated by the fuse manufacturer and Idaho National Engineering Laboratory.
The OPERABILITY of the motor-operated valves thermal over load protection and/or bypass devices ensures that these devices will not prevent safety related valves from performing their function.
The surveillance requirements f'r demonstrating the OPERABILITY of these devices are in accordance with Regulatory Guide 1. 106, "Thermal Overload. Protection for Electrical Motors on Motor Operated Valves," Revision 1. March 1977.
PALO VERDE - UNIT 2 B 3/4 8-23 Amendment No. 90,.107
II h
gl tI
INOEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE UIREMENTS SECTION 3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIHARY CONTAINHENT CONTAINMENT INTEGRITY.............................-..
CONTAINMENT LEAKAGE................................-.
PAGE 3/4 6-1 3/4 6-2 CONTAINMENT AIR LOCKS.....................;..........
3/4 6-4 INTERNAL PRESSURE....................................
.AIR TEHPERATURE......................................
3/4 6-6 3/4 6-7 CONTAINMENT VESSEL STRUCTURAL INTEGRITY..............
3/4 6-8 CONTAINMENT VENTILATIONSYSTEM.......................
3/4 6-14 3/4. 6. 2 DEPRESSURIZATION AND COOLING SYSTEHS CONTAINMENT SPRAY SYSTEM.............................
3/4 6-15 3/4.6.3 CONTAINMENT ISOLATION VALVES............................
3/4 6-19 3/4.6.4 COMBUSTIBLE GAS CONTROL HYDROGEN MONITORS....................................
3/4 6-36 ELECTRIC HYDROGEN RECOMBINERS.......................'.
3/4 6-37 HYDROGEN PURGE CLEANUP SYSTEM........................
3/4 6-38 PALO VERDE - UNIT 3 VII AMENDMENT NO. 37
INDEX 3/4.7.5 3/4.7.6 ULTIMATE HEAT SINK ESSENTIAL CHILLED WATER SYSTEM 3/4.7.7 CONTROL ROOM ESSENTIAL I=ILTRATION'SYSTEM.'..
3/4.7.8 ESF PUMP ROOM AIR EXI-IAUST CLEANUP SYSTEM..
3/4.7.9 SNUBBERS 3/4.7. 10 SEALED SOURCE CONTAMINATION.
3/4.7. 11 SHUTDOWN COOLING SYSTEM..
3/4.7. 12 CONTROL ROOM AIR TEMPERATURE LIMITING CONDITIONIS FOR OPERATION AND SURVE LL N 'E E UIREHENTS SECTION 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAfETY VALVES.
AUXILIAfkY fEE'.DWATER SYSTEM.
CONDENSATE STORAGE TANK...,.................
ACTIVITY MAIN STEAM LINE ISOLATION VALVES ATMOSPHERIC DUMP VALVES 3/4.7. 2 STEAM GENEfQTOR PRESSURI=/T'EMf'ERATLJRE LIMITATION...
3/4.7.3 ESSENTIAL COOLING WATER SYSTEM...,.........
3/4.7.4 ESSENTIAL SPRAY POND SYSTEM PAGE 3/4 7-:L 3/4 7-i1 3/4 7-tl 3/4 7-7 3/4 7-9 3/4 7-ILO 3/4 7-11 3/4 7-12 3/4 7-13 3/4 7-14 3/4 7-15 3/4 '7-16
'/4
'7-19
'/4 7-(71 3/4 7-27 3/4 7-29 3/4 7-30 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8. 1 A.C.
SOURCES OPERATI t4G..
SHUTDOWN.
DIESEL I=UEL OIL STORAGE, SYSTEM - DIESEL FUEL OIL. RI=QUIREHENTS..
CATHODIC PRO'llECTION.
3/4 8-1 3/4 8-7 3/4 8-8 3/4 8-Ba PALO VERDE - UNIT 3 VIII Amendment, No.
86
INDEX BASES SECTION 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION..
3/4.7.3 ESSENTIAL COOLING WATER SYSTEM.
3/4.7.4 ESSENTIAL SPRAY POND SYSTEM.
3/4.7.5 ULTIMATE HEAT SINK 3/4 7.6 ESSENTIAL CHILLED WATER SYSTEM.
3/4.7. 7 CONTROL ROOM ESSENTIAL FILTRATION SYSTEM.
3/4.7.8 ESF PUMP ROOM AIR EXHAUST CLEANUP SYSTEM.
3/4.7.9 SNUBBERS 3/4.7.10 SEALED SOURCE CONTAMINATION.
3/4.7. 11 SHUTDOWN COOLING SYSTEM.
3/4.7.12 CONTROL ROOM A'IR TEMPERATURE 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8. 1, 3/4.8.2
~ and 3/4.8.3 A.C.
- SOURCES, D.C.
- SOURCES, and ONSITE POWER DISTRIBUTION SYSTEMS 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES 3/4. 9 REFUELING OPERATIONS 3/4.9. 1 BORON CONCENTRATION..
3/4.9.2
'NSTRUMENTATION.
3/4.9.3 DECAY TIME 3/4.9. 4 CONTAINMENT BUILDING PENETRATIONS 3/4.9. 5 COMMUNICATIONS 3/4.9. 6 REFUELING MACHINE PAGE B 3/4 7-1 B 3/4 7-3 B 3/4 7-3 B 3/4 7-4 B 3/4 7-4 B 3/4'7-4 B 3/4 7-5 B 3/4 7-5 B 3/4 7-5 B 3/4 7-7 B 3/4 7-7 B 3/4 7-7 B 3/4 8-1 B.3/4 8-23 B 3/4 9-1 B 3/4 9-1 B 3/4.9-1 B 3/4 9-1 B 3/4 9-1 B 3/4 9-2 PALO VERDE - UNIT 3 XIII Amendment No. 2,86
BASES 0
QlQ.
3/4.9.7 CRANE TRAVEL - SPENT FUEL STORAGE POOL BUILDING'.........
B 3/4 9-2I 3/4.9.8.
SHUTDOWN COOLING AND COOLANT CIRCULATION....l...........
B 3/4 9-2'/4.9.
9 CONTAINHENT PURGE VALVE ISOLATION SYSTEH;... s.... ~......
B-3/4 9-3 3/4.9.10 and 3/4.9<<11 MATER LEVEL - REACTOR VESSEL and STORAGE I OOL <<............ <<....
<<..I.. 3.. I...i.. ~...........
3/4 9 12 FUEL BUILDING ESSENTIAL VENTILATIOINSYSti'Ehi
~
B 3/4 9-3 B 3/4 9-3 3/4.9.13 BORON CONCENTRATION - SPENT FUEL SYORAGE POOL............
B 3/4 9-3 4.
0 SP CIA
!s~~X(:EP~)~
3/4 10 1
SHUTDOWN HARGIN AND Kr~ q
'CEA.WORltH TESTS'
~
B 3/4 10 1
3/4.10.2 HODERATOR TEHPERATURE COEFFICIENT, GROUP llEIGHT, INSERTION, AND POWER DISTRIBUTION LIHITS..............,.
B 3/4 10-1 3/4 10 3 REACTOR COOLANT LOOPS
~ ~ ~,'
~
~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~
l~ ~ <<<<
~
B 3/4 10 l 3/4.10.4 CEA POSITION, REGULATING C'EA INSERTION LIHITS AND REACTOR COOLANT COLD* LEG TEHPERATURE...........'.....,
B 3/i4 10-X 3/4.10<<5 HINIHUH TEHPERATURL AND PRESSURE FOR CRITICALITY........
B 3/4 10-1 3/4.10<<6 SAFETY INJECTION TANKS..................................
3/4.10.7 SPENT FUEL POOL LEVEL...,............,.....,......,.........
B 3/,4 10-2 B 3/,4 10-2 3/4.10.8 SAFETY INJECTION TANK PRESSURE...........,......,.........
B 3/4 10-,2, 3/4.10.9 SHUTDOWN HARGIN ANI) K.q - CEDHS TESTING...;...<<....<<....
OA T VKJZELGZEk B 3/4 10-2 3/4.11.1 3/4.11.2 3/4.11.3 LIQUID HOLDUP TANKS....<<....<<....s..c...................
EXPLOSIVE GAS HIXTURE..<<....<<....,.......,.............
GAS STORAGE TANKS......,......,....,.....;.....,............
B 3/4 11-1 B 3/4 11-1 B 3/4 11-1 PALO VERDE - UNIT 3 XIV I
I I I... AHENDHENT NO. 8, 8+,
54
ELECTRICAL POWER SYSTEMS BASES 3/4.8.4 ELECTRICAL E UIPMENT PROTECTIVE DEVICES Containment electrical penetrations and penetration conductors, are protected by either deenergizing circuits not required during reactor operation or by demonstrating the OPERABILITY of primary and backup overcurrent protection circuit breakers during periodic surveillance.
The circuit breakers will be tested in accordance with NEMA Standard Publication No. AB-2-1980.
For a frame size of 250 amperes or less, the field tolerances of the high and low setting of the injected current will be within +40K/-25K of the setpoint (pickup) value.
For a frame size of 400 amperes or greater, the field toler ances will be +25K of the setpoint (pickup) value.
The circuit breakers should not be affected when tested within these tolerances.
The surveillance requirements applicable to lower voltage circuit breakers provide assurance of breaker reliability by testing at least one representative sample of each manufacturer's brand of circuit breaker.
Each manufacturer's molded case and metal case circuit breakers are grouped into representative samples which are then tested on a rotating basis to ensure that,all breakers are tested.
If a wide variety exists within any manufacturer's brand of circuit breakers it is necessary to divide that manufacturer's breakers into groups and treat each group as a separate type of br eaker for surveillance purposes.
There are no surveillance requirements on fuses.
For in-line fuses, the applicable surveillance would require removing the fuses from the circuit which would destroy the fuse.
The test data for surveillance on the other fuses would not indicate whether the fuse was degrading which has been stated by the fuse manufacturer and Idaho National Engineering Laboratory.
The OPERABILITY of the motor-operated valves thermal overload protection and/or bypass devices ensures that these devices will not prevent safety related valves from performing their function.