Text
DOCKET 05000528 05000529 05000230
SUBJECT:
Discusses pv oposed enhancements to contv ol bldg elevation 74 ft masonv g iiialls I'fod consists of sev'ies of steel pla+e assemblies bolted in pairs
+o masonry iiialls to "sandwich" iiialls. Description of pv oposed mod encl.
DIBTRIBUTIDN CODE:
AOOID CDPIEB RECEIVED: LTR
}
ENCL I
SIZE;~~+
TITLE:
OR Submittal:
Qenev al Distv ibution REGULATORY INFORI'IATION DISTRIBUTION SYSTEI'I (R IDB) i.
ACCESSION NBR: 861105041'1 DOC. DATE: 86/10/31
- NO xi<IZED:
NO FACIL:BTN-50-528 Palo Verde Nuclear Station>
Unit 1> Arizona Publi STN-50-529 Palo Vev de Nuclear Station>
Unit 2>
Av izona Publi 50-230 Pavia Research Reactov'>
Univ. of Pavia AUTH. NA}~fE AUTHOR AFFILIATION HAYNES> J. Q.
Av izona Nucleav Pouev Prospect
( fovmerlg Arizona Public Serv REC IP. NANE RECIPIENT AFFILIATION NNIQHTON> Q. N.
PNR Pv oJect Direc+ov ate 7
NOTES: Btandav d ized plant. N. Davis> NRR: iCg.
Standardized plant. f'. Davis> NRR: iCg.
XR-56 issued 3/12/65. Export fov Italy.
05000528 0 500052'P 05000230 RECIPIENT ID CODE/NANE PNR-8 EB PNR-8 FOB PNR-8 PD7 PD 01 PNR-8 PEICSB COP IEB LTTR ENCL 1
1 5
5 RECIPIENT ID CODE/NANE PNR-8 PEICSB PNR-8 PD7 LA LICITRA>E PWR-8 RBB COPIES LTTR ENCL 2
2 0
1 1
1 INTERNAL: ACRB ELD/HDB3 NRR/ORAB RCN5 09 6
6 0
0 1
ADN/LFNB FI SCB 04 0
1 1
EXTERNAL: ECM BRUSQUE> S NRC PDR 02 NOTES:
LPDR NSIC 03 05 TOTAL NU]IBER OF COPIES REQUIRED:
LTTR 31 ENCL 27 I'I ly I
I
,E t
Arizona Nuclear Povver Project P.O. BOX 52034 4
PHOENIX. ARIZONA85072-2034 October 31, 1986 ANPP-38888-JGH/t<Fq/98.05 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Project Director Power Project Directorate 87 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos.
STN 50-528 (License NPF-41)
STN 50-529 (License NPF-51)
STN 50-530 Masonry Walls File:
86-056-026
References:
(A) Letter from E.
A. Licitra, NRC, to E.
E.
Van Brunt, Jr.,
- ANPP, Dated October 6,
1986.
Subject:
Palo Verde Masonry Walls.
(B)
Letter to G.
W. Knighton,
- NRC, from E.
E.
Van Brunt, Jr.,
- ANPP, Dated June 19, 1986 (ANPP-37062).
Subject:
Masonry Walls.
(C)
Letter from E.
E.
Van Brunt, Jr.,
- ANPP, to G.
W. Knighton, NRC, Dated April 18, 1986 (ANPP-36302).
Subject:
Evaluation of Masonry Walls.
(D)
Letter to G.
W. Knighton,
- NRC, Mom. J.
G. Haynes, ANPP, Dated September 19, 1986 (ANPP-38366).
Dear Mr. Knighton:
Over the past several
- months, the NRC and ANPP have conducted technical discussions regarding the construction of specific PVNGS masonry walls.
On October 14,
- 1986, ANPP received the NRC staff's response (Reference A) to our June 19, 1986, submittal (Reference B).
The NRC staff's response stated that:
(1)
The walls at elevation 100'-0" of the Control Building are adequate as constructed.
(2)
The walls at elevation 74'-0" require strengthening to meet industry standards.
(3)
Preliminary assessment of the additional ANPP information submittal (Reference C) leads the NRC to believe that the NRC staff conclusions (Reference A) will remain unchanged.
8611050411 861031 PDR ADOCK 05000528 P
e" f
P W
~
~
C 4
l
~
V t
e s
~
'l I'I P>>
t I
g
~
t I
C V
o v
~
C
'1 I
~
(
~
R A
k H,>
Mr. G.
W. Knighton
Subject:
Masonry Walls ANPP-38888 Page Two Based on a review of Reference B, the NRC staff has not reached our conclusion that all of the subject masonry walls are satisfactory as constructed.
- However, the NRC staff has not completed evaluation of all pertinent data included up through the September 19, 1986 submittal.
Assuming the results of the NRC staff review of all pertinent data results in the position as stated in Reference A, we have proceeded in good faith to develop an enhancement to the masonry walls at elevation 74'-0".
The modification would consist of a series of steel plate assemblies
- bolted, in pairs, to the masonry walls to "sandwich" them.
The design provides both a strengthening effect and a
stiffening effect to respond to the concerns expressed in the NRC staff's initial evaluation.
A description of the proposed modification is enclosed for your review.
Since immediate implementation of the masonry wall enhancements is not a
significant safety issue, and a short delay would pose no additional seismic risk impact, any physical work to enhance the elevation 74'-0" masonry walls on the licensed units is best achieved during planned plant shutdown.
As previously discussed with your staff, it is also more appropriate to implement this modification while the nuclear units are not operating based on the facts that the modification requires aggressive construction activities associated with drilling a very large number of holes through walls having attached safety related components, moving heavy steel plates with lifting rigs in the vicinity of safety related components, and overseeing a
large construction force while working in the vicinity of safety related equipment.
ANPP therefore proposes the following implementation schedules:
Unit 1
Complete implementation by first appropriate planned outage of sufficient duration, but not later than first refueling.
Unit 2
Complete implementation by first appropriate planned outage of sufficient duration, but not later than first refueling.
Unit 3
Complete implementation by initial criticality.
This schedule provides an update to the original schedule provided in Reference C and is also based on results of the agreement with the NRC reached at our August 28, 1986 meeting.
At the August 28, 1986 meeting NRC and ANPP agreed to have the masonry wall solution approved by December 22, 1986 and agreed that implementation of any wall modifications would occur during a
future outage for Units 1
and 2
and before initial criticality for Unit 3.
This letter then also serves to confirm and document that agreement and to confirm that no construction will occur until NRC concurrence with the proposed wall enhancement.
ANPP shall continue to implement the same interim compensatory measures discussed in Reference D until the walls are deemed satisfactory.
f
Mr. G.
W. Knighton
Subject:
Masonry Walls ANPP-38888 Page Three In summary, we have proceeded in good faith to address and resolve all NRC concerns with regard to the adequacy of the elevation 74'-0" masonry walls.
We expect that the information presented in this letter will lead to NRC concurrence with both the proposed design and implementation schedules by December 22, 1986.
In parallel, we are awaiting response to the ANPP September 19, 1986 submittal (Reference D), including your consideration of the additional information provided therein.
After receipt and review of this letter, we believe a meeting with the NRC staff to review this information would be appropriate.
Very truly yours'.
G. Haynes Vice President Nuclear Production JGH/WPQ/)le
Enclosure:
Description of Proposed Enhancements to the PVNGS Control Building Elevation 74'-0" Masonry Walls.