TAC:60773
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Questions Answers | |
| From | |
MONTHYEARML17299B1921986-04-16016 April 1986
[table view]Forwards Evaluation of Adequacy of Nonstructural,Nonload Bearing Masonry Walls Used in Auxiliary & Control Bldgs & Subj to Lateral Seismic Inertial Loads,Per Concerns Raised During Recent Audit & 860320-21 & 0411 Meetings ML17299B2071986-04-18018 April 1986 Provides Resolution Schedule for Masonry Wall Evaluation. Acceptable Analysis & Performance of Addl Testing or Implementation of Design Mods on Masonry Wall Will Be Provided by 861222 ML17300A1851986-06-19019 June 1986 Forwards Rept on Evaluation of Masonry Walls for Arizona Nuclear Power Project,Palo Verde Nuclear Generating Station Units 1,2 & 3. Response to Rept Requested by 860711 ML17300A1901986-06-20020 June 1986 Trip Rept of 860320 Site Visit & Followup on 860321 in Phoenix,Az Re Design & Const of Masonry Walls.List of Meeting Attendees & Viewgraphs Encl ML17300A5241986-09-19019 September 1986 Forwards Supplemental Rept on Evaluation of Masonry Walls For..., in Response to NRC Concerns Re Ability of Walls to Withstand OBE & Sse.Confirmatory Analyses Support Time History Results Demonstrating Adequacy of Walls ML17300A6181986-10-31031 October 1986 Description of Proposed Enhancements to Palo Verde Nuclear Generating Station Control Bldg Elevation 74-Ft 0-Inches Masonry Walls for Units 1,2 & 3 ML17300A6161986-10-31031 October 1986 Discusses Proposed Enhancements to Control Bldg Elevation 74-ft Masonry Walls.Mod Consists of Series of Steel Plate Assemblies Bolted in Pairs to Masonry Walls to Sandwich Walls.Description of Proposed Mod Encl 1986-04-18 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:60773&oldid=5086100"