MONTHYEARML17299B1921986-04-16016 April 1986 Forwards Evaluation of Adequacy of Nonstructural,Nonload Bearing Masonry Walls Used in Auxiliary & Control Bldgs & Subj to Lateral Seismic Inertial Loads,Per Concerns Raised During Recent Audit & 860320-21 & 0411 Meetings Project stage: Meeting ML17299B2071986-04-18018 April 1986 Provides Resolution Schedule for Masonry Wall Evaluation. Acceptable Analysis & Performance of Addl Testing or Implementation of Design Mods on Masonry Wall Will Be Provided by 861222 Project stage: Other ML17300A1851986-06-19019 June 1986 Forwards Rept on Evaluation of Masonry Walls for Arizona Nuclear Power Project,Palo Verde Nuclear Generating Station Units 1,2 & 3. Response to Rept Requested by 860711 Project stage: Other ML17300A1901986-06-20020 June 1986 Trip Rept of 860320 Site Visit & Followup on 860321 in Phoenix,Az Re Design & Const of Masonry Walls.List of Meeting Attendees & Viewgraphs Encl Project stage: Meeting ML17300A5241986-09-19019 September 1986 Forwards Supplemental Rept on Evaluation of Masonry Walls For..., in Response to NRC Concerns Re Ability of Walls to Withstand OBE & Sse.Confirmatory Analyses Support Time History Results Demonstrating Adequacy of Walls Project stage: Supplement ML17300A6181986-10-31031 October 1986 Description of Proposed Enhancements to Palo Verde Nuclear Generating Station Control Bldg Elevation 74-Ft 0-Inches Masonry Walls for Units 1,2 & 3 Project stage: Other ML17300A6161986-10-31031 October 1986 Discusses Proposed Enhancements to Control Bldg Elevation 74-ft Masonry Walls.Mod Consists of Series of Steel Plate Assemblies Bolted in Pairs to Masonry Walls to Sandwich Walls.Description of Proposed Mod Encl Project stage: Other 1986-04-18
[Table View] |
Text
DOCNET,,O 05000528 0 5000529'5000530
SUBJECT:
Fov wav'ds "Supplemental Rept on Eval uati on of Nasonarg Walls por.
~
~
" in response to NRC concerns re abilitp op nails to withstand OBE
~c SSE. Conf iv matorg analyses suppov t time history v esults demonstv ating adequacy of walls.
DISTRIBUTION CODE:
BOEID COPIES RECEIVED: LTR i ENCL
/
SIZE:
De TITLE: QR/Licensing Submittal:
Combined General Distribution e~~sS
~
si Jl REGULA~,.Y INFORI"IATION DISTRIBUTI
-.~YSTEN (R IDB)
ACCEBSIQN N8R: 8609240092 DOC. DATE: 86/09/i9 NOTARIZED:
NO FACIL:BTN-50-528 Palo Vev'de Nuclear Station>
Unit 1>
Av'izona Publi CSTN-50-52'P Palo Verde Nucleav Station>
Unit 2> Arizona. Publi STN-50-530 Palo Vev de Nuclear Station>
Unit 3>
Av izona Publi AUTH. NAl']E AUTHOR AFFILIATION HAYNES, J. G.
Arizona Nucleav Powev Pv o Ject
( formerly *vi zona Public Sev v RECIP. NANE RECIPIENT AFFILIATION KNIGHTQN> G. N.
PNR Pv object Div ectov ate 7
NOTES: Btandav di.zed plant. N. Davis> NRR: iCg.
Standav'dized plant. N. Davis> NRR: iCg.
Standardized plant. I'. Davis. NRR: iCg.
05000528 05000529 05000530 RECIPIENT ID CODE/hIANE PWR-8 ADTS PWR-8 PEICS8 PWR-8 PD7 LA LICITRA>E Oi PNR-8 RB8 INTERNAL ACRB 29 ELD/HDB3 NRR PWR-A ADTS DIR EG FIL 04 RN/DDANI/I'IIB COPIEB LTTR ENCL i
2 i
i+
i 0
RECIPIENT ID CODE/NANE PNR-8 E8 PNR-8 FQ8 PNR-8 PD7 PD 05 PWR-8 PEICSB
- DN/LFM8 NRR 8WR ADTS NRR PWR-8 ADTS NRR/GRAS RGN5 COP IES LTTR ENCL EXTERNAL: LPDR NBIC NOTES:
03 06 i
i +
NRC PDR 02 PNL GRUEL>R CYNgK'. H LiQ.Ikey p I
D TOTAL NUI'I8ER OF COPIES REQUIRED:
LTTR 33 ENCL
Iu P Pf>(
0SSS IP5S) u u
F:PSu
'S S "u~
'1 u'
."Pl '4 S, "If-'"P +,
~ u
". ~ ' l II'j f
u S,
u 5f'S)
'f Su I
., S u,
Appendix A allowables.
2 ~
3 ~
Confirmatory response spectra
- analyses, based on the use of conservative floor response
- spectra, also result in acceptable stresses and confirm the conclusion of the time history analyses.
Both time history and response spectra analyses conservatively address uncertainties, seismic input, and material properties.
4.
Review of available test data shows that the 12-inch fully grouted PVNGS walls have seismic resistance (modulus of rupture) greater than the UBC modulus of rupture value.
5.
Use of realistic stiffness/cracking properties for the PVNGS walls demonstrates that the walls will not crack under SSE loads and that high margins of safety are maintained.
6.
To account for variabilities, substantial margin exists (approximately 65X) in the stiffness of the's-built walls such that no increase in wall response will occur.
7.
In the low seismic area of PVNGS the block walls are not seriously loaded (OBE deflections less than,0.25 inch).
8.
SRP 3.8.4 allowables are conservative in nature and result in high margins of safety.
ANPP has proceeded, in good faith, to address and resolve all NRC concerns on this issue and to achieve resolution in accordance with our December 22, 1986 commitment.
We request that you review the referenced submittal and all of the confirmatory information documented in the enclosure to this letter, to establish the adequacy of the Elevation 74'-0" masonry block walls at PVNGS.
f j
r li
>g I II r
JL 1'
I p
1 i
Mr. George W. Knighton Masonry Wall Evaluation Confirmatory Data ANPP-38366 Page 4
We are providing two of the referenced documents to Enclosure 81 to assist your staff in performing their review.
Your response is requested by October 10, 1986.
Very truly yours, J
~ Haynes ice President Nuclear Production JGH/RAB/dim cc:
- 0. M. DeMichele E.
E.
Van Brunt, Jr.
E. A. Licitra R.
P.
Zimmerman A. C. Gehr :
"Supplemental Report on the Evaluation of Masonry Walls.for the Arizona Nuclear Power
- Project, Palo Verde Nuclear Generating Station Units 1, 2 and 3".
Enclosure 2:
"Pactors Influencing Deflections in Grouted Hollow Unit Concrete Masonry Walls" (Reference 88 to Enclosure 1).
Enclosure 3: