ML17299A442

From kanterella
Jump to navigation Jump to search

Forwards SER Re Util Response to Generic Ltr 83-28,Items 1.1 & 1.2 on post-trip Review Program Description/Procedure & Data & Info Capability,Respectively.Program/Procedures & Data/Info Capabilities Acceptable
ML17299A442
Person / Time
Site: Palo Verde  
Issue date: 07/03/1985
From: Knighton G
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17299A443 List:
References
GL-83-28, TAC-59163, TAC-59164, NUDOCS 8507170758
Download: ML17299A442 (4)


Text

'

gUl g 1985

,Docket Nos.:

50-528, 50-529

'and 50-530 Mr. E.

E.

Van Brunt, Jr.

Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034

Dear Mr. Van Brunt:

Subject:

Safety Evaluation for Palo Verde Units 1, 2 and 3 Response to Generic Letter 83-28, Items 1. 1 and 1.2 We have completed our review of the Palo Verde Nuclear Generating Station, Units. 1, 2 and 3, response to Generic Letter 83-28, Item 1.1 (Post-Trip

Review, Program Description and Procedure) and Item 1.2 (Post-Trip Review, Data and Information Capability), with regard to. required actions based on generic implications of Salem ATWS events.

Based on our review, we conclude that the Palo Verde post-trip review program and procedures

( Item 1.1) and data and information capabilities (Item 1.2) are acceptable.

Our safety evaluations of Items 1. 1 and 1.2 are provided as Enclosures 1 and 2, respectively.

If you have any questions regarding these evaluations, you should contact Mr. E. Licitra, the Licensing Project Manager.

Sincerely, 8507170758 850703 I

PDR 'DQCK 050005283 P

PDR Enclosures As stated George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing cc:

w/enclosures See next page Distribution LB83 Rdg.

NRC PDR Gray File LPDR ABournia JLee EJordan HThompson JPartlow BGrimes GKnighton DShum RRamirez Licitra OELD ACRS (10) 7 BP3 85 DL:LB83fgg DL EALicitra I hton 7/g,/85 7/g /85

~

~

~

44 4

I 4

I I

~ 4 i

4 4 I, I 4 i

4 '/"I ~

4 I

4

~ e, I

4 I ~ I,,I II 44*44 ii(

I, l

~,

Mr. E.

E.

Van Brunt, Jr.

Arizona Nuclear Power Project Palo Verde CC:

Arthur C. Gehr, Esq.

Snell

& Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0.

Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V

U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berl in, Esq.

Winston 5 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Suite 1310

Bethesda, Maryland 20814 Mr. Ron Rayner P. 0.

Box 1509

Goodyear, AZ 85338