Forwards EGG-NTA-7432, Conformance to Generic Ltr 83-28, Item 2.2.1, Equipment Classification for All Other Safety- Related Components, Palo Verde Units 1,2 & 3. Response Acceptable
ML17304A787
Person / Time
Site: Palo Verde  
Issue date: 11/29/1988
From: Chan T
Office of Nuclear Reactor Regulation
To: Karner D
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17304A788 List:
References
GL-83-28, TAC-59164, NUDOCS 8812070135
Download: ML17304A787 (8)


Text

Docket Nos.:

STN. 50-528, STN 50-529 and STN 50-530 Mr. Donald B. Karner Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034

Dear Mr. Kar ner:

SUBJECT:

GENERIC LETTER 83-28, ITEM 2.2.1 "EQUIPMENT CLASSIFICATION PROGRAM FOR ALL SAFETY RELATED COMPONENTS",

(TAC NO'. 59164)

The staff has completed its review of Generic Letter (GL) 83-28, "Required Actions Based on Generic Implications of Salem ATNS Events,'"

Item 2.2.1 for the Palo Verde Nuclear Generating Station.

Based upon your response in letters dated November 3, 1983 and September 15,

1987, we conclude that your means of meeting Item 2.2.1 of GL 83-28 is acceptable.

The staff was assisted in the review of Item 2.2.1 by our. contractor EGIwG Idaho.

The results of this review, with which we concur and support, are documented -in the enclosed contractor's Technical Evaluation Report.

Our review regarding GL 83-28, Item 2.2.2, "Vendor Interface for Safety Related Components" will be the subject of future, correspondence.

Sincerely, ori gi nal s igned by

Enclosure:

As stated

'c:

See next page Terence L. Chan, Senior Project. Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects DISTRIBUTION h

NRC 8

LPDRs OGC (f/info only)

PD5 Reading, EJordan MVirgilio BGrimes JLee ACRS (10)

DRSP/PD'5 DR D5 TLChan:dr Gl on 11/Pf/88 11/ /88 OFFICIAL RECORD COPY SS12070135 SSI 129 PDR ADOCK 05000528 P

PDC po(

ehi 0

<ga REoy

~o Cy 0O

""L

+a*++

'UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 29, 1988 Docket Nos.:

STN 50-528, STN 50-529 and STN 50-530 Mr. Donald B. Karner Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034

Dear Mr. Karner:

SUBJECT:

GENERIC LETTER 83-28, ITEM 2.2.1 "EQUIPMENT CLASSIFICATION PROGRAM FOR ALL SAFETY RELATED COMPONENTS",

(TAC NO. 59164)

The staff has completed its review of Generic Letter (GL) 83-28, "Required Actions Based on Generic Implications of Salem ATWS Events,"

Item 2.2.1 for the Palo Verde Nuclear Generating Station.

Based upon your response in letters dated November 3, 1983 and September 15,

1987, we conclude that your means of meeting Item 2.2.1 of GL 83-28 is acceptable.

The staff was assisted in the review of Item 2.2.1 by our contractor EGSG Idaho.

The results of this review, with which we concur and support, are documented in the enclosed contractor's Technical Evaluation Report.

Our review regarding GL 83-28, Item 2.2.2, "Vendor Interface for Safety Related Components" will be the subject of future correspondence.

Sincer y,

Enclosure:

As stated cc:

See next page

~A c T rence L. Chan, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects

ed w

, ~

Mr. Donald B. Karner Arizona Nuclear Power Project Executive Vice President Post Office Box 52034 Phoenix, Arizona 85072-2034 Palo Verde CC:

Arthur C. Gehr, Esq.

Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Nr. James N. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix,. Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Mr.. Nark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Nr.

Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Nr. Tim Polich U.S. Nuclear Regulatory Commission HC-03 Box 293-NR Buckeye, Arizona 85326 Regional Administrator, Region V

U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Ns.

Lynn Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington,

.DC 20009 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Suite 1310

Bethesda, Maryland 20814

>Hi OO

L

~"

Arizona Nuc1ear Power Project Pa1o Verde CC:

Chairman Arizona Corporation Commission Post Office Box 6019 Phoenix, Arizona 85003 Arizona Radiation Regu1atory Agency ATTN:

Ms. C1ara Pa1ovic, Librarian 4814 South 40 Street Phoenix, Arizona

,85040 Mr. Char1es Tedford, Director Arizona Radiation Regu1atory Agency 4814 South 40 Street Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors ill South Third Avenue

Phoenix, Arizona 85003

IN 4 I~