ML17279A314
| ML17279A314 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 06/03/1987 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17279A315 | List: |
| References | |
| RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-64838, NUDOCS 8706100249 | |
| Download: ML17279A314 (4) | |
Text
'I
~pR REGS, (4
Mp
~4 0
Cy C
O II/I
,II
+0 qO
++*++
0 ~
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASI{INGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 WPPSS NUCLEAR PROJECT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 46 License No. NPF-21 l.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Washington Public Power Supply System (the Supply System, also the licensee),
dated March 10, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
E.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
{
870bi00249 870603 PDR ADOCK 05000397 P
~
2.
Accordingly, Facility Operating License No.
NPF-21 Attachment 2, Paragraph 3.(b) is hereby, amended to read as follows:, Paragraph 3.(b)
(b)
The licensee shall implement (installation or upgrade) requirements of Regulatory Guide 1.97, Revision 2, for flux monitoring prior to startup following the third refueling outage.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR'REGULATORY COMMISSION George W
Knighton irector Project Directorate Y
Division. of Reactor Projects - III/IY/Y E Special Projects Date of Issuance:
June 3,
1987