LER 79-011/03L-0 on 790316:during Power Operation, 1C Charging Pump Found to Have Cracked Pump Casing.Caused by Vibration Due to Suction Cavitation on Pumps.Suction Dampening Devices Will Be Installed
ML17266A064
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/13/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17206A740 List:
References
LER-79-011-03L, LER-79-11-3L, NUDOCS 7904230321
Download: ML17266A064 (3)


Text

N(IC c 0(t4t SSII t(.S. (It(Ct.rag gscu~TOq Y C~St IS-:C 4 P 15)

LICENSC= Pl": 4 I R=OORY

'I I

cou".act. St.eccl I I I I lQI litt -ASc P(ttuT'Qst TYPK*t,t itpctJtrt 0 I IFCcIAIArT(C4)

I 0 P It, IS ILI Sf 1 fQ!0 }Of -Io I OI OI 0} OI- I 030 CSI 4f1 I 1I lf 1 I I I 't4sis r Apt IS 5 t rCLtSPaAIc>rs rI .ctusa Yvri 55 sl CC 4'T

>Src-"T I L g) 0 INI IO I 0 0} 3 I 3I 5'Qx 0}

6I Cct= I (IINsSSR N~ ctirc+Y 0* a 30 s ituTONSCBINnou Auo ttttCSABt = 'IS: U-tuc=N Qo 0 t2 During porkier operation, "lc" charging pur p T as. found to have a cracked W

pump casing. The pump was stopped and placed out of service IJate>>

leakage thru the'crack v'as quite minor and contained by the rad. Traste.

management system. Due to. design redundancy, the remaining thoro cbarging pumos in service can pump . the required design capacity of the Ctl(CS and

~

~0, fully meet the applicable Technical Specifications. This is the second occurrence of a cracked charging pump casing (See LEE 33S-'78-34).

T oi 'crrrauscIT 00i SVSTZV CAUStt C USi COWtP c(s r>

5

.-CIAO t>0 5

t 05 tt1 Coos II SUSC I.IS'I II" I-'

IZ l1 I. 8 I1tt

'lS IQ j lQ saQU aNn*t 0 C4(t>" 4C~ (tsro>IT lt~ tr(5IO>S ~

Qr r=rt. r g>NO SVa(ITvSAA

~p9 ~ ~01 1, A cP0IIT 40

~m 1(

~03 13 0008 S

~L'it Tvsi

~0 11 A"T Ctt SU.UPS t~t.iu Ac,lau L>ttt>tt 33 js SPSSCY~

C4 Nr~uT LUII. LIS 5$

5&l CMV>l 4"TCIOO

'Ll" "Ict IIOUtIS Q rr Cttt(iu i SUS'>IT XO 4I 4PIIOW P'Cll'.I NUN, LJO 7ttIUNCCstst I'"'I SUPrLIict CO" N'Nsu CAUS:" ONSCRtPT(ONI Aruo CQctctSCi tU= Ct.or'tS QH o } The cause appears to be due to vibr"tion caused by suction cavitation on the pumps. Suction dampening devices (accumulators) xrill be installed" on all three pumps to reduce cavitation. Preliminary installation i;ork for these accumulators and replacer en" of lc pump casing lrill be perfor-. I med during the 1979 refueling outage.

5 3 NsCIU Y S-.~tr5S ~t W/I!(I . OTIIBSTA US Q 5>iTIICQ CIS~v*Nv (IV OSS~NINT.~u T a 1 0

SCTIUITV Orr ~3I DID Irt CQ"IYc4T li 5 l1

. NI.

ss f A'Q Operator Observation 10

'Ict.a*SSO Osii~rsi A>roUNTONscnl>ITYOSS t CCAnouas sit.ZASi QG 3

0 ~~8 IO F&50:4ciit SXrotuitt5

~~

NA s4-NA

~06. 0 '/. y+z Nk

~ I QI T 3 0 tttiat Lu(UN>a ~

I'QS I~Oil 0 0 lQnl Ni1 5 II li NA EK L/JCI T a 5 3II Ic t'5- CNt v I'! t}tilt NUNLICI NctC

$ $ 030 cstcNtp..04~

NA 't  ! l

'0 it5 hl.A. Sebo Jnan ~oust 505 552-3502 7 904830 3Z.I

REPORTABLE OCCURRENCE 335-79-11 LICENSEE EVENT REPORT PAGE Th'0 Additional Cause Descri tion and Corrective Action:

An engineering evaluation of the Charging and Volume Control System (CVCS) operation and vibration was performed in September of 1977.

This evaluation suggested that suction cavitation may be the cause of vibration within the system. Based on this, plans were made to install pulsation dampening devices (accumulators) on the suction of each charging pump. Installati.on was scheduled to be performed during the 1980 refueling shutdown.

On 9-2-78, lA charging pump was found to have a cracked casing (See LER 335-78-34). The procurement of materials to install the suction

~

pulsation dampening devices was placed on an expedited basis. The cracked casing was replaced with a new casing on 1-9-79.

Presently, the plant is shut down for the 1979 refueling outage. Preliminary work on the CVCS 'will be performed during this refueling outage to enable installation of the pulsation dampening devices during full power operation later this year. During power operation, only one charging pump at a time will have to be removed from service to install the pulsation dampening device on that pump. This will:allow installation during power operation and still fulfillTechnical Specification, require-ments for the CVCS. Delivery time for the pulsation dampening devices is presently scheduled for June, 1979. The devices will be installed shortly after delivery.

1C charging pump casing will be replaced with a new casing prior to startup following the 1979 refueling outage.