LER 78-037/01T-1 on 780919:during Sys Insp,Class I Longitudinal Braces on Auxiliary Bldg Ventilation Ducts Were Found Missing.Caused by Unique Combination of Personnel Errors
ML17266A023
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/18/1978
From: Siebe A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17206A593 List:
References
LER-78-037-01T, LER-78-37-1T, NUDOCS 7901080161
Download: ML17266A023 (3)


Text

UPOATE REPORT PREVIOUS REPORT DATE 0

OCTOBER 2, 1978 N RC PORM $ $ 4 V *NUCLLLRRSCVLATCRV C uNllSSIQN IT TT)

LlCEWSE= EVEbl7 REIOQRT O~O..

CCNTRQl SLCCIEI I l r I I Ql (PL~0 PAINT QR TVPS'ALLRSCUIRKO INPCIRRIATTQN)

I

~l 0$ O CON'T XQl 3

3 9 ucauaat

".::. LJS 44 cQQS 41 PIZNTQSSCRIPTICN ANQ P.t4$ 44LK CQNSZCLISNCZS QOCX ar 'IIJMS 4 A QIQ

'O~OI LLllIS uc<<u54 NUMssil avaNTQ*ra 15 M 1$

LLCSN$ 4 TYPS 75 JO ASPQAT OATS

$7 <<Ai 54 34

~02 Durin 's stem ins ctions 66 Class I Lon itudinal Braces on the RAB

~03 Ventilation Ducts were found to be missing. Radial restraints are

~oa 'ro erl installed. The affected safe related ventilation s stems are only required in the event of a LOCA. An engineering evaluation by our AE indicates that restraints existing at the time of;the occurrence were

~$

capable of sustaining the additional loads during"a design basis seismic

~oa event

~$ I<<$

1 4 9 34 SYSTKM CA454 CA454 CQ04 COOS $ 4SC 04 ccMNQN SN'r cd 0 4 val.va

$ 44CQCS $ 4$ 0005 7 4 9 14 II L'JS.

I'1 11 '1$

LNS LNS 19 53CUSNTI*I- OCCUAASNCK

~

ASPOAT A SVI SION

~

AEPOATNO "

LSAIAQ COOS On iinr ii~78 ~03 7 ~~ ~01 ~T TYPS ~

PIO

~1 11 11 1$ 14 27 '13 19 14

  • T ACNMSN 1'PR OA 11 ACTIONi PUTUAS SPPSC 044TQOWN )AIMS

. C<<LuS. CQMPCN EN T TANSN *CTION Cv PLANT uST7100 4PPLISR, AQUAS Q22 4SMITTSO SCAM NUS.

InSLIS LLS LJS

$ $ uANUPA iUASR 11 3$ 14 n-IS LJS SI $1 LANL' 31 CAUM OESCRIPTIQN ANO CQRRScrlve*cnQNS 022 0 A i u co. 'tion of errors and weaknesses in construction administra-..

~

tion and quality assurance allowed the omission to occur. Installation

~I2 of the prev'iously'missing braces in PSL-l was completed on October 5,1978, and actions to prevent similar occurrences on PSL-2 have been identified for implementation.

7 a

4 9 PACIUTY STATUS LJS ACTIVITY CON Taur

~$

IO

<SLCA$ 40 QP ASLSASS SR I'1 11 OTH SR STATUS AMOUNTQP ACTIYITV026 0

~CQQI

+4 SPZCIAL 5TSMH%'hI LOCATION OP ASLSA$ 4 026 0<<2 1 3

~ZQ22 fZ IO tQ 11 NA 4$ +5 NA PEA SONNSL SXSOSUASS L000<<00IQgr I~ZQS[ Illn 7 11 I2 11

~ili 7 3 LL01 1

L~

uLMSSA 010 11 l&<<NA

$ $ ASCNNSL IN14PI 11 ai

<<$ $ mINTION~AI CP CR QAMACS 0 PACI UTY ao

.YPS <<SLBIPTICN 0~

EKaa'o LSJG2 NA AU due:m NAC LSP. CNLV 0 ~l~m NA a 9 Io da NAAIS CP PASPARSR puoNS {305~ 552 3958 V 9010 8 0'4 (

REPORTABLE OCCURRENCE LICENSEE EVENT REPORT 335-78-37 Rev. l PAGE TWO Additional Event Descri tion.

The system inspections were being conducted to verify plant "as built" design drawings. The a'ffected safety related systems, Control, Room Ventilation, Emergency Core Cooling Systems Area Ventilation (including portions of the Reactor Auxiliary Building-Ventilation supply system), and Shield Building. Ventilation are. only required in the event of a.

LOCA. In order for them to possibly fail to fulfilltheir functions an earthquake would also have to occur The probability of these two events occurring in'he near future is extremely low An engineering evaluation performed by the AE has determined that the ventilation duct restraint system existing at the. time'of the occurrence, on the safety related system in question was capable of sustaining the additional loads imposed upon it due to the absence of the 66 missing longitudinal braces during a design basis seismic event. Other ventilation systems in containment and shield building do not require the longitudinal braces so are not a concern.

Additional Cause Descri tion and Corrective Action'e have concluded that a unique combination of factors involved in the contracting, dxawings and quality control. for .these ventilation braces resulted in their not being installed as required. A description of the circumstances is as follows:

a . It was not until late into the St; Lucie Unit 1 project that the ventilation system installer, an independen" contractor, was to be assigned the additional scope of work of installing the permanent restraints and braces for ventilation system ducting, which included the 66 braces in question. A communication error between the AE and the ventilation system installer apparently contributed to the installer not including these 66 braces on the installation drawings, even though these braces appeared on the Architect-Engineer's (A-E's) design engineering drawings which were used as a source for the installation drawings.

b. The installer was also responsible for the quality con~1 inspections associated with the ventilation system installation; consequently the "as-built"

.condition was inspected to the installation drawings, which, as noted above, did not include these 66 braces.

Had the ventilation system been inspected by our A-E's QC, who did most of the other inspecting, or had the installer used the A-E's design drawings for inspec-tion, the missing braces probably would have been identified during the construction phase.

REPORTMKE OCCURRENCE 335-78-37 Rev. 1 LICENSEE EVENT REPORT PAGE THREE Additional Cause Descri tion and Corrective Action (continued)

Although there were several other contractors participating in the St. Lucie Unit 1 constzuction who performed their own quality control, it has been determined that. none of these contractors used other than design drawings for installations and inspections.

Installation of the previously missing braces in PSL-1 was.

completed on October 5, 1978.

Measures are being established to prevent a similar omission from occurring on our St Lucie Unit 2. These measures include=

a More effective comparison of installation drawings against design drawings for accuracy and. completeness prior to site approval of installation drawings.

b Pezforming a walkdown by PPL Quality Contxol personnel of seismic duct. supports to verify that the "as-built" is in accordance with the design drawings