REGULA, iY INFORMATION DISTR~IBUT'IO YSTEM, (RIDS)
ACCESS IONA NBR: 81100702V 1 DOC ~ DATElt 81/10'/01 NOTARIZED;:, NO DOCKEiT> 0 FACILi:50 244 Robet't; Ktiimeit>> Ginnai Nucl ear I Pl ant'r Uni t lr Rochester I
G 050002'44 AUTH',NAME(
AUl'HQR" AFF ILIATiION 8H'ITEM L' D ~
Rochester Gas 8 Electric C'or p+
RECIPe NAMKI RECiIPZENT AFFILiIAH'ION CRUTCHFIELOiiD.
OperatingReactors Bi anch:
5 SUB'JKCITi: For wards technical L schedular. info re SEP Topic III. 5i,A r ei' fects'f pipei'r eak on structuresisys 8 components<.inside; containmpntRper NRC 810630 request, DISTRISUTION CODED ASSES COPIES RECEtIVED:LiTR
'NCL(
'IZE'::ITLKh:
SEP Topi cs NOTES;1 copy:SKP Sect.
Lid+
050902'44 RECIPE ENT" IDi CODE/NAMKl ACTION:I ORBi 05 BC) 04 INTERNALS'/D",iATLKQUALil3i HYD'/GEOI BR 10.
OR ASSESS'R 11 SEP BR 12E COPIES LTTR ENCLi 7
7 1
1 2
2' 1
3N 3
RECIPIENT'D CODE'/NAME CONT SYS A
07 ILEi 06" 01 COPIES LR'iTRi ENCL~
1 2
2'=-
KXTERNALi: ACRS 14 NRCt PDRI 02'T'IS lb 16 1
1 1>>
1 LPDR NSIC<
03 05>>
sV TOtl'AL NUiiBER'F COPIES'EQUIRED:: LiTTRI ENCLi 3Af
If W
I
'll II V~
/////////////
//////////
t41tON/> ~
~
xi~-z zizuriz 8Z..::::
ROCHESTER GAS AND ELECTRIC CORPORATION
~ 89 EAST AVENUE, ROCHESTER, N.Y. I4649 LEON D. WHITE, JR.
Executive Vice Preeieent TELEPHONE ARCA COOE Tle 546-2700 October 1, 1981 Director of Nuclear Reactor Regulation Attention:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No.
5 U.
S. Nuclear Regulatory Commission Washington, DC 20555 eggy~,
e,
- 1g84, 6
ep+~lceetie
Subject:
SEP Topic III-5.A, Effects of Pipe Break on Structuresg Systems and Components Inside Containment R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Crutchfield:
A letter dated June 30, 1981 from Mr. Dennis M. Crutchfield requested that we provide a schedule within 30 days of receipt of the letter for resolution of ten open items for SEP Topic III-5.A, Effects of Pipe Break on Structures, Systems and Components, Inside Containment.
Our letter dated August 5, 1981 stated that RG&E would address items 1 through 6 in the Conclusions section of the NRC evaluation and that a schedule for resolution of items 7, 8 and 9
would be provided in October.
Attachment A to this letter provides the technical and schedular information addressed in that letter.
Very truly yours, p.
L. D. White Jr.
Attachment Bii007027i Sii001 PDR ADQCK 05000244, P
~PDR
ATTACHMENT A SEP TOPIC III-5.A HIGH ENERGY LINE BREAKS INSIDE CONTAINYiENT R.
E.
GINNA NUCLEAR PONER PLANT DOCKET NO. 50-244 October. 1981
I
Rochester Gas and Electric Corporation submitted a report on September 12, 1979 (reference
- 1) which evaluated the effects of high energy line breaks inside containmont.
The objective of the evaluation was to assure that the integrity of structures, systems
'and':components relied, upon for.safe reactor shutdown or for mitigating the consequence of postulated pipe breaks is maintained.
The 1979 report identified the high energy lines inside the R.
E. Ginna containment and the essential equipment needed to mitigate the consequences of pipe breaks.
An effects-oriented-approach was used for evaluating the postulated breaks in the high energy lines which assumed a pipe break anywhere along the line inside containment.
As a result of this conservative
- approach, some breaks could not be shown to have acceptable consequences based upon the effects-oriented evaluation alone.
In addition, the NRC draft evaluation of SEP Topic III-5.A (reference 2) identified areas where clarification of the methods used in our evaluation and where additional information concerning our as-sumptions are required for staff acceptance of our evaluation.
As a result, ten items appearing in the Conclusions section of the NRC evaluation remain to be resolved to close out SEP Topic III-5.A.
Each of these ten items is addressed below.
The NRC evaluation item is repeated for clarity.
1.
Clarify the assumptions used in the evaluation of the effects of postulated pipe breaks with respect to the jet riedel and the analyses of pipe mtions caused by the dynamic effects of postulated pipe breaks. If the assmgtions ~e different frcm those described in Sections V.A and VI.A, justify the assumptions used or demonstrate that the consequences of the possible new interactions are acceptable.
An effects-oriented procedure was used for evaluating high energy line breaks inside containment.
All high energy lines
-(identified in reference
- 1) were assumed to fail and whip or form jets at any place along the line where a sustained high energy source was attached.
Credit was taken for all closed valves or check valves which would restrict, flow., and thus limit the length of pipe subject to whip or jet formation.
Each remaining line segment which could whip or form jets was evaluated individually in reference 1.
Most of these line segments were shown to be contained entirely within one of the primary loop compartments or were above the operating floor of the'ontainment.
These locations are separated from all of the equipment required to mitigate the effects of the high energy line breaks by substantial concrete walls or one or more floors with steel reinforcing.
The operating floor is 9 inches of concrete with a supporting steel structure.
The intermediate floor is 6 inches of concrete with a steel supporting structure.
The loop compartment walls are concrete walls at least 30 inches thick.
Breaks in the following lines
will have no adverse effect upon mitigating equipment because of this separation:
Alternate Charging Residual Heat Removal Gut Residual Heat Removal In Reactor Coolant System Pressurizer Safety and Relief Lines Main Steam Feedwater
,.Standby Auxiliary Feedwater Because of the physical separation between the broken lines and the mitigating equipment, it was unnecessary to perform jet impingement calculations for these lines.
No jets will reach required equipment.
No jet calculational models were required to evaluate the effects upon valves, piping or cabling.
The main steam line was identified as having a potential for pipe whip impact upon the containment wall.
That interaction is addressed in 2. below.
Pipe whip and jet loads from reactor coolant system pipe breaks have been addressed in NRC Task Action Plan A-2 (TAP A-2) and have been shown to result in acceptable consequences.
Develop-ment of a leak-before-break analysis capability and supporting materials testing has been performed by Westinghouse Electric Corporation for a group of utilities including RG&E.
Docu-mentation of this work and the resulting conclusions may be found in reference 3 and reference 4.
The Residual Heat Removal-In line was identified as having a
potential pipe whip impact upon a primary system component support because of the proximity of the pipe and support but the RHR line was eliminated from consideration because the plane of motion of the broken pipe would not carry it into the support.
TAP A-2 work also should apply to this line and give added confidence that no adverse effects will result (see S. below).
Breaks in three lines outside the loop compartments and in lines which are fed by the positive displacement charging pumps were shown to result in acceptable consequences based upon specific jet impingement calculations.
These lines are:
RCP Seal Water In Charging Auxiliary Spray For the thr'ee lines it was shown that the maximum jet force at the exit from the broken pipe would be less than 100 pounds.
This was determined by multiplying the service pressure (2235 psi) by the largest opening which the charging pump could sustain at pressure with all pipe losses ignored.
Applying a dynamic load factor of 2 and assuming the entire jet. strikes each target still results on loads which are small and clearly acceptable.
\\
The remaining lines (letdown, steam generator
- blowdown, accumulator "lines, pressurizer surge and pressurizer spray),
which could not be eliminated because of location or conservative calculations, are all identified as potential problem areas in reference 1,which require. additional, work.,All,.of,these, lines are discussed in other sections of this rcport.
- Thus, except for the discussions below for specific problem areas, no detailed jet or pipe whip calculational models were required to conclude that breaks in any of the above lines will result in acceptable conse-quences.
2.
A break in either a main steam or main feedwater line could impact the containment wall.
The licensee must demonstrate that the pipe whip will not result in penetration of the containment wall. If some loss of containment function occurs an assessm nt must be provided of the conse-quences.
Because an effects-oriented evaluation of the main steam and feedwater lines could not rule out the potential for a ruptured line striking the containment wall, a mechanistic evaluation of the main steam line was performed.
The analysis methods used made evaluation of the main steam line a conservative envelope for both main steam and feedwater line rupture effects upon the containment wall.
The thrust force applied by the escaping fluid to-the pipe was calculated by multiplying the initial pressure by the pipe cross-sectional area.
The steam line force calculation thus envelopes the feedwater force calculation.
The evaluation of pipe whip effect on containment wall integrity was performed for both main steam lines A and B.
The piping stress analysis results from the RGE seismic upgrade program were used in the evaluation.
The piping break locations were postulated at the following locations:
1 Terminal ends of piping run.
2 Sections where S
1
+ SEJ 0.8 (1.2Sh
+ SA), where 01 the occasional loads're due to normal and upset (OBE) conditions.
3
A minimum of two locations of maximum stress.
Table 1 provides the location of the maximum stress combi-nations S
1
+
SE for each main steam line; these locations are 01 shown in Figure 1.
TINGIROUSE NUCLEAR TECHNOL DIVISION TlT LE
~
~
PAGE A/77. 7 Q g~ gjpn ~We g, 2 FiN'v'PIP A'0 c5arA. i~/
PROJECT CH K'D. IIY PQTE CHK'D. GY DATE a~nr-ld>d LC. NO.
FILE NO gP~ xif5-158 9r~~ trf s-&JE PEA/+ QO/,I,:
I 7/g m
czAuE Sa~CT CONAN
~+ I/I/7~<<GDIA7 6 LoCATlofi r
oe H/c.kesT smFss
+ bAge <ceps'~ %r gA?w ~/pg.y~~
QEG4L5E OF jBpRcY'n/
tdRLI Z85'7V305
/HR"s7=
A/~
7DD smn ~
Q~<<
=.pm'~gD2 6~M /ie'S
,i ~
~cuPF 4'g5 YV
/5~~
iPHc7 I/QX/i'i'0/"/
~r-g E ~~i / dZ$7Vh/5 ZoI<dk' A/-', %04'8 kpbc7-AHF/)~~
AUTHOR AIIV.
AEV.
NO.
DATE 1VESTINGHOUSE fOHM 552130 DATE CHK'D. 0 Y DATE CHK'D. OY DATE
Steam Line TABLE 1 S
+
S Node Point Number 0.8 (1.2Sh
+
S
)
S3.
A A
A A
B B
B 810 511 700 710 740 730 610 27,831 25,361 24,855 24,525 27,837 24,135 23,843 29,592 Since none of the combinations S
+
S exceeds the stress ol E
limit, circumferential breaks are assumed at the two intermediate points of maximum stress.
The instantaneous thrust force generated by the flashing steam water mixture was calculated according to the methods described in "Structural Analysis and Design of Nuclear Plant Facilities" J.
D. Stevenson et al,
- ASCE, 1980.
This thrust force results in piping moments that may exceed the ultimate plastic moment at a local cross section.
A plastic hinge may be formed and the kinetic moment of the thrust force may accelerate the pipe toward the containment wall.
The dynamic characteristics of the pipe required to evaluate its penetration in the containment wall for those locations where the wall is struck are:
a) the striking velocity of the pipe v0 4A b) the effective pipe diameter d
= where A
is the contact area.
c c) the pipe weight H, and d) the pipe shape factor N
These variables have been evaluated for the break cases considered in Figure 1.
In this evaluation, the effeet of the existing pipe supports and the crane structure were neglected to maximize the impact upon the wall.
This is conservative since these restraints tend to decelerate the pipe motion and, therefore, decrease the striking velocity v0 The results of the analysis are provided in Table 2 and the impact zones of the containment wall are shown in Figure 1.
h1ain Steam Line Break Location TABLE,2 Max. Impact Velocity ft/sec Effective Pipe Pipe Weight Diameter lb in A
A A
A A
A B
B B
B B
Pen.
401 SG Nozzle 810 511 700 710 PEN.
402 SG Nozzle 740 730
'10 No No No No 195 No No No No No 29 Impact Impact Impact Impact Impact Impact Impact Impact Impact with Containment Wall with Containment Wall with Containment Wall with Containment Wall 8,578 52 with Containment Wall with Containment Wall with Containment Wall with Containment Wall with Containment Wall 16,463 52 It should be noted that the two intermediate locations of highest stress do not result in an impact on the containment wall and therefore no further analyses are required.
Nonetheless, to provide additional confidence that, postulated breaks will not yield a ruptured containment wall, the highest stressed location in each steam line which results in an impact upon the wall has been evaluated.
The locations considered are 5700 on MSL A and g610 on MSL B (see Figure 1).
The analyses evaluated the structural integrity of the wall considering overall wall response and evaluated the total pipe penetration depth in the wall.
Containment liner plate was not considered in the evaluation of the containment shell integrity.
Characteristics for the wall were based upon prestressed concrete detail drawings for the R.
E. Ginna plant.
The Modified National Defense Research Committee (NDRC) formula was used for penetration depth calcul-ations.
In addition, the evaluation considered the response of the reinforced concrete wall system to resist penetration from a deformable missile.
The characteristics of the missile were used to develop an applied force time history and an analysis for the overall response to the force is carried out as for 'an impulsive load.
The analytical methods used are outlined in reference 5.
The analysis results for penetration depth (X in inches) using the NDRC formula were as follows:
For break location 4700:
MSL "A" X = 13.96" For break location 5610:
MSL "B" X = 3.48" The analysis for missile penetration into the wall con-sidering overall wall response resulted in Xm/Xc = 1.352.
This is considerably less than the allowable ductility ratio for impulse loads for flexure in structures.
The rectangular impulse load considered:
Collapse load of slab
= 29649K; Plastic hinge moment
= 2360 in K/in Duration of impulse load
=.00098 seconds
'=The ~conclusion of these analyses is-that, even neglecting the three-eighths inch steel liner plate, structural integrity,of the containment shell is assured.
3.
At some locations in the "B" main steam line, a bre'ak could impact support columns for the containrrent crane structure and possibly cause the crane to fall.
The licensee Fust ensure that the dynamic effects of a main steam line break will not cause the crane to fall or.detranstrate that breaks need not be postulated in those locations based on a m chanistic evaluation.
Piping stresses in the "B" main steam line were determined during the RGE seismic upgrade evaluation (see
- 2. above).
There were no locations where the stress exceeded 0.8 (1.2 S
+
S
) and thus required breaks to be postulated.
The two highest stress locations betweon the terminal ends which are postulated to break are not located along the pipe where it passes between the crane supports (see figure 1).
Breaks at the terminal ends also will not impact the crane supports.
Therefore, additional analyses to demonstrate that the dynamic effects of a main steam line break will not cause the crane to fall are unnecessary.
Breaks resulting in damage to the crane are not postulated to occur.
4.
A break in the accunulator line between the tank skirt and the loop compartrrent walls could interact with the LPSI lines (resulting in a LGCA) and with the HHR outlet line.
A break could also impact con-tainrrent spray or safety injection lines.
Breaks in this line could also interact with cables for instrunentation circuits, the LPSI valve controls and fan coolers.
The licensee must dennnstrate that the consequences of this scenario are acceptable, provide restraints and protection or demonstrate that breaks need not be postulated in this area based on a rrechanistic evaluation.
The staff evaluation of the 10 inch A accumulator line break (no potential problems have been identified for the B accumulator) identifies potential problems resulting from interactions of the piping with the following equipment:
a) b)c) d)
e)f) g)
LPSI line RHR outlet line Containment spray line Safety injection line Instrumentation circuits LPSI valve control circuits Fan coolers Breaks in the A accumulator line between the accumulator tank skirt and the loop compartment walls will not, by themselves, result in,,a 'loss of primary coolant.
" Check valve 867 located inside the B loop compartment will prevent loss of primary coolant.
Only accumulator fluid will be lost as a result of the break.
Interaction with other equipment is acceptable provided the
'nteraction does not cause loss of primary inventory or interfere with maintaining the plant in a safe shutdown condition.
There-fore, equipment required only for mitigation of LOCA's or large secondary system breaks need not remain functional for the ac-cumulator break and items c, d, f, and g may be eliminated from consideration.
The remaining items, a,
b and e require evaluation.
The A accumulator line stresses have been determined in the seismic upgrade program.
Stresses in the line are low and generally are only 10 to 25 percent of allowable.
Two intermediate break locations have been examined based upon the highest stress locations.
One of these locations is inside the loop B compartment where no interactions with surrounding equipment, will result in adverse effects.
The second intermediate location is at node 420 near valve 110V 841 and is shown in Figure 2.
The stress at, this location is less than 4000 psi.
The allowable stress is greater than 27,000 psi.
The stress at node 420 is so low that a break at this location should not be postulated.
If a break is postulated at node 420, piping downstream of the node will not whip because the line is filled with cold water with no sustained high energy source available.
Check valve 867A prevents blowdown.of the RCS.
The line between the elbow at node 420 and the tank skirt is a straight run of piping near the floor and separated from the LPSI line by at least 15 feet, a distance greater than the length of pipe between the tank skirt and node 420.
Portions of the RHR line are closer to the accumulator line but are also out of reach of the pipe segment between the tank skirt and node 420.
Valve 700, located in the A loop compartment, provides isolation from the primary system.
If a rupture is postulated at, node 420, the pipe may deflect downward or even strike the floor but the-pipe deflection will not be toward the RHR line or the LPSI line (see drawing E-303-603 in reference 1).
In addition, work performed for TAP A-2 and presented in references 3 and 4 is applicable to this line.
The material in this line is similar to that tested, stresses in the line are low and leakage from the line will be easily detected.
In addition
~orr raro calltwo Coawarl willa
'I Orll 141
\\Cl Tl dOOOtc >I
~~0~~
1' al oo II III II
~tip CC
~
I
<<0 Ol att
~
0 lot ot
)0 r
ra=
r
~
I
'.I r. I ~ Its 'g ')
01 1\\
.CO
- 0'C 4 Or "tr
~ 4 '
Ir 104 4
rC 4
cs+
COO '
"OC4 t
Csq
~
sll sll SSO 1st rh rrCO p, g lr, ~
toto ata
~ol 0
~ CO lt 544 Slo ~I
)I
~ '0 I
ltallo IOLSl ar Ira al ÃDIID
~Arorrortol Ilrlcoaolaactoa MVrotokrDR
~
I
~,
>C*
fc'
~ r=
I-II ~
~ a l,p~jf,t,a;j
~.. f.-.
Cr. I.)
~ I
~
~I F000 I
I h
~
'rS. ~
CO"
~I
-rr ~
Orla
~I ICIIISIOtA'~'
5QIE.
-'GR
%TAILS SEE DW6.
~
RCPCRflkCCI-
,I' tol Ya'Gart lrtoorrallDII OCC I ~
oat Ottoarl 5504
, k.
OOR toaaoratRT artotlal TICOC llC Oal lloolllltl
~r sa toa
~ Ot Ottc.artocllocrcal I'ct aat alto'll ctlt 1
's.
+, two 4 aro too lraa arltrl'
'sawA aaral'rravo
~ 44 oa o tora
~
I ss)t' I'.
I Ds~ I
.I
- j. 0 WIIII wtllI
~ s 0
to containment sump monitoring to detect
- leakage, level indication on the accum'ulator will give early warning of trouble.
Level in the tank is governed by the Technical Specifications and is closely controlled.
Therefore, rupture of the 10 inch accumulator line should not be postulated because of the 'applicability of "leak befor'e break" established by TAP A-2 work and because stresses in the line are very low.
- Further, even if rupture of the line at the two highest stressed intermediate locations is postulated, the break will not adversely 'affe'ct 'required equipment.
The effect of a break in the 2 inch accumulator level taps on nearby instrument -circuits does warrant further investigation which will be completed at a later date.
The effect of any jets from cracks in the 10 inch accumulator line will be small.
The jet force is obtained by multiplying the accumulator pressure (approximately 800 psi) times the crack opening area.
The con-duits and trays can easily withstand an impact force of 200 pounds or, assuming a dynamic load factor of 2, a jet force of 100 pounds.
- Thus, a crack opening of 100 pounds/800 psi or.125 square inch is acceptable.
Cracks with easily detectable leakage in operating plants and with similar pipe wall thicknesses and system pressure have been observed.
Opening areas calculated for these cracks (see Table I-5 of reference
- 3) are at least an order of magnitude smaller than the opening which is.acceptable for jet impingement.
Therefore, jets from a postulated crack in the 10 inch accumulator line require no further evaluation.
5.
Breaks in the 10" pressurizer surge line could result in a large LOCA.
Pipe whip from breaks in this line could impact sona of the following:
A LPSI valve, one SI-train, a containment spray line and the sump.
Damage to one LPSI valve, and a single (independent) failure of the other LPSI valve would result in a loss of the low pressure ECCS flow which is needed to mitigate a 10" line break.
Also, damage to the st could affect long-tenn post-LOCA core cooling.
Therefore, the licensee rmst provide shields and/or restraints to protect essential equipnent fran the dynamic effects (pipe whip and jet impingement) or demonstrate that breaks need not ke postulated in these areas based on rrechanistic evaluation.
The 10 inch pressurizer surge line connects the B hot leg to the bottom of the pressurizer.
The line is run along the loop B
compartment wall and an exterior vertical wall of the refueling canal before turning upward to connect to the bottom of the pressurizer (see drawing E-303-603 in reference 1).
Rupture of the line may require operation of the nearby LPSI, SI and con-tainment spray to mitigate the LOCA.
These lines, although
- nearby, are mostly routed on the underside of the refueling canal which is above the basement floor.
The surge line and mitigating
equipment pipes are on walls which are normal to each other at an exterior corner over most of the pipe run.
Most jets, although not all jets, from the surge line will not impinge upon the mitigating equipment lines.
However, work performed to demonstrate "leak-before-break" for TAP A-2 is also applicable to this line.
The material is the same as the rest of the reactor coolant system and leakage from the surge line will be detected by the same systems 'that detect leakage from other RCS pipes.
References 3 and 4 document analyses and.test results which confirm that substantial leak rates will result from piping flaws prior to reaching crack instability even in the presence of earthquakes.
Appropriate conservatism was used in all of the calculations.
Loads used in the analyses to determine crack stability included thermal,
- pressure, deadweight and safe shutdown earthquakes.
Loads used to calculate crack opening areas and leak rates included only internal pressure.
The calculated leak rate of 10 gpm includes only the escaping liquid and does not account for escaping steam.
The actual leakage from the postulated 7.5 inch through-wall flaw used in the analysis is probably closer to 50 gpm.
Leakage will be detected by sump level, condensate from the fan coolers, humidity monitors, radioactive gas detectors and radioactive particulate detectors.
Leakage rates of 10 gpm or more will also be easily detected by monitoring pressurizer level and charging pump speed.
The crack opening areas calculated in reference 3 corresponding to leak rates which are easily detectable
( ~ 10 gpm) are
.010 square inches or less.
The total jet force from an opening this size in the
- RCS, which operates at approximately 2235 psig, is less than 25 pounds.
This force can be easily withstood by the piping systems required to mitigate small LOCAs.
It should be noted that no mechanism has been identified to produce a large flaw in a PV7R coolant pipe.
The leak rates which have been calculated consider only the liquid portion of the escaping fluid.
- Thus, leaks which are easily detectable will probably result from flaws which are smaller than those identified.
Larger leak rates from smaller flaw openings will mean that the jet forces will be smaller prior to plant shutdown for repair.
Therefore, with detectionof gross leakage assured and stability of the piping system assured even under large flaw conditions, rupture of the surge line should not be postulated.
Shields and restraints to protect against full diameter breaks or additional analyses of smaller surge line flaws are unnecessary.
6.
A break in the "A" locp pressurizer spray line could affect reach rods for the sump valves 851A and B.
The licensee must ensure that adequate
10 protection is provided for the reach rcds so that a spray line break dces not restrict sard flow below the required value.
A mechanistic evaluation of the pressurizer spray line from the A =loop, "which passes near -the reach. rods Xor-,IIOV.851A,.and 851B, has been performed.
Stresses in the line were determined during the seismic upgrade program analysis.
The analysis shows
'hat breaks need not be postulated near the sump valve reach rods
~
The -pressurizer spray li'ne fx'om the' loop passes through three distinct areas within the containment:
the A loop compart-
- ment, an area outside the two loop compartments, and the pressurizer compartment (see drawing. D-304-602 in reference 1).
On the basis of the stress
- analyis, four breaks are postulated to occur.
These breaks are at each terminal end, one in the A loop compartment and one in the pressurizer 'compartment, and at the two highest stressed intermediate locations.
One intermediate location is in the A loop compartment and the other is in the pressurizer com-partment.
Therefore, because no breaks are postulated to occur near the sump valve reach rods, no protection for these rods'or additional restraints on the spray line are required.
7.
The letdown line outside the "B" carpartrrent is near the pressurizer pressure cables.
The licensee must provide protection for the cables frcm the dyanmic effects of a letdown line break or demonstrate that breaks in this line will not prevent accident mitigation and safe shutdown.
A letdown line break would result in a small cold leg LOCA.
Damage to pressurizer instrumentation could prevent safety in-jection from being initiated from a low pressurizer pressure signal (although it is most. likely that a failure would be in the
- safe, low, direction, actually resulting in SI).
However, other instrumentation such as the high containment pressure signal (4
psig) should provide automatic safety injection initiation. If pressure does not increase quickly enough to rapidly initiate SI, manual SI could be actuated by the. operator.
Substantial information will be available to the operator via charging flow instrumentation, sump level, and containment radiation signals.
Also, cables for at least one pressurizer pressure and one pressurizer level instrument would be unaffected by the letdown line break.
Generic Westinghouse PWR analyses (WCAP-9600) have shown that SI is not required for an hour or more following a small LOCA.
Because of the amount of available instrumentation, operator action can occur within 10 minutes with no unacceptable consequences.
0
11 RG&E is still evaluating the effect. of the letdown line pipe break and jet impingement on cables and cable trays.
Until this work is completed,
- however, no immediate concerns are apparent.
8.
The steam generator blowdown lines are on the same elevation as the fan coolers.
Although the lines are restrained by the surrounding service water piping so that pipe whip is not of concern, protection of the fan cooler fran a jet has not been established.
In addition, cables for some of the steam generator level transmitters, pressurizer instrumentation and fan coolers are near the blowdown line.
The licensee must either provide protection for essential equipment frcm the dynanic effects or show that the break effects will not prevent safe shutdown and mitigation of the break.
The steam generator blowdown line is comparable to a 2 inch feedwater line.
Based on previous containment analyses, performed for large steam line breaks, it is not anticipated that containment integrity will be challenged, even with loss of all containment fan coolers.
As in 7. above, damage to certain cables could prevent. automatic initiation of safety injection although adequate instrumentation is available for manual operator action.
Because of the small break size, SI actuation by operator action from the control room within 10 minutes will provide all necessary safety functions for accident mitigation.
The operator will have containment. pressure, radiation, and sump level instru-mentation available to provide information to initiate SI. If
.necessary, the containment spray system would be available to
~ maintain containment conditions.
RGSE is still evaluating the effect of the letdown line pipe
'"break and jet impingement on cables and cable trays.
Until this work is completed,
- however, no immediate concerns are apparent.
. 9., Cur acceptance of the consequences of breaks within loop canpartments is predicated on the assunption that the dynamic effects of pipe breaks are contained by the canpartm nt walls.
Therefore, the licensee should provide appxopriate references to supporting analyses for ccmpartm nt wal 1 integrity.
The compartment walls are 30 to 48 inch thick concrete walls. Analyses of subcompartments were performed during Phase B
and Phase C of the Asymmetric Loads work.
Documentation that the walls will withstand the effects of a full RCS guillotine break is provided in references 6 and 7 submitted for TAP A-2.
12 An analysis of a broken main steam line impact upon the containment wall, ignoring the containment liner, was performed in 2. above.
The broken 30 inch steam line penetrated the con-crete less than 14 inches.
It is expected that broken 10 inch or smaller...pipes inside the.loop.compartments will have a minor effect upon the walls.
10.,
As discussed in Section VI.B, conclusions on the adequacy of the review of pipe breaks in the primary RCS loop are deferred pending i,ssuance of the USI A-2 position; No further response required.
Information to establish a
"leak-before-break" criterion for stainless steel piping is given in references 3 and 4.
References Rochester Gas and Electric letter from L. D. White, Jr. to Mr. Dennis L. Ziemann, Chief, Operating Reactors Branch 52, USNRC ~dated September 12, 1979.
USNRC letter from Mr. Dennis M. Crutchfield, Chief, Operating'eactors Branch No.
5 to John E. Maier, RGE dated June 30, 1981.
WCAP 9558 Rev.
2, "Mechanistic Fracture Evaluation of Reactor Coolant Pipe Containing a Postulated Circumferential Throughwall Crack,"
S.
S.
Palusamy and A. J.
- Hartman, Westinghouse Electric Corporation, May 1982.
(SIC)
WCAP 9787, "Tensile and Toughness Properties of Primary Piping Weld Metal For Use In Mechanistic Fracture Evaluations,"
S.
S.
- Palusamy, Westinghouse Electric Corporation, May 1981.
"Structural Analysis and Design of Nuclear Plant Facilities,"
ASCE, 1980, Sections 4.7 and 6.4.1.
WCAP 9628, "Westinghouse Owners Group Asymmetric LOCA Roads Evaluation Phase B," Westinghouse Electric Corporation, November 1979.
WCAP 9748, "Westinghouse Owners Group Asymmetric LOCA Roads Evaluation Phase C," Westinghouse Electric Corporation, June 1980.