Transmittal of Reply to a Notice of Violation, EA-17-030
ML17233A172
Person / Time
Site: Pilgrim
Issue date: 08/11/2017
From: Perkins E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation, NRC Region 1
References
1-2016-011, 2.17.055, EA-17-030
Download: ML17233A172 (2)


Text

~Entergx Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August 11, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Reply to a Notice of Violation; EA-17-030 Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 REFERENCE 1: Letter, NRC to PNPS, "PILGRIM NUCLEAR POWER STATION-NRG INVESTIGATION REPORT NO. 1-2016-011," dated June 28, 2017 (EA-17-030)

LETTER NUMBER: 2.17.055

Dear Sir or Madam:

This letter provides Pilgrim Nuclear Power Station's (PNPS) reply to Notice of Violation; EA 030 (Reference 1). This information is provided pursuant to the provisions of Title 10 Code of Federal Regulations (CFR) 2.201.

PNPS requests that the attachment to this letter, which contains Security-Related Information, be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1).

In a conversation on July 27, 2017, Entergy requested NRC Region 1 management provide a two (2) week extension of the due date for this letter. This extension was requested to allow Entergy to complete some related investigations. This extension was granted on July 28, 2017.

If you have any questions or require additional information, please contact me at (508) 830-8323.

There are no regulatory commitments contained in this letter.

Sincerely< (') _b .r-

, ,~~~~

Everett P. Perkins, Jr. _ _....;;...-...---;m-""""==

Regulatory Assurance Manager EPP/mp This letter contains Security-Related Information - Attachment is withheld from public disclosure per 10 CFR 2.390

Entergy Nuclear Operations, Inc. Letter No. 2.17.055 Pilgrim Nuclear Power Station Page 2 of 2 This letter contains Security-Related Information -Attachment is withheld from public disclosure per 10 CFR 2.390

Attachment:

Reply to a Notice of Violation; EA-17-030 cc:

Mr. Daniel H. Dorman Regional Administrator - Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406 Mr. John G. Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555-0001 NRC Resident Inspector Pilgrim Nuclear Power Station This letter contains Security-Related Information -Attachment is withheld from public disclosure per 10 ~FR 2.390