MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] |
Text
~ CATEGORY ly REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
'7 CESSION NBR:9803040302 DOC.DATE: 98/02/26 NOTARIZED: NO DOCKET I ACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 5: Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION PLUNKETT,T.F. Florida Power E Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits response to violations noted in insp repts 50-335/97-14 E 50-389/97-14.Corrective actions:SG replacement project personnel alerted to St Lucie plant procedural requirements on planned deviations of TS limits.
DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR i ENCL I SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response E NOTES:
RECIPIENT COPXES RECIPIENT COPIES Q ZD .CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 GLEAVES,W 1 1 R XNTERNAL: ACRS 2 2 AEOD/SPD/RAB 1 1 Y 1 1 DEDRO 1 1 1 1 NRR/DRCH/HHFB 1 1 CB 1 1 NRR/DRPM/PERB 1 1 NUDOCS -ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN2 FILE 01 1 1 XTERNAL I L TCO BRYCE J H P 1 1
1 1
NOAC NUDOCS FULLTEXT 1
1 1
1 D
NRC PDR 0
C N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19
Florida Power 6 Light Company, P. 0. Box 14000, Juno Beach, FL 33408 0420
%PL FEB 2 6 3998 L-98-039 10 CFR $ 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Reply to a Notice of Violation Florida Power and Light Company (FPL) has reviewed the subject Notice of Violation and, pursuant to 10 CFR $ 2.201, the response to violations B and C are attached. NRC Inspection Report 97-14 stated that no response to violation A was required since the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved, were adequately addressed on the docket.
With respect to violation B, inadequate oversight of contractors by FPL personnel during the St.
Lucie Unit 1 Steam Generator Replacement Project (SGRP ) resulted in a failure to properly implement plant procedural requirements for documenting and approving planned exceedances of the Technical Specification limits on overtime. St. Lucie site management will ensure that the lessons learned in regard to the level of contractor oversight required to perform at high levels from the SGRP outage are applied to future refueling outages.
With respect to violation C, personnel errors continue to dominate the cause of performance shortcomings at St. Lucie. I personally have discussed the unacceptability of continuing personnel errors with the management team and the nuclear plant supervisors at the plant. I have stated my expectations for error-free performance in all activities and the consequences for not meeting my
'xpectations. To prevent future personnel errors, the plant is emphasizing self and peer-checking in addition to its focus on verbatim procedural compliance. This is clearly an area which requires focus and action by the plant managers and staff in the future.
9803040302 980226 PDR ADQCK 05000335 6 PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII an FPL Group company
L-98-039 P~ae 2 Please contact us with questions on the enclosed violation responses.
Very truly yours, Thomas F. Plunkett President Nuclear Division TFP/JAS/EJW Attachment cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant
L-98-039 Attachment P~ae 1 Violation B Section 6.2.2.f of both units'echnical Specifications state, in part, that "Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions." Additionally, "An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period, all excluding shift turnover time." Furthermore, the Technical Specifications require that "Any deviation from the above guidelines shall be authorized by the Plant General Manager or his deputy, or higher levels of management."
Contrary to the above, deviations from the overtime guidelines were routinely authorized by the Steam Generator Replacement Project Director rather than the Plant General Manager or his deputy, or a higher level of management during the 1997 Unit 1 Steam Generator Replacement and Refueling Outage. This included deviations on October 21, and December 1, 1997.
This is a Severity Level IV violation (Supplement I) applicable to both Units.
~Res oese
- 1. FPL concurs with the violation.
- 2. REASON FOR VIOLATION The reason for this violation was inadequate contractor oversight by Florida Power Ec Light Company (FPL) personnel. The replacement of the St. Lucie Unit 1 steam generators was a major construction project and a separate organization was established for the project. The Steam Generator Replacement Project (SGRP) organization was separate from, but matrixed with, other plant departments. SGRP contractor work procedures were reviewed and approved by FPL. During the SGRP, the plant's overtime procedure was revised to address SGRP personnel and, specifically, the applicability of Technical Specification overtime limits to SGRP personnel. Revision 1 to the SGRP overtime guidelines identified that SGRP Quality Assurance, Engineering, and non-destructive examination (NDE) personnel were subject to the St. Lucie overtime requirements, including the required approval authority for exceeding overtime limits.
St. Lucie Plant administrative procedures require that personnel subject to the Technical Specification limits on overtime document requested overtime deviations in a waiver letter that is approved by the St. Lucie Vice President or Plant General Manager. Additionally, the procedure requires that a Condition Report (CR) be written for each requested waiver
L-98-039 Attachment P~ae 2 to document the deviation, its cause, and corrective actions. The SGRP Director, a contracted employee, incorrectly concluded that SGRP personnel who had been designated as being subject to the Technical Specification limits on overtime and the associated St. Lucie Plant administrative procedure, but were not performing safety-related work, could have overtime deviations approved in accordance with the SGRP overtime guidelines. In certain cases, deviation forms for applicable SGRP personnel had been approved by the SGRP director, and not by the St. Lucie Vice President or Plant General Manager, as required by plant procedure. Additionally, in some cases, CRs were not written for some events for which deviation forms had been submitted for approval.
- 3. COR ECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED A. The SGRP director was counseled on the plant's and SGRP's procedural requirements for obtaining approval for exceeding the Technical Specification limits on overtime.
SGRP personnel were alerted to the St. Lucie Plant procedural requirements on planned deviations of the Technical Specification limits on overtime. Subsequent to December 5, 1997, deviations from the Technical Specification limits on overtime for affected SGRP personnel were approved by the St. Lucie Vice President.
C. Additional levels of contractor oversight were provided by the FPL Quality Assurance Department to ensure procedural compliance by the Steam Generator Team.
- 4. CORRECTIVE STEPS TO AVOIDFURTHER VIOLATIONS Management expectations concerning FPL oversight of contractors will be reinforced during the site wide pre-outage stand down meetings. FPL field coverage of contractors and adherence to FPL procedures by contractors will be one of the topics covered in these meetings.
B. FPL is revising and enhancing its contract coordinator training program; this event will be included in contractor coordinator training by July 31, 1998.
- 5. Full compliance with the St. Lucie overtime requirements by the SGRP was met on December 5, 1997, with the completion of corrective action 3.B. above.
L-98-039 Attachment P~ee 3 Violation C Technical Specification 6.8.1 requires that the licensee implement and maintain the procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, 1978 including locking and tagging of equipment.
Procedure ADM-09.04, Revision 2, "In-Plant Equipment Clearance Orders," Section 6.15.10 stated that boundary modifications should be processed using the computer system.
Procedure ADM-09.04, Revision 2, "In-Plant Equipment Clearance Orders," Section 6.1.17 allowed a system with an unisolable clearance provided that "Parameters are being maintained by the Operations shift for control of protective conditions."
Contrary to the above, On November 16, 1997, the Clearance Center Supervisor failed to process a boundary modification using the computer system. An Equipment Clearance Order Boundary Modification was implemented using only the hard copy of the clearance. A difference in the two versions of the clearance order led to the valve being left open aAer returning the system to service.
e On December 16, 1997, the licensee chose to implement an unisolable clearance but did not maintain parameters for the control of protective conditions. A tagless clearance was established to allow fillingthe Reactor Coolant System to 29 feet 6 inches. However, the level in the Reactor Coolant System was subsequently raised to 30 feet.
This is a Severity Level IV violation (Supplement I) applicable to Unit 1 only.
R~es ense
- 1. FPL concurs with the violation.
- 2. REASON FOR VIOLATION The reason for the first example of this violation was cognitive personnel error by the Assistant Nuclear Plant Supervisor (ANPS) and Senior Nuclear Plant Operator (SNPO).
The clearance procedure requires that aAer a clearance boundary is established, all subsequent clearance boundary modifications and releases for test are to be performed
'1 L-98-039 Attachment
~Pa e4 using the computer record of the clearance "as hung" in the field. Contrary to this procedure, the ANPS modified the original clearance boundary on the hard copy of the equipment clearance order (ECO) to allow for the opening of a drain valve to permit pipe purging to remove hydrogen from the piping within the work boundary. The drain valve was removed from the hard copy clearance, without updating the clearance computer database, to allow manipulating the valve under a letter of instruction (LOI) that was developed to control the gas purging evolution. The ANPS failed to update the computerized record of the ECO to reflect the modified clearance boundary.
Post-modification testing required modifying the clearance boundary, so a clearance release for test (RFT) was generated based on the erroneous computerized clearance database, which showed the drain valve position as tagged open. When the RFT was subsequently released, the drain valve was tagged open in accordance with the erroneous clearance computer database. The ECO was later released using the hard copy of the clearance, and the drain valve remained tagged open in the field. This resulted in a hydrogen leak in the reactor auxiliary building via the open drain valve.
Additionally, the failure to update the computerized clearance database should have been identified by the SNPO who hung the clearance RFT boundary modification. The SNPO that hung the clearance RFT boundary modification should have identified the failure to update the computerized clearance database and should have reported that the drain valve was found closed, not tagged open, as expected on the clearance RFT boundary modification.
The reason for the second example of this violation was a procedural inadequacy within ADM-09.04, Revision 2, "In-Plant Equipment Clearance Orders" in that a caution tag was inappropriately permitted by procedure to implement a clearance. In order to allow maintenance on the primary manways, an unisolable system clearance was hung on the reactor coolant system ( RCS). The clearance included the following statement:
This is an ECO for an unisolable system. Parameters are being maintained by the Operations shift for control of protective conditions. DO NOT RAISE RCS LEVEL ABOVE 29'" PRIMARY MANWAYSBEING INSTALLED.
A caution tag was placed on the tygon tubing that stated:
Do not raise level greater than 29'" without ANPS/NPS permission There was no procedural requirement that the caution tag reference the clearance order.
When control room supervision was notified that the primary manways were installed, they did not understand that the caution tag was related to an unisolable clearance order.
L-98-039 Attachment P~ae 5 Subsequently, the ANPS authorized increasing RCS level greater than 29'". RCS level was increased to 30'efore the source of the caution tag was recognized.
- 3. CORRECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED For the first example (failure to update computer clearance database):
The drain valve was closed on November 27, 1997, and a system lineup was conducted on the portion of the reactor auxiliary building hydrogen system that was potentially affected by the clearance.
Stand down meetings were held with Operations personnel to discuss the event, and emphasize the need for keeping the hard copy and computerized clearance database identical.
C. The ANPS and SNPO involved with the clearance error were disciplined.
D. Procedure ADM-09.04, "In-Plant Equipment Clearance Orders," was revised to require a walkdown (or procedural lineup) of major flowpath valves and components within the boundary of all clearances when the clearance is released.
For the second example (unisolable system clearance):
E. The clearance was released on December 17, 1997.
- 4. CORRECTIVE STEPS TO AVOID FURTHER VIOLATIONS For the first example (failure to update computer clearance database):
A. The process used to procedurally change clearances is under review. This effort includes coordination with FPL's other nuclear facility, Turkey Point. This review will be completed by April 30, 1998.
The need to revise the computer clearance soAware to allow deletion of individual clearance tags is currently being tracked on the 10 highest priority safety items list.
This will correct the manual workaround required to change the computer clearance database. The revision to the computer clearance software, and associated procedure changes, will be completed by June 30, 1998.
L-98-039 Attachment P~ee 6 For the second example (unisolable system clearance):
C. Procedure ADM-09.04, "In-Plant Equipment Clearance Orders," was revised to require the use of a clearance information tag, including the clearance order number, on the instrument being used to control the parameter.
- 5. Full compliance with the clearance procedure was reached on December 17, 1997, with the completion of corrective action 3.E. above.