MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] |
Text
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9709300033 DOC.DATE: 97/09/24 NOTARIZED: NO DOCKET I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 UTH.NAME AUTHOR AFFILIATION LUNKETT,T.F. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) ~
SUBJECT:
Responds to violations noted in insp repts 50-335/97-06 &
50-389/97-06.Corrective actions:evaluated work performed under Condition Rept 97-0028 & found acceptable & developed stand-alone troubleshooting procedure.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response E NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 WIENS,L. 1 1 INTERNAL: ACRS 2 2 AEOD/SPD/RAB 1 1 1 1 DEDRO 1 1 ILE CEN 1, 1 NRR/DISP/PIPB 1 1 NRR RCH HHFB 1 1 NRR/DRPM/PECB 1 1 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 OE DIR 1 1 OGC/HDS3 1 1 RGN2 FILE 01 1 1 D
EXTERNAL LITCO BRYCE g J H 1 1 NOAC 1 1 NRC PDR 1 1 NUDOCS FULLTEXT 1 1 N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER'OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20
Florida Power 8 Light Company, 6501 South Ocean Orive, Jensen Beach, FL 34951 L-97-227 tPL September 24. 1997 10 CFR $ 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Reply to a Notice of Violation NRC Inte ated Ins ection Re ort 97-06 Florida Power and Light Company (FPL) has reviewed the subject Notice of Violation and, pursuant to 10 CFR $ 2.201, the responses to the violations are attached.
Since the late calendar year 1996 violation in which a scope change was improperly made to a nuclear plant work order, St. Lucie Plant has strived to improve the conduct of maintenance in the plant. Significant improvements are being made to the plant's work process. A stand-alone troubleshooting procedure was developed, and additional procedural guidance on nuclear plant work order scope changes is being developed.
Concerning the violation for untimely corrective action, we have determined that the 1996 change by St. Lucie Plant to the Condition Report process, which has been in use for several years at Turkey Point, will prevent similar future violations. The importance of the fire penetration seal corrective actions were not recognized during the conversion of the previous program, or STARs, to the current Condition Report and Plant Manager Action Item process. The St. Lucie Quality Assurance Department is performing an independent assessment on the conversion process to determine ifcorrective actions may have been missed during the early 1996 transition period.
Please contact us with questions on the enclosed violation responses.
Very truly yours, Thomas. F. Plunkett President Nuclear Division TFP/JAS/EJW Attachment IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII CC Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant
'tr70'i'300033 9709'24 PDR ADOCK 05000335 8 PDR an FPL Group company
L-97-227 Attachment
~Pe el Violation A 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances.
A scope change was made to nuclear plant work order (NPWO) 2830 on November 20, 1996 which contained step by step instructions for performing testing/troubleshooting activities to demonstrate, in part, the operability of the 125 volt dc bus'ross tie circuit breaker.
'Contrary to the above, the testing/troubleshooting activities were not performed in accordance with procedures of a type appropriate to the circumstances in that the step by step instructions contained in the scope change to NPWO 2830 did not provide adequate details for the testing/troubleshooting activities being performed. The scope change did not adequately delineate testing prerequisites and was not appropriately integrated with the other work control documents being used for this evolution. For example, it was not clear which steps of the original work order were to be completed prior to performing the steps in NPWO 2830. Also, it was not clear which of the breakers was to be worked.
This is a Severity Level IV violation (Supplement I) applicable to Unit l.
~Res ese A FPL concurs with the violation.
REASON FOR VIOLATION FPL identified a deficiency regarding the failure to establish surveillance testing procedures to ensure the operability of the DC bus tie breakers during FPL's preparation for the NRC s Architect Engineer Design Inspection. During on-line testing of these breakers, a failure was noted on the undervoltage (UV) device. This failure necessitated troubleshooting within a Technical Specification ACTION statement for the affected 1C AFW pump, which was accomplished by scope change 1A to the NPWO. The original NPWO was a contingency for additional bench testing/troubleshooting of a failed functional test. Just prior to functionally testing the 125 VDC breaker, a decision was made to perform additional testing/troubleshooting of the breaker in place, instead of" bench testing as the original NPWO scope'outlined. The field scope change 1A, written by Electrical Technical Support, was to allow in place testing/troubleshooting with an energized DC bus.
e L-97-227
'ttachment
~Pe e2 The specific scope change was performed by a technical support person who was a subject matter expert. Detailed scope change instructions were felt to be unnecessary since supervisory oversight was provided, and because the work to be performed was considered to be within the skill of the craft. However, the existing procedural guidance for scope changes was inadequate. Plant Administrative Procedure ADM 0010432 Rev 7, "Control of Plant Work Orders," did not contain su6icient information on minimum requirements for performing a scope change to a NPWO and did not contain instructions or guidance for the use of direct supervision and technical oversight while performing work. Additionally, at the time of this condition, St. Lucie Plant did not have a stand-alone troubleshooting procedure.
CORRECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED A. The work performed was evaluated under Condition, Report 97-0028, and was found to be acceptable.
B. A stand-alone troubleshooting procedure, GMP-21, "Troubleshooting Process,"
was developed and approved on March 10, 1997.
C. A training bulletin was provided to Maintenance supervision on April 15, 1997, for the NPWO field scope change process, and when to solicit assistance from the NPWO planners.
CORRECTIVE STEPS TO AVOID FURTHER VIOLATIONS A. Plant Administrative Procedure ADM 0010432, "Control of Plant Work Orders,"
will be further clarified to include additional guidance on the level of detail required when performing a field scope change to NPWOs by October 10, 1997.
B. Additional training will be provided to Maintenance supervisors and technical support personnel on the level of detail to use when preparing scope changes to NPWOs, and when to solicit review and preparation support by the NPWO planners by October 20, 1997.
Full compliance was achieved on August 25, 1997, with the completion of items 3.B and 3.C above.
e L-97-227
'ttachment
~Pa e3 Violation B Technical Specification Section 6.8.1 states that written procedures shall be established, implemented, and maintained covering the fire protection program implementation.
Final Safety Analysis Report (FSAR) Appendix 9.5A Section 8, Quality Assurance Program, states that the QA program for fire protection is a part of the overall company QA program and is contained in the Florida Power and Light Topical Quality Assurance Report (FPL TQR).
FPL TQR Section 16.1 states that documented measures shall be used to assure that conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective materials and equipment and nonconformances are promptly identified and corrected as soon as practical.
Contrary to the above, in January 1995, corrective action was not initiated to resolve as soon as practical the 222 out of 365 mechanical fire barrier penetration seals installed in various safety related areas of the St. Lucie facility in which a licensee's engineering evaluation determined were not bounded by the vendor's design and test documentation.
This is a Severity Level IV violation. (Supplement I) s R~es ease B FPL concurs with the violation. However, the number of unbounded mechanical fire barrier penetrations is 218, not the 222 stated in the notice of violation. It appears as though penetrations in more than one discrepancy list resulted in those penetrations being counted more than once.
- 2. REASON FOR VIOLATION The apparent cause of this event was weaknesses associated with the previous problem identification and corrective action process, STAR, in place during the original IN 94-28 review. An operability assessment on the condition of the 218 fire penetration seals was not performed under the STAR program, and the need for field modifications was not identified. The original STAR only identified the need to perform additional evaluations.
The importance of these evaluations was not recognized during the STAR to Condition Report (CR) and Plant Manager Action Item (PMAI) conversion that occurred in early 1996. The St. Lucie STAR program was subsequently replaced by the CR process. The CR procedure ensures that operability determinations are performed for potentially
L-97-227
'ttachment P~ae 4 degraded Systems, Structures, and Components (SSCs), and provides positive tracking mechanisms for required corrective actions.
- 3. CORRECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED A. A Condition Report was generated to document this condition. FPL personnel performed an operability assessment for the 218 penetration seals that were not directly bounded by test data. Of this population, the operability assessment has shown that seven penetration seals in Unit 1 and eight penetration seals in Unit 2 are inoperable. These inoperable penetration seals have had Fire Breach Permits generated and posted in the area of the seal and are being monitored by the hourly roving fire watch as required by the Appendix "R" Fire Protection Program at St.
Lucie. It should be noted that the routing of the existing hourly fire watches did not need to be changed to accommodate the inoperable fire seal penetrations.
B. St. Lucie is currently developing a schedule to complete Generic Letter 86-10 mechanical fire penetration evaluations which will be performed for the 218 mechanical seals that are not bounded by tested configurations.
C. St. Lucie is currently developing a schedule to develop modifications of the inoperable mechanical fire penetrations to ensure that the three hour fire barrier criteria will be met.
- 4. CORRECTIVE STEPS TO AVOID FURTHER VIOLATIONS A. The previous problem identification and corrective action program, the St. Lucie STAR procedure, was replaced with the Condition Report procedure (Plant Administrative Procedure AP-0006130, "Condition Reports" ).
B. Operating Experience (OE) items which are determined to require review by St.
Lucie Plant are now addressed using the St. Lucie Plant Condition Report process.
Condition Reports are used to document the evaluation and corrective actions for such applicable OE items and provide a vehicle to assure that proper evaluations are completed and documented, and that corrective actions are properly captured and tracked to completion. The Condition Report process produces standardized responses to OE items, ensures timely and enhanced visibility of OE reviews, and establishes minimum standards for documentation, review, and approval. (Plant Administrative Procedure ADM-17.03, "Operating Experience Feedback" )
L-97-227 Attachment P~ae 5 C. The Quality Assurance Department is performing an independent assessment by sampling past STAR to CR and Plant Manager Action Item (PMAI) conversions to determine ifany corrective actions may have been missed in the conversion.
This activity will be completed by the beginning of the 1997 Unit 1 SL-15 refueling outage.
D. The Engineering Department supervisors recently reviewed and prioritized all open Plant Management Action Items (PMAIs) assigned to Engineering based on safety or regulatory significance. While not included as a discrete activity within the scope of the PMAI review, FPL is confident that the review provided assurance that additional OPERABILITYconcerns which should have been identified in STARs were not missed in the 1996 STAR to.CR and PMAI conversion process.
Full compliance with 10 CFR 50 Appendix R requirements was achieved on July 28, 1997 when the 15 inoperable mechanical fire barrier penetrations were included in the existing hourly roving fire watch patrols.