Requests Addl Info Re Util 870612 Request to Expand Spent Fuel Pool Storage Capacity.Response Requested within 30 Days of Ltr Receipt
ML17221A482
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/23/1987
From: Tourigny E
Office of Nuclear Reactor Regulation
To: Woody C
FLORIDA POWER & LIGHT CO.
References
TAC-65587, NUDOCS 8711030051
Download: ML17221A482 (5)


Text

October 23, 1987 Docket No. 50-335 Mr. C.

O. Hoody Group Vice President Nuclear Energy Florida Power and Light Company Post Office Box 14000 Juno

Beach, Florida 33408

Dear Mr. Woody:

DISTRIBUTION NRC PDR Local PDR PD22 Reading S.

Varga G. Lainas D. Miller E. Tourigny OGC-Bethesda E. Jordan

1. Partlow ACRS (10)

Gray File H. Ashar

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (TAC NO. 65587)

In conducting our review of your June 12, 1987 submittal relating to expanding.

the spent fuel pool storage capacity at the St. Lucie Plant, Unit No. I, we have determined that we will need additional information identified in the enclosure to continue our review.

In order for us to maintain our review schedule, your response is requested within 30 days of your receipt of this letter.

We are also prepared to meet with your staff to discuss the responses to expedite our review.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Please contact me at (301) 492-9786 if you have any questions concerning this letter.

Sincerely,

Enclosure:

As stated cc w/enclosure:

See next page E.

G. Tourigny, Project Manager Project Directorate II-2 Division of Reactor Projects-I/II L

II-2 D

0/

/87 P

2 E

B Dq

-2 u i ny:bg GBagchi Hge ow 10//0/87 10~/87 10/ $87 f

87.i 2 03005k '87'23 RD'R '000~< 00000888 ROR.. lQ

r

~

'll II i r

I i'

October 23, 1987 Docket No. 50-335 Mr. C.

O.

Moody Group Vice President Nuclear Energy Florida Power and Light Company Post 0<fice Rox 14000 Juno

Reach, Florida 33408

Dear Mr. Moody:

DISTRIBUTION Docet i e NRC PDR Local PDR PD",2 Reading S.

Varga G. Lainas D. Miller F.. Tourigny OGC-Bethesda E. Jordan

~1. Partlow Ar.RS ! i.o)

Gray File H. Ashar

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (TAC NO. 6558")

In conducting our review of your June 12, 1987 submittal relating to expanding the spent fuel pool storage capacity at the St. Lucie Plant, Unit No. 1, we have determined that we will need additional information identified in the enclosure to continue our review.

In order for us to maintain our review schedule, your response is requested within 30 days of your receipt o+ this letter.

Me are also prepared to meet with your staf~ to discuss the responses to expedite our review.

The reporting and/or recordkeeping requirements contained in this letter affect

<ewer than 10 respondents; therefore, OMR clearance is not required under P.L.96-511.

Please contact me at (301> 492-9786 if you have anv questions concerning this letter.

Sincerely, E.

G. Tourigny, Proiect Manager Proiect Directorate IT-7 Division of Reactor Proiects-I/II

Enclosure:

As stated cc w/enclosure:

See next page L

11-2 D

0/

/87 GBagchi Hge ow 10'/87 10/ >Vj87 u i ny bg 10//g/87 P

2 E. iB D;P.

-2

Mr. C. 0.

Woody FloridaPower 5 Light Company St. Lucie Plant CC:

Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.

NRC 7585 S.

Hwy A1A Jensen

Beach, Florida 34957 State Planning 8 Development Clearinghouse Office of Planning A Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.

Newman 5 Holtzinger 1615 L Street, N.W.

Washington, DC

?0036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-?398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 3?301 Mr. Weldon B. Lewis, County Administrator St. Lucie County

?300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington - Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue

Bethesda, Maryland

?0814 lacob Daniel Nash 0ffice of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Executive Director for Operations 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 303?3

ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION ST.

LUCIE I << SPENT FUEL STORAGF.

POOL EXPANSION 2.

Provide the results of the multi-rack seismic analysis for racks (modules) AI, A2'l'nd B2'xplain how the increased load of the spent fuel pool due to the re-racking changes the safety margin on the liquefaction potential of the soils beneath the fuel handling building?

3.

Demonstrate that in developing the simulated seismic excitation for the pool floor, the spectra enveloping requirement of SRP 3.7.].II.a is met.

4.

Mas pool wall flexibilityconsidered in the fuel rack analysis model?

5.

Provide a description of the EBS/NASTPAN and the POSRUKF programs and sam-ple outputs.

Discuss how these programs were verified.

Also, provide a

list of values of modeling parameters used in the pool structure analysis.

6.

How was fuel assembly structural integrity demonstrated under seismic and impact load conditions?

7.

How was the structural integrity of the Boraflex material and its cover plate demonstrated under all design conditions?

8.

How was the leak-tight integrity of the pool liner evaluated?

Was conside-ration given to potential punching or tearing of the liner due to rack-to-floor impacts?