ML17199R319
| ML17199R319 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/17/1987 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | Butterfield L COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17199R320 | List: |
| References | |
| GL-83-33, TAC-59853, TAC-59854, NUDOCS 8708140241 | |
| Download: ML17199R319 (3) | |
Text
_\\.
UNITED STATES NUCLEAR REGULATORY COMMISSION Docket Nos. 50-237/249 Mr. L. D. Butterfield_, Jr.
Nuclear Licens1ng Manager Coaaonwealth Edison Cmnpany Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Butterf1eld:
WASHINGTON, D. C. 20555 July 17, 1987
SUBJECT:
FIRE PROTECTION APPENDIX R ITEMS III.G.3 AND III.L (TAC 59853 ANO 59854)
Re:
Dresden Nuclear Power Station, Unit Nos. 2 and 3 By letter dated August 10, 1984 and March 1, 1985 you provided inforwation regarding Section III.G and III.L of Appendix R.
In these sublltttals, you stated that a reverification of COllPliance with Appendix R require111nts at Dresden, which was required based on your review of our Generic Letter 83-33 dated October 19, 1983 has been C011Pleted.
In your subllittals, you presented findings which included 1) revised alternate shutdown peths based on their zonal 1nteraction analysis 2) the current status of already ca111itted llOdif1ca-t1ons 3) newly proposed modifications with the schedules for thetr cQ11pletion, and 4) interim COllpensatory.. 1sures for applicable mocttftcattons until thetr completion.
By letter dlted July 1, 1985, we 1denttfted the need for additional infol"llltion 1n the ar"91 of assoctatec:I circutts concerns such as electrical tsolation deficiency, ftre-tnduced spurtous operations, 1nd htgh fllpedance faults.
By letters dated August 9, 1985, January 9, 1986 and May 30, 1986 you provided the requested tnfor111tion. Also, by letter dated September 18, 1985, you subllttted Revision 1 to your August 10, 1984 sublltttal.
As stated tn Ute Staff Safety Evaluation (Enclosure 1), we conclude that your currently proposed revtston to the a 1 ternate shutdown capebtl tty for Dresden Units 2 and 3 s1ttsftes the requtre111nt of Appendix R, ItlllS III.6.3 and III.L.
The NRC tnspectton te111 wtll vertfy that the needed *nual operations can be CQlllPleted 1n a ttmly *nner. We note that the use of the alternative
al Mr. L. D.
Butter~ield, Jr. shutdown procedure*would be expected during a fire when other means of shutdown identified 1n the plant procedures are not considered to be dvailable by the operating personnel.
Enclosure:
As stated cc w/enclosure:
See next page Q~;m/Jl-Danfel R. Muller, Director Project Directorate III-2 Dfvision of Reactor Projects - III, IV, V and Special Projects
Mr. L. D. Butterf.ield, Jr.
Comnonwealth Edison Company cc:
Mr. Michael I. Miller Isham, Lincoln & Beale Three First National Plaza Suite 5200 Chicago, Illinois 60602 Mr. J. Een1genburg Plant Superintendent Dresden Nuclear Power Station Rural Route 11 - -
Morris, Illinois 60450 U. S. Nuclear Regulatory COC11Dission Resident Inspectors-Office Dresden Station Rura 1 Route fl Morris, Illinois 60450 Chai nnan Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Dresden Nuclear Power Station Units 2 and 3 Regional Administrator Nuclear Regulatory C01mission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Michael E. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, I111no1s 62704
~-- __.:..._
- _..