UNITED STATES
- NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 July 6, 1989 Docket Nos.
50-237 and 50-249
\\
Mr. Thomas J. Kovach Nuclear Licensing Manager Conunonwealth Edison Company Post Office Box 767 Chicago, IL 60690
Dear Mr. Kovach:
SUBJECT:
SAFETY EVALUATION REGARDING COMPLIANCE WITH 10 CFR PART 50, APPENDIX R, ITEMS IIIiG~3 AND III.LAND EXEMPTION REQUEST FOR HOT SHUTDOWN REPAIRS FOR DRESDEN UNITS 2 AND 3 (TAC NOS. 59853 AND 59854)
By submittals dated September 10 and November 17, 1987, and March 15, April 19 July 13, and September 16, 1988, you further revised your Appendix R compliance program at Dresden regarding Items III.G.3 and III.L {alternative/dedicated shutdown capability} which was previously approved by the staff in a Safety Evaluation issued July 17, 1987.
As discussed in the enclosed Safety Evaluation, we have determined that the revised alternative shutdown capability for Dresden Units 2 and 3 meets the requirements of Appendix R, Item III.G.3 and the performance goals of Item III.L and is, therefore acceptable.
In addition, your request for exemptions from the Appendix R, Item III.G~l requirement for performing proposed hot shutdown repairs is also granted.
\\
In this context, we note that a few of the proposed manual.actions require completion within a very short time after scram (e.g., replacement of blown controlpower fuses for the swing diesel generator starting controls, removal of 20 control power fuses for reactor relief valves, and engaging the automatic blowdown inhibit switch prior to evacuating the control room for a fire in the control room).
We will request that the Region verify your ability to perform the identified short-term hot shutdown repairs in a timely manner.
Enclosure:
As stated cc w/enclosure:
See next page 8907110111 890706 I'
P PDR
. A!IOCK 050002:37 I i !
PDC r,J
- w.__ -
~~/'~~{ject Manager Project Directorate III-2 Division of Reactor Projects III, IV, V, and Special Projects
~
July 6, 1989 Docket Nos.
50-237 and 50-249 DISTRIBUTION Docket fl le PDIII-2 r/f NRC & Local
- PDRs MVirgil io Mr. Thomas J. Kovach
. Nuclear Licensing Manager Co1TDJ1onwealth Edison Company Post Office Box 767 Chicago, IL 60690
Dear Mr. Kovach:
LLuther OGC BG rimes JHarrison~ RGNilI Plant file
- BSiegel
, 'EJ6.rdan ACRS(lO)
RGardner, RGNIII
,I
.~
- *~
'*,:..}* *
~-
J
- ~...
- *~-<-'
SUBJECT:
- .SAFETY EVALUATION REGARDlNG COMPL!ANCE *WITH :10.CFR; PART 5*0,,,:.
APPENDIX R, ITEMS I,II.G.3 AND.UI:.L:AND EXEMPTION 'REQUEST.
FOR HOT SHUTDOWN REPAIRS FOR DRESDEN UNITS.. *2. AND '.3 '.;..,,.,
~
(TAC NOS. 59853 AND 59854)
.'<., t
(' -_:
I.::',:}.. * '
k..
,,~.--
~
.~~*
i--**,... _ /~
~* \\;_
By submittals dated September 10 and November< 1},' 198£;,_.a'nd.,M~~ch*.*l5*; Aprii'19.
Jt,1ly 13, and September 16; 1988, you further revi.se(your Appenai,x R'.comRliance.
- .program at Dresden regard.ing I~ems III.G.3 a*iJd. IlI..L (aHernative/dedicated
- shutdown capability) which was previously approved ~Y.the _staff in a. Safety Evaluation issued July 17; 1987. -
'~r
- J' As discu*ssed irf th~ enclos:ed Safety Evai~ation, we have determiried.*that the revised alternative shutdown capability for Dres'den Units 2_ and.3 meets the _
requirements of Appendix R, *item III.G.3 and the performance goals *Of Item*
.,Ill.Land is,. therefore accepta~le. In addition,.your r*equest for.exemption.s from the Appen_dix R~ Item III_.G.1 requirement for performing proposed hot' shutdown repairs is al so granted... *
. In -this con:text~ we note that a. few of the propo-sed manual actions requfre.
completion within a very short time after scram (e.g., replacement of blown._
control power fuses for the swing.diesel generator starting tontrols, removal of 20 c6ntro1 powe~ fuses for reactor relief valves, and engaging the automatft blowdown inhibit switch pr.for.to evacuating_:the control room-for a fire in the control room).
We will request that the Region verify your ability to perform
.the identified.-~~ort:..ter~ hot shutdown repairs iii. a timely manner._
Enclosure:
As stated cc w/enclosure:
See next page.
PDIII-2:d.
BSiegel :dlJi"""'V 11 b /89 PDJII-2~
LLuther.
6/,:J.~/89
/5/
Byron L siege 1, Project Manager:.
P~oject Directorate III-2
- Division of Reactor Projects III,*
,.IV, V, and Speci.a~ Proje~ts
- f. s.
PDIII-2:(A)PD PShemanski 71 '/89
Mr. Thomas J. Kovach Commonwealth Edison Company cc:
Michael I. Miller, Esq.
Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mr. J. Eenigenburg Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U. S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County Grundy County Courthouse Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Commission, Region III 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Mr. Michael E. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety
. 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Dresden Nuclear Power Station Units 2 and 3
--.--: ---=--- _..:_*.:'.'"..,:.__::_,.:._-=----- _;
--~=-.:-~---:...:.
-_:-.:,__~---