Forwards Safety Evaluation of App R Insp of Alternate Safe Shutdown of Plant.Notification of Verification of Sections 3.4.1,3.4.4 & 3.5 by NRC App R Walkthrough Team,Requested
ML17199S865
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/03/1987
From: Muller D
Office of Nuclear Reactor Regulation
To: Norelius C
Office of Nuclear Reactor Regulation
References
TAC-59853, TAC-59854, NUDOCS 8709100524
Download: ML17199S865 (1)


Text

"

-it September 3, 1987 Dockets Nos.:

50-249 and 50-237 DISTRIBUTION,

~Dockets files~Plant File NRC & Local PDRs MEMORANDUM FOR:

FROM:

SUBJECT:

C. E. Norelius, Director Division of Reactor Projects PDIII-2 Rdg. File GHolahan Lluther MGrotenhuis OGG-Bethesda I I I, EJordan JPartlow ACRS ( 10)

APPENDIX R INSPECTION FOR DRESDEN STATION (TAC NOS. ~59853 AND 59854)

Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects IV, V and Special Projects Attached is a copy of the Safety Evaluation for the Alternate Safe Shutdown for the Dresden Station which has been issued to the Commonwealth Edison Company.

In Sections 3.4.1, 3.4.4 and 3.5 there are conclusions that are contingent upon verifications by the NRC'Appendix R walkthrough team.

We request that this verification be brought to the attention of that inspection team.

The results should be included in their inspection report. This has been discussed with J. Harrison and M. Grotenhuis.

Enclosure: