LER-1979-055, /03L-0:on 791004,following Pipe Hanger Repairs, Valve 2-1601-60 Failed to Close by Moving Control Switch, But Did Close When Versa Air Switching Valve Was Tapped. Caused by Malfunction of Versa Air Switching Valve |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2371979055R03 - NRC Website |
|
text
Common-Ith Edison Dresden Nuclear Power Station R.R. #1 Morris, Illinois 60450 Telephone 815/942-2920 BBS.Ltr fl 79-866 October 29, 1979 James G. Keppler, Regional Director Directorate of Regulatory Operations - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DS5 Reportable Occurrence Report fl79-55/03L-0~ Docket 11050-237 is hereby submitted to your office in accordance.with Dresden Nuclear Power Station Technical Specification 6.* 6.B."2. (b), conditions leading to operation in a degraded mode permitted by a limiting condition for operation,or plant shutdown required by a limiting condition for operation.
.BBS: leg Enclosure ens on Station Super.intendent
. Dresden Nuclear Power Station cc:
Director of Inspection & Enforcement Direc*tor of Management Information & Program Control File/NRC 79 I/ 060 -;;..6~
.,...... eaa
- ........... r1._,.....,.....,.-..
'.,,..,* '. rbNTROL BLOCK' !
I ! I j 0.
'. IPLEASE PRINT QR TV.LL REQUIRED INFORMATION I
... ~*.
liliJ,. I,. LI D I R I s I 2 101 ° I 0 I - I 0 I ~, 0* 1 ° I 0 1-I 0 I 0 101 4 11 11 11 *1 1 101. I I 0 11 8
- 9.
LICENSEE CODE 14
. 15 LICENSE NUMBER
- 25.
26 LICENSE TYPE
- JO 57 CAT 58
.-CON'T
'WIJ
- ~~~~~~* L!J© I o I s I o I o I o I 2 I 3 I 1 10W or o I 4 I 1 I 9 I© I 1 I o I 3 I o I 1 I 9 10 17 8
60 61 DOCKET NUMBER 68 69
. EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
'.IIJIJ I During normal operation, valves 2-1601-62,. 23, 60, and 61 were cycled prior to return
'.IiJiJ to service after pipe hanger repairs on. drywell/t~r~s vent l.ine (REF. 79-0S4/03L-0).
- 1.
Ji11J The 2-1601-60 valve f*ailed to close when control switch was moved to closed position *
'..filTI but did close when Versa air switching valve was tapped.
- Since primary containment*
'.Io j s I I integrity was maintained with the 2-1601-ffJ. & 24 valves closed, the safety signif i:-
'.III2J I cance of this event was minimal.
Previous failures of solenoid valve have occurred SYSTEM
CAUSE
CAUSE COMP.
- coDE CODE SUBCODE COMPONENT CODE SUB CODE ltliJ Is In I@ w@ LILJ@ (v 1 A 1 L 1 v 1 E 1 x 1 @. L!J@
7 8
9 10 11 12 13 18 19 SEQUENTIAL OCCURRENCE REPORT
@ LEA/RO CVENT YEAR REPORT NO.
CODE TYPE REPORT I 7 I 9 I l=J Io 1 s is I I/I 10 13 I L!J NUMBER 21 22 23 24 26 27 28 29 30 REVISION NO.
1=1*
~-
31 32 ACTION FUTURE
- TAKEN ACTION EFFECT SHUTDOWN
~* ATTACHMENT NPRD-4.
ON PLANT METHOD HOURS \\!31 SUBMITTED F.ORM.~UB.
PRIME COMP..
SUPPLIER COMPONENT MANUFACTURER
~@L£1@ ~@ ~ 1 01 01 or 01
~J@ LU 33 34 35 36 37 40 41 42 UJ@ l v Io I 9 Is I@
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @
43 44 47
]J))J I Valve failed to close due to the-malfunction of the Versa air switching valve.
In-
'ITIIJ ternal inspection of switching valve revealed accumulation of corrosion and dirt JITIJ particles on iri.tem.als.
Entire Versa air*switching valve replaced & proper*valve IIITJ
._I _o_p_e_r_a_t_i_o_n_d_e_m_o_n_s_t_r_a_t_e_-d_. _Q_u_a_r_t_e_r_l_y_v_a_l_v_e_t_i_m_i_n_g_* _s_u_r_v_e_i_l_l_a_n_c_e_* _(D_O_S_-_1_6_0_0_-_l""'")_w_i_l_l_b_e __
- rr:r:rJ I *utilized to ensure operability.
8 9
FACILITY
. ljQ\\
STATUS
% POWER OTHER STATUS *i..::::J IiliJ ~@
I 01 91 71@1~ --~_IA __
- 1.
METHOD OF A
DISCOVERY D.ISCOVEf;Y DESCRIPTION ~
~0Jl __ ~c_y_c_l_e~te_s_t_i_*n_g~~-* ~~~*~~~~~_,.......
8 9
10 12 1'.l ACTIVITY CONTENT
(.;;;\\
RELEASED OF RELEASE AMOUNT OF ACTiVITY
.[DI] W@ 1-Ll@I N/A
- - 7 8
9 10 11 PERSONNEL EXPOSURES Q\\
7 45 46 LOCATION OF RELEASE @
(':;:;\\TYPE
DESCRIPTION
.[!]2] I 0 I 0 I 010~@.____N_/A __. ________________
.7 8
9 1f 12 13 PERSONNEL INJURIES
~
NUMBER.
DESCRIPTION6 Eli) IO jO IO l@ ___
N_/A_. _______________________ __
7 8
9 11 12 LOSS OF OR OAMAGE TO FACILITY t4J\\
TYPE
DESCRIPTION
. i.::::,J Eli) tu@
N/ A 7
8 9
10
.PUBLICITY Q\\
ISSUEDt,;.:;\\ DESCRIPTION~
ITI£). l!J6 N/A so
. NRC USE ONLY 0
1* I *1 I I I I I I I I I I!
7 8
- 9.
10 68 69
- _.;.,.,
- ~~::..:~.:,,~_*:.....,.....~AME OF PREPARER __
S_h_.a_f_i_c_B_a_d_r_a_n__________
PHONE: ___
2_.6_s;..._. _______ _
~
0
~
\\
r 1
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000237/LER-1979-001-03, /03L-0 on 790103:torus Level Increased to -1 Inch, Due to Repetitive Starts of HPCI Turbine.Increase in Torus Level Determined to Be Result of Inadequate Procedure.Hpci Surveillance Procedures to Be Amended | /03L-0 on 790103:torus Level Increased to -1 Inch, Due to Repetitive Starts of HPCI Turbine.Increase in Torus Level Determined to Be Result of Inadequate Procedure.Hpci Surveillance Procedures to Be Amended | | | 05000237/LER-1979-001, Forwards LER 79-001/03X-1 | Forwards LER 79-001/03X-1 | | | 05000010/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000010/LER-1979-001-03, /03L-0 on 790518:while Digging Ditch for New Pipe, Const Personnel Observed Water Running Into Trench from Proximity of Radwaste return-to-storage Line.Caused by Return Line to 1A Storage Leaking from Aluminum Line | /03L-0 on 790518:while Digging Ditch for New Pipe, Const Personnel Observed Water Running Into Trench from Proximity of Radwaste return-to-storage Line.Caused by Return Line to 1A Storage Leaking from Aluminum Line | | | 05000010/LER-1979-002-03, /03L-0 on 780825:during Monthly Surveillance DI5 5400-2,offgas Monitor 1 Tripped at Greater than 100%, Which Is Not within Setpoint Limit.Caused by Instrument Drift.Setpoint Recalibr | /03L-0 on 780825:during Monthly Surveillance DI5 5400-2,offgas Monitor 1 Tripped at Greater than 100%, Which Is Not within Setpoint Limit.Caused by Instrument Drift.Setpoint Recalibr | | | 05000010/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000237/LER-1979-002, Forwards LER 79-002/01X-1 | Forwards LER 79-002/01X-1 | | | 05000237/LER-1979-002-01, /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability | /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability | | | 05000237/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000237/LER-1979-003-03, /03L-0 on 790105:PS 2-1430-1466D Tripped at 105 Psi.Caused by Instrument Drift | /03L-0 on 790105:PS 2-1430-1466D Tripped at 105 Psi.Caused by Instrument Drift | | | 05000237/LER-1979-004-03, /03L-0 on 790111:LPCI Sys Full Flow Test Valve MO-2-1501-38B Failed While Securing D LPCI Pump.Caused by Broken Pinion Gear on Valve Operator Motor Shaft | /03L-0 on 790111:LPCI Sys Full Flow Test Valve MO-2-1501-38B Failed While Securing D LPCI Pump.Caused by Broken Pinion Gear on Valve Operator Motor Shaft | | | 05000237/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000237/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000237/LER-1979-005-03, /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced | /03L-0 on 790119: During Normal Operation, Mass Spectometer Leak Detector Downscale Condition Annunciated & High Rad Alarm & Half Scram Occurred Twice on Same Day. Log Rad Monitor Replaced | | | 05000237/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000237/LER-1979-008-03, /03L-0 on 790126: LPCI Min Flow Value MO-2-1501-13A Failed to Close Completely During LPCI Pump Operability Surveillance.Cause of Failure Unknown | /03L-0 on 790126: LPCI Min Flow Value MO-2-1501-13A Failed to Close Completely During LPCI Pump Operability Surveillance.Cause of Failure Unknown | | | 05000237/LER-1979-009-03, /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open | /03L-0 on 790121:plant Chimney Sampling Sys Operating Incorrectly.Caused by Purge Valve V2 Being Stuck Open | | | 05000237/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000237/LER-1979-010-01, /01T-0 on 790202:section of Blowout Panel Blown Out,Breaching Secondary Containment.Cause Under Investigation | /01T-0 on 790202:section of Blowout Panel Blown Out,Breaching Secondary Containment.Cause Under Investigation | | | 05000237/LER-1979-010, Forwards LER 79-010/01T-0 | Forwards LER 79-010/01T-0 | | | 05000237/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000237/LER-1979-013-03, /03L-0 on 790223:after Diesel Generator Was Manually Started Prior to Taking Transformer Out of Svc, Water Pump Breaker Thermally Tripped & Redundant Power Supply Also Tripped.Cause Unknown | /03L-0 on 790223:after Diesel Generator Was Manually Started Prior to Taking Transformer Out of Svc, Water Pump Breaker Thermally Tripped & Redundant Power Supply Also Tripped.Cause Unknown | | | 05000237/LER-1979-014-03, /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced | /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced | | | 05000237/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | | | 05000237/LER-1979-015, Forwards LER 79-015/01T-0 | Forwards LER 79-015/01T-0 | | | 05000237/LER-1979-016, Forwards LER 79-016/01T-0 | Forwards LER 79-016/01T-0 | | | 05000237/LER-1979-017-01, X2 for Dresden, Units 2 and 3 Re Inadequacies Observed in Implementation of Administrative Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection System or Engineered Saf | X2 for Dresden, Units 2 and 3 Re Inadequacies Observed in Implementation of Administrative Procedural Controls Which Threaten to Cause Reduction of Degree of Redundancy Provided in Reactor Protection System or Engineered Safety Feature Sys | | | 05000237/LER-1979-017, Forwards LER 79-017/01T-0 | Forwards LER 79-017/01T-0 | | | 05000237/LER-1979-019, Forwards LER 79-019/03L-0 | Forwards LER 79-019/03L-0 | | | 05000237/LER-1979-020-03, /03L-0 on 790413:measured Leakage for Personnel Air Lock Was 54.63 Std Cubic Ft/H.Leakage Identified Through Outer Lower Handwell.Shaft Packing Was Replaced & Air Lock Retested | /03L-0 on 790413:measured Leakage for Personnel Air Lock Was 54.63 Std Cubic Ft/H.Leakage Identified Through Outer Lower Handwell.Shaft Packing Was Replaced & Air Lock Retested | | | 05000249/LER-1979-021-03, /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly | /03L-0:on 790821,during Normal Operation,Offgas Monitor 3A Took Step Increase W/No Power Change & hi-hi Trip Light Was On.Caused by Faulty V1 Electrometer Tube,Which Was Replaced.Monitors Will Be Tested Monthly | | | 05000237/LER-1979-021, Forwards LER 79-021/03L-0 | Forwards LER 79-021/03L-0 | | | 05000237/LER-1979-022, Forwards LER 79-022/03L-0 | Forwards LER 79-022/03L-0 | | | 05000237/LER-1979-023-03, /03L-0 on 790406:during Radioactive Insp,Lack of Fusion Noted in Weld 4-4 on 4-inch Reactor Head Vent Line 2-0215-4.Weld Cut Out & Rewelded Per ASME Boiler & Pressure Vessel Code.Asme Hydrostatic Test Completed | /03L-0 on 790406:during Radioactive Insp,Lack of Fusion Noted in Weld 4-4 on 4-inch Reactor Head Vent Line 2-0215-4.Weld Cut Out & Rewelded Per ASME Boiler & Pressure Vessel Code.Asme Hydrostatic Test Completed | | | 05000249/LER-1979-023-03, /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified | /03L-0:on 790823,source Range Monitor Calibr Supplied Rod Block Trip at 1.03E5,exceeding Tech Specs Limit.Caused by Drift & Temp Dependency in Source Range Monitor.Defective Component Not Yet Identified | | | 05000237/LER-1979-025, Forwards LER 79-025/03L-0 | Forwards LER 79-025/03L-0 | | | 05000237/LER-1979-026, Forwards LER 79-026/03L-0 | Forwards LER 79-026/03L-0 | | | 05000249/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000237/LER-1979-027-03, /03L-0 on 790502:during Startup,Main Turbine Tripped on High Water Level.Caused by Packing Leak on Isolation Valve for PS-263-60B.Packing Adjusted,Tested & Sys Lineup Returned to Normal | /03L-0 on 790502:during Startup,Main Turbine Tripped on High Water Level.Caused by Packing Leak on Isolation Valve for PS-263-60B.Packing Adjusted,Tested & Sys Lineup Returned to Normal | | | 05000237/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000249/LER-1979-027-03, /03L-0:on 791003,half of Trip Sys Inoperable Due to Lifting of Flooding Magnetrol Switch Leads to Condenser Pit.Switch Leads Reattached.No Precise Cause Found | /03L-0:on 791003,half of Trip Sys Inoperable Due to Lifting of Flooding Magnetrol Switch Leads to Condenser Pit.Switch Leads Reattached.No Precise Cause Found | | | 05000237/LER-1979-028, Forwards LER 79-028/03L-0 | Forwards LER 79-028/03L-0 | | | 05000237/LER-1979-028-03, /03L-0 on 790508:N2 Line Low Temp Alarm Received & Frost Found on Inerting line.A0-2-1601 & Inerting Line Failed Leak Rate Test.Caused by Failure of Temp Recorder at N2 Vaporizer | /03L-0 on 790508:N2 Line Low Temp Alarm Received & Frost Found on Inerting line.A0-2-1601 & Inerting Line Failed Leak Rate Test.Caused by Failure of Temp Recorder at N2 Vaporizer | | | 05000237/LER-1979-029-03, /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing | /03L-0 on 790508:DIS 1400-3,pressure Switch 2-1430-1466D Failed to Trip.Caused by Sticky Plunger in Pressure Switch.Switch Removed,Cleaned & Reset to Trip at 94.5 Psig Increasing | | | 05000237/LER-1979-029, Forwards LER 79-029/03L-0 | Forwards LER 79-029/03L-0 | | | 05000249/LER-1979-030-03, During Scram Testing in Refuel Mode,Substantial Loss of Position Indication Noted for Control Rod Driveline H-9.Caused by Improperly Seated Socket,Suggesting Faulty Electrical pin-socket Alignment | During Scram Testing in Refuel Mode,Substantial Loss of Position Indication Noted for Control Rod Driveline H-9.Caused by Improperly Seated Socket,Suggesting Faulty Electrical pin-socket Alignment | | | 05000249/LER-1979-030, /03X-1 for Dresden Unit 3 Regarding a Supplement to LER 79-30/03L-0 Addressing the Cause and Corrective Actions for the Loss of Position Indication for CRD H-9 | /03X-1 for Dresden Unit 3 Regarding a Supplement to LER 79-30/03L-0 Addressing the Cause and Corrective Actions for the Loss of Position Indication for CRD H-9 | | | 05000237/LER-1979-031-03, /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded | /03L-0 on 790509:crack Found on 2D1 Feedwater Emergency Spill to Condenser Line & Crack Located on Pipe to Condenser Weld.Caused by Mechanical Failure.Cracked Portion Removed & Rewelded | | | 05000237/LER-1979-031, Forwards LER 79-031/03L-0 | Forwards LER 79-031/03L-0 | | | 05000237/LER-1979-032, Forwards LER 79-032/03L-0 | Forwards LER 79-032/03L-0 | |
|