05-24-2017 | On March 29, 2017, during an evaluation of protection of Technical Specification (TS) equipment from the damaging effects of tornados, nonconforming conditions were identified in the plant design. Specifically, TS equipment did not meet current design basis for protection against potential tornado missile impact. Identified components/systems were declared inoperable and NRC Enforcement Guidance Memorandum (EGM) 15-002, " Enforcement Discretion for Tornado Generated Missile Protection Noncompliance," was implemented. Initial compensatory measures were implemented, per the guidance of NRC Interim Staff Guidance DSS-ISG-2016-01 Appendix A, within the time allowed by the applicable Limiting Conditions for Operation (LCOs) and the associated systems were then declared operable but nonconforming.
The six systems, containing TS required equipment, did not meet current design basis for protection against potential tornado missile impact. Credible tornado missile impacts could affect the following systems; Service Water, Fuel Oil, Emergency Diesel Generators, Auxiliary Feedwater, Component Cooling Water and Control Room Ventilation Filtration.
Comprehensive compensatory measures will be implemented in approximately 60 days of discovery, per the guidance of NRC Interim Staff Guidance DSS-ISG-2016-01 Appendix A.
Due to the historical nature of the issue, a specific cause for the identified vulnerabilities was not determined. |
---|
LER-2017-001, Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design ConditionsPalisades Nuclear Plant |
Event date: |
03-29-2017 |
---|
Report date: |
05-24-2017 |
---|
2552017001R00 - NRC Website |
|
Letter Sequence Request |
---|
EPID:L-2017-LLL-0037, Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions, LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions (Open) |
|
MONTHYEAR05000255/LER-2017-0012017-05-24024 May 2017 Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions, LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions Project stage: Request PNP 2017-050, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection2017-12-0707 December 2017 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection. Project stage: Request ML18008A2302018-01-10010 January 2018 Summary of Public Teleconference Meeting with Entergy Nuclear Operations, Inc., Regarding Request to Extend Enforcement Discretion for Tornado-Generated Missile Non-Conformances at Palisades Nuclear Plant Project stage: Meeting PNP 2018-001, Supplement to Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06,.2018-01-18018 January 2018 Supplement to Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06,. Project stage: Supplement ML18046A6752018-02-16016 February 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection Project stage: Other 2018-01-10
[Table View] |
|
---|
Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] Category:Licensee Event Report (LER)
MONTHYEARML18344A4142018-12-10010 December 2018 LER 1979-037-00 for Palisades Nuclear Plant, Two Manual Three Inch Containment Isolation Valves in Bypass Line Were Discovered to Be Locked Open 05000255/LER-2017-0022017-07-17017 July 2017 Reactor Protection System Actuation While the Reactor was Shutdown, LER 17-002-00 for Palisades Regarding Reactor Protection System Actuation While the Reactor was Shutdown 05000255/LER-2017-0012017-05-24024 May 2017 Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions, LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions PNP 2014-100, Cancellation of Licensee Event Report (LER) 2004-002, Leak Indications Identified in Reactor Pressure Vessel Head Nozzle Penetrations2014-11-19019 November 2014 Cancellation of Licensee Event Report (LER) 2004-002, Leak Indications Identified in Reactor Pressure Vessel Head Nozzle Penetrations PNP 2011-009, Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor2011-02-10010 February 2011 Special Report of Inoperability of Main Steam Line Gross Gamma Activity Monitor ML0726101822007-09-14014 September 2007 Cancellation of Licensee Event Report 07-003, Potential for Reduced Component Cooling Water Cooling Capability ML0609002832006-03-30030 March 2006 Cancellation of Licensee Event Report 05-006, Inoperable Containment Due to Containment Air Cooler Through-Wall Flaws ML18347B2971998-05-19019 May 1998 Submit, NPDES Notification Report, Incident No. Pal-98-05-NC138 for NPDES Permit No MI0001457 Re Difference from Daily Maximum Effluent Limitation for Facility ML18348A9021989-02-0707 February 1989 LER 1988-005-01 for Palisades, Inadequate Procedure Results in Valve Testing During Prohibited Conditions ML18346A2471981-06-19019 June 1981 LER 1981-020-00 for Palisades Nuclear Plant, Pcs Unidentified Leakage Greater than 1.0 Gpm ML18346A2481981-05-13013 May 1981 LER 1981-015-00 for Palisades Nuclear Plant, Safety Injection Tank Boron Concentration ML18346A2491981-02-20020 February 1981 LER 1981-005-00 for Palisades Nuclear Plant, Update - Inoperable Diesel Generator ML18346A2501981-02-19019 February 1981 LER 1981-007-00 for Palisades Nuclear Plant, Inoperable Auxiliary Feedwater Pump ML18346A2511981-01-26026 January 1981 LER 1981-002-00 for Palisades Nuclear Plant, Inadequate Mounting of DC Distribution Panel ML18346A2521981-01-16016 January 1981 LER 1981-001-00 for Palisades Nuclear Plant, During Charging of Station Batteries, Output Breakers of Both Batteries Were Inadvertently Opened for Approximately One Hour ML18346A2531981-01-14014 January 1981 LER 1980-046-00 for Palisades Nuclear Plant, Hydraulic Snubber Failure ML18346A2541981-01-0707 January 1981 LER 1980-045-00 for Palisades Nuclear Plant, Low Condensate Makeup Inventory ML18347A8141980-10-10010 October 1980 LER 1980-037-00 for Palisades Nuclear Plant, Pipe Support Sway Struts Identified to Have the Potential of the Bushing Becoming Loose And/Or Disengaged from the Clamp End of the Sway Strut ML18347A8461980-08-27027 August 1980 License Event Report 1980-027-00 Re Gaseous Release, Extended Due Date of Reporting by Region III on 8/26/1980 ML18347A8471980-08-12012 August 1980 License Event Report 1980-024-00 Re Containment High Radiation Monitor ML18347A8481980-08-0808 August 1980 License Event Report 1980-023-00 Re Containment High Radiation Monitor ML18347A8491980-08-0808 August 1980 License Event Report 1980-022-00 Re Inoperable Nuclear Instrumentation ML18347A8501980-08-0606 August 1980 License Event Report 1980-021-00 Re Misaligned Containment Sump Valve ML18347A8521980-07-29029 July 1980 License Event Report 1980-020-00 Re Misaligned Control Rod ML18347B2071980-06-19019 June 1980 Licensee Event Report 80-018 Regarding Oil Level in Snubber No. 2 Found to Be Less than Zero During Routine Testing of Hydraulic Snubbers ML18347B2081980-06-13013 June 1980 Licensee Event Reports 80-014, 80-015, and 80-016 Regarding Oil Level in Snubbers No. 5, 9, and 7 Were Found to Be Less than Zero During Routine Testing of Hydraulic Snubbers ML18347B2091980-05-15015 May 1980 Licensee Event Report 80-012 Regarding Bottom Half of the Barrier for Fire Penetration HO-12 Was Missing During Inspection of Fire Barriers ML18347B2101980-05-14014 May 1980 License Event Report 1980-011-00 Re Improper Return-to-Service of Porv'S ML18348A9071980-05-12012 May 1980 Submittal of LER 1980-006-00 Purge Valve T-Ring Air Supplies ML18348A9051980-05-12012 May 1980 Submittal of LER 1980-008-00 Update of Valve Leakage ML18347B1411978-09-0606 September 1978 LER 1978-029-00 for Palisades Plant Re Lower Level of Hydrazine in Iodine Removal Tank Due to Approximately 6% of Drainage from the Tank T-102 ML18347B1421978-08-18018 August 1978 LER 1978-028-00 for Palisades Plant Re Containment Building Purge Valve T-Ring in CV-1806 Was Not Pressurized ML18347B1441978-08-11011 August 1978 LER 1978-022-00 for Palisades Plant Re Four Incore Alarms Following Reactor Start-up ML18347B1451978-08-10010 August 1978 LER 1978-021-00 for Palisades Nuclear Plant, Containment Purge Supply Valve CV-1808 Failed to Open During Monthly Test ML18347B1491978-07-20020 July 1978 LER 1978-024-00 & LER 1978-025-00 for Palisades Nuclear Plant, Steam Generator Ph Dropped to 8.02 & One of Two Heaters for T-53B (Concentrated Boric Acid Tank) Failed ML18347B1781978-04-28028 April 1978 License Event Report LER-78-000-00 Re Out-of-Sequence Rod Withdrawal ML18347B1801978-04-19019 April 1978 License Event Report 78-008: Cycle 2 Core Axial Power Distribution Limits of TS 3.10.3 Were Exceeded by Approximately 12% for Steady State Operation During Cycle 2 ML18347B1811978-03-27027 March 1978 License Event Report 1978-007-00 Relates to Electrical Connectors Inside of Containment ML18347B1841978-03-13013 March 1978 Two Updated License Event Reports, LER-78-004 & LER-78-006 ML18348A1951978-03-0202 March 1978 License Event Report 1978-006-00 Re Shipping Cask Movement ML18347B1851978-03-0202 March 1978 License Event Report 1978-005-00 Re Steam Generator Level Instrumentation ML18348A1961978-03-0101 March 1978 License Event Report 1978-004-00 Re Steam Generator Pressure Instrumentation ML18348A1981978-02-0101 February 1978 License Event Report 1978-003-00 Re CV-3025 Failed Closed ML18348A1971978-02-0101 February 1978 License Event Report 1977-065-00 Re Operation in a Degraded Mode Permitted by a Limiting Condition for Operation ML18348A1991978-01-20020 January 1978 LER 1977-063-00 Re Iodine Removal System Hydrazene Tank, LER 1978-001-00 Re Containment Door Interlock Failure & LER 1978-002-00 Re Setpoints of Five Valves Were Outside Band ML18348A2001978-01-0606 January 1978 License Event Report 1977-062-00 Re Iodine Removal System Naoh Tank (T-103) ML18348A2011978-01-0606 January 1978 License Event Report 1977-064-00 Re HPSI Pump P-66B ML18348A2021977-12-21021 December 1977 LER 1977-054-00 Re Four Coincident In-Core Alarms, LER 1977-057-00 Re Pressure Set Point for Channel C, & LER 1977-058-00 Re De-Energized R Bus ML18348A2031977-12-16016 December 1977 License Event Report 1977-055-00 Re Loss of Off-Site Power and Plant Trip ML18348A2041977-12-12012 December 1977 License Event Report 1977-056-00 Re Gaseous Waste Discharge 2018-12-10
[Table view] |
comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
PALISADES NUCLEAR PLANT 05000-255 2017 - 00
BACKGROUND
- 001 Enforcement Guidance Memorandum (EGM) 15-002, "Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance," provides guidance to exercise enforcement discretion when an operating power reactor licensee does not comply with a plant's current site-specific licensing basis for tornado-generated missile protection.
Specifically, discretion would apply to the applicable Technical Specification (TS) Limiting Condition(s) for Operation (LCO) that would require a reactor shutdown or mode change in the event a licensee could not meet TS LCO required action(s) within the TS completion time.
Interim Staff Guidance DSS-ISG-2016-01, "Clarification of Licensee Actions in Receipt of Enforcement Discretion Per Enforcement Guidance Memorandum EGM 15-002," provides interim staff guidance to facilitate staff understanding of expectations for consistent oversight associated with implementing enforcement discretion for tornado missile protection noncompliance(s) per EGM 15-002.
Appendix A to DSS-ISG-2016-01 provides guidance for acceptable initial and comprehensive compensatory measures for licensee use in implementing the enforcement discretion outlined in EGM 15-002. The licensee should declare (log) the utilization of EGM 15-002, inform the resident inspector, and enter the issue into the corrective action program. For initial compensatory measures, it is expected that the measures listed are already in place at sites that may be affected by severe weather, such as tornados and/or hurricane force winds. The measures should be verified as current and readily deployable within a very short timeframe.
EVENT DESCRIPTION
On March 29, 2017, during an evaluation of protection of TS equipment from the damaging effects of tornados, nonconforming conditions were identified in the plant design. Specifically, TS equipment did not meet current design basis for protection against potential tornado missile impact. In some systems, both trains of TS equipment are impacted, potentially resulting in the loss of safety functions. The plant was in Mode 1 at approximately 70% reactor power. No Structures, Systems or Components (SSCs) were inoperable when the conditions were identified that contributed to the event.
Six systems containing TS equipment are affected to the extent that an impact on operability was credible. Potential tornado missile impacts could affect the following systems:
- Service Water (SW) and Fuel Oil (FO) - Ventilator openings in the structure housing portions of the SW and FO systems provide a straight-line path to TS equipment that is part of the systems.
- Auxiliary Feedwater (AFW) - The steam supply relief valves for the steam turbine driven AFW pump downstream of the steam supply valve are located adjacent to the turbine building siding which is not designed for tornado missile impact. A potential tornado missile strike of either relief valve could cause a loss of steam supply to the pump.
- Component Cooling Water (CCW) — A wall of the CCW surge tank room may not be adequate protection for the surge tank. A calculation demonstrating the adequacy of the wall could not be located.
- Control Room Ventilation (CRV) Filtration - The air intake piping for the CRV system is exposed and could cause a loss of air intake to the control room envelope if struck and crimped.
comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
PALISADES NUCLEAR PLANT 05000-255 2017 - 00
CAUSE OF THE EVENT
Due to the historical nature of the issue, a specific cause for the identified vulnerabilities was not determined.
ASSESSMENT OF SAFETY CONSEQUENCES
No actual safety consequence occurred, as Palisades did not experience an actual tornado missile event. As stated in the NRC Enforcement Guidance Memorandum,15-002, the basis for exercising enforcement discretion is a result of a generic risk analysis performed by the Office of Nuclear Reactor Regulation (NRR), Division of Risk Assessment (DRA). The assessment documents a conservative, bounding-type analysis of the risk significance for plant facilities that may not be in compliance with their tornado missile protection licensing basis. The generic analysis assumed that core damage would occur if a tornado hit a plant located in the most active tornado region in the country and that it caused a tornado-generated missile to fail all emergency core cooling equipment at the plant with no ability to recover.
Given this conservative assumption, the core-damage frequency (CDF) associated with tornado missile related to the non-compliances are well below CDFs requiring immediate regulatory action. Some tornado generated missiles may not cause system failures at all or may cause failures that are repairable or recoverable within a reasonable time frame.
In summary, the generic bounding risk analysis performed by NRR DRA has concluded that this issue is of low risk significance. Therefore, enforcement discretion will not impose significant additional risk to public health and safety.
CORRECTIVE ACTIONS
Corrective Actions Completed:
All applicable TS equipment and systems were declared inoperable. Initial compensatory measures were implemented, per the guidance of DSS-ISG-2016-01 Appendix A, within the time allowed by the applicable LCOs.
Subsequently, the affected TS equipment and systems were declared operable but nonconforming.
To establish a heightened level of station awareness and preparedness relative to identified tornado missile vulnerabilities, a description of the nonconforming SSCs and the associated compensatory measures were documented in operations standing orders log.
Corrective Actions Planned:
Establish comprehensive compensatory measures in approximately 60 days of discovery, per the guidance of NRC Interim Staff Guidance DSS-ISG-2016-01 Appendix A.
PREVIOUS SIMILAR EVENTS
None.
- 001
|
---|
|
|
| | Reporting criterion |
---|
05000255/LER-2017-001 | Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions LER 17-001-00 for Palisades Nuclear Plant Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design Conditions | | 05000255/LER-2017-002 | Reactor Protection System Actuation While the Reactor was Shutdown LER 17-002-00 for Palisades Regarding Reactor Protection System Actuation While the Reactor was Shutdown | |
|