h
~p,R Rfoo Cg
~4 ~,
0
~
'P
~
l I
O Ih
..r
~O
++**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555.i February 10, 1992 Docket Nos.
50-220 and 50-410 LICENSEE:
Niagara Mohawk Power Corporation FACILITY:
Nine Mile Point Nuclear Station Units 1 and 2
SUBJECT:
MEETING MINUTES REGARDING JANUARY 30,
- 1992, MEETING TO DISCUSS CURRENT LICENSING ISSUES AND FIVE-YEAR LICENSING PLAN FOR NINE MILE POINT UNITS 1
AND 2 A meeting was held in the NRC One White Flint North Office in Rockville, Maryland, with Niagara Mohawk Power Corporation (NHPC) and NRC staff representatives to discuss current licensing issues and NHPC's five-year licensing plan for Nine Mile Point Units 1 and 2.
The licensee had requested this meeting.
Enclosure 1 is a list of the meeting attendees.
Enclosure 2 is a copy of NMPC's five-year licensing plan for Nine Mile Point Units 1 and 2.
The meeting attendees discussed the current licensing issues open on both units.
NMPC requested that the NRC staff complete its reviews of Unit 1
TACs H81833 and H81951 as soon as possible.
Completion of TAC H81833 is needed for outage planning while completion of TAC H81951 is 'needed to minimize inadvertent scrams due to the RPS being in a half-scram for extended time intervals (up to l-l/2 days) while testing the RPS.
The NRC staff agreed to attempt to expedite these reviews.
NMPC noted that Unit 2 is scheduled to begin its second refueling outage on February 29, 1992.
This outage has a scheduled duration of approximately 70 days.
NHPC requested that TACs H82257 and H82635 be completed as soon as possible since their completion is required to support this outage.
NMPC also noted that they will be submitting a report following inservice inspection of the HPCS nozzle and that an NRC staff safety evaluation will then be required before restart.
The NRC staff agreed to attempt to accommodate the licensee's needs in these areas.
NMPC briefed the NRC staff representatives on the five-year licensing plan for Nine Mile Point Units 1 and 2.
The plan is a living document which will be updated at least annually.
The document is being used as a resource for long range planning.
The shaded areas on the calendar year schedules indicate 9202i20317 9202i0 PDR ADOCK 05000220 P
PDR Q)Fo
t L
r V
Ih I
Niagara Hohawk Power Corporation February 10, 1992 target times for refueling outages.
NRC staff representatives noted that the plan appears useful for anticipating licensing actions and urged NHPC to provide the NRC staff with revisions whenever the plan is updated.
NHPC agreed to provide the requested revisions.
Enclosures:
- 1. List of Attendees
- 2. Licensee Handout Haterial Donald S.
Brinkman, Senior Project Hanager Project Directorate I-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc w/enclosures:
See next page
Hr. B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station Unit Nos.
1 and 2
CC:
Mark J. Wetterhahn, Esquire Winston 8 Strawn 1400 L Street, NW.
Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, New York 13126 Hr. Joseph F. Firlit Vice President - Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 126
- Lycoming, New York 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hs.
Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor
- Albany, New York 12223 Mr. Kim Dahlberg Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Hr. Hartin J.
HcCormick Jr.
Plant Manager, Unit 2 Nine Nile Point Nuclear Station Post Office Box 32
- Lycoming, New York 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Hr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, New York 12223 Hr. David K. Greene Manager Licensing Niagara Mohawk Power Company 301 Plainfield Road
- Syracuse, New York 13212 Hr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, New York 12223 4
Hr. Richard H. Kessel Chair and Executive Director State Consumer Protection Board 99 Washington Avenue
- Albany, New York 12210
ATTENDANCE LIST ENCLOSUR 1
January 30, 1992 Heeting to Discuss Current Licensing Issues and Five-Year Licensing Plan for Nine Mile Point 1 and 2
Name Donald S.
Brinkman John E. Menning Rich Laura Robert A. Capra Nick Spagnoletti Al Reyna Denise J. Wolniak W. David Baker David Greene Position Senior Project Manager Project Manager Project Manager
- Director, PDI-1 Program Director U-1 Licensing Engineer Sup.-Licensing Support Program Director U-2 Manager Licensing Or anization NRC/NRR/PDI-1 NRC/NRR/P0 I-1 NRC/NRR/PD I-1 NRC/NRR/PD I-1 Niagara Mohawk Niagara mohawk Niagara Mohawk Niagar a Mohawk Niagara Mohawk
~
~
ENCLOSURE 2
t NjlAGAHAMOHAWKPOWER CORPORATION NUCLEARDIVISION NINEMILEPOINT 1VUCLFAB,STATION UNITS 1 AM)2 FD'E YEARPLOW OF NRC RELATED ISSUES
'992 1996 NOVEMBER 1991
0 4i
FIVE YEAR PLAN OF NR RELATED ISSUES INTRODUCTION:
The Nuclear Division Business Plan is a road map to guide efforts toward improvements in four key performance areas, i,e., Safety, Commercial, Regulatory, and Professional.
Strategy C of Objective 3 (Regulatory Performance) provides for the development of a comprehensive 5-year plan to address all NRC-related issues.
This document is the product resulting from the Strategy C Action Plan.
Additional actions to present the plan to the NRC and to perform continuing maintenance of the plan will be carried out as required by the Business Plan.
A comprehensive 5-year plan of NRC-related issues was included in the Business Plan to focus additional attention on the number of issues facing each unit, scheduling of those issues, and the impacts on resources.
It is expected that this document will aid in improving communications within the Nuclear Division, between Niagara Mohawk and the NRC, and will provide information for overall planning efforts. Through this document, Niagara Mohawk hopes to communicate a broad overview of the regulatory environment, Niagara Mohawk commitments
.and Niagara Mohawk/Industry initiatives being undertaken by and for the Nine Mile Point stations.
The NRC should then be better able to plan its resources in support of Niagara Mohawk.
Niagara Mohawk will also be in a better position to manage its current workload and commitments, and to plan future efforts.
DEVELOPMENT:
A number of potential sources for "NRC-Related" issues were reviewed for issues to include in the plan.
Among those reviewed were:
Nuclear Division Business Plan Nuclear Commitment Tracking System Technical Specification Amendment Request Lists Recently Issued Generic Letters/Bulletins Recently Issued Regulations BWROG/NUMARC initiatives FSAR Issues 001715LL
Literally hundreds of issues could have been selected from these sources.
Consequently, in order to make this document as meaningful and useful as
- possible, a set of guidelines was developed to assist in selecting which issues would be included in the 5-year plan.
The guidelines are included as Attachment A.
Once selected for inclusion, each issue was identified in the 5-year plan by unit (or site), by year, and by calendar quarter within the year.
Generally, placement by year (and calendar quarter) represents when the issue will be submitted to the NRC for action, review or information. When nothing is planned to be submitted, placement represents when the issue is expected to be completed or fully implemented.
For clarity, issues have also been separated by submittal or no submittal, to assist in determining which resources may be involved.
In order to complete actions by the dates specified, naturally work must begin well in advance.
For a few select long term efforts, key milestones have also been included to give a more complete picture.
Generally, however, additional detail on individual issue schedules is available from other tracking systems.
MAINTENANCE:
This document is a "living"document.
This means it will be regularly updated as changes and additions become known, and issued in accordance with the Business Plan.
The same sources used in the initial development will continue to be monitored for new issues and updates.
In addition, all Nuclear Division and NRC personnel who have occasion to use this document are invited to submit updates, as well as suggestions or recommendations to make the 5-year plan more useful.
Please submit any input to the Manager of Nuclear Licensing at Salina Meadows-2.
5-YEAR PLAN:
As noted above, the 5-year plan is presented by year, beginning with 1992.
All further breakdowns for each year are presented on the same page to provide an overview for the entire year.
In addition, each units'efueling outage is shaded in the appropriate place.
Specific dates for refueling outages from 1993-1996 have not yet been formalized, and are therefore only provided as approximations.
Each of the issues included on the 5-year plan are obviously abbreviated.
In order to provide some clarification, Attachment B has been included.
This attachment details from what source items were identified. If you need additional information on a particular item, you may consult that source or those responsible for the Issue.
001715LL
~
~
I
1992 CALENDARQUARTERS SUBMITTAL
~
SRM/IRM Calibration Amendmant
~
Tech. Speo. Bases 3.5.3
~
Refuel Outage Amendments
~
GL 91-11 (Proc.) Response
~
Radioactive Eff. Rel. Rpt.
~
Reactor Coolant Amendmont
~
Rev. 2nd 10-Yr. ISI Program
~
FSAR Update
~
Delete AETS Amend
~
10CFR20/RP Progr Amendment
~
Radioactive Eff. Rel.
~
Perform Torus Thick Measurements c 8.9.3 Spec Rpt Am.
ntation Amondment (SW) Report (IA) Rpt. - Phase 2 Hardened Vent Mod.
nsp.(Coro Spray Insp.)
G1.97 619 FW flow Repo pargers/UT Nozzle NO
~
EDG Reliability Program SUBMITTAL
~
Develop Spent Fuel Interim Storego Plan
~
~
GL 89-08 (E/C) Insp.
~
Tech Spec Improvem
~
CRD Stub Tube Cree Development
~
Outage Safety Revie om Access-VA Req.
5 (ERDS) Impl.
5 Rx. Head Cev. DLFS Downcomer Bay/Torus CS Pump/Recirc Op harge Chock Volvo tline Install/lest rbine Eff. Mod.
trol Valve Repl.
ceduro Changes NO SUBMITTAL
~
Shoreham Fuel Amend
~
31 Day Position Verifi Amendment
~
Uc. Cond. 2.C(3)b.ii A
~
GL 91-11 (Proc.) Resp
~
Radioactive Eff. Rel. R
~
Outage Safety Review Dosign/Amendment ndment (SW) Report ciators (70%)
Items rrosion (MOV) Implementation-
~
Power Uprate Amendment
~
10CFR20/RP Program Amendment
~
~
Radioactive Eff. Rel. Rpt.
Tech Spec improvement Rpt.
~
UPS Modificiations
~
"B Trensf. Root Cause
~ Incroased MSIV Leakage Amendment Leakage Detec'tlon (IGSCC)
Amendment
~
ERDS Survey
~
FSAR Update
~
IBlC Procedure Rowrite
~ Adv. Sys. Training
~ EDG'Reliability Program
~
FFD Report
~
Occupation Exp. Report
~
QATR Update
~
Present 5-Yr. Plan to NRC
~
Dovolop LLAWInterim Storage Plan
~
Rad. Env. Oporating Report
~
FFD Report NO SUBMITTAL
~
~
GL 91-14 (ENS Phones) Complote
~
NUMARC Procurement Initiativo
~ Annual Emorgoncy Exercise
~
Access Authorization Rule
~
ERF Audit Corrective Actions
~ ISTA/Present to NRC
~
ISTA
~
Develop RCM Program
~
~
1993 CALENDARaUARTERS
~
P UHIT 1 SUBMITTAL
~
T.S. Amendments as Required
~
Radioactive Eff. Rel. Rpt.
~
Perform Torus Thickness Measurements
~
T.S. Amendmants as Required
~
FSAR Update
~
T.S. Amendments as Required
~
Radioactive Eff. Rel. Rpt.
~
GL 88-20 IIPEI Roport
~
Perform Torus Thickness Measurements
~ T.S. Amendments as Roquirod UHIT2 NO SUBMITTAL SUBMITTAL NO SUBMITTAL
~
EROS Implementation
~
T.S. Amendments es Required
~
Refuel Outage Amendments
~
Radioactive Eff. Rol. Rpt.
~
Issue 1993 Refuel Outage Preplan
~
ERDS Implementation
~
T.S. Amandmants as Required
~
Right-Sized USAR
~
Issue 1994 Refuel Outage Preplan
~
T.S. Amandmants os
~
Radioacuve Eff. Ral.
~
Power Uprato Impla uired SITE SUBMITTAL NO SUBMITTAL
~
FFD Report
~
Occupation Exp. Report
~
aATR Update
~
Presont 5-Yr. Plan to NRC
~
Implement LLRWInterim Storage Plan
~
10CFR20 - RP Program Implementation
~
Reliability Centered Maintenance Program Implementation
~
Rad. Env. Operating Report
~
FFD Report
~ Annual Emergency Exerciso 001710LL
j I
1994 CALENDARQUARTERS UNIT 7 SUBMITTAL
~
T.S. Amendments as Required
~
Radioactive Eff. Rel. Rpt.
~
Refuel Outage Amendments
~
Perform Torus Thickness Measurements
~
T.S. Amendments as Required
~
FSAR Update
~
T.S. Amendments a
~
Radioacuve Eff. Rel.
Perform Torus Thick
'aasuremants Requirod ner
. Une Spray NO
~
Doc. RG 1.97 Compliance SUBMITTAL
~
Begin 4-Downcomer Bay/Torus Mod.
ogram r.
Thermal in Tost UNIT2 SUBMITTAL
~
T.S. Amendments as Required
~
T.S. Amandmants as Roquirod
~
Rofuol.Outage Amandmonts
~
Radioactive Eff. Ral. Rpt.
~
Radioactive Eff. Ral. Rpt.
~
4-Yr. Simulator Cert.
~ T.S. Amendments as Roqu>rod
~
FSAR Update SITE NO SUBMITTAL SUBMITTAL
~
FFD Roport
~
Occupational Exp. Report
~
QATR Update
~
Prosent 5-Yr. Plan to NRC
~
Rad. Env. Operating Report
~
QA Prgm. Rnwl. Rad. Mtl. Pkg.
~
CR Annunciators IBsl.l
~
FFD Report NO SUBMITTAL
~ Annual Emorgancy Exorcise 001 710LL
1995 CALENDARQUARTERS van f SUBMITTAL
~
T.S. Amendments as Required
~
T.S. Amendments as Required
~
T.S. Amendments as Required
~ T.S. Amendments as Required
~
Radioactive Eff. Rel. Rpt.
~
FSAR Update
~
Radioactive Eff. Rel. Rpt.
~ Yr. Simulator Cert. Report NO SU BhlllTTAL
~ Implement Spent Fuel Interim Storage Plan
~
DBR Program Complete UNIT2 SUBMITTAL
~
T.S. Amendments as R
~
Radioactive Eff. Rel. R endments as Required
~
T.S. Amendments as Required
~
Radioactive Eff. Rel. Rpt.
~ T.S. Amendments as Require
~
FSAR Update SITE NO SUBMITTAL SUBMITTAL NO SUBMITTAL
~
FFD Report
~
Occupational Exp. Report
~
QATR Update
~
Present 5-Yr. Plan to NRC
~
Rad. Env. Operating Report
~
FFD Report
~ Annual EmergencY Exercise 001710LL
1996 CALENDARQUARTERS UNIT 1 SUBMITTAL
~
Refuel Outago Amendments
~
Radioactive Eff. Rel. Rpt.
~
T.S. Amendmonts as Required
~
FSAR Update
~
T.S. Amendments as
~
Radioactwo Eff. Rel.
ments as Required NO SUBMITTAL
~
Maintenance Program Review C
~
Msint. Rute Implemen OV)
'on - Complete ne Overhaul eak Rate Test IIHIT2 SUBMITTAL
~
T.S. Amendments as
~
Radioactive Eff. Rel.
~
T.S. Amondmonts as Required
~
T.S. Amendments os Required
~
Radioactive Eff. Rol. Rpt.
~ T.S. Amendments as Required
~
FSAR Update NO SUBMITTAL
~
Mointonance Progra
~
Maint. Rule Implementation SITE SUBMITTAL
~
FFD Report
~
Occupational Exp. Report
~
QATR Update
~
Presont 5-Yr. Plan to NRC NO SUBMITTAL
~
Rad. Env. Operating Report
~
FFD Report
~ Annual Emergency Exercise
I
ATTACHMENTA SUIVIIVIA F
UIDELINE FOR INCLUSI N IN 5-YEAR PLAN An issue will be considered for inclusion in the 5-year plan of NRC-related issues if it meets:
ONE OR MORE OF THE FOLLOWING:
A submittal is required for NRC action/review/information based on:
Commitments Regulations Needs of an NMPC Initiative A submittal is not required, but the issue represents implementation of a prior commitment or regulation/other requirement.
The results of an internal initiative that typically are made available (not submitted) to the NRC for their review/information.
An industry initiative that has been committed to on behalf of NMPC.
AND ONE OF THE FOLLOWING:
Any issue whose development and/or implementation spans more than one quarter (i.e., three months).
QR Any issue which occurs more than once.
An item meeting the guidelines above may still be excluded from the 5-year plan.
This decision will typically be based on judgement considering the significance of the issue, the need for NMPC resources to complete the item, or expected NRC action following NMPC completion.
001717LL
t
~
~
ATTACHNIENTB UR E
F ISSUE UNIT 1:
10CFR20/RP Program/Amendment (BP 1.B.2; 502850)
I B 80-13 Inspection - Core Spray Sparger and Piping (500456-01)
B 88-04 CS Pump/Recirc Line Operability Test (502086-07)
B 88-04 Install Recirc Line (502086-09)
Begin 8-Downcomer Bay/Torus Mod. (Engineering Plans)
CRD Stub Tube Cracking (BP 1.A.5)
DBR (Design Basis Reconstitution) Program Complete (BP 2.C.3)
DCRDR/RG 1.97 - Follow up Report (502672)
Delete RETS Amendment (Tech Spec Amendment Requests)
Document RG 1.97 Compliance (500489-03)
EDG Reliability Program (502603-07)
ERDS Implementation (502866)
FSAR Verification Program (502589-02)
GL 91-11 (Proc.) Response (502862)
GL 88-14(IA) Report - Phase 2 (502470) - Generic Letter on Instrument Air System GL 89-13 (SW) Report (502539) - Generic Letter on Service Water Systems GL 87-05 Reactor Head Cavity Grain Line Flow Switch (500675-05)
GL 88-16 Hardened Vent Mod (502533)
GL 89-13 (SW) Perform PAT (502539-07) 001 724LL
i 1
ATTACHMENT8 URCE OF IS UES
@NIT 1: (Continuedi GL 89-08 (E/C) Inspection Plans (502501)
GL 89-15 (ERDS) Implementation (502569-02)
GL 88-20 (IPE) Report (503647)
Instrumentation Amendment (Tech Spec Amendment Requests)
Issue Refuel Outage Preplan (BP 2.B.3)
LPP (Liquid Poison Pump) Discharge Check Valve Test (502380-05)
Maintenance Program Review/Rule Implementation (502818)
MSIV Room Access - Vital Area Requirements (502692)
NUREG 0619-Feedwater Flow Report (502772-01)
Outage Safety Review (BP 1.A.2)
PT/UT Feedwater Nozzle (502415-05, 502415-07)
PT "A" Nozzle Bore/Inner Radius (502415-01)
Radioactive Effluent Release Report (503294-04)
Reactor Coolant Amendment (Tech Spec Amendment Requests)
Refuel Outage Amendments (Tech Spec Amendment Requests)
- Select based on outage needs Revised 2nd 10-Year ISI Program Plan (502356)
SRM/IRM Calibration Amendment (Tech Spec Amendment Requests)
Tech Spec Bases 3.5.3 (Tech Spec Amendment Requests) 001 724LL (2)
~ a
ATTACHMENTB SOURCE OF ISSUES UNIT 1: (Continued)
Tech Spec 6,9,3 Special Reports Amendment (Tech Spec Amendment Requests)
Tech Spec Improvement Report (BP 3,C.2)
VT Feedwater Spargers/UT Nozzle (502415)
@NIT 2:
"B" Transformer Root Cause (502874-01) 31 Day Position Verification Amendment (Tech Spec Amendment Requests) 4-Year Simulator Certification (502687-02)
Advanced System Training (503232)
CR Annunciators (503117) - Modifications to Control Room Annunciators to Reduce Number of Nuisance Alarms; "Black Board" Concept.
Drawdown Design/Amendment (503154-05)
EDG Reliability Program (502603-06)
EOP Inspection Items (502822-04) - Emergency Operating Procedure Inspection Open Items ERDS Survey (502569-01) - Emergency Response Data Systems ERDS Implementation (502569)
Erosion-Corrosion (502540) - Part of the Service Water Generic Letter GEXL Amendment (Tech Spec Amendment Requests) 001 724LL
A g
ATTACHMENTB
~
OUR E OF IS UE UNIT 2: (Continuedi GL 91-11 (Proc.) Response (502870-00)
GL 89-13(SW) Report (502540) - Generic Letter on Service Water Systems GL 88-20(IPE) Report (502532-01)
- Generic Letter on Individual Plant Evaluations GL 89-10 (MOV) Implementation (BP 1.A.6)
IRC Procedure Rewrite (502780-02)
Issue Refuel Outage Preplan (BP 2.B.3)
License Condition 2,C(3)b.ii (See Shoreham Fuel Amendment)
Maintenance Program Review/Rule Implementation (502817)
Outage Safety Review (BP 1.A.2)
Power Uprate Amendment (Tech Spec Amendment Requests; GE Settlement)
Power Uprate Amendment/Implementation (BP 2.A.3; GE Settlement)
Radioactive Effluent Release Report (503296-05)
Refuel Outage Amendments (Tech Spec Amendment Requests)
- Select based on outage needs Right-Sized USAR (BP 3.C.3)
Shoreham Fuel Amendment (BP 2.B.6; Tech Spec Amendment Requests)
Tech Spec Improvement Report (BP 3.C.2)
UPS Modifications (502882-03) - Review of UPS Loads and Replacement of some of the UPS Units Involved in the 8/13/91 SAE.
001 724LL (4)
e
ATTACHMENTB R
E Fl E
SITE:
10CFR20/RP Program/Amendment (BP 1.B.2; 502850-00) 5-Year Plan Presentation to NRC (BP 3.C.1)
Access Authorization Rule (502847)
ERF Audit Corrective Actions (503335)
FFD Report (502656)
GL 91-14 (ENS Phones) Upgrade (502902)
ISTA (BP 3.A.2) - Internal SALP-Type Assessment Low Level Radwaste Storage Plan (BP 1.C.1)
NUMARC Procurement Initiative (502682-01)
Occupational Exposure Report (503401-03)
QA Program Renewal for Radioactive Material Packaging (502479)
Radiological Environmental Operating Report (503213-03)
Reliability Centered Maintenance Program (BP 2.A.1) 001 724LL
lI P
1 ~
~
~
Niagara Mowak Power Corporation February 10, 1992 target times for refueling outages.
NRC staff representatives noted that the plan appears useful for anticipating licensing actions and urged NMPC to provide the NRC staff with revisions whenever the plan is updated.
NMPC agreed to provide the requested revisions.
Original Signed By Donald S.
Brinkman, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosures:
- 1. List of Attendees
- 2. Licensee Handout Material cc w/enclosures:
See next page 0 ISTR IBUTION:
Docket File NRC 5 Local PDRs PDI-1 Reading TMurley/FMiraglia JPartlow SVarga JCalvo RCapra DBrinkman CVogan OGC EJordan JMenning RLaura ACRS (10)
RLobel CCowgill OFC NAME DATE LA:PDI-1 CVogan C<
$'2' PM: PDI-1 DBrinkma :pmc g
o92 0: PDI-1 lo 92 92 92 OFFICIAL RECORD COPY FILENAME: A:iNMPC.MEE
S
Niagara Howak Power Corporation February 10, 1992 target times for refueling outages.
NRC staff representatives noted that the plan appears useful for anticipating licensing actions and urged NHPC to provide the NRC staff with revisions whenever the plan is updated.
NHPC agreed to provide the requested revisions.
Original Signed By Donald S.
Brinkman, Senior Project Manager Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Enclosures:
- 1. List of Attendees
- 2. Licensee Handout Material cc w/enclosures:
See next page DISTRIBUTION:
Docket Fi1 e~-.,
NRC 5 Local PDRs PDI-1 Reading THurley/FHiraglia JPartlow SVarga JCalvo RCapra DBrinkman CVogan OGC EJordan JHenning RLaura ACRS (10)
RLobel CCowgill OFC NAME LA:PDI-1 CVogan+
PM: PDI-1 DBrinkma :pmc D:PDI-1 DATE 5
92
~
~ 92
/0 92 92 92 OFFICIAL RECORD COPY FILENAME: A:iNHPC.MEE
0 r
E fg t