ML17053A861
| ML17053A861 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/26/1979 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rhode G NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17053A860 | List: |
| References | |
| NUDOCS 7907300374 | |
| Download: ML17053A861 (6) | |
See also: IR 05000410/1979002
Text
gag ASCgp
Pp0
C
r+ '0
n +>>*++
Docket No. 50-410
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KINO OF PRUSSIA, PENNSYLVANIA 19406
.AN 26 w>
Niagara
Mohawk Power Corporation
ATTN:
Mr. G.
K. Rhode
Vice President
System Project Management
300 Erie Boulevard,
West
Syracuse,
13202
Gentlemen:
Subject:
Inspection 50-410/79-02
This refers to the inspection
conducted
by Mr. L. Narrow of this office
on March 20-23,
1979 at Nine Mile Point Nuclear Station, Unit 2, Scriba,
New York of activities authorized
by
NRC License
No.
CPPR-112
and to the
discussions
of our findings held by Mr. Narrow with Mr. Fenton
and other
members of your staff at the conclusion of the inspection.
Areas
examined during this inspection are described
in the Office of
Inspection
and Enforcement Inspection
Report which is enclosed with this
letter.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
.Based
on the results of this inspection, it appears
that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed
herewith
as Appendix
A.
This item of noncompliance
has
been categorized
into the levels
as
described
in our correspondence
to you dated
December
31,
1974.
This
notice is sent to you pursuant to the provisions of Section
2.201 of the
NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal
Regulations.
- Section
2.201 requires
you to submit to this office, within thirty (30)
days of your receipt of this notice,
a written statement
or explanation
in reply including:
(1) corrective steps
which have
been taken
by you
and the results
achieved;
(2) corrective steps
which will be taken to
avoid further items of no'ncompliance;
and (3) the date
when full compli-
ance will be achieved.
0
In accordance
with Section
2.790 of the
NRC's "Rules of Practice,"
Part
2, Title 10,
Code of Federal
Regulations,
a copy of this letter and the
enclosures will be placed in the
NRC's Public Document
Room.
If this
report contains 'any information that you (or your .contractor)
believe to
'>9
e
g g QV8085 ~
IJ
y,
>>rfi<
~$
'
Niagara
Mohawk Power Corporation
2
be proprietary, it is necessary
that you make
a written application
within 20 days to this office to withhold such information from public
disclosure.
Any such application must
be accompanied
by an affidavit
executed
by the owner of the information, which identifies the document
or part sought to be withheld, and which contains
a statement of reasons
which addresses
with specificity the items which will be considered
by
the Commission
as listed in subparagraph
(b) (4) of Section 2.790.
The
information sought to be withheld shall
be incorporated
as far as possible
into a separate
part of the affidavit. If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Oocument
Room.
Should you have any questions
concerning this inspection,
we will be
pleased
to discuss
them with you.
Sincerely,
Robert T. Carlson,
Chief
Reactor Construction
and Engineering
Support Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Office of Inspection
and Enforcement
Inspection
Report
Number 50-410/79-02
cc w/encls:
Eugene
B. Thomas, Jr.,
Esquire
Niagara
Mohawk Power Corporation
2
be proprietary, it is necessary
that you make
a written application
within 20 days to this office to withhold such information from public
disclosure.
Any such application must
be accompanied
by an affidavit
executed
bv the owner of the information, which identifies the document
or par t sought to be withheld, and which contains
a statement of reasons
which addresses
with specificity the items which will be considered
by
the Commission- as listed in subparagraph
(b) (4) of Section 2.790.
The
information sought to be withheld shall
be incorporated
as far as possible
into a separate
part of the affidavit., If we do not hear from you in
this regard within the specified period,
the report will be placed in
the Public Document
Room.
-Should you have
any questions
concerning this inspection,
we will be
pleased
to discuss
them with you.
Sincerely,
Robert T. Carlson,
Chief
Reactor Construction
and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection
and Enforcement
Inspection
Report
Number 50-410/79-02
cc w/encls:
Eugene
B. Thomas, Jr.,
Esquire
>3