IR 05000387/2016301
| ML17018A264 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 01/17/2017 |
| From: | Diane Jackson Operations Branch I |
| To: | Rausch T Susquehanna |
| Jackson D | |
| Shared Package | |
| ML16076A438 | List: |
| References | |
| 50-387/16-301, 50-388/16-301 | |
| Download: ML17018A264 (8) | |
Text
January 17, 2017
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -
NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000387/2016301 AND 05000388/2016301
Dear Mr. Rausch:
On November 23, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at the Susquehanna facility. The enclosed report documents the examination findings, which were discussed on January 5, 2017, with Mr. J. Goodbred, Training Manager.
The examination included the evaluation of four applicants for reactor operator licenses, and five applicants for instant senior operator licenses. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The license examiners determined that eight of the nine applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on January 5, 2017.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams/web-based.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Donald E. Jackson, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.
50-387 and 50-388 License Nos. NPF-14 and NPF-22
cc w/encl: Distribution via ListServ SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -
NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000387/2016301 AND 05000388/2016301 dated January 17, 2017
Enclosure:
NRC Initial Operator Licensing Examination Report 05000387/2016/301 and 05000388/2016/301 w/Attachment: Supplemental Information
DISTRIBUTION w/encl: (via e-mail)
DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DR DSchroeder, DRP SBarber, DRP ATurilin, DRP JGreives, DRP, SRI TDaun, DRP, RI AGould, DRP, AA JBowen, RI, OEDO TFish, DRS DEJackson, DRS RidsNrrPMSusquehanna Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource
DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Exam 17-Susq Nov 14 2016 (U01931)\\Exam 2016 Report.docx ADAMS PKG: ML16076A438
ADAMS ACCESSION NO.: ML17018A264
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available
OFFICE RI/DRS/OB RI/DRS/OB
NAME TFish/DEJ for DEJackson/DEJ
DATE 01/17/17 01/17/17
OFFICIAL RECORD COPY
Enclosure EXAMINATION REPORT
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Docket:
50-387 and 50-388 License:
05000387/2016301 and 05000388/2016301 Licensee:
Susquehanna Nuclear, LLC Talen Energy Facility:
Susquehanna Steam Electric Station, Units 1 and 2 Location:
Berwick, PA 18603-0467 Dates:
November 14-18, 2016 (Operating Test Administration)
November 23, 2016 (Written Examination Administration)
November 23 - December 20, 2016 (NRC Examination Grading)
December 2 and 12, 2016 (Licensee Submitted Post Exam Package)
January 5, 2017 (Licenses Issued)
Examiners:
T. Fish, Chief Examiner, Operations Branch T. Hedigan, Operations Engineer N. Embert, Operations Engineer T. Dunn, Operations Engineer
Approved By:
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
SUMMARY
ER 05000387/2016301 and 05000388/2016301; November 14-18, 2016 and November 23, 2016; Susquehanna Steam Electric Station, Units 1 and 2; Initial Operator Licensing Examination Report.
The examination included the evaluation of four applicants for reactor operator licenses, and five applicants for instant senior operator licenses. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The license examiners determined that eight of the nine applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on January 5, 2017.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
The examiners reviewed all license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The examiners also audited four of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on each applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
On November 23, 2016, the licensee proctored the administration of the written examinations to all applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on December 2, 2016.
The NRC examination team administered the various portions of the operating examination to all applicants November 14-18, 2016. The four applicants for reactor operator licenses participated in at least two dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of 11 system tasks, and an administrative test consisting of four administrative tasks. The five applicants seeking an instant senior operator license participated in at least two dynamic simulator scenarios, a control room and facilities walkthrough test consisting of 10 system tasks, and an administrative test consisting of five administrative tasks.
b. Findings
All applicants passed all parts of the operating test. Eight of the nine applicants passed the written examination. One reactor operator applicant failed the written exam.
For the written examinations, the reactor operator applicants average score was 82.99 percent and ranged from 78.66 to 88.00 percent; the senior operator applicants average score was 85.80 percent and ranged from 85.00 to 87.00 percent.
The text of the examination questions may be accessed in the ADAMS system under the accession numbers noted in Attachment 1. In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years.
Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis and submitted the analysis to the chief examiner.
.3 Initial Licensing Examination Development
a. Examination Scope
The facility licensee developed the examinations in accordance with NUREG-1021, Revision 10. All facility licensee training and operations staff involved in examination preparation and validation were listed on a security agreement. The facility licensee submitted both the written and operating examination outlines on August 19, 2016. The chief examiner reviewed the outlines against the requirements of NUREG-1021, and provided comments to the licensee. The facility licensee submitted the draft examination package on September 16, 2016. The chief examiner reviewed the draft examination package against the requirements of NUREG-1021, and provided comments to the licensee. The NRC conducted an onsite validation of the operating examinations and provided further comments during the week of October 17, 2016. The licensee satisfactorily completed comment resolution on November 10, 2016.
b. Findings
The NRC approved the initial examination outline and advised the licensee to proceed with examination development.
The examiners determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
No findings were identified.
.4 Simulation Facility Performance
a. Examination Scope
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Examination Scope
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Mr. J. Goodbred, Training Manager, on January 5, 2017. The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
Supplemental Information
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- G. van den Berg, Facility Exam Author
ITEMS OPENED, CLOSED, AND DISCUSSED
None