NL-16-135, Watts Bar Nuclear Plant (Wbn), Unit 2 - Request for Approval of a Relief from the American Society of Mechanical Engineers, Section Xi Coverage Examinations for Preservice Inspection (PSI) - Number WBN-2/PSI-1, Revision 1, and Submittal of
From kanterella
(Redirected from ML16293A334)
Jump to navigation
Jump to search
Similar Documents at Watts Bar | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARWBL-24-005, American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner’S Activity Report for Cycle 5 Operation2024-02-15015 February 2024
[Table view]American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner’S Activity Report for Cycle 5 Operation WBL-23-038, American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owners Activity Report for Cycle 18 Operation2023-08-0707 August 2023 American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owners Activity Report for Cycle 18 Operation CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements WBL-22-057, American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 4 Operation2022-09-26026 September 2022 American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 4 Operation WBL-22-018, Cycle F214 Steam Generator Tube Inspection Report2022-03-28028 March 2022 Cycle F214 Steam Generator Tube Inspection Report WBL-22-006, American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 17 Operation2022-03-0404 March 2022 American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 17 Operation WBL-21-036, Supplement to the American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 3 Operation2021-08-0505 August 2021 Supplement to the American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 3 Operation WBL-21-028, Cycle 3 Steam Generator Tube Inspection Report2021-05-10010 May 2021 Cycle 3 Steam Generator Tube Inspection Report WBL-21-008, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 3 Operation2021-02-11011 February 2021 American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 3 Operation WBL-20-049, Augmented Inservice Test Program, Revision 22020-10-21021 October 2020 Augmented Inservice Test Program, Revision 2 WBL-20-042, American Society of Mechanical Engineers, Section XI, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 16 Operation2020-09-0303 September 2020 American Society of Mechanical Engineers, Section XI, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 16 Operation L-19-041, Cycle 2 Steam Generator Tube Inspection Report2019-08-27027 August 2019 Cycle 2 Steam Generator Tube Inspection Report L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation2019-08-14014 August 2019 American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation2019-01-24024 January 2019 American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation ML18047A3702018-02-16016 February 2018 Cycle 1 Steam Generator Tube Inspection Report ML17214A4942017-08-0202 August 2017 Updated Inservice Test Program ML17212A5502017-07-31031 July 2017 American Society of Mechanical Engin, Section XI, Second and Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 14 Operation ML17005A3182017-01-0303 January 2017 American Society of Mechanical Engineers, Section XI, Initial Inservice Inspection Report ML16293A5652016-10-0505 October 2016 Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch) ML16293A5522016-10-0505 October 2016 Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch) ML16293A5592016-10-0505 October 2016 Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch) ML16293A5602016-10-0505 October 2016 Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch) ML16293A5662016-10-0505 October 2016 Report No. R-P2466, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch) ML16293A5612016-10-0505 October 2016 Report No. R-P2441, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch) ML16293A5642016-10-0505 October 2016 Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch) ML16293A5632016-10-0505 October 2016 Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch) ML16293A5622016-10-0505 October 2016 Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch) ML16293A5582016-10-0505 October 2016 Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2441, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2441, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2437, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2437, Wall Thickness Profile Sheet. (Sketch) ML16293A3342016-10-0505 October 2016 Watts Bar Nuclear Plant (Wbn), Unit 2 - Request for Approval of a Relief from the American Society of Mechanical Engineers, Section Xi Coverage Examinations for Preservice Inspection (PSI) - Number WBN-2/PSI-1, Revision 1, and Submittal of ML16293A5502016-10-0505 October 2016 Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch) ML16293A5532016-10-0505 October 2016 Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch) ML16293A5492016-10-0505 October 2016 Report No. R-P2148, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch) ML16293A5572016-10-0505 October 2016 Report No. R-P2437, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch) CNL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch) 2024-02-15 Category:Letter MONTHYEARCNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024
[Table view]Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 2024-09-05 |