NL-16-135, Report No. R-P0149, Wall Thickness Profile Sheet, (Sketch)
From kanterella
(Redirected from ML16293A329)
Jump to navigation
Jump to search
ML16293A329 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 10/05/2016 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16293A318 | List:
|
References | |
CNL-16-135 R-P0149 | |
Download: ML16293A329 (2) | |
Similar Documents at Watts Bar | |
---|---|
Category:Drawing
MONTHYEARWBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022
[Table view]Update to Fire Protection Report Figures Redacted CNL-20-058, Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27)2020-08-27027 August 2020 Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27) ML16293A5682016-10-0505 October 2016 Report No. R-P2473, Wall Thickness Profile Sheet. (Sketch) ML16293A5612016-10-0505 October 2016 Report No. R-P2441, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch) CNL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2479, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2479, Wall Thickness Profile Sheet. (Sketch) ML16293A5742016-10-0505 October 2016 Report No. R-P2479, Wall Thickness Profile Sheet. (Sketch) ML16293A5732016-10-0505 October 2016 Report No. R-P2477, Wall Thickness Profile Sheet. (Sketch) ML16293A5722016-10-0505 October 2016 Report No. R-P2476, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2476, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2476, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2477, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2477, Wall Thickness Profile Sheet. (Sketch) ML16293A5692016-10-0505 October 2016 Report No. R-P2474, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2474, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2474, Wall Thickness Profile Sheet. (Sketch) ML16293A5712016-10-0505 October 2016 Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch) ML16293A5602016-10-0505 October 2016 Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch) ML16293A5672016-10-0505 October 2016 Report No. R-P2472, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2472, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2472, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2473, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2473, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch) ML16293A5652016-10-0505 October 2016 Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch) ML16293A5642016-10-0505 October 2016 Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch) ML16293A5632016-10-0505 October 2016 Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch) ML16293A5622016-10-0505 October 2016 Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch) ML16293A5552016-10-0505 October 2016 Report No. R-P2373, Wall Thickness Profile Sheet. (Sketch) ML16293A5512016-10-0505 October 2016 Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch) ML16293A5542016-10-0505 October 2016 Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch) ML16293A5572016-10-0505 October 2016 Report No. R-P2437, Wall Thickness Profile Sheet. (Sketch) ML16293A5482016-10-0505 October 2016 Report No. R-P2147, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2148, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2148, Wall Thickness Profile Sheet. (Sketch) ML16293A5582016-10-0505 October 2016 Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch) ML16293A5532016-10-0505 October 2016 Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch) ML16293A5502016-10-0505 October 2016 Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch) ML16293A5472016-10-0505 October 2016 Report No. R-P2146, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2146, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2146, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2373, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2373, Wall Thickness Profile Sheet. (Sketch) ML16293A5592016-10-0505 October 2016 Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch) ML16293A5522016-10-0505 October 2016 Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch) 2022-08-01 Category:Inservice/Preservice Inspection and Test Report MONTHYEARWBL-24-005, American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner’S Activity Report for Cycle 5 Operation2024-02-15015 February 2024
[Table view]American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner’S Activity Report for Cycle 5 Operation WBL-23-038, American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owners Activity Report for Cycle 18 Operation2023-08-0707 August 2023 American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owners Activity Report for Cycle 18 Operation CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements WBL-22-057, American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 4 Operation2022-09-26026 September 2022 American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 4 Operation WBL-22-018, Cycle F214 Steam Generator Tube Inspection Report2022-03-28028 March 2022 Cycle F214 Steam Generator Tube Inspection Report WBL-22-006, American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 17 Operation2022-03-0404 March 2022 American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 17 Operation WBL-21-036, Supplement to the American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 3 Operation2021-08-0505 August 2021 Supplement to the American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 3 Operation WBL-21-028, Cycle 3 Steam Generator Tube Inspection Report2021-05-10010 May 2021 Cycle 3 Steam Generator Tube Inspection Report WBL-21-008, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 3 Operation2021-02-11011 February 2021 American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 3 Operation WBL-20-049, Augmented Inservice Test Program, Revision 22020-10-21021 October 2020 Augmented Inservice Test Program, Revision 2 WBL-20-042, American Society of Mechanical Engineers, Section XI, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 16 Operation2020-09-0303 September 2020 American Society of Mechanical Engineers, Section XI, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 16 Operation L-19-041, Cycle 2 Steam Generator Tube Inspection Report2019-08-27027 August 2019 Cycle 2 Steam Generator Tube Inspection Report L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation2019-08-14014 August 2019 American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation2019-01-24024 January 2019 American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation ML18047A3702018-02-16016 February 2018 Cycle 1 Steam Generator Tube Inspection Report ML17214A4942017-08-0202 August 2017 Updated Inservice Test Program ML17212A5502017-07-31031 July 2017 American Society of Mechanical Engin, Section XI, Second and Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 14 Operation ML17005A3182017-01-0303 January 2017 American Society of Mechanical Engineers, Section XI, Initial Inservice Inspection Report ML16293A5652016-10-0505 October 2016 Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch) ML16293A5522016-10-0505 October 2016 Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch) ML16293A5592016-10-0505 October 2016 Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2439, Wall Thickness Profile Sheet. (Sketch) ML16293A5602016-10-0505 October 2016 Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch) ML16293A5662016-10-0505 October 2016 Report No. R-P2466, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2455, Wall Thickness Profile Sheet. (Sketch) ML16293A5612016-10-0505 October 2016 Report No. R-P2441, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch) ML16293A5642016-10-0505 October 2016 Report No. R-P2444, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch) ML16293A5632016-10-0505 October 2016 Report No. R-P2443, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch) ML16293A5622016-10-0505 October 2016 Report No. R-P2442, Wall Thickness Profile Sheet. (Sketch) ML16293A5582016-10-0505 October 2016 Report No. R-P2438, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2440, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2441, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2441, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2437, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2437, Wall Thickness Profile Sheet. (Sketch) ML16293A3342016-10-0505 October 2016 Watts Bar Nuclear Plant (Wbn), Unit 2 - Request for Approval of a Relief from the American Society of Mechanical Engineers, Section Xi Coverage Examinations for Preservice Inspection (PSI) - Number WBN-2/PSI-1, Revision 1, and Submittal of ML16293A5502016-10-0505 October 2016 Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2182, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2184, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2183, Wall Thickness Profile Sheet. (Sketch) ML16293A5532016-10-0505 October 2016 Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2185, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2265, Wall Thickness Profile Sheet. (Sketch) ML16293A5492016-10-0505 October 2016 Report No. R-P2148, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P2475, Wall Thickness Profile Sheet. (Sketch) ML16293A5572016-10-0505 October 2016 Report No. R-P2437, Wall Thickness Profile Sheet. (Sketch) NL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch) CNL-16-135, Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch)2016-10-0505 October 2016 Report No. R-P3450, Wall Thickness Profile Sheet. (Sketch) 2024-02-15 |
Text
- *WALL THICKNESS REPORT il!O: TVA PROFILE SHEET a PROJECT: 161 G.N WELD NO: e c. -c:.3 -:L UNIT: :l. SYSTEM: e. c,,s Record Thickness M&asurements As Weld w Weld Edge Indicated, Including Weld Width, Centerline Edge*To*Edge At 0° 2.5" '" 2.5" -I
- m
- r11 rn 141 151 Position o* 90° 180" 270° 1 f DJ ,v("A NIA-.v\¥'i rn HIA 3."11 lo 7,. 3.k>l [!] &s-8
- !,31
- II [!] 3.21
- 3. 2.c.I 3.it> "-[i] z..tl3 2,.'f.1 2J1'4 Flow;. CROWN HEIGHT: Y.Sb DIAMETER:
<t.I'\. CRQWN WIDTH: a.1,s WELD LENGTH: '/)6_. s. W [':>. o*
- Ct.. qd G.. .. ... .. tiff I Ct...
- ---. fl
- REVIEWED
,,..,
£2* EXAMINER:
f\'\Af!.pj(-
ila1t.bv1 f'lt\e..-.um: \\ LEVEL: 'rT -DATE*
\\L l ') 'Qf( <i-12t:C'}
LEVEL: Ll ..::::::;.
DATE: PAGE OF 1-108-999-44 TVA Office of Nuclear Power PROJECT:
___ _ UNIT: WELD NO: Rc'F-C.5-2..
.... -.... --.... --------. t t ' I I I f REPORT LEVEL:____;;;._n:.
__ DATE:
PAGE S OF S . ..