ML16293A403
| ML16293A403 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 10/05/2016 |
| From: | Tennessee Valley Authority |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16293A318 | List:
|
| References | |
| CNL-16-135 R-P0591 | |
| Download: ML16293A403 (3) | |
Text
- WALL THICKNESS PROFILE SHEET REPORT NO:
PROJECT:
L>J e:, N UNIT:
2 Record Thh:kntss Measur*m*nts A*
lndlc::1ted, lnc::ludlng Weld Width, Edge-To-Edge At o*
Position o* to* uo* 210*
~
-Side CROWN HEIGHT: ____
wf>~"!!::.:'ZS=..------
L"',,
CRQWN WIDTH: ____
LEYEL:; _
___,~;.....+------
LEVEL:~--*
OATE:
'IV A 19668 (NP-S-89)
WELD NO:
.:::51 F" - B-tD7 ~ - 23 SYSTEM:
6 IS (Qk.3)
- Weld Edge 5
p Side flow...
/.s" DIAMETER: ---........i_--.;..;::;;._ ________
/,sw WELD LENGTH: __
_.;;;;.~....;;;... _________
ANll:
DATE;~* d*o9' DATE:
H Of PAGE 1-101-999*44
TVA PROJECT: W t3 t0 SYSTEM: Sf S
( °"' '3)
REPORT Office of Nuclear Power UNIT:
z_
WELD NO: S/F', 13-W7'*-Z.3 Pt P~
VLow LEVEL: -r/ DATE: t/z1h" PAGE 5 OF 5 I
I
TV A Procedure N-GP-31 Item 1 Item 2 ltem3 ltem4 Item 5 Item 6 Item?
item a Item 9 Item 10 item 11 Weld# SIF-B-T076-23 Required examination Volume in sq. in.
(width x height)
Number of scan directions Total Scan volume in sq. in.
Total length of weld Total required exam volume in cubic inches Exam volume achieved (sq. in.) in direction 1 X length of weld achieved Exam volume achieved (sq. in.) in direction 2 X length of weld achieved Exam volume achieved (sq. in.) in direction 3 X iength oi weid achieved Exam volume achieved (sq. in.) in direction 4 X length of weld achieved Determined the achivied exam volume add 6, 7, 8 & 9 Exam volume percentage item 1 O/item 5 x 100 0.102 0.051 6.5 sq. in.
~==---4..;.i*** 1directions sq. in.
'--'------6_.s
.... I inches cu. in.
cu. In.
cu. In.
cu. in.
0.33{5 cu. In.
cu. In.
Directions 3 & 4 (Circ Scan directions 5 & 6) were restricted to pipe side of weld.
T
- as a singl si ed examination
~'
Level: )J.. -
Date: tUqfe7
-""'+; -+; ___. __