=ZIONSOLUTIONSLLc-An EnergySolutions Company ZION STATION RESTORATION PROJECT FINAL RADIATION SURVEY RELEASE RECORD AUXILIARY BUILDING 542 FT EMBEDDED FLOOR AND EQUIPMENT DRAIN PIPE SURVEY UNITS 05119A AND 05119B
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A& 05119B PREPARED BY /DATE: D. Wojtkowiak
~~--"--~~~~~~~~~~~~~~~~~~
09/01/16 Radiological Engineer Far C Fi. 11.u* ~
1 REVIEWED BY I DATE: 09/01/16 APPROVED BY I DATE: R. Yetter 09101116
[1]
FRSRELEASERECORD .~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc= M[IWliJ'~~
SURVEY UNITS 05119A & 05119B TABLE OF CONTENTS
- 1. EXECUTIVE
SUMMARY
................................................................................................... 3
- 2. SURVEY UNIT DESCRIPTION ......................................................................................... 4
- 3. CLASSIFICATION BASIS ............................................................................. :.................... 6
- 4. SURVEY DESIGN ................................................................................................................ 6 4.1 DATA QUALITY OBJECTIVES ............. .'...................................................................... 6 4.1.1 STATETHEPROBLEM ............................................................................................. 6 4.1.2 IDENTIFY TI-IE DECISION ....................................................................................... 7 4.1.3 IDENTIFY TI-IE INPUTS TO TI-IE DECISION ......................................................... 8 4.1.4 DEFINE THE BOUNDARIES OF TI-IE SURVEY. .................................................. 10 4.1.5 DEVELOP A DECISION RULE ............................................................................... 11 4.1.6 SPECIFY TOLERABLE LIMITS ON DECISION ERRORS ................................... 12 4.1.7 OPTIMIZE DESIGN .................................................................................................. 13
- 5. SURVEY IMPLEMENTATION........................................................................................ 14
- 6. SURVEY RESULTS ........................................................................................................... 26
- 7. QUALITY CONTROL ....................................................................................................... 29*
- 8. INVESTIGATIONS AND RESULTS ............................................................................... 29
- 9. REMEDIATION AND RESULTS ..................................................................................... 29
- 10. CHANGES FROM THE SURVEY PLAN .................................................................... 29
- 11. DATA QUALITY ASSESSMENT (DQA) .................................................................... 29
- 12. ANOMALIES .................................................................................................................... 30
- 13. CONCLUSION ................................................................................................................ 30
- 14. ATTACHMENTS ............................................................................................................ 31
[2]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
- M(lmrm~~
SURVEY UNITS 05119A & 05119B
- 1. EXECUTIVE
SUMMARY
This Final Radiation Survey (FRS) Release Record for survey unit 05119, Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe, has been generated for the Zion Station Restoration Project (ZSRP) in accordance with ZionSolutions procedure ZS-LT-300-001-005, "Final Radiation Survey Data Reporting" and satisfies the requirements of Section 5.11 of the ZSRP License Termination Plan (LTP).
Because of differences in conceptual models and source terms, FRS at ZSRP has two different approaches depending on the media; (1) a Final Status Survey (FSS) is conducted on soil, buried piping and groundwater to demonstrate that residual radionuclide concentrations are equal to or below site-specific Derived Concentration Guideline Levels (DCGL), and (2) a Source Term Survey (STS) is conducted to' demonstrate that the inventory of residual radioactivity in building basements, embedded piping and penetrations is below a source term inventory commensurate with the dose criterion in 10 CFR 20.1402.
For STS, building-specific Basement Dose Factors (BDF) were calculated in units of mrem/yr per mCi. The residual radioactivity inventory remaining for each radionuclide-of-concem (ROC) is multiplied by the BDF for each radionuclide to calculate the actual dose from the remaining source term. Due to the presence of multiple ROC, the dose contribution from each ROC is accounted for using the sum-of-fractions (SOF) to ensure that the total dose from all ROC does not exceed the dose criterion. To support STS implementation, the BDFs for all ROC are converted to Basement Inventory Levels (BIL) in accordance with ZSRP LTP section 5.5.2.1.
Two (2) STS packages (STS Sample Plans Sl-05119A-S and Sl-05119B-S) were developed* in accordance with ZionSolutions procedure ZS-LT-300-001-001, "Final Radiation Survey Package Development," the ZSRP L TP, and guidance from NUREG-1575, Revision 1, "Multi-Agency Radiation Survey and Site Investigation Manual" (MARS SIM).
The Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe are classified as STS Class 1. The Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe are part of the Auxiliary Building STS basement. In accordance with LTP section 5.5.4, in situations where there are multiple survey units in a STS basement, a fraction of the BIL is allocated to each survey unit. The sum-of-fraction for each ROC is calculated by dividing the reported activity level by an allocated fraction of the applicable BIL, which equates to the upper bound of the gray region for the Sign Test.
For the assessment of the Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe STS data, the sum of the allocated fractions for all embedded equipment and floor drain pipe was 32.671 % of the BIL. Note that the sum of the allocated BIL
[3]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
/¥.[lwwSlllmtl~
SURVEY UNITS 05119A & 05119B fractions for the remaining STS units in the Auxiliary Building STS basement (walls, floors and any remaining penetrations) must be less than or equal to 67.329% as the sum of all allocated fractions in a given STS basement must be less than or equal to one ..
Both survey plans (Sl-05119A-S for the floor drain pipe and Sl-05119B-S for the equipment drain pipe) were designed based upon the acquisition of a measurement for each foot of pipe that was accessible. This resulted in an areal survey coverage of 100%
for the interior surfaces of all accessible pipe. The contribution to the source term inventory from portions of the pipe that were found to be not accessible were extrapolated based on the measured mean concentrations of each ROC from the accessible pipe that was surveyed. Two thousand seven hundred and eighteen (2,718) feet of embedded equipment and floor drain pipe were surveyed in 31 different pipe lengths. Nine hundred and thirty-six (936) feet of pipe was found to be not accessible, either by obstruction or due to insufficient pipe diameter size necessary for the insertion of an available detector. Of the 936 feet of inaccessible pipe, 553 feet had a pipe diameter of 2-inch or less.
The STS results produced a Mean Inventory that was 29.3% of the Auxiliary Building Basement BIL corresponding to an assigned dose of7.324 mrem/yr.
- 2. SURVEY UNIT DESCRIPTION The Auxiliary Building 542 ft. elevation embedded equipment and floor drain survey unit consists of 31 different pipes ranging from 2-inch to 6-inch in diameter. The floor drain system consists of approximately 2,941 linear feet of floor drain pipe, embedded 4 feet deep in the concrete floor in 28 pipe headers that are accessed by 125 drain openings and terminate in one of the two Auxiliary Building sumps. Sump A services 10 pipe headers in the west portion of the basement and Sump B services 18 pipes in the east portion of the basement. The equipment drain system consists of approximately 713 linear feet of floor drain pipe, embedded 2 inches deep in the concrete floor in 3 pipe headers that are accessed by 4 7 drain openings and terminate in one of two Auxiliary Building equipment drain collection tanks located beneath the 542 ft. elevation floor. The floor and equipment drain headers are presented in Table 1. A layout of the floor and equipment drains is provided in Figures 1 and 2, respectively.
[4]
FRS RELEASE RECORD AUX ILIARY BUILDING EQUIPM ENT AND FLOOR DRAIN PIPE SURVEY UNITS 0511 9A & 051198
~
ZIONSOLUTIONSw:
Table 1 - Auxiliary Building 542 ft. Embedded Floor and Equipment Drain Pipe
~ Length Dia.
- Sump Pipe of Pipe (in) (feet) l A 4 85 2 B 4 89 3 c 4 65
- 4 D 4 149 5 E 4 100
- 6 A
F 4 105
- 7 G 4 111 8 H 4 19 9 J 4 80
- 10 K 4 26 11 A 6 137 12 B 4 111
- 13 c 4 191 14 D 4 81 15 E 4 182 16 F 6 183
- 17 G 4 88
- 18 H 4 74 f--
19 J 6 75
- 20 B
K 4 48
- 21
.....__ L 4&2 253 22 M 4 25
- 23
.....__ N 6 36 24 p 4 80 25 R 4 71
- 26 s 6 202
- 27
.....__ T 4 146 28 u 6 129 29
.....__ B 6 215 30 EQ Ul 2 363 31 U2 2 135 TOTAL 3,654
[5]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
- 3. CLASSIFICATION BASIS Survey unit 05119 was classified in accordance with ZionSolutions procedure ZS-LT-300-001-002, "Survey Unit Classification."
Throughout the operation of the Zion Nuclear Power Station, and during the period of SAFSTOR, the Auxiliary Building 542 ft. elevation embedded equipment and floor drain system received contaminated liquids from equipment operation, spills and flooding.
During the operation of the facility, storage tank overflow into the Auxiliary Building basement resulted in water flooding up to 2 feet deep. The Historical Site Assessment (HSA) documents 5 occurrences between 1990 and 1996 where the Lake Discharge Tanks overflowed to the Auxiliary Building 542 ft. elevation floor.
No characterization surveys were performed of the interior of the pipe headers, however, operational surveys showed significant dose rates at the drain scuppers. The results of these surveys, the known introduction of contaminated liquids into the pipe, the analysis of contaminated liquids in the sumps and collection tanks prior to processing and the documented spills and flooding in the Auxiliary Building basement would indicate the presence of a significant radioactive source inventory in the pipe. Consequently, all embedded floor and equipment drain pipe in the Auxiliary Building 542 ft. elevation floor was classified as STS Class 1.
- 4. SURVEY DESIGN Survey design for this STS were incorporated into and performed in accordance with STS Sample Plans Sl-05119A-S and Sl-0511B-S, which were developed in accordance with ZionSolutions procedure ZS-LT-300-001-001, "Final Radiation Survey Package Development."
4.1 DATA QUALITY OBJECTIVES Final Radiation Survey planning and design hinges on coherence with the Data Quality Objective (DQO) process to ensure, through compliance with explicitly defined inputs and boundaries, that the primary objective of the survey is satisfied. The DQO process is described in the LTP in accordance with MARSSIM. The main features of the DQO process for STS survey units 05119A and 05119B are illustrated below.
4.1.1 STATE THE PROBLEM
. The Problem: To demonstrate that the residual radioactivity inventory quantified in STS survey units 05119A and 05119B, when added to the
[6]
FRSRELEASERECORD .;::::::::=-
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
ZIONSOLUTIONSuc
MtiwiiJ.kUcm~
total allowable residual radioactivity inventory for the Auxiliary Building (a Class 1 STS unit), is below a source term inventory commensurate with the dose criterion in 10 CFR 20.1402 (i.e., the BIL).
Stakeholders: The primary stakeholders are ZionSolutions LLC, Exelon Nuclear Generation, LLC (Exelon), the Illinois Environmental Management Agency (!EMA), and the United States Nuclear Regulatory Commission (NRC).
The Planning Team: The planning team consisted of the assigned Characterization/License Termination (C/LT) Engineer with input from other C/LT personnel as well as the Safety Department. The primary decision maker was the Technical Lead/Radiological Engineer with input from the C/LT Manager.
Schedule: A total of ten (10) working days were assigned to mobilize, implement, and assess the STS in parallel with decontamination and inspection activities.
Resources: The primary resources required were the C/LT Technicians to collect survey measurements and collect media samples, the C/L T Engineer to prepare the plan and evaluate data, the C/LT Field Supervisor to coordinate and monitor field activities, the Survey Mapping/CAD Specialist to prepare .survey maps, Environmental Health and Safety to support work space evaluation hazard assessment and mitigation plans,
- 1abor support for equipment transport and set up and the preparation of survey locations and the Chemistry/Analysis laboratory staff to analyze samples as necessary. Material and equipment resources included a pipe inspection device with indexing and video capabilities (See Snake),
radiation detection instrumentation and sample containers and sample collection equipment.
4.1.2 IDENTIFY THE DECISION The Decision: Determine whether or not the radioactivity inventory remaining in the equipment and floor pipe that is embedded in the concrete floor of the Auxiliary Building 542 ft. elevation basement is less than the allowable source term commensurate with the dose criterion in 10 CFR20.1402, taking into consideration that the SOF for the allowable fraction and mean fraction in the entire STS unit for the Auxiliary Building basement (including concrete walls, concrete floor and other embedded penetrations) must be less than or equal to one. If
[7]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc~
Mfni:m~~
SURVEY UNITS 05119A & 05119B measurements indicate that the inventory exceeds the allowable radioactivity inventory, then confirmatory surveys, investigations and/or additional remedia.tion will be performed. If measurements indicate that the inventory does not exceed the allowable radioactivity inventory, then the survey unit meets the release criteria and STS activities are complete.
4.1.3 IDENTIFY THE INPUTS TO THE DECISION Radionuclides of Concern: The primary gamma emitting ROC for the STS of the Auxiliary Building basement STS unit are Co-60, Cs-134 and Cs-137. Ni-63 and Sr-90 are also ROC for the Auxiliary Building basement STS unit. Ni-63 is inferred from the measured concentration of Co-60 and Sr-90 is inferred from the measured concentration of Cs-137. The mixtures used to derive the ratios for inferring Hard-to-Detect (HTD)
ROC was based on the analysis of sediment samples taken from the Auxiliary Building drain pipe. LTP Chapter 6, section 6.5.2 discusses the process used to derive the final suite of dose significant ROC for the decommissioning of ZNPS, including the elimination of insignificant dose contributors from the ROC.
Basement Dose Factors: Building-specific BDF are the product of the Groundwater BDF and Drilling Spoils BDF from ZionSolutions Technical Support Document (TSD)14-010, "RESRAD Dose Modeling for Basement Fill Model, Soil DCGL and Calculation of Basement Fill Model Dose Factors", Rev 2. BDF are caljculated in units of mrem/yr per mCi.
The radioactivity inventory based upon the mean concentration for each ROC is multiplied by the BDF for each radionuclide to calculate the attributed dose from the radioactivity inventory in each pipe. The BDF for the Auxiliary Building basement STS unit from TSD 14-010 are reproduced below.
Table 2 - Basement Dose Factors (mrem/yr per mCi)
Radionuclide A'iiliary Bµildin2 Co-60 l.llE-02 Cs-134 l.60E-02 Cs-137 3.04E-02 Ni-63 2.94E-04 Sr-90 3.38E-01
[8]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE .
SURVEY UNITS 05119A & 05119B Basement Inventory Limit: The BDF for the Auxiliary Building STS unit were used to calculate a hypothetical maximum inventory limits for each ROC in the embedded pipe that would equate to 25 mrem/yr. These calculated values are designated as Basement Inventory Limits (BIL). The BIL is used during STS survey design to determine a reasonable areal coverage based upon the theoretical potential of exceeding the inventory limit. The BIL for the Auxiliary Building basement STS unit are reproduced below.
Table 3- Basement Inventory Limits (mCi)
.. I **
Auxiliarr Radionuclide Building Co-60 2.25E+03 Cs-134 l.56E+03 Cs-137 8.22E+02 Ni-63 8.52E+04 Sr-90 7.39E+Ol The BIL for each ROC is then converted to units of pCi/m2 by converting mCi to pCi and then dividing by the internal surface area of the pipe being surveyed. This value was then adjusted by multiplying the BIL by an assigned allocated fraction, which equates to the upper bound of the gray region for the Sign Test. The STS measurement results, which are also converted to units of pCi/m2 , are then divided by the adjusted BIL to derive a SOF value for each measurement.
Areal Coverage Requirements: In accordance with LTP Chapter 5, section 5.5.2.1, 100% areal coverage is required for all Class 1 STS units.
For the STS of the equipment and floor drain pipe embedded in the Auxiliary Building 542 ft. elevation concrete floor, 1" x 1" cesium iodide (CsI) detectors were inserted into each pipe using a simple "push-pull" methodology, whereby the position of the detector inside the pipe can be
- easily determined and in a reproducible manner. The CsI detectors were configured in a fixed geometry relative to the surveyed surface, thus creating a situation where a defensible efficiency can be calculated. The detectors were then deployed into the actual pipe and a timed one-minute
[9]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
. ...,~~~**
SURVEY UNITS 05119A & 05119B measurement was acquired at an interval of one measurement for every foot of pipe. Based upon a conservative "area of detection" for the detectors. used, a measurement interval of one measurement for each foot of pipe conservatively provided 100% areal coverage of the pipe interior surfaces.
Quality Control (QC) Measurements: In compliance with ZS-LT-01, "Quality Assurance Project Plan," replicate measurements were performed on 5% of the survey locations chosen at random.
Investigation Levels: There were no investigation levels directly applicable to individual measurements taken for the STS of the Auxiliary Building 542 ft. embedded equipment and floor drain pipe. However, at the discretion of the C/LT Engineer, additional investigation surveys were an option if anomalies were identified with the data.
Sampling and Analysis Methods to Meet the Data Requirements: A composited sediment samples were acquired during the vacuuming of floor drains_ representative of the following pipe sections;
- West Central Floor Drains
- HUT Floor Drains
- Unit 2 Horizontal Pipe Chase
- Unit I side Floor Drains
- Unit 2 side Floor Drains The sediment samples were taken from the vacuum, which was then decontaminated prior to use in another region. The objectives for the acquisition and analysis of these samples were to assess the radionuclide mixture present in each section and to analyze for the presence of HTD radionuclides. These samples were analyzed initially by the on-site gamma spectroscopy system and then composited and sent for HTD analysis by Eberline Laboratories.
4.1.4 DEFINE THE BOUNDARIES OF THE SURVEY Boundaries of the Survey: See Section 2 of this Release Record.
Temporal Boundaries: Measurements were acquired indoors minimizing seasonal constraints due to weather. The physical configuration of the Auxiliary Building 542 ft. embedded equipment aQ.d floor drain piping
[10]
FRSRELEASERECORD .~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
Mtiw'QJ~Ocr'OS"J SURVEY UNITS 05119A & 05119B required a* coordinated effort by multiple groups in order to accomplish personnel and material access for survey performance.
Constraints: The STS of the interior surfaces of the Auxiliary Building 542 ft. embedded equipment and floor drain piping required the pipe to be dry and relatively clear of debris to the extent practicable. There were instances where measurements were acquired with loose sediment and standing water present on the bottom of the pipe, however not to the extent where the detector was submerged or covered.
4.1.5 DEVELOP A DECISION RULE Decision Rule: As the Auxiliary Building 542 ft. embedded equipment and floor drain piping is one of multiple survey units in the Auxiliary Building basement STS unit (e.g. one for the walls, one for the floor and one for any other embedded piping and/or penetrations that may remain in the end-state), the BIL, converted to units of pCi/m2 was adjusted by multiplying the BIL by the allocated fraction assigned to the pipe. The upper bound of the gray region for the Sign Test is the allocated fraction of the BIL for each of the multiple survey units in the Auxiliary Building basement STS unit, as opposed to the full BIL in the case of a basement that has only one STS survey unit. The STS measurement results for each ROC, also in units of pCi/m2 , were divided by the adjusted BIL for each ROC to derive a SOF value for each ROC, which were then summed to derive a total SOF for the measurement.
The Sign Test was used to evaluate the measured radioactivity inventory in each section of pipe against the allocated BIL fraction. The total SOF for each measurement was used as the weighted sum for the Sign Test.
During the assessment of the data, if the survey unit failed the Sign Test, then the allocated fraction was increased until the Sign Test was passed.
This is allowable as long as the allocated fractions in the other STS units in the basement are decreased accordingly such that the revised allocated
- fractions still sum to less than or equal to one. Passing the Sign Test demonstrates that the mean activity of the survey unit is less than the adjusted BIL at a 5% Type I error rate. The Sign Test must be passed for all other survey units in the Auxiliary Building basement STS unit at the final allocated fraction selected. After all survey units in the Auxiliary Building basement STS unit have passed the Sign Test and, the sum of the
[11]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
. M~~
SURVEY UNITS 05119A & 05119B allocated fractions is less than or equal to one, then the Mean Inventory Fractions for each of the survey units will also be summed.
If a combination of allocated fractions cannot be_selected that results in all survey units in a given basement passing the Sign Test, or ifthe sum of the Mean Inventory Fractions of all STS units in a basement exceeds one, then the survey unit will fail STS. If a survey unit fails STS, then additional remediation will be performed and the STS performed again. Also, if the_
results of a quality control sample (e.g., splits or replicates) failed the acceptance criteria, then an investigation would be performed and documented.
4.1.6 SPECIFY TOLERABLE LIMITS ON DECISION ERRORS
\
The DQO process incorporates hypothesis testing and probabilistic sampling distributions to control decision errors during data analysis.
Hypothesis testing is an inference tool that compares a baseline condition, referred to as the null hypothesis, to an alternate condition. Hypothesis testing rests on the premise that the null hypothesis is true and that sufficient evidence must be provided to reject it in favor of an alternate hypothesis.
The Null Hypothesis: Residual radioactivity in the survey unit exceeds the release criterion.
Rejection of the null hypothesis in favor of an alternate condition, based on data that reveals the release criterion was not exceeded, would satisfy the release criterion objective of the STS.
Type I Error: This is also known as the "a" error. This is the error associated with incorrectly concluding the null hypothesis has been rejected. In accordance with LTP section 5.5.4, the a error was set at 0.05 (5%).
Type II Error: This is also known as the "W' error. This is the error associated with incorrectly concluding the null hypothesis has been accepted. As the classification for the STS unit for the Auxiliary Building 542 ft. embedded equipment and floor drain piping is Class 1, and the number of measurements to be taken were based on a survey frequency of one measurement for every foot of pipe that was accessible, the Type II error is not applicable for this survey.
[12]
FRSRELEASERECORD -~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONS;;:c=
M["9'11'JSaYbll~
SURVEY UNITS 05119A & 05119B
- Lower Bound of the Gray Region: As the classification for the STS unit for the Auxiliary Building 542 ft. embedded equipment and floor drain piping is Class 1, and the number of measurements to be taken were based on a survey frequency of one measurement for every foot of pipe that was accessible, the Lower Bound of the Gray Region is not applicable for this survey.
Upper Bound of the Gray Region: In accordance with LTP section 5.5.4, the Upper Bound of the Gray Region for the Sign Test was the allocated fraction of the BIL for the Auxiliary Building 542 ft. embedded equipment and floor drain piping.
4.1.7 OPTIMIZE DESIGN Type of Statistical Test: The Sign Test was the non-parametric statistical test selected for this STS unit.
Number of Samples: The Auxiliary Building 542 ft. embedded equipment and 'floor drain piping is a Class 1 STS unit. In accordance with L TP Chapter 5, section 5.5.2.1, 100% areal coverage is required for all Class 1 STS units. Based upon a conservative "area of detection" for the detectors used, a measurement interval of one measurement for each foot of pipe conservatively provided 100% areal coverall of all accessible pipe interior surfaces.
The Csl detectors were inserted into each pipe using a simple "push-pull" methodology, whereby the position of the detector inside the pipe was easily determined in a reproducible manner through the use of tape measures and/or distance encoders. This ensured that a timed one-minute measurement was acquired for every foot of pipe travelled.
Number of Judgmental Samples and Locations: Due to the fact that 100%
areal coverage was required for the accessible internal area of all pipe surveyed, the acquisition of judgmental samples was not applicable.
Number of Scan Areas and Locations: For the survey of pipe internal surfaces, areal coverage is achieved by the "area of detection" for each static measurement taken. Scanning, in the traditional context, is not applicable to the survey of pipe internal surfaces.
Number ofSamples for Quality Control: One hundred and thirty-two (132) replicate static measurements were collected to satisfy the 5% requirement
[13]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
An1'.191D'~°""""7 SURVEY UNITS 05119A & 05119B from the QAPP for QC measurements. Locations were selected* at random.
A synopsis of the survey design is denoted in Table 4 below.
Table 4 - Synopsis of Survey Design FEATURE DESIGN .CRjTERIA BASIS '
Accessible - 302.76 m2 Foot Encoding During Survey STS Unit Area Obstructed- 73.50 m2 Estimated from Drawings Number of One measurement for every foot of 2,718 Measurements accessible pipe.
Release Record Dose Factors TSD 14-010 Table 2 Areal Coverage 100% LTP Chapter 5, section 5.5.2.1 Investigation Level Not Applicable Not Applicable
- 5. SURVEY IMPLEMENTATION Survey instructions for this STS were incorporated into and performed in accordance with STS Sample Plans Sl-05119A-S and Sl-0511B-S, which were developed in accordance with ZionSolutions procedure ZS-LT-300-001-001, "Final Radiation Survey Package Development". The STS unit was inspected and controlled in accordance with ZionSolutions procedure ZS-LT-300-001-003, "Isolation and Control for Final Radiation Survey".
Surveys of the Auxiliary Building 542 ft. embedded equipment and floor drain piping began on May 20, 2016 and concluded on June 27, 2016. The survey design estimated 10 working days to implement the STS in parallel with any required decontamination and inspection activities. In reality, 27 working days were necessary to complete this work due to obstacles and standing water observed in the pipe and the additional time that was necessary to remove debris using a HEPA-vacuum system. Although the work was usually performed during normal working hours, some overtime and weekend work was required. Throughout these activities, briefings were conducted on a daily basis to discuss the expectations for job performance and to review safety aspects of the job.
Prior to inserting radiological detectors into the pipe, video recordings were made of each pipe length using a See Snake miniature camera system. The interior length of each accessible length of embedded pipe was inspected. The miniature camera with
[14]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLUTIONSuc=
' ...,~~~
SURVEY UNITS 05119A & 05119B supporting lighting components were maneuvered through the pipe by the manipulation of semi-rigid camera cable, which were manually pushed or pulled to provide locomotion. This inspection provided an unambiguous record of the physical condition of the piping and identified obstructions.
Following inspection, an attempt was made to remove as much standing water and debris from the pipe interior as possible using a HEPA-vacuum system. The vacuuming process also attempted to remove obstacles observed during the inspection that would prevent the passage of the detector during the survey.
Once vacuuming was completed in a section of pipe to the extent practicable, the residual radioactivity remaining in each accessible section of embedded piping was assessed and quantified by direct survey. The approach used for the radiological survey of the interior surfaces of the Auxiliary Building 542 ft. embedded equipment and floor drain piping involved the insertion of a 1" x 1" Csl detector that was attached to the See Snake and transported through the pipe to the maximul!l deployment length, or to a location of drain drop. A simple "push-pull" methodology was used, whereby the position of the detector in the piping system could be easily determined in a reproducible manner. Footage was tabulated on the See Snake, then measurements were obtained at each one-foot location while backing out of the pipe section.
The Csl detectors were configured in a fixed geometry relative to the surveyed surface, thus creating a situation where a defensible efficiency could be calculated. The detectors were then deployed into the actual pipe and timed measurements were acquired at an interval of one measurement for every foot of pipe. A conservative "area of detection" of one-foot was assumed. It was also conservatively assumed that any activity inside of the pipe was uniformly distributed in the area of detection ..
For each detector in each diameter of pipe, an instrument efficiency factor was derived by placing a flexible Cs-137 radiological plane source into either a 4-inch diameter or a 6-inch diameter pipe jig, depending on the diameter of the pipe length to be surveyed. This created a geometry similar to what would be encountered in the actual pipe. Using the known source activity, an efficiency factor was then derived for the detector in that geometry.
A background value was also determined for the detector/instrument combination to be used prior to deployment. The background value was obtained at the location where the pre-use response check of the instrument was performed. The background value was primarily used to ensure that the detector had not become cross-contaminated by any previous use.
[15]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
Mc..miScUo'llCo"P""J' SURVEY UNITS 05119A & 05119B Daily prior to use and daily following use, each detector was subjected to an Operational Response Check in accordance with procedure ZS-LT-300-001-006, "Radiation Surveys of Pipe Interiors Using Sodium/Cesium Iodide Detectors." The Daily Operational Response Check compared the background response and the response to check sources ranges established for normal background and detector source response to ensure that the detector was working properly.
Once the detector was determined to be fully functional, it was then deployed to the field for insertion into the targeted piping. A one-minute static measurement was acquired at each foot traversed into the pipe. The detector output represented the gamma activity for each one-minute timed measurement in units of gross cpm. The gamma measurement value in units of cpm was then converted to units of dpm using the efficiency factor for the detector applicable to the diameter of the pipe surveyed.
Each measurement assumed a conservative "area of detection" for the CsI detector of one foot. This assumption is_ conservative because there is additional instrument response from contamination located in the pipe at distances outside of the "area of detection".
Consequently, the total activity from the measurement, in units of dpm is adjusted for the total effective surface area commensurate with the pipe diameter and the assumed "area of detection", resulting in measurement results in units of dpm/100 cm2
- Using the appropriate conversion factors, the result is then converted to units of pCi/m2
- This measurement result represents a commensurate and conservative gamma surface activity for the one foot of pipe surface where the measurement was taken.
Two thousand seven hundred and eighteen (2, 718) feet of embedded equipment and floor drain pipe were surveyed in 31 different pipe lengths. Nine hundred and thirty-six (936) feet of pipe was found to be not accessible, either by obstruction or due to insufficient pipe diameter size necessary for the insertion of an available detector. Of the 936 feet of inaccessible pipe, 553 feet had a pipe diameter of 2-inch or less.
After completion of the STS measurements in the pipe, the sample plan was reviewed for completeness and the survey data was validated in accordance with procedure ZS-LT-300-001-004, "Final Radiation Survey Data Assessment." Data processing includes converting measurement data into reporting units, validating instrument applicability and sensitivity, calculating relevant statistical quantities, and verification that all DQO have been met. In accordance with step 5 .4 of the procedure, a preliminary Data As,sessment was prepared for each section of pipe surveyed.
Sediment samples were acquired during the vacuuming of floor drains representative of the following pipe sections;
- West Central Floor Drains
[16]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
M[lwuJ.$al41om~
SURVEY UNITS 05119A & 05119B
- HUT Floor Drains
- Unit 2 Horizontal Pipe Chase
- Unit 1 side Floor Drains
- Unit 2 side Floor Drains All sediment samples that were collected were controlled, transported, stored, and transferred to the on-site laboratory using chain-of-custody protocol from procedure ZS-LT-100-001-004, Attachment 1, "Sample Processing Log." A unique radionuclide mixture was determined for each of the 5 regions based on the analysis of the sediment samples by the on-site gamma spectroscopy system. The primary gamma emitting ROC for the STS of the Auxiliary Building basement STS unit are Co-60, Cs-134 and Cs-137.
Ni-63 and Sr-90 are also ROC for the Auxiliary Building basement STS unit. Ni-63 is inferred from the measured concentration of Co-60 and Sr-90 is inferred from the measured concentration of Cs-137. The ratios used to infer the Ni-63 and Sr-90 concentration were based on the analysis of sediment samples taken from the Auxiliary Building drain pipe shown in Table 10. The 5 mixtures and the pipes where the mixture was applied is presented in the following tables.
Table 5 -Radionuclide Mixture for West Central Floor Drains This mixture applies to the following pipes: Sump A - Pipes A, B, C, D, E, F and K Notrnalized*oamrria Mixture Radionuclide pCi/g Distribution Co-60 5.54E+03 18.134%
Cs-134 l.06E+Ol 0.035%
Cs-137 , 2.50E+04 81.831%
Ni-63 Ratio to Co-60 0.50466 Sr-90 Ratio to Cs-137 0.00066
[17]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLUTIONSuc=
. M[ll!rm~eo,cr, SURVEY UNITS 05119A & 05119B Table 6 - Radionuclide Mixture for HUT Floor Drains This mixture applies to the following pipes: Sump A - Pipe G Normalized Gamma Mixture
.Radionuclide.
pCi/g Distribution Co-60 4.30E+03 44.330%
Cs-134 O.OOE+OO 0.000%
Cs-137 5.40E+03 55.670%
Ni-63 Ratio to Co-60 0.50466 Sr-90 Ratio to Cs-137 0.00066 Table 7-Radionuclide Mixture for Unit 2 Horizontal Pipe Chase This mixture applies to the following pipes: Sump A- Pipes Hand J
.. Normalized Gamma Mixture
- Radionuclide ..
. pCi/g Distribution Co-60 6.40E+03 22.207%
Cs-134 2.34E+Ol 0.099%
Cs-137 l.71E+04 72.694%
Ni-63 Ratio to Co-60 0.50466 Sr-90 Ratio to Cs-13 7 0.00066
[18]
FRSRELEASERECORD .~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
M[lvw~~
SURVEY UNITS 05119A & 05119B Table 8-Radionuclide Mixture for Unit 1 Side Floor Drains This mixture applies to the following pipes: Unit 1 2-inch Equipment Drains and Sump B -
Pipes A, B, C, D, E, F, G, H, J and K Normalized Gamma Mixture Radionuelide
'c' *
'pCVg
- Distribution Co-60 1.74E+04 77.783%
Cs-134 O.OOE+OO 0.000%
Cs-137 4.97E+03 22.217%
Ni-63 Ratio to Co-60 0.50466 Sr-90 Ratio to Cs-137 0.00066 Table 9 - Radionuclide Mixture for Unit 2 Side Floor Drains This mixture applies to the following pipes: Unit 2 B Equipment Drain, Unit 2 2-inch Equipment Drains and Sump B - Pipes L, M, N, P, R, S, T and U
.. Normalized Gainma Mi](tllre Radionuclide .
. pe}lg Distribution Co-60 6.14E+03 43.270%
Cs-134 O.OOE+OO 0.000%
Cs-137 8.05E+03 56.730%
Ni-63 Ratio to Co-60 0.50466 Sr-90 Ratio to Cs-137 0.00066.
Sediment acquired in each of the 5 regions were composited and shipped to Eberline Laboratory for HID analysis. The concentrations for Ni-63 and Sr-90 used to determine the ratios above were taken from the results of this analysis. The results are presented in the following table.
[19]
~--- ------------
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLUTIONSuc=M[Jw;JSalilt:mC:U.,...,.
SURVEY UNITS 05119A & 05119B Table 10 - Analytical Results from Composite Sediment Sample Results 1 .Uncertainty MDA (pCi/gm~
H-3 7.44E+Ol l.28E+Ol 1.86E+Ol C-14 3.47E+02 7.17E+OO 4.93E+OO Fe-55 -2.21E+Ol 6.55E+Ol 9.83E+Ol Ni-59 9.00E+Ol 2.91E+02 4.58E+02 Co-60 2.76E+04 2.31E+03 1.15E+03 Ni-63 1.39E+04 9.29E+Ol 2.39E+Ol Sr-90 4.57E+o1
- 7.63E+OO 8.84E+OO Nb-94 1.16E+02 2.21E+02 2.58E+02 Tc-99 2.85E+Ol 8.51E+OO 1.36E+Ol Ag-108m 1.18E+02 l.90E+02 2.65E+02 Sb-125 6.90E+02 7.03E+02 1.01E+03 Cs-134 6.86E+Ol l.72E+02 2.48E+02 Cs-137 6.86E+04 6.03E+03 1.49E+03 Pm-147 2.66E+Ol 8.95E+OO 1.42E+Ol Eu-152 -6.50E+02 8.36E+02 4.96E+02 Eu-154 1.33E+02 3.97E+02 2.53E+02 Eu-155 -1.04E+02 2.90E+02 3.02E+02 Np-237 5.37E-01 6.lOE-01 8.08E-01 Pu-238 1.97E+OO l.23E+OO 8.81E-01 Pu-239/240 1.44E+OO 1.04E+OO 7.69E-01 Pu-241 2.47E+Ol 5.24E+Ol 8.88E+Ol 2
Am-241 1.0lE+Ol 2.52E+OO 8.03E-01 Am-243 1.80E-01 3.43E-01 6.35E-01 Cm-243/244 2.63E+OO 1.19E+OO 9.79E-01 1 Bold values indicate concentrations >MDC 2 Indications of"false positive" result from subsequent analysis ofresults by Eberline
[20]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
' ,,,.~~
SURVEY UNITS 05119A & 05119B LTP Chapter 6, section 6.5.2 discusses the process used to derive the final suite of dose significant ROC for the decommissioning of ZNPS, including the elimination of insignificant dose contributors from the ROC. In addition, ZSRP committed to identify and calculate the dose from insignificant contributor radionuclides in several areas where characterization had not yet occurred. The Auxiliary Building 542 ft elevation embedded equipment and floor drain pipe were identified as an area where this assessment was to be performed. If the insignificant contributor dose from the HTD analysis results is less than the insignificant contributor dose from LTP Chapter 6, section 6.5.2, then the current adjustment to the BDF to account for insignificant contributor dose would be retained. If the insignificant contributor dose from the HTD analysis results was greater than the insignificant contributor dose from L TP Chapter 6, section 6.5.2, then the BDF for the Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe would be re-adjusted to account for the increased dose.
Using the same approach as described in LTP Chapter 6, section 6.5.2, the mixture percentages for the initial suite of radionuclides for ZSRP were derived using the results from the analysis of the composited sediment sample taken from the Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe (Table l 0). Several radionuclides in the initial suite were not positively identified in the sediment sample analyses. The mixture percentages for these radionuclides were conservatively determined using the reported MDC values. Note that Np-237 was removed from the list of the initial suite for ZNPS and is not included in this analyses. The mixture percentages for the initial suite of radionuclides for ZSRP, as well as the percent of annual dose are provided in the following table.
[21]
FRSRELEASERECORD .~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
M[191D'~~
SURVEY UNITS 05119A & 05119B Table 11 - Initial Suite of Potential Radionuclides for ZNPS, Radionuclide Mixture and Dose Contribution Based on Composite Sediment Sample Percent Percent *
,. Activity Annual Dose H-3 0.065% 0.0192%
C-14 0.304% 0.9346%
Fe-55 0.086% 0.0000%
Ni-59 0.401% 0.0026%
Co-60 24.188% 12.3819%
Ni-63 12.207% 0.1655%
Sr-90 0.040% 0.6243%
Nb-94 0.226% 0.1509%
Tc-99 0.025% 0.1748%
Ag-108m 0.232% 0.1957%
Sb-125 0.887% 0.5551%
Cs-134 0.217% 0.1605%
Cs-137 60.086% 84.2998%
Pm-147 0.023% 0.0000%
Eu-152 0.434% 0.1045%
Eu-154 0.222% 0.0591%
Eu-155 0.264% 0.0036%
Pu-238 0.002% 0.0172%
I Pu-239/240 0.001% 0.0156%
Pu-241 0.078% 0.0169%
Am-241. 0.009% 0.1081 %
Am-243 0.001% 0.0070%
Cm-243/244 0.002% 0.0029%
100% 100%
[22]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
' No~~~
SURVEY UNITS 05119A & 05119B The sum of the dose contribution from insignificant radionuclides, including H-3, Eu-152 and Eu-154 equals 2.368%. For the Auxiliary Building basement, a margin of 100%
(factor of two) was added to the insignificant contributor dose percentage. The revised insignificant fraction, after applying a multiplier factor of two, is 2.640%. Consequently, no re-adjustment of the Auxiliary Building BDF is necessary for application to the embedded pipe.
The Auxiliary Building BIL is a hypothetical maximum inventory level for each ROC that would equate to 25 mrem/yr. The BIL for each ROC was converted to units of pCi/m2 by converting mCi to pCi and then dividing by the internal surface area of the pipe being surveyed. This value was then adjusted by multiplying the BIL by an allocated fraction for the pipe being surveyed. This "Adjusted BIL per STS Area,"
equates to the Upper Bound of the Gray Region for the Sign Test.
Each gross gamma measurement was multiplied by the appropriate ratio for each ROC, based on the mixture applicable to the pipe undergoing survey, to derive an "Activity per ROC" for each ROC in units of pCi/m2
- This value was then divided by the "Adjusted BIL per STS Area" to derive a "Fraction of the Allowable Inventory" for each ROC.
These individual ROC fractions were then summed to produce a SOF for the measurement. The SOFs for each measurement were then used as the Weighted Sum (Ws) variable for the Sign Test. The Sign Test was then used to evaluate the remaining
- residual radioactivity in each pipe against the allocated fraction of the allowable inventory for the pipe.
During the assessment of the data, if the pipe failed the Sign Test, then the allocated fraction of the allowable inventory assigned to the pipe was increased until the Sign Test was passed. This is acceptable as long as the allocated fractions in the other STS units in the basement are decreased accordingly such that the revised allocated fractions for all STS survey units in the Auxiliary Building basement still sum to less than or equal to one.
Once the Sign Test was passed, a "Mean Activity per ROC" was derived in units of pCi/m2
- This value represented the mean concentration for all measured or derived individual measurement concentrations for each ROC. The mean concentration for each ROC was then multiplied times the total internal surface area of the surveyed pipe and converted to units of mCi to produce the "Total Mean Activity" for each ROC. The Total Mean Activity for each ROC was then divided by the BIL for each ROC to derive a "Mean Fraction of Allowable Inventory" for each ROC, which were then summed to produce a "Mean Inventory Fraction" for the pipe surveyed. In addition, the Total Mean Activity for each ROC, in units of mCi, was also multiplied by the Auxiliary Building BDF for each ROC (in units of mrem/yr per mCi) to calculate a mean dose for each ROC
[23]
FRSRELEASERECORD .~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
... Ml"Jw0StlWIO'lr.~
SURVEY UNITS 05119A & 05119B in units ofmrem/yr. The mean dose for each of the ROC were then summed to calculate a total "Mean Dose" assigned to the pipe surveyed.
Two thousand seven hundred and eighteen (2, 718) feet of embedded equipment and floor drain pipe were surveyed in 31 different pipe lengths. This equated to 2, 718 separate STS measurements. The length of pipe surveyed, number of measurements taken and area of pipe surveyed in presented in Table 12. The "FRS Field Log" (ZS-LT-300-001-001, Attachment 14) was used to document field activities and other information pertaining to each STS performe_d.
During the inspection and survey of several pipe sections, obstructions were identified due to the presence of debris and/or configuration that prevented the insertion and/or transport of the CsI detector in the pipe. Nine hundred and thirty-six (936) feet of pipe was found to be not accessible. Of the 936 fee~ of inaccessible pipe, 553 feet were the small bore equipment drain pipe which has a pipe diameter of 2-inch. The diameter of this pipe was of insufficient size to insert the available 1" x 1" CsI detectors. Only 383 feet of pipe with a diameter sufficient for survey was obstructed due to the presence of debris. The identified obstructed pipe, including the estimated lengths and area of obstructed pipe surface are also presented in Table 12.
The contribution to the source term inventory from portions of the pipe that were found to be not accessible were extrapolated based on the measured mean concentrations of each ROC from the accessible pipe that was surveyed. The "Mean Activity per ROC" in units of pCi/m2 that was determined for the length of pipe that was surveyed was multiplied times the sum of the area of the surveyed pipe plus the area of un-surveyed pipe and then converted to units of mCi. The same process was again then used to derive a "Mean Fraction of Allowable Inventory" for each ROC, the "Mean Inventory Fraction" for the pipe and the assigned dose, however all results are denoted as "adjusted" to include the source term contribution from the area of the un-surveyed pipe, assuming that the pipe is uniformly contaminated at the "Mean Activity per ROC derived for the pipe surveyed.
[24]
FRS RELEASE RECORD AUXILIARY BUILDING EQU IPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05 1198
~. __
ZlONSOLUTIONSu:c
Ta ble 12 -Auxilia ry Building 542 ft. E mbedded Floor and Equipment Drain Pipe, Number of Measurements, Length of Pi pe Surveyed a nd Obstructed Length of Pipe Estimated Estimated Surveyed (ft) Area of Pipe Length of Area of
- Sump Pipe Dia. /#of Surveyed (m2) Obstructed Obstructed Measurements Pipe (ft) Pipe (m2)
-- 1 2
A B
4 4
75 89 7.30 8.66 10 0.97
-- 3 4
c D
4 4
65 147 6.32 14.30 2 0. 19 5 E 4 90 8.76 10 0.97
- 6 A
F 4 85 8.27 20 1.95
- 7 G 4 71 6.91 40
- 8 H 4 7 0.68 12 3.89 1.17
- 9 J 4 78 7.59 2
- 10 K 4 26 2.53
- 0. 19 11 A 6 94 13.72 43 6.28
- 12 B 4 90 8.76 21 2.04
- 13 c 4 19 1 18.58
- 14 D 4 51 4.96 2.92
- 15 E 4 182 17.71 30
- 16 F 6 183 26 .71
- 17 G 4 88 8.56
- 18 H 4 39 3.79
- 19 J 35 3.4 1
- 20 B
K 6
4 75 48 10.94 4.67
- 21 L 4&2 186 18.10 67 3.99
- 22 M 4 25 2.43 23 N 6 36 5.25 24 p 4 80 7.78 25 R 4 71 6.9 1 26 s 6 143 20 .87 59 8.61 27 T 4 146 14.20 28 u 6 78 11.38 51 7.44 29 B 6 179 26.12 36 5.25 30 EQ Ul 2 0 0.00
- 31 U2 2 0 0.00 363 135 17.66 6.57 TOTAL 2,7 18 302.76 936 73.50
[25)
FRSRELEASERECORD .~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSzu=
. ..,,,~~~
SURVEY UNITS 05 l l 9A & 05 l l 9B
- 6. SURVEY RESULTS The survey results from the STS of the Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe were processed and interpreted using the Data Quality Assessment (DQA) process in accordance with ZionSolutions procedure ZS-LT-300-001-004, "Final Radiation Survey Data Assessment." Data processing included the converting of measurement data into reporting units, the validation of instrument selection and sensitivity, the calculation of relevant statistical quantities, and the verification that all DQOs for the STS were met.
The instrument and detectors used for this survey are presented in the following table.
All instruments and/or detectors were verified to be properly calibrated prior to use.
Table 13 - Instruments and Detectors Instrument/Detector Calibration Due Serial#
- <- Type. .. ,",, ' ~ Dat~
Ludlum 2350-1 304713 08/19/16 Ludlum 44-159 PR327895 08/19/16 Ludlum 2350-1 304730 Black 08/05/16 Ludlum 44-159 PR327896 10/29/16 Instrument efficiency determinations are developed in accordance with the ZionSolutions procedure ZS-LT-300-001-004, "Radiation Surveys of Pipe Interiors Using Sodium/Cesium Iodide Detectors." A Cs-13 7 radiological source traceable to the National Institute of Standards and Technology (NIST) was used to determine detector efficiency. The Cs-13 7 standard was appropriate for the types of radiation involved and the media being surveyed.
Daily prior to use (Pre-Test) and daily upon completion of surveys (Post-Test), a response check was performed in accordance with section 5.2 of procedure-ZS-LT-300-001-004 for each detector and data logger pairing. In C).ddition, all instruments and detectors were physically inspected for mechanical damage as part of the response check process. During the STS of the Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe, no instances were encountered where an instrument and/or detector failed a Pre or Post response check or were found to be physically damaged during the inspection.
Of the 3,684 linear feet of pipe embedded in the Auxiliary Building 542 ft. basement floor, 80.47% was accessible. Of the 19.53% that was not accessible, approximately
[26]
~-------------- - - - - - - - - -
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQU IPMENT AND FLOOR DRAIN PIPE = ZIONSOLUTIONSuc=
¥'-wr~C::..-,
SURVEY UNITS 05119A & 051198 13.10% was 2-inch diameter equipment drain pipe. The surface area for one-foot of accessible 4-inch diameter pipe is 0.097 m 2 , for a total of 187. 77 m 2 of 4-inch pipe surveyed. The surface area for one-foot of accessible 6-inch diameter pipe is 0. 146 m2, for a total of 101.42 m2 of 6-inch pipe surveyed. Of the accessible 4-inch and 6-inch diam eter pipe, a stati c one-minute timed measurement was taken with a I " x I " Csl detector at one-foot increments for a total of 2, 718 measurements taken in 31 different lengths of pipe . Background was not subtracted from any survey measurement. The results of the data assessment for each individual pipe are provided in Attachment 1.
Each pipe passed the Sign Test at the corresponding "A llocated Fraction of Inventory" va lue assigned to the pipe. In 10 pipes, the calculated mean fraction for the survey data in the pipe exceeded the allocated fraction value assigned to the pipe. In these cases, the allocated fraction was adjusted to equal the mean fraction value. The affected pipes and the adjusted allocated fraction values are presented in Table 14. The summary of the survey results for each pipe is prov ided in Table 15.
Table 14 - Adjusted Allocated Fractions Adjusted Allocated
- Sump Pipe Dia. Allocated Fraction Fraction J 4
-119 A A 6 0.0052 0.0120 0.0055 0.0 156
-15
-- 17 E
G 4
4 0.0106 0.0053 0.0107 0.0055 21 L 4&2 0.0085 0.0154
- B p
--24 26 s 4
6 0.0060 0.0071 0.0066 0.0074
- 27 28 T
u 4
6 0.0041 0.0059 0.0042 0.0068 29 EQ B 6 0.0008 0.0009
[27)
FRS RELEASE RECORD ~
AUXILIARY BUILDT G EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05 l l 9A & 051198
ZIO SOLUTIONSuc
Ta ble 15 - Auxilia ry Building 542 ft. Embedded Floor a nd Equipment Drain Pipe, Sta tistical Summary Allocated Mean
- Sump Pipe Dia. Dose Fraction Fraction
-- l 2
3 A
B c
4 4
4 0.0 139 0.01 17 0.0 11 8 0.0129 0.0111 0.0106 0.323 0.278 0.266
- 4 5
A D
E F
4 4
4 0.0205 0.0 199 0.0246 0.0 198 0.0 170 0.0 177 0.494 0.424 0.443 6
- 7 8
G H
4 4
0.0124 0.0100 0.0111 0.0009 0.277 0.024 9 J 4 0.0055 0.0055 0.137 10 K 4 0.0059 0.0046 0.114 Il A 6 0.0 156 0.0 156 0.39 1 12 B 4 0.0084 0.0070 0. 175 13 c 4 0.0 137 0.0 120 0.300 14 D 4 0.0025 0.0023 0.056 15 E 4 0.0107 0.0 107 0.268 16 F 6 0.0298 0.0272 0.680 17 G 4 0.0055 0.0055 0. 137 18 H 4 0.006 1 0.0049 0. 123 19 J 6 0.0089 0.0079 0.197
- B 20 K 4 0.0018 0.00 16 0.040 21 L 4&2 0.0154 0.0154 0.384 22 M 4 0.0009 0.0008 0.020 23 N 6 0.0071 0.0070 0.176 24 p 4 0.0066 0.0066 0.1 65 25 R 4 0.0038 0.0036 0.089 26 s 6 0.0074 0.0074 0.184 27 T 4 0.0042 0.0042 0. 105 28 u 6 0.0068 0.0068 0.169 29 B 6 0.0009 0.0009 0.022 30 EQ Ul 2 0.0227 0.0227 0.567 31 U2 2 0.01 19 0.0119 0.297 T OTALS 0.3267 0.2931 7.324
[28)
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONStii=
MC,.,..,~~
SURVEY UNITS 05119A & 05119B
- 7. QUALITY CONTROL In compliance with ZS-LT-01, "Quality Assurance Project Plan," replicate measurements were performed on 5% of the survey locations chosen at random. One hundred thirty-two (132) replicate measurements were taken. Using the acceptance criteria specified in NRC Inspection Procedure No. 84750, "Radioactive Waste Treatment, and Effluent and Environmental Monitoring," there was acceptable agreement between all replicate measurements. Refer to Attachment 3 for quality control analysis results.
- 8. INVESTIGATIONS AND RESULTS As 100% areal coverage of all accessible pipe interior surface area was achieved by the STS, no investigations were required or performed.
- 9. REMEDIATION AND RESULTS Prior to acquiring STS measurements, the accessible lengths of the embedded pipe were vacuumed to remove gross amounts of debris and water inside the pipe to allow detector access. No radiological remediation was performed in this survey unit as a result of the STS.
- 10. . CHANGES FROM THE SURVEY PLAN There were no changes made and no addendums added to STS Sample Plans Sl-05119A-S and Sl-0511B-S.
- 11. DATA QUALITY ASSESSMENT (DQA)
In accordance with section 5.2 of procedure ZS-LT-300-001-004, the DQOs, sample design, and data were reviewed for completeness, accuracy, and consistency.
Documentation was complete and legible. The STS unit was properly classified as Class
- 1. All measurement results were individually reviewed and validated. The number of measurements were sufficient to meet the requirement of 100% areal coverage of accessible surfaces. The instrumentation used to perform the STS were in calibration, capable of detecting the activity with an adequate MDC and successfully response checked prior to and following use. An adequate number of replicate measurements were taken and the results meet the acceptance criteria as specified in the QAPP.
The Sign Test was performed on each set of data representing each length of pipe surveyed. The SOF for each measurement, calculated using the fraction of the allowable inventory assigned to the pipe, was used as the weighted sum variable for the test. Each pipe passed the Sign Test at the assigned allocated fraction of inventory. The total fraction of the Auxiliary Building Basement BIL assigned to the Auxiliary Building 542
[29]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
- M[11IJllV)'~~
SURVEY UNITS 05119A & 05119B ft. elevation embedded equipment and floor drain pipe was32.671 %. Taking into consideration that the allocated fraction of the BIL available for the remaining STS units in the Auxiliary Building basement (concrete walls, concrete floor and any other remaining embedded pipe and/or penetration) is deemed sufficient at 67 .329%, the 32.671 % value assigned to embedded pipe was acceptable. Therefore, the STS unit passes and meets the release criteria.
- 12. ANOMALIES No anomalies were observed during the performance or analyses of the survey.
- 13. CONCLUSION In situations where there are multiple survey units in a STS basement (e.g. the Auxiliary Building has at least three STS units, one for the walls, one for the floor and one for embedded piping and/or penetrations), a fraction of the BIL will be allocated to each survey unit that is selected apriori to the performance of STS for planning purposes. The sum of the allocated BIL fractions for each survey unit applicable to a given basement must be less than or equal to one.
If the actual mean inventory in a STS unit exceeds the allocated fraction, or the survey unit fails the Sign Test, then the allocated fraction may be increased as long as the allocated fractions in the other STS units in the basement are decreased accordingly such that the revised allocated fractions still sum to less than or equal to one. After all survey units are demonstrated to pass the Sign Test, the Mean Inventory Fractions for each of the survey units are summed.
If a combination of allocated fractions cannot be selected that results in all survey units in a given basement passing the Sign Test, or if the sum of the Mean Inventory Fractions of all STS units in a basement exceeds one, then the survey unit will fail STS. If a survey unit fails STS, then additional remediation will be performed and the STS performed again.
For the assessment of the Auxiliary Building 542 ft. elevation embedded equipment and floor drain pipe STS data, the sum of the allocated fraction of the BIL for all embedded equipment and drain pipe was 32.671 %. Note that the sum of the allocated BIL fractions for the remaining STS survey units in the Auxiliary Building STS basement (walls, floors and any remaining penetrations) must be less than or equal to 67.329% as the sum of all allocated fractions in a STS basement must be less than or equal to one. The STS results produced a Mean Inventory Fraction of0.293 and an assigned dose of7.324 mrem/yr.
[30]
,........----------~---- -- - -
FRSRELEASERECORD .~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSLU=
M[Nrm~~
SURVEY UNITS 05119A & 05119B
- 14. ATTACHMENTS 14.1. Attachment 1 - Figure and Maps 14.2. Attachment 2- Sample and Statistical Data 14.3. Attachment 3 -QC Data 14.4 Attachment 4 - Insignificant Contributor Dose Analysis
[31]
14.1ATTACHMENT1 FIGURES AND MAPS
FRS RELEASE RECORD ;:::::=-
AUXILIARY BU ILD ING EQU IPM ENT AND FLOOR DRAIN PIPE = ZIONSOLJ.fI!Q~ur=
SURVEY UN ITS 05119A & 05 119B FIG URE 1 AUX 542' DRAINS FT TOTAL FT ACCESSIBLE FT PERCENTAGE ACC ESS PERCENTAGE SURVEYED 2344 2801 2344 84% 100%
Legend
- - Surveyed Date: 8/11/2016
- - Inaccessible Aux. Build ing 542'
- Floor Dra in Embedded Floor Drai ns Clean Out I - - -
1
- Sump O*
(32]
FRS RELEASE RECORD AUX ILIARY BUILDI NG EQU IPMENT AND FLOOR DRAIN PIPE
- =-
ZIONSOL..f.((!Q!i§;;;
SURVEY UN ITS 051 19A & 05 11 98 FIGURE 2 AUX 542' EQUIP DRAINS FT TOTAL FT ACCESSIBLE FT PERCENTAGE ACCESS PERCENTAGE SURVEYED 171 713 171 24% 100%
--p-Z-07/2 1/2016 Legend r* Equipment Drains
- Surveyed Aux. Building 542'
- Inaccessible Embedded Equipment Drains
()sump
~ *'
81 B2
[33]
14.2 ATTACHMENT 2 SAMPLE AND STATISTICAL DATA
FRS RELEASE RECORD ~
AUXILIARY BUILDING E QUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B M---
ZIONSOLUTIONSur
[_ __ . _* -*--*- ;i:'3'3~' ~:*.*>--*. **"- -=~=---~*'-~-~~ ~! ~pe A.-.!+/--~n~~ .l!:!~~!~~n}: S~ll}!"!!J:.~~~ryey&I~_:_~~-===-=-=~~===-:----=~:-c~ ,;-;..=**~:J Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit 2
- - -7.297 ---- m Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _7_5_ _ _ ft Maximum SOF Observed 1.2520 2
Mean of Total Activity Results ---'l'"".5'-'-7-"'E_+0'-'9_ _ (pCi/m ) .
Percentage of Allowable Inventory for Sign Test ---"l"'".3'-90'-o/c""o_ _
ROC MeanA ctivity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per Roc Activity for Pipe Activity Building Allowable ROC (pCilm 2 Ci mCi mCi Inventory mrem/ *r er mCi mrem/ *r Co-60 . 2.61 E+08 l.90E+09 l.90E+OO 2.25E+03 0.00085 l.l IE-02 0.02114 Cs-134 4.99 E+05 3.64E+06 3.64E-03 l.56E+03 0.00000 l.60E-02 0.00006 Cs-137 1.18E+o9 8.59E+09 8.59E+OO 8.22E+02 0.01046 3.04E-02 0.26127 Ni-63 1.32E+o8 9.61E+08 9.61E-Ol 8.52E+04 0.00001 2.94E-04 0.00028 Sr-90 7.84 E+05 5.72E+06 5.72E-03 7.39E+Ol 0.00008 3.38E-Ol 0.00193 TOTAL 0.0114 0.28469 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed 10 ft Area of Pipe Not Surveyed 0.97 m2 ROC Mean Ac tivity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per Roc Activity for Pipe Activity Building Allowable ROC (oCi/m2 Ci mCi mCi Inventory mrem/ *r er mCi mrem/ *r Co-60 2.61 E+08 2.16E+09 2.16E+OO 2.25E+03 0.00096 l.l IE-02 0.02396 Cs-134 4.99E+05 4.13E+06 4.13E-03 l.56E+03 0.00000 l.60E-02 0.00007 Cs-137 1.18E+o9 9.74E+09 9.74E+OO 8.22E+02 0.01185 3.04E-02 0.29611 Ni-63 1.32E+08 l.09E+09 l.09E+OO 8.52E+04 0.00001 2.94E-04 0.00032 Sr-90 7.84E+05 6.49E+06 6.49E-03 7.39E+Ol 0.00009 3.38E-Ol 0.00219 TOTAL 0.0129 0.32264
[34]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B .
Sump A, Pipe A - Sign Test Classification _l_ Type I error 0.05 Number of Measurements 75 Gamma Result Total Activity SOF
- Pipe Measurement Location 1-Ws Sign (pCi/m2) (pCi/m2) (Ws) 0 Section A2 to A3 Position Zero l.43E+09 l.56E+09 0.923 0.08 +l 1 Section A2 to A3 Position 1 l.23E+09 l.34E+09 0.794 0.21 +l 2 Section A2 to A3 Position 2 l.l 8E+09 1.29E+09 0.762 0.24 +l 3 Section A2 to A3 Position 3 l.46E+09 l.59E+09 0.942 0.06 +l 4 Section A2 to A3 Position 4 l.50E+09 1.64E+09 0.968 0.03 +1 5 Section A2 to A3 Position 5 l.l 9E+09 l .30E+09 0.768 0.23 +I 6 Section A2 to A3 Position 6 l.61E+09 1.76E+09 1.039 (0.04) -1 7 Section A2 to A3 Position 7 l.32E+09 1.44E+09 0.852 0.15 +l 8 Section A2 to A3 Position 8 l.32E+09 l.44E+09 0.852 0.15 +1 9 Section A2 to A3 Position 9 1.46E+09 1:59E+09 0.942 0.06 +l 10 Section A2 to A3 Position I 0 1.31E+09 1.43E+09 0.845 0.15 +l 11 Section A2 to A3 Position 11 l.49E+09 l.63E+09 0.962 0.04 +l 12 Section A2 to A3 Position 12 7.38E+08 8.06E+08 0.476 0.52 +l 13 Section Al to Header Position Zero 1.71E+09 l.87E+09 1.104 (0.10) -1 14 Section A 1 to Header Position I l.53E+09 l.67E+09 0.987 0.01 +l 15 Section Al to Header Position 2 1.48E+09 1.62E+09 0.955 0.04 +1 16 Section A 1 to Header Position 3 l.48E+09 1.62E+09 0.955 0.04 +I 17 Section Al to Header Position 4 l.31E+09 1.43E+09 0.845 0.15 +l 18 Section Al to Header Position 5 l.30E+09 1.42E+09 0.839 0.16 +1 19 Section Al to Header Position 6 l.31E+09 1.43E+09 0.845 0.15 +l 20 Section Al to Header Position 7 1.26E+09 1.38E+09 0.813 0.19 +l 21 Section A 1 to Header Position 8 l.36E+09 1.49E+09 0.878 0.12 +1 22 Section A 1 to Header Position 9 1.21E+09 l.32E+09 0.781 0.22 +1 23 Section Al to Header Position 10 l.35E+09 1.47E+09 0.871 0.13 +l 24 Section Al to Header Position 11 1.59E+09 1.74E+09 1.026 (0.03) -1 25 Section Al to Header Position 12 1.45E+09 1.58E+09 0.936 0.06 +1 26 Section A 1 to Header Position 13 l.42E+09 l.55E+09 0.916 0.08 +1 27 Section A 1 to Header Position 14 l.37E+09 l.50E+09 0.884 0.12 +1 28 Section Al to Header Position 15 1.78E+09 l.94E+09 1.149 (0.15) -1 29 Section A 1 to Header Position 16 1.85E+09 2.02E+09 1.194 (0.19) -1 30 Section A 1 to Header Position 17 1.70E+09 1.86E+09 1.097 (0.10) -1 31 Section A 1 to Header Position 18 1.71E+09 1.87E+09 1.104 (0.10) -1 32 Section A 1 to Header Position 19 1.70E+09 1.86E+09 1.097 (0.10) -1 33 Section A I to Header Position 20 l.59E+09 l.74E+09 1.026 (0.03) -1 34 Section A 1 to Header Position 21 l.61E+09 l.76E+09 1.039 (0.04) -1 35 Section Al to Header Position 22 l.63E+09 l.78E+09 1.052 (0.05) -1 36 Section Al to Header Position 23 1.61E+09 l.76E+09 1.039 (0.04) -1 37 Section Al to Header Position 24 3.67E+08 4.01E+08 0.237 0.76 +l 38 Section Al to Header Position 25 3.64E+08 3.98E+08 0.235 0.77 +l 39 Section Al to Header Position 26 3.64E+08 3.98E+08 0.235 0.77 +l 40 Section Al to Header Position 27 3.61E+08 3.94E+08 0.233 0.77 +l 41 Section Al to Header Position 28 l.15E+09 l.26E+09 0.742 0.26 +l 42 Section A3 to Sump A Position Zero l.82E+09 l.99E+09 1.175 (0.17) -1 43 Section A3 to Sump A Position 1 l.74E+09 l.90E+09 1.123 (0.12) -1 44 Section A3 to Sump A Position 2 l.55E+09 1.69E+09 1.000 (0.00) -1 45 Section A3 to Sump A Position 3 1.55E+09 1.69E+09 1.000 (0.00) -1 46 Section A3 to Sump A Position 4 1.44E+09 l.57E+09 0.929 0.07 +l
[35]
FRS RELEASE RECORD ~
ZIONSOL!!I!Qt§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
- . ', ~amm.~
R;~~.It
- (p~1/m ~)',,
47 Section A3 to Sump A Position 5 l.42E+09 l.55E+09 0.916 0.08 +I 48 Section A3 to Sump A Position 6 l.26E+09 1.38E+09 0.813 0.19 +l 49 Section A3 to Sump A Position 7 l.32E+09 l.44E+09 0.852 0.15 +l 50 Section A3 to Sump A Position 8 1.35E+09 l.47E+09 0.871 0.13 +1 51 Section A3 to Sump A Position 9 l.25E+09 1.37E+09 0.807 0.19 +1 52 Section A3 to Sump A Position 10 l.21E+09 l.32E+09 0.781 0.22 +1 53 Section A3 to Sump A Position 11 l.50E+09 l.64E+09 0.968 0.03 +l 54 Section A3 to Sump A Position 12 l.62E+09 l.77E+09 1.045 (0.05) -1 55 Section A3 to Sump A Position 13 l.75E+09 l.91E+09 1.129 (0.13) -1 56 Section A3 to Sump A Position 14 l.75E+09 l.91E+09 1.129 (0.13) -1 57 *Section A3 to Sump A Position 15 l.76E+09 l.92E+09 1.136 (0.14) -1 58 Section A3 to Sump A Position 16 l.75E+09 l.91E+09 1.129 (0.13) -1 59 Section A3 to Sump A Position 17 l.61E+09 l.76E+09 1.039 (0.04) -1 60 Section A3 to Sump A Position 18 l.72E+09 l.88E+09 1.110 (0.11) -1 61 Section A3 to Sump A Position 19 l.84E+09 2.01E+09 1.187 (0.19) -1 62 Section A3 to Sump A Position 20 l.94E+09 2.12E+09 1.252 (0.25) -1 63 Section A3 to Sump A Position 21 l.93E+09 2.l 1E+09 1.246 (0.25) -1 64 Section A3 to Sump A Position 22 l.82E+09 l.99E+09 1.175 (0.17) -1 65 Section A3 to Sump A Position 23 l.87E+09 2.04E+09 1.207 (0.21) -1 66 Section A3 to Sump A Position 24 l.70E+09 l.86E+09 1.097 (0.10) -1 67 Section A3 to Sump A Position 25 l.53E+09 l.67E+09 0.987 O.ol +1 68 Section A3 to Sump A Position 26 l.38E+09 l.51E+09 0.891 0.11 +l 69 Section A3 to Sump A Position 27 l.43E+09 l.56E+09 0.923 0.08 +1 70 Section A3 to Sump A Position 28 1.33E+09 l.45E+09 0.858 0.14 +l 71 Section A3 to Sump A Position 29 1.30E+09 l.42E+09 0.839 0.16 +l 72 Section A3 to Sump A Position 30 1.44E+09
- u7E+09 0.929 0.07 +1 73 Section A3 to Sump A Position 31 1.46E+09 l .59E+09 0.942 0.06 +1 74 Section A3 to Sump A Position 32 l.46E+09 l.59E+09 0.942 0.06 +1 Number of positive differences (S+) 46 Critical Value 45 Survey Unit MEETS the Acceptance Criteria
[36]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B M---
=ZIONSOLUTIONSuc=.
Surveved Pipe - Calculation of Mean Activitv and Dose 2
AccessibleAreaofSTS Unit _ _ _8"'""'."'65"'9_ _ _ m Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _8'"""9_ _ _ ft Maximum SOF Observed --~l~.6~6_40~--
Mean of Total Activity Results _ _l_.2~9_E_+0~9_ _ (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test _ _ _I_.1_74_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (pCi) (mCi) (mCi) Inventory (rnrem/yr per men mrem/vr Co-60 2.15E+08 I.86E+09 l.86E+OO 2.25E+03 0.00083 I.I IE-02 0.02064 Cs-134 4.1 IE+05 3.56E+06 3.56E-03 l.56E+03 0.00000 l.60E-02 0.00006 Cs-137 9.69E+08 8.39E+09 8.39E+OO 8.22E+02 0.01021 3.04E-02 . 0.25508 Ni-63 l.08E+08 9.38E+08 9.38E-OI 8.52E+04 0.00001 2.94E-04 0.00028 Sr-90 6.45E+05 5.59E+06 5.59E-03 7.39E+OI 0.00008 3.38E-OI 0.00189 TOTAL 0.01 I I 0.27795
[37]
FRSRELEASERECORD ~
ZIONSOLJ.!I!!l!J§.
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A, Pipe B - Sign Test Classification _l_ Type I error 0.05 Number of Measurements 89 Gamma Result Total Activity . SOF
- ;Pipe MeasurernentLocation ... (Ws), .. f-Ws Sign .. *
- .I* *< ' : *: (pCi/m2) (pCi/m2).
0 Section B 1 to B Header Position Zero l.09E+09 l.19E+09 0.872 0.13 +I 1 Section B 1 to B Header Position 1 l.12E+09 1.22E+09 0.896 0.10 +1 2 Section B 1 to B Header Position 2 l.20E+09 l.31E+09 0.960 0.04 +l 3 Section B 1 to B Header Position 3 l.19E+09 l.30E+09 0.952 0.05 +l 4 Section B 1 to B Header Position 4 l.43E+09 1.56E+09 1.144 (0.14) -1 5 Section B 1 to B Header Position 5 l.51E+09 l.65E+09 1.208 (0.21) -1 6 Section B 1 to B Header Position 6 l.50E+09 l.64E+09 1.200 (0.20) -1 7 Section B 1 to B Header Position 7 l.29E+09 1.41E+09 1.032 (0.03) -1 8 Section B 1 to B Header Position 8 l.24E+09 l.35E+09 0.992 0.01 +l 9 Section B 1 to B Header Position 9 l.25E+09 l.37E+09 1.000 0.00 +1 10 Section B 1 to B Header Position 10 l.16E+09 l.27E+09 0.928 0.07 +1 11 Section B 1 to B Header Position 11 l.16E+09 1.27E+09 0.928 0.07 +1 12 Section B 1 to B Header Position 12 l.13E+09 l.23E+09 0.904 0.10 +1 13 Section B 1 to B Header Position 13 l.13E+09 1.23E+09 0.904 0.10 +l 14 Section B 1 to B Header Position 14 l.09E+09 1.19E+09 0.872 0.13 +l 15 Section B 1 to B Header Position 15 l.37E+09 l.50E+09 1.096 (0.10) -1 16 Section B 1 to B Header Position 16 l.61E+09 l.76E+09 1.288 (0.29) -1 17 Section B 1 to B Header Position 17 l.41E+09 l.54E+09 1.128 (0.13) -1 18 Section BI to B Header Position 18 l.48E+09 . l.62E+09 1.184 (0.18) -1 19 Section B 1 to B Header Position 19 l.83E+09 2.00E+09 I.464 (0.46) -1 20 Section B 1 to B Header Position 20 2.05E+09 2.24E+09 1.640 (0.64) -1 21 Section Bl to B Header Position 21 2.08E+09 2.27E+09 1.664 (0.66) -1 22 Section B 1 to B Header Position 22 2.01E+09 2.20E+09 1.608 (0.61) -1 23 Section BI to B Header Position 23 8.96E+08 9.78E+08 0.717 0.28 +1 24 Section B 1 to B Header Position 24 7.91E+08 8.64E+08 0.633 0.37 +1 25 Section B 1 to B Header Position 25 4.59E+08 5.01E+08 0.367 0.63 +I 26 Section Bl to B Header Position 26 5.34E+08 5.83E+08 0.427 0.57 +I 27 Section B2 to Sump A Position Zero l.74E+09 l.90E+09 1.392 (0.39) -1 28 Section B2 to Sump A Position 1 l.84E+09 2.01E+09 1.472 (0.47) -1 29 Section B2 to Sump A Position 2 1.70E+09 l.86E+09 1.360 (0.36) -1 30 Section B2 to Sump A Position 3 l.72E+09 l.88E+09 1.376 (0.38) -1 31 Section B2 to Sump A Position 4 l.51E+09 l.65E+09 1.208 (0.21) -1 32 Section B2 to Sump A Position 5 1.28E+09 1.40E+09 1.024 (0.02) -1 33 Section B2 to Sump A Position 6 l.27E+09 l.39E+09 1.016 (0.02) -1 34 Section B2 to Sump A Position 7 l.39E+09 l.52E+09 1.112 (0.11) -1 35 Section B2 to Sump A Position 8 l.25E+09 l.37E+09 1.000 0.00 +l 36 Section B2 to Sump A Position 9 l.15E+09 l.26E+09 0.920 0.08 +l 37 Section B2 to Sump A Position 10 l.17E+09 1.28E+09 0.936 0.06 +1 38 Section B2 to Sump A Position 11 l.21E+09 l.32E+09 0.968 0.03 +I 39 Section B2 to Sump A Position 12 l.25E+09 l.37E+09 1.000 0.00 +1 40 Section B2 to Sump A Position 13 l.11E+09 l.21E+09 0.888 0.11 +1 41 Section B2 to Sump A Position 14 l.30E+09 l.42E+09 1.040 (0.04) -1 42 Section B2 to Sump A Position 15 l.04E+09 l.14E+09 0.832 0.17 +l 43 Section B2 to Sump A Position 16 9.25E+08 l.01E+09 0.740 0.26 +l 44 Section B2 to Sump A Position 17 9.81E+08 l.07E+09 0.785 0.22 +l 45 Section B2 to Sump A Position 18 9.66E+08 l.05E+09 0.773 0.23 +1 46 Section B2 to Sump A Position 19 l.01E+09 l.10E+09 0.808 0.19 +1
[38]
FRSRELEASERECORD ~
ZIONSOL!l!!f!!Y~*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- . Pipe Measurement Location 1-Ws Sign (pC0m2) (pCi/m2 ) (Ws) 47 Section 82 to Sump A Position 20 1.00E+09 l.09E+09 0.800 0.20 +l 48 Section 82 to Sump A Position.21 9.38E+08 1.02E+09 0.750 0.25 +l 49 Section 82 to Sump A Position 22 9.66E+08 l.05E+09 0.773 0.23 +l 50 Section 82 to Sump A Position 23 9.76E+08 l.07E+09 0.781 0.22 +l 51 Section 82 to Sump A Position 24 9.61E+08 l.05E+09 0.769 0.23 +1 52 Section 82 to Sump A Position 25 8.74E+08 9.54E+08 0.699 0.30 +l 53 Section 82 to Sump A Position 26 8.76E+08 9.57E+08 0.701 0.30 +l 54 Section 82 to Sump A Position 27 9.36E+08 1.02E+09 0.749 0.25 +1 55 Section 82 to Sump A Position 28 9.15E+08 9.99E+08 0.732 0.27 +1 56 Section 82 to Sump A Position 29 9.l 7E+08 1.00E+09 0.734 0.27 +1 57 Section 82 to Sump A Position 30 9.10E+08 9.94E+08 0.728 0.27 +l 58 Section 82 to Sump A Position 31 9.05E+08 9.88E+08 0.724; 0.28 +l 59 Section 82 to Sump A Position 32 1.01E+09 1.10E+09 0.808 0.19 +l 60 Section 82 to Sump A Position 33 9.36E+08 1.02E+09 0.749 0.25 +1 61 Section 82 to Sump A Position 34 9.57E+08 l.05E+09 0.766 0.23 +1 62 Section 82 to Sump A Position 35 l.19E+09 1.30E+09 0.952 0.05 +1 63 Section 82 to Sump A Position 36 l.27E+09 1.39E+09 1.016 (0.02) -1 64 Section 82 to Sump A Position 37 l.27E+09 1.39E+09 1.016 (0.02) -1 65 Section 82 to Sump A Position 38 l.45E+09 l.58E+09 1.160 (0.16) -1 66 Section 82 to Sump A Position 39 l.42E+09 l.55E+09 1.136 (0.14) -1 67 Section 82 to Sump A Position 40 1.33E+09 l.45E+09 1.064 (0.06) -1 68 Section 82 to Sump A Position 41 l.26E+09 l.38E+09 1.008 (0.01) -1 69 Section 82 to Sump A Position 42 l.25E+09 l.37E+09 1.000 0.00 +l 70 Section 82 to Sump A Position 43 l.19E+09 l.30E+09 0.952 0.05 +1 71 Section 82 to Sump A Position 44 l.02E+09 1.l 1E+09 0.816 0.18 +1 72 Section 82 to Sump A Position 45 9.l IE+08 9.95E+08 0.729 0.27 +1 73 Section 82 to Sump A Position 46 9.43E+08 l.03E+09 0.754 0.25 +1 74 Section 82 to Sump A Position 47 9.83E+08 l.07E+09 0.786 0.21 +1 75 Section 82 to Sump A Position 48 8.63E+08 9.42E+08 0.690 0.31 +1 76 Section 82 to Sump A Position 49 l.02E+09 1.l 1E+09 0.816 0.18 +1 77 Section 82 to Sump A Position 50 l.60E+09 1.75E+09 1.280 (0.28) -1 78 Section 82 to Sump A Position 51 l.85E+09 2.02E+09 1.480 (0.48) -1 79 Section 82 to Sump A Position 52 l.74E+09 l.90E+09 1.392 (0.39) -1 80 Section 82 to Sump A Position 53 1.79E+09 1.95E+09 1.432 (0.43) -1 81 Section B2 to Sump A Position 54 l.78E+09 1.94E+09 1.424 (0.42) -1 82 Section 82 to Sump A Position 55 l.85E+09 2.02E+09 1.480 (0.48) -1 83 Section 82 to Sump A Position 56 l.63E+09 l.78E+09 1.304 (0.30) -1 84 Section 82 to Sump A Position 57 5.82E+08 6.36E+08 0.466 0.53 +l 85 Section 82 to Sump A Position 58 1.75E+08 l.91E+08 0.140 0.86 +l 86 Section 82 to Sump A Position 59 4.34E+07 4.74E+07 0.035 0.97 +l 87 Section 82 to Sump A Position 60 4.51E+07 4.93E+07 0.036 0.96 +l 88 Section 82 to Sump A Position 61 4.35E+07 4.75E+07 O.D35 0.97 +l Number of positive differences (S+) _ _5_5_ _
Critical Value - - -
Survey Unit MEETS the Acceptance Criteria
[39]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLUTIONSuc=
SURVEY UNITS 05119A & 05119B ~-""-
_______ --==~~-:-::_:.=~-~~-:-:-~- ____Sumi::~!'!_Pe ~i~~ch_¥JoirPr:ll~~~of-~urve)* >>~~=~'-=-~:~=-~-=-- . _ :__________:___ ._ _ :. ____ l Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit - - -6.324 ----
m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _6_5_ _ _ ft Maximum SOF Observed
- - -1.3778 ----
Mean of Total Activity Results _ _ _ l._69_E_+_0_9_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test ----'1'-'-.1'--'8"'0-'-%'----
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (pCi) (mCi) (mCi) Inventory (mrem/vr per mCi) mrem/yr Co-60 2.81E+08 l.78E+09 1.78E+OO 2.25E+03 0.00079 1.1 lE-02 0.01975 Cs-134 5.38E+05 3.41E+06 3.41E-03 l.56E+03 0.00000 l.60E-02 0.00005 Cs-137 l.27E+09 8.03E+09 8.03E+OO 8.22E+02 0.00977 3.04E-02 0.24413 Ni-63 l.42E+o8 8.98E+08 8.98E-01 8.52E+04 0.00001 2.94E-04 0.00026 Sr-90 8.46E+05 5.35E+06 5.35E-03 7.39E+Ol 0.00007 3.38E-01 0.00181 TOTAL 0.0106 0.26601
[40]
FRSRELEASERECORD ~
ZlONSOLJlI!Q!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A. Pipe C - Sign Test Classification _l_ Type I error 0.05 Number of Measurements 65
., Gamma Result Total Activity .SOF
.# pipe Me.asuremen(Location.* 1-Ws, Sign.
- <od1n-i2) (pCi/m2), * (Ws) 0 Section Cl to C Header Position Zero 2.18E+09 2.38E+09 1.267 (0.27) -I I Section Cl to C Header Position 1 2.34E+09 2.56E+09 1.360 (0.36) -I 2 Section C 1 to C Header Position 2 2.32E+09 2.53E+09 1.349 (0.35) -1 3 Section Cl to C Header Position 3 2.02E+09 2.21E+09 1.174 (0.17) -1 4 Section Cl to C Header Position 4 l.02E+09 1.1 IE+09 0.593 0.41 +I 5 Section Cl to C Header Position 5 8.77E+08 9.58E+08 0.510 0.49 +I 6 Section Cl to C Header Position 6 5.55E+08 6.06E+08 0.323 0.68 +I 7 Section C2 to A Sump Position Zero l.73E+09 l.89E+09 1.006 (0.01) -1 8 Section C2 to A Sump Position I l.60E+09 l.75E+09 0.930 0.07 +I 9 Section C2 to A Sump Position 2 l.55E+09 l.69E+09 0.901 0.10 +I 10 Section C2 to A Sump Position 3 l .47E+09 l.61E+09 0.855 0.15 +I 11 Section C2 to A Sump Position 4 l.53E+09 l.67E+09 0.889 0.11 +l 12 Section C2 to A Sump Position 5 l.41E+09 l.54E+09 0.820 0.18 +I 13 Section C2 to A Sump Position 6 l.38E+09 l.51E+09 0.802 0.20 +I 14 Section C2 to A Sump Position 7 l.37E+09 l.50E+09 0.796 0.20 +I 15 Section C2 to A Sump Position 8 l.26E+09 l .38E+09 0.732 0.27 +I 16 Section C2 to A Sump Position 9 l.30E+09 l.42E+09 0.756 0.24 +I 17 Section C2 to A Sump Position I 0 l.42E+09 l.55E+09 0.826 0.17 +I 18 Section C2 to A Sump Position 11 l.32E+09 l.44E+09 0.767 0.23 +I 19 Section C2 to A Sump Position 12 l.44E+09 l.57E+09 0.837 0.16 +I 20 Section C2 to A Sump Position 13 l.26E+09 l.38E+09 0.732 0.27 +I 21 Section C2 to A Sump Position 14 l.18E+09 l.29E+09 0.686 0.31 +l 22 Section C2 to A Sump Position 15 l.21E+09 l.32E+09 0.703 0.30 +l 23 Section C2 to A Sump Position 16 l.43E+09 l.56E+09 0.831 0.17 +I 24 Section C2 to A Sump Position 17 l.41E+09 l.54E+09 0.820 0.18 +I 25 Section C2 to A Sump Position 18 l.41E+09 l.54E+09 0.820 0.18 +1 26 Section C2 to A Sump Position 19 l.40E+09 l.53E+09 0.814 0.19 +I 27 Section C2 to A Sump Position 20 l.55E+09 l.69E+09 0.901 0.10 +I 28 Section C2 to A Sump Position 21 l.42E+09 l.55E+09 0.826 0.17 +1 29 Section C2 to A Sump Position 22 1.32E+09 1.44E+09 0.767 0.23 +I 30 Section C2 to A Sump Position 23 l.58E+09 l.73E+09 0.919 0.08 +l 31 Section C2 to A Sump Position 24 l.82E+09 l.99E+09 1.058 (0.06) -1 32 Section C2 to A Sump Position 25 l.90E+09 2.07E+09 1.105 (0.10) -1 33 Section C2 to A Sump Position 26 l.79E+09 l.95E+09 1.041 (0.04) -1 34 Section C2 to A Sump Position 27 l.93E+09 2.l IE+09 1.122 (0.12) -1 35 Section C2 to A Sump Position 28 l.94E+09 2.12E+09 1.128 (0.13) -1 36 Section C2 to A Sump Position 29 2.13E+09 2.33E+09 1.238 (0.24) -1 37 Section C2 to A Sump Position 30 l.96E+09 2.14E+09 1.139 (0.14) -1 38 Section C2 to A Sump Position 31 l.91E+09 2.09E+09 1.110 (0.11) -1 39 Section C2 to A Sump Position 32 l.72E+09 l.88E+09 1.000 0.00 +l 40 Section C2 to A Sump Position 33 l.65E+09 l.80E+09 0.959 0.04 +I 41 Section C2 to A Sump Position 34 l.60E+09 l.75E+09 0.930 0.07 +I 42 Section C2 to A Sump Position 35 l.96E+09 2.14E+09 1.139 (0.14) -1 43 Section C2 to A Sump Position 36 l.98E+09 2.16E+09 1.151 (0.15) -1 44 Section C2 to A Sump Position 37 2.08E+09 2.27E+09 1.209 (0.21) -1 45 Section C2 to A Sump Position 38 l.97E+09 2.15E+09 1.145 (0.15) -1 46 Section C2 to A Sump Position 39 l.79E+09 l.95E+09 1.041 (0.04) -1
[41]
_J
FRSRELEASERECORD ~
ZlO_NSOLJ/I!Q!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
'*' '*, .;\*;.*, ,*,, .. ; ; .. :',,.}; :_
- X1arruna Result ;'$',
Tota!A.ctivity. SOF.
S-*
t* .** Pipe Measui:ement.Location i * *(pci/m2) :.(pQi/m.2-) '1 <Ws)
.1-W.s' , 1gp
.;i", ,'1,-*
47 Section C2 to A Sump Position 40 l.94E+09 2.12E+09 l.128 (0.13) -1 48 Section C2 to A Sump Position 41 2.15E+09 2.35E+09 1.250 (0.25) -1 49 Section C2 to A Sump Position 42 2.37E+09 2.59E+09 1.378 (0.38) -1 50 Section C2 to A Sump Position 43 2.21E+09 2.41E+09 1.285 (0.28) -1 51 Section C2 to A Sump Position 44 2.16E+09 2.36E+09 1.256 (0.26) -1 52 Section C2 to A Sump Position 45 2.16E+09 2.36E+09 1.256 (0.26) -1 53 Section C2 to A Sump Position 46 2.10E+09 2.29E+09 1.221 (0.22) -1 54 Section C2 to A Sump Position 47 l.50E+09 1.64E+09 0.872 0.13 +l 55 Section C2 to A Sump Position 48 l.24E+09 1.35E+09 0.721 0.28 +l 56 Section C2 to A Sump Position 49 1.03E+09 l.12E+09 0.599 0.40 +l 57 Section C2 to A Sump Position 50 1.l3E+09 1.23E+09 0.657 0.34 +l 58 Section C2 to A Sump Position 51 l.11E+09 1.21E+09 0.645 0.35 +l 59 Section C2 to A Sump Position 52 1.l8E+09 1.29E+09 0.686 0.31 +l 60 Section C2 to A Sump Position 53 8.54E+08 9.33E+08 0.496 0.50 +l 61 Section C2 to A Sump Position 54 7.24E+08 7.91E+08 0.421 0.58 +l 62 Section C2 to A Sump Position 55 5.45E+08 5.95E+08 0.317 0.68 +l 63 Section C2 to A Sump Position 56 5.67E+08 6.19E+08 0.330 0.67 +l 64 Section C2 to A Sump Position 57 5.l 1E+08 5.58E+08 0.297 0.70 +l Number of positive differences (S+) _ _4_0_ _
Critical Value -----
39 Survey Unit MEETS the Acceptance Criteria
[42]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSw=
SURVEY UNITS 05119A & 05119B ~--
Surveyed Pipe - Calculation of Mean Activitv and Dose 2
Accessible Area ofSTS Unit - - - 14.301
m NumberofMeasurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _1'--4'"'"7_ _ _ ft Maximum SOF Observed _ _ _l'""'.'--98'""'6'"'"7_ __
Mean of Total Activi.ty Results --~1.~37~E~+~0~9_ _ (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test _ _ _2_.0_5_0_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 2.28E+08 3.26E+09 3.26E+OO 2.25E+03 0.00145 1.1 IE-02 0.03617 Cs-134 4.36E+05 6.23E+06 . 6.23E-03 1.56E+03 0.00000 l.60E-02 0.00010 Cs-137 1.03E+09 1.47E+10 1.47E+Ol 8.22E+02 0.01789 3.04E-02 0.44701 Ni-63 1.15E+08 1.64E+09 1.64E+OO 8.52E+04 0.00002 2.94E-04 0.00048 Sr-90 6.85E+05 9.79E+06 9.79E-03 7.39E+Ol 0.00013 3.38E-Ol 0.00331 TOTAL 0.0195 0.48707 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _ _2_ _ _ _ ft Area of Pipe Not Surveyed _ _ _0_.1_9_ _ _ m2 ROC Mean Activity per Total Mean T9tal Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 2.28E+08 3.30E+09 3.30E+OO 2.25E+03 0.00147 l.l IE-02 0.03666 Cs-134
- 4.36E+05 6.32E+06 6.32E-03 1.56E+03 0.00000 *1.60E-02 0.00010 Cs-137 l.03E+09 1.49E+l0 1.49E+Ol 8.22E+02 0.01813 3.04E-02 0.45309 Ni-63 l.15E+08 1.67E+09 1.67E+OO 8.52E+04 0.00002 2.94E-04 0.00049 Sr-90 6.85E+05 9.93E+06 9.93E-03 7.39E+Ol 0.00013 3.38E-01 0.00336 TOTAL 0.0198 0.49370
[43]
FRSRELEASERECORD ~
ZIO)'i$0L!!11!!NS
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A, Pipe D - Sign Test Classification _1_ Type I error 0.05 Number of Measurements 147
'. ',~ \', *~~, ',,,\~-"~~',:r.>.~:~,,*-1'*.~ ~\.\\~~:~:::.:.~:,,"'\'"',.." '
1
.Bariuha Result .; 'foial Activity , , SQF, .
~\ .~\.~ ; ',;
'(* :, )
1P1p~:lVfeasuJement '!-09atHm
. ' : ' : ...~ : ,,,,, .. ': *, '.,,,:,; :,.: : * '
. * :;~~"(pci1ih2Y~*'Y ' ' '(pC"J :iy 1 lTI, ' ;,. 'dWs): 1:-:\Vs'
" *~ ,,
.;::~t~~si,:
0 Section D 1 to D Header Position Zero l.19E+09 l.30E+09 0.913 0.09 +1 1 Section D 1 to D Header Position 1 l.14E+09 l.24E+09 0.874 0.13 +l 2 Section Dl to D Header Position 2 9.33E+08 l.02E+09 0.716 0.28 +1 3 Section Dl to D Header Position 3 8.77E+08 9.58E+08 0.673 0.33 +l 4 Section Dl to D Header Position 4 8.54E+08 9.33E+08 0.655 0.34 +1 5 Section D 1 to D Header Position 5 1.05E+09 l.15E+09 0.805 0.19 +l 6 Section Dl to D Header Position 6 1.02E+09 l.11E+09 0.782 0.22 +1 7 Section D 1 to D Header Position 7 l.36E+09 1.49E+09 1.043 (0.04) -1 8 Section DI to D Header Position 8 9.79E+08 l.07E+09 0.751 0.25 +l 9 Section D 1 to D Header Position 9 l.28E+09 1.40E+09 0.982 0.02 +1 10 Section D 1 to D Header Position 10 l.21E+09 l.32E+09 0.928 0.07 +1 11 Section D 1 to D Header Position 11 1.28E+09 1.40E+09 0.982 0.02 +1 12 Section Dl to D Header Position 12 l.10E+09 1.20E+09 0.844 0.16 +1 13 Section D 1 to D Header Position 13 l.05E+09 1.15E+09 0.805. 0.19 +l 14 Section D 1 to D Header Position 14 l.17E+09 1.28E+09 0.897 O.iO +l 15 Section Dl to D Header Position 15 l.37E+09 l.50E+09 1.051 (0.05) -1 16 Section Dl to D Header Position 16 l.39E+09 1.52E+09 1.066 (0.07) -1 17 Section Dl to D Header Position 17 l.56E+09 l.70E+09 1.197 (0.20) -1 18 Section D 1 to D Header Position 18 l.60E+09 l.75E+09 1.227 (0.23) -1 19 Section Dl to D Header Position 19 l.35E+09 1.47E+09 1.036 (0.04) -1 20 Section Dl to D.Header Position 20 1.47E+09 l.61E+09 1.128 (0.13) -1 21 Section D1 to D Header Position 21 l.46E+09 l.59E+09 1.120 (0.12) -1 22 Section D 1 to D Header Position 22 l.45E+09 l.58E+09 1.112 (0.11) -1 23 Section D 1 to D Header Position 23 1.27E+09 l.39E+09 0.974 0.03 +1 24 Section D 1 to D Header Position 24 l.34E+09 1.46E+09 1.028 (0.03) -1 25 Section D 1 to D Header Position 25 l .38E+09 l.51E+09 1.059 (0.06) -1 26 Section D 1 to D Header Position 26 l.39E+09 l.52E+09 1.066 (0.07) -1 27 Section D 1 to D Header Position 27 l.47E+09 l.61E+09 1.128 (0.13) -1 28 Section Dl to D Header Position 28 l.31E+09 l.43E+09 1.005 (0.00) -1 29 Section Dl to D Header Position 29 l.21E+09 l.32E+09 0.928 0.07 +1 30 Section D 1 to D Header Position 30 l.44E+09 l.57E+09 1.105 (0.10) -1 31 Section D 1 to D Header Position 31 1.46E+09 l.59E+09 1.120 (0.12) -1 32 Section Dl to D Header Position 32 l.76E+09 l.92E+09 1.350 (0.35) -1 33 Section D 1 to D Header Position 33 l.34E+09 1.46E+09 1.028 (0.03) -1 34 Section D 1 to D Header Position 34 l.26E+09 1.38E+09 0.967 0.03 +l 35 Section Dl to D Header Position 35 l.55E+09 l.69E+09 1.189 (0.19) -1 36 Section DI to D Header Position 36 l.78E+09 l.94E+09 1.365 (0.37) -1 37 Section Dl to D Header Position 37 2.16E+09 2.36E+09 1.657 (0.66) -1 38 Section D1 to D Header Position 38 2.35E+09 2.57E+09 1.803 (0.80) -1 39 Section Dl to D Header Position 39 2.59E+09 2.83E+09 1.987 (0.99) -1 40 Section Dl to D Header Position 40 2.02E+09 2.21E+09 1.549 (0.55) .-1 41 Section Dl to D Header Position 41 l.91E+09 2.09E+09 1.465 (0.47) -1 42 Section Dl to D Header Position 42 8.83E+08 9.64E+08 0.677 0.32 +l 43 Section D3 to D5 Position Zero l.86E+09 2.03E+09 1.427 (0.43) -1 44 Section D3 to D5 Position 1 l.44E+09 l.57E+09 1.105 (0.10) -1 45 Section D3 to D5 Position 2 2.01E+09 2.20E+09 1.542 (0.54) -1 46 Section D3 to D5 Position 3 2.33E+09 2.54E+09 1.787 (0.79) -1
[44]
FRSRELEASERECORD :;:::::=-
ZlONSOL!!Il!l!Y§*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B 47 Section D3 to D5 Position 4 2.10E+09 2.29E+09 1.611 (0.61) -1 48 Section D3 to D5 Position 5 l.48E+09 l.62E+09 1.135 (0.14) -1 49 Section D3 to D5 Position 6 7.33E+08 8.00E+08 0.562 0.44 +1 50 Section D3 to D5 Position 7 5.21E+08 5.69E+08 0.400 0.60 +1 51 Section D6 to Header Position Zero 9.72E+08 l.06E+09 0.746 0.25 +1 52 Section D6 to Header Position 1 9.97E+08 l.09E+09 0.765 0.24 +1 53 Section D6 to Header Position 2 8.72E+08 9.52E+08 0.669 0.33 +1 54 Section D6 to Header Position 3 8.00E+08 8.74E+08 0.614 0.39 +1 55 Section D6 to Header Position 4_ 7.22E+08 7.88E+08 0.554 0.45 +1 56 Section D6 to Header Position 5 7.41E+08 8.09E+08 0.568 0.43 +1 57 Section D6 to Header Position 6 7.63E+08 8.33E+08 0.585 0.41 +1 58 Section D6 to Header Position 7 9.44E+08 l.03E+09 0.724 0.28 +1 59 Section D6 to Header Position 8 8.83E+08 9.64E+08 0.677 0.32 +1 60 Section D6 to Header Position 9 8.36E+08 9.13E+08 0.641 0.36 +1 61 Section D6 to Header Position 10 7.42E+08 8.10E+08 0.569 0.43 +1 62 Section D6 to Header Position 11 7.13E+08 7.79E+08 0.547 0.45 +1 63 Section D6 to Header Position 12 9.91E+08 l.08E+09 0.760 0.24 +1 64 Section D6 to Header Position 13 l.05E+09 l.15E+09 0.805 0.19 +1 65 Section D6 to Header Position 14 l.l IE+09 l.21E+09 0.851 0.15 +l 66 Section D6 to Header Position 15 l.26E+09 l.38E+09 0.967 0.03 +1 67 Section D6 to Header Position 16 l.45E+09 l.58E+09 1.112 (0.11) - -1 68 Section D6 to Header Position 17 l.55E+09 l.69E+09 1.189 (0.19) -1 69 Section D6 to Header Position 18 l.57E+09 l.71E+09 1.204 (0.20) -1 70 Section D6 to Header Position 19 l.91E+09 2.09E+09 1.465 (0.4 7) -1 71 Section D6 to Header Position 20 l.73E+09 l.89E+09 1.327 (0.33) -1 72 Section D6 to Header Position 21 l.80E+09 l.97E+09 1.381 (0.38) -1 73 Section D6 to Header Position 22 2.13E+09 2.33E+09 1.634 (0.63) -1 74 Section D6 to Header Position 23 -2.03E+09 2.22E+09 1.557 (0.56) -1 75 Section D6 to Header Position 24 2.15E+09 2.35E+09 1.649 (0.65) -1 76 Section D6 to Header Position 25 2.13E+09 2.33E+09 1.634 (0.63) -1 77 Section D6 to Header Position 26 l.88E+09 2.05E+09 1.442 (0.44) -1 78 Section D6 to Header Position 27 2.08E+09 2.27E+09 1.595 (0.60) -1 79 Section D6 to Header Position 28 l.43E+09 l.56E+09 1.097 (0.10) -1 80 Section D6 to Header Position 29 2.22E+08 2.42E+08 0.170 0.83 +1 81 Section D6 to Header Position 30 l.48E+08 1.62E+08 0.114 0.89 +1 82 Section D4 to Sump A Position Zero l.85E+09 2.02E+09 1.419 (0.42) -1 83 Section D4 to Sump A Position 1 l.76E+09 l.92E+09 1.350 (0.35) -1 84 Section D4 to Sump A Position 2 l.98E+09 2.16E+09 1.519 (0.52) -1 85 Section D4 to Sump A Position 3 l.98E+09 2.16E+09 1.519 (0.52) -1 86 Section D4 to Sump A Position 4 l.18E+09 l.29E+09 0.905 0.09 +1 87 Section D4 to Sump A Position 5 l.39E+09 l.52E+09 1.066 (0.07) -1 88 Section D4 to Sump A Position 6 l.41E+09 l.54E+09 1.082 (0.08) -1 89 Section D4 to Sump A Position 7 l.54E+09 l.68E+09 1.181 (0.18) -1 90 Section D4 to Sump A Position 8 l.36E+09 l.49E+09 1.043 (0.04) -1 91 Section D4 to Sump A Position 9 1.49E+09 l.63E+09 1.143 (0.14) -1 92 Section D4 to Sump A Position 10 l.75E+09 l.91E+09 1.342 (0.34) -1 93 Section D4 to Sump A Position 11 l .83E+09 2.00E+09 1.404 (0.40) -1 94 Section D4 to Sump A Position 12 l.95E+09 2.13E+09 1.496 (0.50) -1 95 Section D4 to Sump A Position 13 l.61E+09 l.76E+09 1.235 (0.23) -1 96 Section D4 to Sump A Position 14 l.50E+09 l.64E+09 1.151 (0.15) -1
[45]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
- '*;.:*Gamm.a R.e~ult' * .r,ofal'.ActivJty.. ~* s0~***
- (pCi/m2) ** 1: * *<PCi/m2) ' .~ (Ws):.
.i~ws 'Sigh.'
97 Section D4 to Sump A Position 15 1.62E+09 l.77E+09 1.243 (0.24) -1 98 Section D4 to Sump A Position 16 1.77E+09 1.93E+09 1.358 (0.36) -1 99 Section D4 to Sump A Position 17 l.85E+09 2.02E+09 1.419 (0.42) -1 100 Section D4 to Sump A Position 18 I .45E+09 l.58E+09 1.112 (0.11) -1 101 Section D4 to Sump A Position 19 l.40E+09 l.53E+09 1.074 (0.07) -1 102 Section D4 to Sump A Position 20 l.28E+09 1.40E+09 0.982 0.02 +1 103 Section D4 to Sump A Position 21 1.22E+09 l.33E+09 0.936 0.06 +l 104 Section D4 to Sump A Position 22 l.26E+09 l.38E+09 0.967 0.03 +1 105 Section D4 to Sump A Position 23 l.19E+09 l.30E+09 0.913 0.09 +1 106 Section D4 to Sump A Position 24 9.80E+08 l.07E+09 0.752 0.25 +1 107 Section D4 to Sump A Position 25 9.91E+08 l.08E+09 0.760 0.24 +1 108 Section D4 to Sump A Position 26 9.49E+08 l.04E+09 0.728 0.27 +1 109 Section D4 to Sump A Position 27 9.98E+08 l.09E+09 0.766 0.23 +1 110 Section D4 to Sump A Position 28 9.70E+08 l.06E+09 0.744 0.26 +1 111 Section D4 to Sump A Position 29 9.67E+08 l.06E+09 0.742 0.26 +1 112 Section D4 to Sump A Position 30 9.52E+08 l.04E+09 0.730 0.27 +1 113 Section D4 to Sump A Position 31 9.56E+08 l.04E+09 0.733 0.27 +1 114 Section D4 to Sump A Position 32 1.07E+09 l.17E+09 0.821 0.18 +1 115 Section D4 to Sump A Position 33 l.05E+09 l.15E+09 0.805 0.19 +1 116 Section D4 to Sump A Position 34 9.34E+08 1.02E+09 0.716 0.28 +l 117 Section D4 to Sump A Position 35 8.98E+08 9.81E+08 0.689 0.31 +1 118 Section D4 to Sump A Position 36 9.75E+08 l.06E+09 0.748 0.25 +1 119 Section D4 to Sump A Position 37 9.36E+08 1.02E+09 0.718 Q.28 +1 120 Section D4 to Sump A Position 38 8.21E+08 8.97E+08 0.630 0.37 +1 121 Section D4 to Sump A Position 39 7.88E+08 8.61E+08 0.604 0.40 +1 122 Section D4 to Sump A Position 40 6.74E+08 7.36E+08 0.517 0.48 +1 123 Section D4 to Sump A Position 41 6.73E+08 7.35E+08 0.516 0.48 +1 124 Section D4 to Sump A Position 42 6.99E+08 7.63E+08 0.536 0.46 +1 125 Section D4 to Sump A Position 43 7.04E+08 7.69E+08 0.540 0.46 +1 126 Section D4 to Sump A Position 44 1.i rn+o8* 7.76E+08 o.545, 0.45 +1 127 Section D4 to Sump A Position 45 7.65E+08 8.35E+08 0.587 0.41 +1 128 Section D4 to Sump A Position 46 9.l 1E+08 9.95E+08 0.699 0.30 +1 129 Section D4 to Sump A Position 47 9.04E+08 9.87E+08 0.693 0.31 +1 130 Section D4 to Sump A Position 48 9.01E+08 9.84E+08 0.691 0.31 +1 131 Section D4 to Sump A Position 49 9.06E+08 9.89E+08 0.695 0.31 +l 132 Section D4 to Sump A Position 50 9.52E+08 l.04E+09 0.730 0.27 +1
. 133 Section D4 to Sump A Position 51 l.04E+09 l.14E+09 0.798 0.20 +1 134 Section D4 to Sump A Position 52 9,00E+08 9.83E+08 0.690 0.31 +1 135 Section D4 to Sump A Position 53 8.70E+08 9.50E+08 0.667 0.33 +1 136 Section D4 to Sump A Position 54 9.53E+08 1.04E+09 0.731 0.27 +1 137 Section D4 to Sump A Position 55 l.04E+09 l.14E+09 0.798 0.20 +1 138 Section D4 to Sump A Position 56 l.13E+09 l.23E+09 0.867 0.13 +1 1'39 Section D4 to Sump A Position 57 l.01E+09 l.10E+09 0.775 0.23 +1 140 Section D4 to Sump A Position 58 9.99E+08 l.09E+09 0.766 0.23 +1 141 Section D4 to Sump A Position 59 9.40E+08 1.03E+09 0.721 0.28 +1 142 Section D4 to Sump A Position 60
- 8.06E+08 8.80E+08 0.618 0.38 +1 143 Section D4 to Sump A Position 61 9.93E+08 1.08E+09 0.762 0.24 +I 144 Section D4 to Sump A Position 62 1.04E+09 l.14E+09 0.798 0.20 +l 146 Section D4 to Sump A Position 63 l.59E+08 1.74E+08 0.122 0.88 +l 146 Section D4 to Sump A Position 64 6.78E+07 7.40E+07 0.052 0.95 +1
[46]
FRSRELEASERECORD ~
ZIONSOLJ!I.!Q!J§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Number of positive differences (S+) _ _8_4_ _
83 - -
Critical Value - - -
Survey Unit MEETS the Acceptance Criteria
[47]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLUTIONSUF-
,.,.,--~
SURVEY UNITS 05119A & 05119B c:=~-=-=-*--~--=~- --~ _*-___ .* .:~- ~--~':'!!1P.~* Pipe E_(4-inch ~~o~E,f<!Tu}:_Sumni~~ex_~a-~-=-=---=-~-- ----~=-* ~~;;_-~=:.~ ~~'. =-~:
Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area ofSTS Unit _ _ _8~*~75~6_ _ _ m 2
Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed --~9_0_ _ _ ft Ma'l:imum SOF Observed _ _ _1_.3_8_42_ __
Mean of Total Activity Results _ _l_.7_6_E_+0_9_ _ (pCi/m2 )
Percentage of Allowable Inventory for Sign Test _ _ _1_.9_90_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (oCil (mCil (mCil InventOI)' ( mrem/vr oer mCil mrem/vr
. Co-60 2.92E+08 2.55E+09 2.55E+OO 2.25E+03 0.00113 l.1 lE-02 0.02833 Cs-134 5.58E+05 4.88E+06 4.88E-03 l.56E+03 0.00000 l.60E-02 0.00008 Cs-137 l.32E+09 l.15E+l0 l.15E+Ol 8.22E+02 0.01401 3.04E-02 0.35017 Ni-63 1.47E+o8 l.29E+09 l.29E+OO 8.52E+04 0.00002 2.94E-04 0.00038 Sr-90 8.76E+o5 7.67E+06 7.67E-03 7.39E+Ol 0.00010. 3.38E-Ol 0.00259 TOTAL 0.0153 0.38155 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _1_0_ _ _ ft Area of Pipe Not Surveyed _ _ _0_.9_7_ _ _ m2 ROC Mean Activity per Total Mean Total Mean BIL for Auxilial)' Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (oCil (mCil (mCil Inventory (mrem/vr oer mCil mrem/vr Co-60 2.92E+08 2.84E+09 2.84E+OO 2.25E+03 0.00126 l.1 lE-02 0.03148 Cs-134 5.58E+05 5.43E+06 5.43E-03 l.56E+03 0.00000 l.60E-02 0.00009 Cs-137 l.32E+09 l.28E+l0 l.28E+Ol 8.22E+02 0.01557 3.04E-02 0.38907 Ni-63 l.47E+o8 l.43E+09 l.43E+OO 8.52E+04 0.00002 2.94E-04 0.00042 Sr-90
- 8.76E+o5 8.52E+06 8.52E-03 7.39E+Ol 0.00012 3.38E-Ol 0.00288 TOTAL 0.0170 0.42394
[48]
FRSRELEASERECORD ~
ZIONSOLJ!I!Qr:J§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A. Pipe E - Sign Test Classification _1_ Type I error 0.05 Number of Measurements 90 Gamma Result Total Activity SOF
- Pipe Measurement Location
. . - (pCilin 2) . (oCi/m2). I (Ws) 1-Ws . Sig~
~ *. .
0 Section E4 to E5 Position Zero l .87E+09 2.04E+09 0.992 O.Ql +l I Section E4 to E5 Position 1 l.81E+09 l.98E+09 0.960 0.04 +1 2 Section E4 to E5 Position 2 l.88E+09 2.05E+09 0.997 0.00 +1 3 Section E4 to E5 Position 3 l.79E+09 l.95E+09 0.949 0.05 +l 4 Section E4 to E5 Position 4 1.88E+09 2.05E+09 0.997 0.00 +1 5 Section E4 to E5 Position 5 l.90E+09 2.07E+09 1.008 (0.01) -1 6 Section E4 to E5 Position 6 l.70E+09 l.86E+09 0.902 0.10 +l 7 Section E4 to E5 Position 7 l.72E+09 l.88E+09 0.912 0.09 +l 8 Section E4 to E5 Position 8 9.87E+08 l.08E+09 0.523 0.48 +1 9 Section E4 to E5 Position 9 l.21E+09 l.32E+09 0.642 0.36 +l 10 Section E4 to E5 Position 10
- 9.79E+08 l.07E+09 0.519 0.48 +l 11 Section E4 to E5 Position 11 2.35E+08 2.57E+08 0.125 0.88 +l 12 Section E4 to E5 Position 12 8.78E+08 9.59E+08 0.466 0.53 +l 13 Section E4 to E5 Position 13 6.69E+08 7.31E+08 0.355. 0.65 +1 14 Section E4 to E5 Position 14 3.35E+08 3.66E+08 0.178 0.82 +l 15 Section E5 to Sump A Position Zero l.76E+09 l.92E+09 0.933 0.07 +1 16 Section E5 to Sump A Position 1 l.51E+09 l.65E+09 0.801 0.20 +l 17 Section E5 to Sump A Position 2 1.47E+09 l.61E+09 0.780 0.22 +1 18 Section E5 to Sump A Position 3 1.39E+09 1.52E+09 0.737 0.26 +l 19 Section E5 to Sump A Position 4 l.55E+09 l.69E+09 0.822 0.18 +1 20 Section E5 to Sump A Position 5 l.70E+09 l.86E+09 0.902 0.10 +l 21 Section E5 to Sump A Position 6 l.70E+09 l.86E+09 0.902 0.10 +l 22 Section E5 to Sump A Position 7 l.70E+09 l.86E+09 0.902 0.10 +1 23 Section E5 to Sump A Position 8 l.54E+09 l.68E+09 0.817 0.18 +1 24 Section E5 to Sump A Position 9 l.52E+09 l.66E+09 0.806 0.19 +I 25 Section E5 to Sump A Position 10 l.58E+09 l.73E+09 0.838 0.16 +l 26 Section E5 to Sump A Position 11 l.58E+09 1.73E+09 0.838 0.16 +l 27 Section E5 to Sump A Position 12 l.67E+09 1.82E+09 0.886 0.11 +l 28 Section E5 to Sump A Position 13 l.78E+09 l.94E+09 0.944 0.06 +1 29 Section E5 to Sump A Position 14 l.90E+09 2.07E+09 1.008 (0.01) -1 30
- Section E5 to Sump A Position 15 2.01E+09 2.20E+09 1.066 (0.07) -1 31 Section E5 to Sump A Position 16 2.03E+09 2.22E+09 1.077 (0.08) -1 32 Section E5 to Sump A Position 17 2.01E+09 2.20E+09 1.066 (0.07) -1 33 Section E5 to Sump A Position 18 2.07E+09 2.26E+09 1.098 (0.10) -1 34 Section E5 to Sump A Position 19 l.97E+09 2.15E+09 1.045 (0.04) -1 35 Section E5 to Sump A Position 20 1.84E+09 2.01E+09 0.976 0.02 +1 36 Section E5 to Sump A Position 21 l.80E+09 l.97E+09 0.955 0.05 +1 37 Section E5 to Sump A Position 22 l.86E+09 2.03E+09 0.986 O.Ql +l 38 Section E5 to Sump A Position 23 l.75E+09 1.91E+09 0.928 0.07 +1 39 Section E5 to Sump A Position 24 l.75E+09 l.91E+09 0.928 0.07 +1 40 Section E5 to Sump A Position 25 l.77E+09 l.93E+09 0.939 0.06 +I 41 Section E5 to Sump A Position 26 l.82E+09 l.99E+09 0.965 0.03 +I
<l2 Section E5 to Sump A Position 27 l.72E+09 l.88E+09 0.912 0.09 +l 43 Section E5 to Sump A Position 28 l.77E+09 1.93E+09 0.939 0.06 +1 44 Section E5 to Sump A Position 29 l.74E+09 l.90E+09 0.923 0.08 +1 45 Section E5 to Sump A Position 30 ' l.85E+09 2.02E+09 0.981 0.02 +1 46 Section E5 to Sump A Position 31 'J.91E+09 2.09E+09 1.013 (0.01) -I
[49]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
~~'"
Gamma Result Total Activity SOF
- Pipe Measurement Location 1-Ws Sign (oCi/m2) (pCi/m2) (Ws) 47 Section E5 to Sumo A Position 32 l.96E+09 2.14E+09 1.039 (0.04) -1 48 Section E5 to Sump A Position 33 l.89E+09 2.06E+09 1.002 (0.00) -1 49 Section E5 to Sump A Position 34 2.01E+09 2.20E+09 1.066 (0.07) -I 50 Section E5 to Sumo A Position 35 2.03E+09 2.22E+09 1.077 (0.08) -1 51 Section E5 to Sumo A Position 36 l.96E+09 2.14E+09 1.039 (0.04) -1 52 Section E5 to Sumo A Position 37 l.98E+09 2.16E+09 1.050 (0.05) -1 53 Section E5 to Sump A Position 38 2.01E+09 2.20E+09 1.066 (0.07) -1 54 Section E5 to Sump A Position 39 l.92E+09 2.10E+09 1.018 (0.02) -1 55 Section E5 to Sump A Position 40 2.00E+09 2.18E+09 1.061 (0.06) -1 56 Section E5 to Sump A Position 41 2.04E+09 2.23E+09 1.082 (0.08) -1 57 Section E5 to Sump A Position 42 2.07E+09 2.26E+09 1.098 (0.10) -1 58 Section E5 to Sump A Position 43 2.20E+09 2.40E+09 1.167 (0.17) -1 59 Section E5 to Sump A Position 44 2.24E+09 2.45E+09 1.188 (0. I 9) -1 60 Section E5 to Sump A Position 45 2.37E+09 2.59E+09 1.257 (0.26) -I 61 Section E5 to Sump A Position 46 2.36E+09 2.58E+09 1.252 (0.25) -1 62 Section E5 to Sump A Position 47 2.61E+09 2.85E+09 1.384 (0.38) -1 63 Section E5 to Sump A Position 48 2.l 1E+09 2.30E+09 1.119 (0.12) -1 64 Section E5 to Sump A Position 49 2.01E+09 2.20E+09 1.066 (0.07) -1 65 Section E5 to Sump A Position 50 l.96E+09 2.14E+09 1.039 (0.04) -1 66 Section E5 to Sump A Position 51 l.96E+09 2.14E+09 1.039 (0.04) -1 67 Section E5 to Sump A Position 52 2.15E+09 2.35E+09 1.140 (0.14) -1 68 Section E5 to Sump A Position 53 2.00E+09 2.18E+09 1.061 (0.06) -1 69 Section E5 to Sump A Position 54 2.00E+09 2.18E+09 1.061 (0.06) -1 70 Section E5 to Sump A Position 55 l.53E+09 l.67E+09 0.811 0.19 +l 71 Section E5 to Sumo A Position 56 4.79E+08 5.23E+08 0.254 0.75 +l 72 Section E5 to Sump A Position 57 9.77E+07 l.07E+08 0.052 0.95 +l 73 Section E5 to Sump A Position 58 8.61E+07 9.40E+07 0.046 0.95 +l 74 Section El to Main Header Position Zero l.89E+09 2.06E+09 1.002 (0.00) -1 75 Section El to Main Header Position 1 2.14E+09 2.34E+09 1.135 (0.13) -1 76 Section El to Main Header Position 1 l.82E+09 l.99E+09 0.965 0.03 +l 77 Section El to Main Header Position 2 2.04E+09 2.23E+09. 1.082 (0.08) -1 78 Section El to Main Header Position 3 l.88E+09 2.05E+09 0.997 0.00 +l 79 Section E 1 to Main Header Position 4 2.02E+09 2.21E+09 1.071 (0.07) -1 80 Section El to Main Header Position 5 2.15E+09 2.35E+09 1.140 (0.14) -1 81 Section El to Main Header Position 6 l.72E+09 l.88E+09 0.912 0.09 +l 82 Section E 1 to Main Header Position 7 l.16E+09 l.27E+09 0.615 0.38 +l 83 Section E 1 to Main Header Position 8 l.85E+08 2.02E+08 0.098 0.90 +1 84 Section E 1 to Main Header Position 9 l.62E+08 l.77E+08 0.086 0.91 +l 85 Section El to Main Header Position 10 l.62E+08 l.77E+08 0.086 0.91 +l 86 Section El to Main Header Position 11 4.14E+08 4.52E+08 0.220 0.78 +l 87 Section El to Main Header Position 12 3.80E+08 4.15E+08 0.202 0.80 +l 88 Section E 1 to Main Header Position 13 3.81E+08 4.16E+08 0.202 0.80 +l 89 Section El to Main Header Position 14 2.85E+08 3.l 1E+08 0.151 0.85 +l Number of positive differences (S+) _ _5_4_ _
Critical Value - - -
Survey Unit MEETS the Acceptance Criteria
[50]
FRS RELEASE RECORD ;::::::=-
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
,...,__..,ecr,-,
SURVEY UNITS 05119A & 051198
-* --~:~~~;~::=-=-- -~~p-~~Pi~e F (4::fu~~~l_oo_r~~!_n.E§'!..1!1~EY~~~~!;!~J'>a!a-=-=-~ .:* *_=__ ~=~- '"'.*,..-=:::-__-~~~~-:~
Surveved Pipe - Calculation of Mean Activitv and Dose
- Accessible Area of STS Unit m2
- - -8.269 ----
Number of Measurements Taken in Survey Unfr/Feet of Pipe Surveyed _ _ _ _ 85_ _ _ _ ft Maximum SOF Observed _ _ _l'-'-."-'13'-'-9-=2_ __
2 Mean of Total Activity Results --"'l.""7:;,'""-E"-+-'0"'--9_ _ (pCi/m )
Percentage of Allowable Inventory for Sign Test _ _ _2_.4....o6_1_%~--
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC Ci/m2 Ci mCi mCi Inventory (rnrem/ *r er mCi mrem/ 'r Co-60 2.90E+08 2.40E+09 2.40E+OO 2.25E+03 0.00107 l.l lE-02 0.02661 Cs-134 5.55E+05 4.59E+06 4.59E-03 l.56E+03 0.00000 l.60E-02 0.00007 Cs-137 l.31E+09 l.08E+l0 l.08E+Ol 8.22E+02 0.01316 3.04E-02 0.32891 Ni-63 l.46E+08 l.21E+09 l.21E+OO 8.52E+04 0.00001 2.94E-04 0.00036 Sr-90 8.71E+05 7.21E+06 7.21E-03 7.39E+Ol 0.00010 3.38E-Ol 0.00244 TOTAL 0.0143 0.35839 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed 20 ft Area of Pipe Not Surveyed 1.95 m' ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary* Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC 2
Ci/m Ci mCi mCi Inventory mrem/ *r er mCi mrem/vr Co-60 2.90E+08 2.96E+09 2.96E+OO 2.25E+03 0.00132 l.l IE-02 0.03288 Cs-134 5.55E+05 5.67E+06 5.67E-03 l.56E+03 0.00000 l.60E-02 0.00009 Cs-137 l.31E+09 l.34E+l0 l.34E+Ol 8.22E+02 O.OI626 3.04E-02 0.40630 Ni-63 l.46E+08 l.49E+09 1.49E+OO 8.52E+04 0.00002 2.94E-04 0.00044 Sr-90 8.71E+05 8.90E+06 8.90E-03 7.39E+Ol 0.00012 3.38E-01 0.00301 TOTAL 0.0177 0.44272
[51]
FRSRELEASERECORD ~
ZIONSOL!!I!Q!Y§*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A, Pipe F - Sign Test Classification _I_ Type I error 0.05 Number of Measurements 85 Gamma Result Total.Activity SOf .. Sign* .
- .Pipe
.. Measurement I.;ocation *1-Ws
- . .... ; . (pC\tm2) (pG::i/m2 ) . (Ws) . ..
0 Section F4 to Fl4 Position Zero l.74E+09 l.90E+09 0.783 0.22 +I 1 Section F4 to Fl4 Po*sition 1 2.13E+09 2.33E+09 0.959 0.04 . +l 2 Section F4 to Fl4 Position 2 7.05E+08 7.70E+08 0.317 0.68 +l 3 Section F4 to Fl4 Position 3 l.39E+09 l.52E+09 0.626 0.37 +l 4 Section F4 to F14 Position 4 l.49E+09 l.63E+09 0.671 0.33 +l 5 Section F 14 to F Header Position Zero 2.28E+09 2.49E+09 1.027 (0.03) -1 6 Section F 14 to F Header Position 1 l.98E+09 2.16E+09 0.892 0.11 +l 7 Section F 14 to F Header Position 2 l.63E+09 l.78E+09 0.734 0.27 +l 8 Section F14 to F Header Position 3 l.40E+09 l.53E+09 0.630 0.37 +l 9 Section F 14 to F Header Position 4 l.38E+09 1.51E+09 0.621 0.38 +1 10 Section F 14 to F Header Position 5 l.57E+09 l.71E+09 0.707 0.29 +I 11 Section F 14 to F Header Position 6 l.56E+09 l.70E+09 0.702 0.30 +l 12 Section F 14 to F Header Position 7 l.26E+09 l.38E+09 0.567 0.43 +l 13 Section F 14 to F Header Position 8 l.26E+09 l.38E+09 0.567 0.43 +l 14 Section Fl4 to F Header Position 9 7.64E+08 8.34E+08 0.344 0.66 +l 15 Section F14 to F Header Position 10 4.28E+08 4.67E+08 0.193 0.81 +1 16 Section F3 to F13 Position Zero 2.35E+09 2.57E+09 1.058 (0.06) -1 17 Section F3 to F 13 Position 1 2.02E+09 2.21E+09 0.910 0.09 +l 18 Section F3 to F 13 Position 2 2.02E+09 2.21E+09 0.910 0.09 +l 19 . Section F3 to F13 Position 3 233E+09 2.54E+09 1.049 (0.05) -1 20 Section F3 to Fl3 Position 4 2.34E+09 2.56E+09 1.054 (0.05) -I 21 Section F3 to Fl3 Position 5 1.26E+09 l.38E+09 0.567 0.43 +1 22 Section F2 to Fl 1 Position Zero l.75E+09 l.91E+09 0.788 0.21 +l 23 Section F2 to Fl 1 Position 1 9.85E+08 l.08E+09 0.444 0.56 +l 24 Section F2 to Fl I Position 2 2.l 1E+09 2.30E+09 0.950 0.05 +I 25 Section F2 to Fl I Position 3 2.17E+09 2.37E+09 0.977 0.02 +l 26 Section F2 to Fl 1 Position 4 l.71E+09 l.87E+09 0.770 0.23 +l 27 Section F 1 to F8 Position Zero 2.53E+09 2.76E+09 1.139 (0.14) -1 28 Section F 1 to F8 Position 1 l.71E+09 l.87E+09 0.770 0.23 +l 29 Section F 1 to F8 Position 2 l.90E+09 2.07E+09 0.856 0.14 +l 30 Section F 1 to F8 Position 3 l.99E+09 2.17E+09 0.896 0.10 +1 31 Section F 1 to F8 Position 4 2.30E+09 2.51E+09 1.036 (0.04) -1 32 Section F8 to A Sump Position Zero 2.22E+09 2.42E+09 1.000 0.00 +l 33 Section F8 to A Sump Position 1 2.24E+09 2.45E+09 1.009 (0.01) -1 34 Section F8 to A Sump Position 2 2.22E+09 2.42E+09 1.000 0.00 +l 35 Section F8 to A Sump Position 3 2.24E+09 2.45E+09 1.009 (0.01) -1 36 Section F8 to A Sump Position 4 2.40E+09 2.62E+09 1.081 (0.08) -1 37 Section F8 to A Sump Position 5 2.31E+09 2.52E+09 1.040 (0.04) -1 38 Section F8 to A Sump Position 6 2.25E+09 2.46E+09 1.013 (O.OI) -1 39 Section F8 to A Sump Position 7 2.28E+09 2.49E+09 1.027 (0.03) -1 40 Section F8 to A Sump Position 8 2.37E+09 2.59E+09 1.067 (0.07) -1 41 Section F8 to A Sump Position 9 2.35E+09 2.57E+09 1.058 (0.06) -1 42 Section F8 to A Sump Position I 0 l.97E+09 2.15E+09 0.887 0.11 +l 43 Section F8 to A Sump Position 11 l.38E+09 l.51E+09 0.621 0.38 +l 44 Section F8 to A Sump Position 12 1.23E+09 l.34E+09 0.554 0.45 +1 45 Section F8 to A Sump Position 13 l.33E+09 l.45E+09 0.599 0.40 +l 46 Section F8 to A Sump Position 14 l.40E+09 l.53E+09 0.630 0.37 +I
[52]
FRSRELEASERECORD ~
ZIONSOLjJTIO!Y§,
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B 47 Section F8 to A Sumo Position 15 l.10E+09 l.20E+09 0.495 0.50 +l 48 Section F8 to A Sumo Position 16 l.OOE+09 l.09E+09 0.450 0.55 +l 49 Section F8 to A Sumo Position 17 l.72E+09 l.88E+09 0.774 0.23 +l 50 Section F8 to A Sump Position 18 l.72E+09 l.88E+09 0.774 0.23 +l 51 Section F8 to A Sump Position 19 l.90E+09 2.07E+09 0.856 0.14 +l 52 Section F8 to A Sumo Position 20 2.03E+09 2.22E+09 0.914 0.09 +l 53 Section F8 to A Sumo Position 21 l.51E+09 l.65E+09 0.680 0.32 +l 54 Section F8 to A Sumo Position 22 l.59E+09 l.74E+09 0.716 0.28 +1 55 Section F8 to A Sump Position 23 l.55E+09 l.69E+09 0.698 0.30 +l 56 Section F8 to A Sumo Position 24 1.38E+09 l.51E+09 0.621 0.38 +1 57 Section F8 to A Sumo Position 25 l.62E+09 l.77E+09 0.729 0.27 +l 58 Section F8 to A Sumo Position 26 1.70E+09 1.86E+09 0.765 0.23 +l 59 Section F8 to A Sumo Position 27 2.04E+09 2.23E+09 0.919 0.08 +l 60 Section F8 to A Sumo Position 28 l.95E+09 2.13E+09 0.878 0.12 +l 61 Section F8 to A Sumo Position 29 l.25E+09 l.37E+09 0.563 0.44 +l 62 Section F8 to A Sumo Position 30 2.33E+08 2.54E+08 0.105 0.90 +l 63 Section F8 to A Sumo Position 31 2.09E+08 2.28E+08 0.094 0.91 +l 64 Section F8 to A Sumo Position 32 2.34E+08 2.56E+08 0.105 0.89 +l 65 Section F8 to A Sump Position 33 l.20E+08 l.31E+08 0.054 0.95 +l 66 Section Fl2 to FlO Header Position Zero l.79E+09 l.95E+09 0.806 0.19 +1 67 Section Fl2 to FlO Header Position 1 1.51E+09 1.65E+09 0.680 0.32 +l 68 Section Fl2 to FlO Header Position 2 1.57E+09 1.71E+09 0.707 0.29 +l 69 Section Fl2 to FlO Header Position 3 2.0IE+09 2.20E+09 0.905 0.09 +1 70 Section Fl2 to FlO Header Position 4 2.20E+09 2.40E+09 0.991 0.01 +l
- 71. Section Fl2 to FlO Header Position 5 l.98E+09 2.16E+09 0.892 0.11 +l 72 Section Fl2 to FlO Header Position 6 l.96E+09 2.14E+09 0.883 0.12 +l 73 Section Fl2 to FlO Header Position 7 1.51E+09 l.65E+09 0.680 0.32 +l 74 Section Fl2 to FlO Header Position 8 l.30E+09 l .42E+09 0.585 0.41 +1 75 Section Fl2 to FlO Header Position 9 l.59E+09 l.74E+09 0.716 0.28 +l 76 Section Fl2 to FlO Header Position 10 l.77E+09 l.93E+09 0.797 0.20 +l 77 Section Fl2 to FlO Header Position 11 l.73E+09 l.89E+09 0.779 0.22 +l 78 Section Fl2 to FIO Header Position 12 2.43E+09 2.65E+09 1.094 (0.09) -1 79 Section Fl2 to FlO Header Position 13 2.12E+09 2.32E+09 0.955 0.05 +l 80 Section Fl2 to FlO Header Position 14 3.40E+08 3.71E+08 0.153 0.85 +l
- 81 Section Fl2 to FlO Header Position l5 l.58E+08 l.73E+08 0.071 0.93 +l 82 Section Fl2 to FlO Header Position 16 l.62E+08 l.77E+08 0.073 0.93 +1 83 Section Fl2 to FlO Header Position 17 l.56E+08 l.70E+08 0.070 0.93 +l 84 Section Fl2 to FlO Header Position 18 l.28E+08 l.40E+08 0.058 0.94 +l Number of positive differences (S+) 52 Critical Value 50 Survey Unit MEETS the Acceptance Criteria
[53]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLUTIONSur=
M(-a~c..._,
SURVEY UNITS 05119A & 05119B t""'*-----*-**-~~---.:.:i.'--~--:_ **---~--~
- ___:_:___ ~umg~LPTpiQJt~c.!!_!'!oorQ!!l~c~~l!.~.~r~}'~ata -~=-----'--'-'. ___ _
Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit - - -6.907 ----
m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _ 7_1_ _ _ ft Maximum SOF Observed _ _ _l""'."'82""'7-'-9_ __
Mean of Total Activity Results --"'l.~42~E~+~0-'-9_ _ (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test _ _ _l_.2_4_0_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/vr Co-60 5.15E+08 3.56E+09 3.56E+OO 2.25E+03 0.00158 l.l IE-02 0.03950 Cs-134 0.00E+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 6.47E+08 4.47E+09 4.47E+OO 8.22E+02 0.00544 3.04E-02 0.13587 Ni-63 2.60E+o8 l.80E+09 l.80E+OO 8.52E+04 0.00002 2.94E-04 0.00053 Sr-90 4.31E+05 2.98E+06 2.98E-03 7.39E+Ol 0.00004 3.38E-Ol 0.00101 TOTAL 0.0071 0.17691-Adjustment for Inaccessible Pipe FeetofPipeNotSurveyed _ _ _ _ 4_0_ _ _ ft Area of Pipe Not Surveyed _ _ _3_.8_9_ _ _ m 2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2) <oCD (mCD <mCD Inventory (mrem/yr per mCi) mrem/yr Co-60 5.15E+08 5.56E+09 5.56E+OO 2.25E+03 0.00247 l.l IE-02 0.06176 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 6.47E+08 6.99E+09 6.99E+OO 8.22E+02 0.00850 3.04E-02 0.21241 Ni-63 2.60E+08 2.81E+09 2.81E+OO 8.52E+04 0.00003 2.94E-04 0.00083 Sr-90 4.31E+05 4.65E+06 4.65E-03 7.39E+OJ 0.00006 3.38E-OJ 0.00157 TOTAL 0.0111 0.27657
[54]
~
FRSRELEASERECORD =ZIONSOL!!IJQ!Y§=
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A, Pipe G - Sign Test Classification _1_ Type I error 0.05 Number of Measurements 71
- : Pipe MeasuremeutLocation
'. Gamma Result Total Activity SOF 1-Ws Sign'
- \
- \ ~ ,,. ' (oCi/m2) (oCi/rri2) <Ws) .~ \
0 Section G3 to G 1 Position Zero 1.47E+09 l.80E+09 1.129 (0.13) -1 1 Section G3 to G 1 Position 1 l.47E+09 1.80E+09 1.129 (0.13) -1 2 Section G3 to G 1 Position 2 l.35E+09 l.65E+09 1.037 (0.04) -1 3 Section G3 to G 1 Position 3 l.28E+09 1.57E+09 0.983 0.02 +1 4 Section G3 to G 1 Position 4 l.20E+09 l.47E+09 0.922 0.08 +1 5 Section G3 to G 1 Position 5 l.51E+09 l.85E+09 1.160 (0.16) -1 6 Section G3 to G 1 Position 6 1.37E+09 l.68E+09 1.052 (0.05) -1 7 Section G3 to G 1 Position 7 9.36E+08 l.15E+09 0.719 0.28 +1 8 Section G3 to G 1 Position 8 l.03E+09 1.26E+09 0.791 0.21 +1 9 Section G3 to G 1 Position 9 l.10E+09 l.35E+09 0.845 0.16 +1 10 Section G3 to G 1 Position 10 l.01E+09 1.24E+09 0.776 0.22 +l 11 Section G3 to G 1 Position 11 l.03E+09 l.26E+09 0.791 0.21 +l 12 Section G3 to GI Position 12 l.21E+09 l.48E+09 0.929 O.Q7 +l 13 Section G3 to G 1 Position 13 1.26E+09 1.54E+09 0.968 0.03 +1 14 Section G3 to G 1 Position 14 l.23E+09 1.51E+09 0.945 0.06 +l 15 Section G3 to G 1 Position 15 l.31E+09 l.60E+09 1.006 (0.01) -1 16 Section G3 to G 1 Position 16 l.30E+09 1.59E+09 0.998 0.00 +1 17 Section G3 to G 1 Position 17 l.19E+09 1.46E+09 0.914 0.09 +l 18 Section G3 to G 1 Position 18 l.14E+09 l.40E+09 0.876 0.12 +l 19 Section G3 to G 1 Position 19 l.71E+09 2.09E+09 1.313 (0.31) -1 20 Section G3 to G 1 Position 20 l.17E+09 1.43E+09 0.899 '0.10 +1 21 Section G3 to GI Position 21 1.18E+09 l.44E+09 0.906 0.09 +l 22 Section G3 to G 1 Position 22 l.21E+09 l.48E+09 0.929 0.07 +1 23 Section G3 to G 1 Position 23 l.26E+09 1.54E+09 0.968 0.03 +1 24 Section G2 to Header Position Zero l.85E+09 2.26E+09 1.421 (0.42) -1 25 Section G2 to Header Position 1 1.66E+09 2.03E+09 1.275 <0.27) -1 26 Section G2 to Header Position 2 1.55E+09 1.90E+09 1.190 (0.19) -1 27 Section G2 to Header Position 3 l.50E+09 l.84E+09 1.152 (0.15) -1 28 Section G2 to Header Position 4 1.42E+09 l.74E+09 1.091 (0.09) -1 29 Section G2 to Header Position 5 l.29E+09 1.58E+09 0.991 0.01 +l, 30 Section G2 to Header Position 6 1.l 7E+09 1.43E+09 0.899 0.10 +1 31 Section G2 to Header Position 7 l.20E+09 1.47E+09 0.922 0.08 +1 32 Section G2 to Header Position 8 l.05E+09 1.29E+09 0.806 0.19 +1 33 Section G2 to Header Position 9 9.85E+08 l.21E+09 0.757 0.24 +1 34 Section G2 to Header Position 10 9.14E+08 l.12E+09 0.702 0.30 +1 35 Section G2 to Header Position 11 8.64E+08 l.06E+09 0.664 0.34 +1 36 Section G2 to Header Position 12 l.14E+09 l.40E+09 0.876 0.12 +1 37 Section G2 to Header Position 13 1.15E+09 l.41E+09 0.883 0.12 +1 38 Section G2 to Header Position 14 8.89E+08 l.09E+09 0.683 0.32 +1 39 Section G2 to Header Position 15 9.47E+08 l.16E+09 0.727 0.27 +1 40 Section G2 to Header Position 16 8.46E+08 l.04E+09 0.650 0.35 +1 41 Section G2 to Header Position 17 9.78E+08 1.20E+09 0.751 0.25 +1 42 Section G2 to Header Position 18 8.86E+08 1.08E+09 0.680 0.32 +1 43 Section G2 to Header Position 19 9.19E+08 1.12E+09 0.706 0.29 +1 44 Section G2 to Header Position 20 7.26E+08 8.89E+08 0.558 0.44 +1 45 Section G2 to Header Position 21 2.48E+08 3.04E+08 0.190 0.81 +1 46 Section G2 to Header Position 22 2.48E+08 3.04E+08 0.190 0.81 +1
[55]
FRSRELEASERECORD ~
ZION$0L!!IJ!l!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B 47 w*
\'.. :*
- >**: :\.
PiRe.Mec:isiirerJ:ierifbo~atiot:i.
- -~ ,,
y **
,~ \.};:* ~ "'
Section G2 to Header Position 23
+, "*
,1
.\,.
- Qani1mi Resu1t+ 'TdtaI'Activit)'.* *SQF **
. **(pCi/m2) 2.48E+08
- . *: (oCi/m~)
3.04E+08
- (Ws) . r~ws 0.190
-~;
0.81
.*sign~*:
+l 48 Section G2 to Header Position 24 2.21E+09 2.71E+09 1.697 (0.70) -1 49 Section G 1 to A Sumo Position Zero 1.64E+09 2.01E+09 1.260 (0.26) -1 50 Section G 1 to A Sumo Position 1 1.62E+08 1.98E+08 0.124 0.88 +1 51 Section G 1 to A Sump Position 2 l.59E+09 1.95E+09 1.221 (0.22) -1 52 Section Gl to A Sump Position 3 l.54E+09 1.89E+09 1.183 (0.18) -1 53 Section G 1 to A Sump Position 4 l.51E+09 1.85E+09 1.160 (0.16) -1 54 Section G 1 to A Sump Position 5 1.45E+09 l.77E+09 1.114 <0.11) -1 55 Section G 1 to A Sump Position 6 1.45E+09 1.77E+09 1.114 (0.11) -1 56 Section G 1 to A Sump Position 7 1.44E+09 1.76E+09 1.106 (0.11) -1 57 Section G 1 to A Sump Position 8 1.43E+09 l.75E+09 1.098 <0.10) -1 58 Section G 1 to A Sump Position 9 l.47E+09 l.80E+09 1.129 (0.13) -I 59 Section GI to A Sump Position IO 1.48E+09 1.81E+09 1.137 (0.14) -1 60 Section GI to A Sump Position 11 1.53E+09 1.87E+09 1.175 <0.18) -1 61 Section GI to A Sump Position 12 l.52E+09 l.86E+09 1.167 (0.17) -1 62 Section GI to A Sump Position 13 l.82E+09 2.23E+09 1.398 (0.40) -1 63 Section G 1 to A Sump Position 14 2.38E+09 2.91E+09 1.828 (0.83) -1 64 Section G 1 to A Sump Position I 5 2.20E+09 2.69E+09 1.690 <0.69) -1 65 Section GI to A Sump Position 16 4.45E+08 5.45E+08 0.342 0.66 +I 66 Section G 1 to A Sump Position 17 l.36E+08 1.66E+08 0.104 0.90 +l 67 Section Gl to A Sump Position 18 l.32E+08 l.62E+08 0.101 0.90 +1 68 Section G 1 to A Sump Position 19 l.23E+08 l.51E+08 0.094 0.91 +1 69 Section G 1 to A Sump Position 20 l.26E+08 1.54E+08 0.097 0.90 +1 70 Section GI to A Sump Position 21 l.33E+08 l.63E+08 0.102 0.90 +1 Number of positive differences (S+) _ _4_3_ _
Critical Value _ _4.c.::2=----
Survey Unit MEETS the Acceptance Criteria
[56]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONS~-
"!>~'-'
SURVEY UNITS 05119A & 05119B Surveyed Pipe - Calculation of Mean Activitv and Dose 2
Accessible Area of STS Unit - - -0.681 ---- m Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _7_ _ _ ft Maximum SOF Observed
- - -0.1968----
Mean of Total Activity Results _ _5_.7_3_E_+_0_8_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test ---"l"".0-'-00'-'o/c-'-o--
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 1.37E+08 9.33E+07 9.33E-02 2.25E+03 0.00004 I.I lE-02 0.00104 Cs-134 5.01E+05 3.41E+05 3.41E-04 1.56E+03 0.00000 1.60E-02 0.00001 Cs-137 3.66E+08 2.49E+08 2.49E-01 : 8.22E+02 0.00030 3.04E-02 0.00758 Ni-63 6.91E+07 4.71E+07 4.71E-02 8.52E+04 0.00000 2.94E-04 0.00001 Sr-90 2.44E+05 1.66E+05 1.66E-04 7.39E+Ol 0.00000 3.38E-01 0.00006 TOTAL 0.0003 0.00869 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _1=2_ _ _ ft Area of Pipe Not Surveyed _ _ _1_.l-'-7_ _ _ m 2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (pCi) (mCi) (mCi) Inventory ( mrem/yr per mCi) mrem/yr Co-60 l.37E+08 2.53E+08 2.53E-01 2.25E+03 0.00011 I.I IE-02 0.00281 Cs-134 5.01E+05 9.26E+05 9.26E-04 1.56E+03 0.00000 l.60E-02 0.00001 Cs-137 3.66E+08 6.77E+08 6.77E-01 8.22E+02 0.00082 3.04E-02 0.02057 Ni-63 6.91E+o7 l.28E+08 l.28E-01 8.52E+04 0.00000 2.94E-04 0.00004 Sr-90 2.44E+05 4.51E+05 4.51E-04 7.39E+Ol 0.00001 3.38E-Ol 0.00015 TOTAL 0.0009 0.02359
[57]
FRSRELEASERECORD ~
ZIONSOLJ[!JQ!Y§ac
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A, Pipe H - Sign Test Classification _I_ Type I error 0.05 Number of Measurements 7
<*' c ** **oaQJriia R~sµlt : 1T9t~ ~ctiy!fy ~ ***SOF'.* .
- ,:*si~L:*
he..\.'.~ ,'>+'A>,**~* > .. **~
' ' /D * +e"\, ""
' ..i'.""
IJ;C* :'.>Pip~' .*.,. .;'cpC1/rn
. 7)>' , '.~'(ws)' '.
- Measureriient.r.:bcation\ ;:*' ;'!%
~,*, \ +i:t,, * ..,,,*,'. '*. "'.\' ".~7':;",~" ".'.,< .\~'"
2 2i.*"'
IS I.<'** ' '
' '; *. . (i:>Ciifu ) :' **.'.; ,*;
0 Section Hl to Sump A Position Zero 9.70E+08 l.10E+09 0.182 0.82 +l 1 Section Hl to Sump A Position 1 l.05E+09 1.19E+09 0.197 0.80 +l 2 Section Hl to Sump A Position 2 5.35E+08 6.09E+08 0.100 0.90 +l 3 Section Hl to Sump A Position 3 2.78E+08 3.16E+08 0.052 0.95 +l 4 Section Hl to Sump A Position 4 2.61E+08 2.97E+08 0.049 0.95 +l 5 Section Hl to Sump A Position 5 2.45E+08 2.79E+08 0.046 0 . 95 +l 6 Section Hl to Sump A Position 6 l.86E+08 2.12E+08 0.035 0.97 +l Number of positive differences (S+) 7 Critical Value 6 Survey Unit - - MEETS
- - - the Acceptance Criteria
[58]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=.
~-""-
SURVEY UNITS 05119A & 05119B E~sIT~;rGs.:~.~;;;;~:~6~.Li::!§J> x;-~iil!<i::!tt~i1\1~~¥~~~ii~~Jll~-~g;:l!~:J>a~:;~z;s1:'.'.~7~~'.';;s~:r.:}~~::r:-*:~::~:fil~~~'.,d;._:;~7!
Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit _ ___:.7.:.:.5c.::8.::.8___ m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _. .:.7.::.8_ _ _ ft Maximum SOF Observed ----=3c:.c.l:...:l-=-l7:____
2 Mean of Total Activity Results _ _.;. ;7."-9"'0E=-+.. .:0:.. :8_ _ (pCi/m )
Percentage of Allowable Inventory for Sign Test _ _. .:.0'"".5-'-48"-'o/c-'-o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) <men Inventory (rnrem/vr ner men mrem/yr Co-60 l.89E+08 l.43E+09 l.43E+OO 2.25E+03 0.00064 l.l IE-02 0.01591 Cs-134 6.91E+05 5.24E+06 5.24E-03 l.56E+03 0.00000 l.60E-02 0.00008 Cs-137 5.05E+08 3.83E+09 3.83E+OO 8.22E+02 0.00466 3.04E-02 0.11641 Ni-63 9.53E+07 7.23E+08 7.23E-OI 8.52E+04 0.00001 2.94E-04 0.00021 Sr-90 3.36E+05 2.55E+06 2.55E-03 7.39E+Ol 0.00003 3.38E-Ol 0.00086 TOTAL 0.0053 0.13347 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _.;:_2_ _ _ ft Area of Pipe Not Surveyed _ ___:::O.:. o.lc:.. 9_ _ _ m2 ROC, Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC foCi/m2 ) foCil <men <mCil Inventory ( rnrem/vr ner men mrem/vr Co-60 l.89E+08 l.47E+09 l.47E+OO 2.25E+03 0.00065 I.I IE-02 0.01632 Cs-134 6.91E+05 5.37E+06 5.37E-03 l.56E+03 0.00000 l.60E-02 0.00009 Cs-137 5.05E+08 3.93E+09 3.93E+OO 8.22E+02 0.00478 3.04E-02 0.11939 Ni-63 9.53E+07 7.42E+08 7.42E-Ol 8.52E+04 0.00001 2.94E-04 0.00022 Sr-90 3.36E+05 2.62E+06 2.62E-03 7.39E+Ol 0.00004 3.38E-Ol 0.00088 TOTAL 0.0055 0.13689
[59]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A, Pipe J - Sign Test Classification _1_ Type I error 0.05 Number of Measurements 78
'}>: . *. : ., . : .. . . .. *. ,*\>: . *.* ' ~all1Il1fl R~sl:iit *, *Tot~ Xctivhx::
I~;}#~*~ *~l~*e}.i~~vr~0~qt:;q{~ti~n , -*~ ::.l,*:.loi/rrt~).
Ii SOF V(\\r~ "~<S~s**** . \,,>~*.
- .** . "" "" " ,, ,.~" ~ ,. ' " " "
\l. "' "' .>~ '*~*.' '; '"" *' '
- ' .. :<( ~Ci!rifi!' . l;**"<:Ws):; .. *.* : . ,_,: *. lgtl'"
- \ ' ~ ' '
0 Section J4 to Sumo A Position Zero 9.07E+08 1.03E+09 1.307 (Q.31) -1 1 Section J4 to Sumo A Position 1 7;74E+08 8.81E+08 1.115 (0.12) -1 2 Section J4 to Sumo A Position 2 5.38E+08 6.12E+08 0.775 0.22 +l 3 Section J4 to Sump A Position 3 6.91E+08 7.86E+08 0.995 0.00 +l 4 Section J4 to Sump A Position 4 6.92E+08 7.87E+08 0.997 0.00 +1 5 Section J4 to Sump A Position 5 7.00E+08 7.96E+08 1.008 (0.01) -1 6 Section J4 to Sump A Position 6 6.54E+08 7.44E+08 0.942 0.06 +l 7 Section J4 to Sump A Position 7 5.10E+08 5.80E+08 0.735 0.27 +l 8 Section J4 to Sump A Position 8 4.32E+08 4.92E+08 0.622 0.38 +l 9 Section J4 to Sump A Position 9 5.30E+08 6.03E+08 0.764 0.24 +l 10 Section J4 to Sump A Position 10 4.95E+08 5.63E+08 0.713 0.29 +l 11 Section J4 to Sump A Position 11 4.62E+08 5.26E+08 0.666 0.33 +l 12 Section J4 to Sump A Position 12 4.73E+08 5.38E+08 0.681 0.32 +l 13 Section J4 to Sump A Position' 13 3.70E+08 4.21E+08 0.533 0.47 +l 14 Section J4 to Sump A Position 14 7.96E+08 9.06E+08
- l.147 (0.15). -1 15 Section J4 to Sump A Position 15 9.35E+08 1.06E+09 1.347 (0.35) -1 16 Section J4 to Sump A Position 16 8.14E+08 9.26E+08 1.173 (0.17) -1 17 Section J4 to Sump A Position 17 8.68E+08 9.88E+OS 1.250 (Q.25) -1 18 Section j4 to Sumo A Position 18 9.97E+08 1.13E+09 1.436 (0.44) -1 19 Section J4 to Sump A Position 19 9.23E+08 1.05E+09 1.330 (Q.33) -1 20 Section J4 to Sump A Position 20 l.01E+09 1.15E+09 1.455 (Q.46) -1 21 Section J4 to Sump A Position 21 l.05E+09 l.19E+09 1.513 (0.51) -1 22 Section J4 to Sump A Position 22 l.05E+09 l.19E+09 1.513 (Q.51) -1 23_ Section J4 fo Sump APosition 23 1.03E+09 1.17E+09 1.484 (Q.48) -1 24 Section J4 to Sump A Position 24 1.03E+09 1.17E+09 1.484 (Q.48) -1 25 Section J4 to Sump A Position 25 8.57E+08 9.75E+08 1.235 (0.23) -1 26 Section J4 to Sump A Position 26 9.93E+08 l.13E+09 'l.431 (0.43) -1 27 Section J4 to Sump A Position 27 .l.10E+09 1.25E+09 1.585 (0.58) -1 28 Section J4 to Sump A Position 28 l.05E+09 l.19E+09 1.513 (0.51) -1 29 Section J4 to Sump A Position 29 l.65E+09 1.88E+09 2.377 (1.38) -1 30 Section J4 to Sump A Position 30 l.64E+09 l.87E+09 2.363 (1.36) -1 31 Section J4 to Sump A Position 31 l.75E+09 l.99E+09 2.521 (1.52) -1 32 Section J4 to Sump A Position 32 l.70E+09 1.93E+09 2.449 (1.45) -1 33 Section J4 to Sump A Position 33 2.16E+09 2.46E+09 3.112 (2.11) -1 34 Section J4 to Sump A Position 34 2.12E+09 2.41E+09 3.054 (2.05) -1 35 Section J4 to Sump A Position 3S 2.09E+09 2.38E+09 3.011 (2.01) -1 36 Section J4 to Sump A Position 36 2.09E+09 2.38E+09 3.011 (2.01) -1 37 Section J4 to Sump A Position 37 2.00E+09 2.28E+09 2.881 ( 1.88) -1 38 Section J2 to JS Position Zero 4.09E+08 4.65E+08 . 0.589 0.41 +1 39 Section J2 to JS Position 1 2.18E+08 2.48E+08 0.314 0.69 +1 40 Section J2 to JS Position 2. l.84E+08 2.09E+08 0.265 0.73 +1 41 Section J2 to J5 Position 3 3.78E+08 4.30E+08 0.S45 0.46' +1 42 Section J2 to J5 Position 4 7.76E+08 8.83E+08 1.118 (0.12) -1 43 Section J2 to J5 Position 5 4.03E+08 4.59E+08 0.581 0.42 +l 44 Section J2 to J5 Position 6 4.84E+08 5.51E+08 0.697 0.30 +l 45 Section J2 to J5 Position 7 l.30E+08 l.48E+08 0.187 0.81 +l 46 Section J2 to JS Position 8 2.23E+08 2.54E+08 0.321 0.68 +l
[60]
FRSRELEASERECORD .~
ZlONSOL!l!!Q~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- Pipe Me,asurement Location 1-Ws. Sign*
I . . (o(;i/m2) * (oCi/m 2) (Ws) 47 Section J2 to J5 Position 9 l.97E+08 2.24E+08 0.284 0.72 +I 48 Section J2 to J5 Position I 0 l.89E+08 2.15E+08 0.272 0.73 +l 49 Section J2 to J5 Position 11 l.80E+08 2.05E+08 0.259 0.74 +l 50 Section J2 to J5 Position 12 l.77E+08 2.01E+08 0.255 0.75 +I 51 Section J2 to J5 Position 13 6.93E+07 7.88E+07 0.100 0.90 +I 52 Section J5 to Header Position Zero 6.77E+08 7.70E+08 0.975 0.02 +I 53 Section J5 to Header Position 1 5.65E+08 6.43E+08 0.814 0.19 +l 54 Section J5 to Header Position 2 4.37E+08 4.97E+08 0.630 0.37 +l 55 Section J5 to Header Position 3 3.75E+08 4.27E+08 0.540 0.46 +l 56 Section J5 to Header Position 4 4.91E+08 5.59E+08 0.707 0.29 +l 57 Section J5 to Header Position 5 5.09E+08 5.79E+08 0.733 0.27 +l 58 Section J5 to Header Position 6 4.49E+08 5.l 1E+08 0.647 0.35 +l 59 Section J5 to Header Position 7 5.45E+08 6.20E+08 0.785 0.21 +l 60 Section J5 to Header Position 8 4.56E+08 5.19E+08 0.657 0.34 +l 61 Section J5 to Header Position 9 6.16E+08 7.01E+08 0.887 0.11 +I 62 Section J5 to Header Position I 0 5.30E+08 6.03E+08 0.764 0.24 +I 63 Section J5 to Header Position 11 4.02E+08 4.57E+08 0.579 0.42 +l 64 Section J5 to Header Position 12 3.36E+08 3.82E+08 0.484 0.52 +l 65 Section J5 to Header Position 13 3.86E+08 4.39E+08 0.556 0.44 +l 66 Section J5 to Header Position 14 4.96E+08 5.64E+08 0.715 0.29 +l 67 Section J5 to Header Position 15 4.73E+08 5.38E+08 0.681 0.32 +l 68 Section J5 to Header Position 16 4.75E+08 5.40E+08 0.684 0.32 +I 69 Section J5 to Header Position 17 3.90E+08 4.44E+08 0.562 0.44 +l 70 Section J5 to Header Position 18 3.87E+08 4.40E+08 0.558 0.44 +l 71 Section J 5 to Header Position 19 3.75E+08 4.27E+08 0.540 0.46 +l 72 Section J5 to Header Position 20 3.15E+08 3.58E+08 0.454 0.55 +l 73 Section J5 to Header Position 21 1.14E+08 l.30E+08 0.164 0.84 +l 74 Section J5 to Header Position 22 7.56E+07 8.60E+07 0.109 0.89 +l 75 Section J5 to Header Position 23 7.25E+07 8.25E+07 0.104 0.90 +l 76 Section J5 to Header Position 24 l.27E+08 l.44E+08 0.183 0.82 +l 77 Section J5 to Header Position 25 l.21E+08 l .38E+08 0.174 0.83 +l Number of positive differences (S+) _ _5_0_ _
Critical Value _ _4_:_6:___
Survey Unit MEETS the Acceptance Criteria
[61]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLUTIONSuc=
Not'-V,i-..c.._.,
SURVEY UNITS 05 l l 9A & 051198 Surveyed Pipe - Calculation of Mean Activitv and Dose 2
Accessible Area of STS Unit ----=2.:::.5.=2;:_9___ m Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _. =2.::.6_ _ _ ft Maximum SOF Observed _ _--=.:1..::.08::.:3:.::5_ __
Mean of Total Activity Results --~1..::.82::.:E=-+....:Oc.:.9_ _ (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test ---'0'-".::.'-'-8:.::5.c..%'----
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) foCil <mCil <mCil Inventory (mrem/vr ner mCj) mrem/vr Co-60 3.03E+08 7.66E+08 7.66E-01 2.25E+03 0.00034 l.l IE-02 0.00850 Cs-134 5.79E+05 1.47E+06 l.47E-03 l.56E+03 0.00000 l.60E-02 0.00002 Cs-137 l.37E+09 3.46E+09 3.46E+OO 8.22E+02 0.00421 3.04E-02 0.10508 Ni-63 l.53E+08 3.87E+08 3.87E-01 '8.52E+04 0,00000 2.94E-04 0.00011 Sr-90 9.10E+05 2.30E+06 2.30E-03 7.39E+Ol 0.00003 3.38E-01 0.00078 TOTAL 0.0046 0.11450
[62]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump A. Pipe K - Sign Test Classification Type I error 0.05 Number of Measurements 26
~e~ult .::i:otal;~~nyicy,*,, 'i. SOF*
- ~!? ';p~~~~e~~~f~~~}1~1~01~*i{ *:~i::C.:,~* **~~*\~~ >:c6ailitna
- f~C; J' 2
- lffi ) *'**.
"' ; :*(oei1ill )**;*~ ~.(jts)'.S 'Cit~~*~: >\!~~,:,
2 0 Section Kl to Sump A Position Zero 2.12E+-09 2.32E+09 0.994 0.01 +l I Section Kl to Sump A Position I l.43E+09 l.56E+09 0.671 0.33 +l 2 Section Kl to Sump A Position 2 3.31E+08 3.61E+08 0.155 0.84 +I 3 Section Kl to Sump A Position 3 2.21E+08 2.41E+08 0.104 0.90 +l 4 Section Kl to Sump A Position 4 2.59E+08 2.83E+08 0.121 0.88 +I 5 Section Kl to Sump A Position 5 3.35E+08 3.66E+08 0.157 0.84 +l 6 Section Kl to Sump A Position 6 3.09E+08 3.37E+08 0.145 0.86 +I 7 Sump A to Section K2 Position Zero 2.31E+09 2.52E+09 1.084 (0.08) -1 8 Sump A to Section K2 Position 1 2.22E+09 2.42E+09 1.041 (0.04) -1 9 Sump A to Section K2 Position 2 2.14E+09 2.34E+09
- 1.004 (0.00) -1 10 Sump A to Section K2 Position 3 2.l 7E+09 2.37E+09 1.018 (0.02) -1 11 Sump A to Section K2 Position 4 2.11E+09 2.30E+09 0.990, 0.01 +l 12 Sump A to Section K2 Position 5 2.22E+09 2.42E+09 1.041 (0.04) -1 13 Sump A to Section K2 Position 6 2.12E+09 2.32E+09 0.994 0.01 +l 14 Sump A to Section K2 Position 7 2.12E+09 2.32E+09 0.994 0.01 +l 15 Sump A to Section K2 Position 8 l.98E+09 2.16E+09 0.929 0.07 +l 16 Sump A to Section K2 Position 9 2.02E+09 2.21E+09 0.947 0.05 +l 17 Sump A to Section K2 Position 10 2.06E+09 2.25E+09 0.966 0.03 +l 18 Sump A to Section K2 Position 11 2.12E+09 2.32E+09 0.994 0.01 +l 19 Sump A to Section K2 Position 12 2.16E+09 2.36E+09 1.013 (0.01) -1 20 Sump A to Section K2 Position 13 2.22E+09 2.42E+09 1.041 (0.04) -1 21 *Sump A to Section K2 Position 14 2.19E+09 2.39E+09 1.027 (0.03) -1 22 Sump A to Section K2 Position 15 l.98E+09 2.16E+09 0.929 0.07 +l 23 Sump A to Section K2 Position 16 l.92E+09 2.10E+09 0.901 0.10 +l 24 Sump A to Section K2 Position 17 l.70E+09 l.86E+09 0.797 0.20 +1 25 Sump A to Section K2 Position 18 6.52E+08 7.12E+08 0.306 0.69 +1 Number of positive differences (S+) 18 Critical Value 17 Survey Unit MEETS the Acceptance Criteria
[63]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLUTIONSuc=
,,,..--~
SURVEY UNITS 05119A & 051198 c-=:-: -__:=__ -. .: -~==-~ : slirilp_B,-PlilrA.(~~}nch FioorDnliii_Fs*iimmary!f]'~ey-Data:._-=--=7 ~-=--=-~=:=~~-:_:~=~-~~-=~==--=
Surveved Pipe - Calculation of Mean Activitv and Dose
=- ._ :
Accessible Area of STS Unit _ _ _ 13_.7_1_8_ _ _ m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _9_4_ _ _ ft Maximum SOF Observed 1.5763 Mean of Total Activity Results _ _ _ 1._34_E_+_0_9_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _1_.,_-6_4_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC loCi/m2 ) (oCi) (mCi) (mCi) Inventory (mrem/vr oer mCi) mrem/yr Co-60 7.23E+08 9.91E+09 9.91E+OO 2.25E+03 0.00441 l.l lE-02 0.11005 Cs-134 1.28E+07 l.75E+08 1.75E-01 1.56E+03 0.00011 1.60E-02 0.00280 Cs-137 2.16E+08 2.96E+09 2.96E+OO 8.22E+02 0.00360 3.04E-02 0.09002 Ni-63 3.72E+o8 5.10E+09 5.lOE+OO 8.52E+04 0.00006 2.94E-04 0.00150 Sr-90 l.37E+o7 1.88E+08 l.88E-01 7.39E+Ol 0.00255 3.38E-01 0.06362 TOTAL 0.0107 0.26799 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _4_3_ _ _ ft AreaofPipeNotSurveyed _ _ _ 6_.2_8_ _ _ m2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2) (oCi) (mCi) (mCi) Inventory ( mremlvr oer mCi) mrem/yr Co-60 7.23E+08 1.44E+10 1.44E+Ol 2.25E+03 0.00642 l.l lE-02 0.16039 Cs-134 l.28E+07 2.55E+08 2.55E-01 l.56E+03 0.00016 l.60E-02 0.00409 Cs-137 2.16E+08 4.32E+09 4.32E+OO 8.22E+02 0.00525 3.04E-02 0.13119 Ni-63 3.72E+08 7.43E+09 7.43E+OO 8.52E+04 0.00009 2.94E-04 0.00219 Sr-90 l.37E+07 2.74E+08 2.74E-01 7.39E+Ol 0.00371 3.38E-01 0.09272 TOTAL 0.0156 0.39058
[64]
FRSRELEASERECORD ~
ZIONSOL!!I!fl!J§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe A - Sign Test Classification l Type I error 0.05 Number of Measurements 94
- Pipe Measurement Location Gamma Result
- Total Activity (pCi/m2) (pCi/m2)
SOF (Ws) 1-ws* Sign 0 Section A2 to A I Position Zero - 8.92E+08 l.24E+09 0.710 0.29 +l I Section A2 to A 1 Position 1 8.41E+08 1.17E+09 0.670 0.33 +l 2 Section A2 to A 1 Position 2 8.62E+08 l.20E+09 0.686 0.31 +l 3 Section A2 to Al Position 3 8.94E+08 l.25E+09 0.712 0.29 +I 4 Section A2 to Al Position 4 8.76E+08 l.22E+09 0.697 0.30 +l 5 Section A2 to A 1 Position 5 8.76E+08 l.22E+09 0.697 0.30 +l 6 Section A2 to A 1 Position 6 9.57E+08 l.33E+09 0.762 0.24 +l 7 Section A2 to A 1 Position 7 9.05E+08 l.26E+09 0.720 0.28 +l 8 Section A2 to A 1 Position 8 9.05E+08 l.26E+09 0.720 0.28 +l 9 Section A2 to A 1 Position 9 9.02E+08 l.26E+09 0.718 0.28 +l 10 Section A2 to A 1 Position 10 8.81E+08 l.23E+09 0.701 0.30 +l 11 Section A2 to Al Position 11 9.27E+08 l.29E+09 0.738 0.26 +l 12 Section A2 to A 1 Position 12 9.39E+08 l.31E+09 0.748 0.25 +l 13 Section A2 to Al Position 13 9.42E+08 l.31E+09 0.750 0.25 +l 14 Section A2 to A 1 Position 14 9.58E+08 l.33E+09 0.763 0.24 +l 15 Section A2 to A 1 Position 15 9.58E+08 l.33E+09 0.763 0.24 +1 16 Sectfon A2 to A 1 Position 16. l.OOE+09 l.39E+09 0.796 0.20 +l 17 Section A2 to A 1 Position 17 l.01E+09 l.41E+09 0.804 0.20 +l 18 Section A2 to A 1 Position 18 L01E+09 l.41E+09 0.804 0.20 +I 19 Section A2 to A 1 Position 19 l.04E+09 l.45E+09 0.828 0.17 +l 20 Section A2 to A 1 Position 20 l.03E+09 l.43E+09 0.820 0.18 +l 21 Section A2 to A 1 Position 21 9.93E+08 l.38E+09 0.791 0.21 +l 22 Section A2 to A 1 Position 22 9.85E+08 l.37E+09 0.784 0.22 +l 23 Section A2 to Al Position 23 l.01E+09 l.41E+09 0.804 0.20 +l 24 Section A2 to A 1 Position 24 9.67E+08 l.35E+09
- 0.770 0.23 +l 25 Section A2 to A 1 Position 25 9.38E+08 l.31E+09 0.747 0.25 +l 26 Section A2 to A I Position 26 9.70E+08 l.35E+09 0.772 0.23 +l 27 Section A2 to A 1 Position 27 9.47E+08 l.32E+09 0.754 0.25 +l 28 Secti!m A2 to A 1 Position 28 9.45E+08 l.32E+09 0.752 0.25 +l 29 Section A2 to Al Position 29 9.55E+08 l.33E+09 0.760 0.24 +l 30 Section A2 to Al Position 30 9.57E+08 l.33E+09 0.762 0.24 +l 31 Section A2 to A 1 Position 31 l.OOE+09 l .39E+09 0.796 0.20 +1 32 Section A2 to Al Position 32 9.90E+08 l.38E+09 0.788 0.21 +1 33 Section A2 to Al Position 33 9.75E+08 l.36E+09 0.776 0.22 +1 34 Section A2 to A 1 Position 34 9.47E+08 l.32E+09 0.754 0.25 +1 35 Section A2 to Al Position 35 9.61E+08 l.34E+09 0.765 0.23 +l 36 Section A2 to Al Position 36 8.90E+08 1.24E+09 0.709 0.29 +1 37 Section A2 to Al Position 37 8.90E+08 l.24E+09 0.709 0.29 +1 38 Section A2 to Al Position 38 8.31E+08 l.16E+09 0.662 0.34 +l 39 Section A2 to Al Position 39 8.39E+08 l.17E+09 0.668 0.33 +l 40 Section A2 to A I Position 40 8.59E+08 l.20E+09 0.684 0.32 +I 41 Section A2 to A I Position 41 8.21E+08 1.14E+09 0.654 0.35 +1 42 Section A2 to Al Position 42 8.23E+08 1.15E+09 0.655 0.34 +1 43 Section A2 to Al Position 43 8.27E+08 l.15E+09 0.658 0.34 +l 44 Section A2 to Al Position 44 8.34E+08 1.16E+09 0.664 0.34 +1 45 Section A2 to A I Position 45 8.52E+08 l.19E+09 0.678 0.32 +l 46 Section A2 to A 1 Position 46 8.33E+08 l.16E+09 0.663 0.34 +l
[65]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity ,SOF
- Pipe Measurement Location 1-Ws Sign
' -< ' ' (pCi/m2) (pCi/m 2) (Ws) 47 Section A2 to Al Position 47 8.64E+08 l.20E+09 0.688 0.31 +l 48 Section A2 to Al Position 48 8.61E+08 l.20E+09 0.685 0.31 +l 49 Section A2 to A 1 Position 49 8.89E+08 l.24E+09 0.708 0.29 +l 50 Section A2 to Al Position 50 8.86E+08 l.23E+09 0.705 0.29 +l 51 Section A2 to A 1 Position 51 9.44E+08 1.31E+09 0.752 0.25 +1 52 Section A2 to A 1 Position 52 9.31E+08 l .30E+09 0.741 0.26 +l 53 Section A2 to Al Position 53 9.65E+08 1.34E+09 0.768 0.23 +l 54 Section A2 to Al Position 54 l.13E+09 l.57E+09 0.900 0.10 +l 55 Section A2 to Al Position 55 l.12E+09 l.56E+09 0.892 0.11 +l 56 Section A2toA1 Position 56 l.l1E+09 l.55E+09 0.884 0.12 +1 57 Section A2 to A 1 Position 57 l.09E+09 l.52E+09 0.868 0.13 +l 58 Section A2 to Al Position 58 9.73E+08 1.36E+09 0.775 0.23 +l 59 Section A2 to Al Position 59 9.29E+08 l.29E+09 0.740 0.26 +l 60 Section A2 to A 1 Position 60 8.27E+08 l.15E+09 0.658 0.34 +l 61 Section A2 to Al Position 61 8.78E+08 1.22E+09 0.699 0.30 +l 62 Section A2 to Al Position 62 9.18E+08 l.28E+09 0.731 0.27 +1 63 Section A2 to A 1 Position 63 9.81E+08 1.37E+09 0.781 0.22 +l 64 Section A2 to Al Position 64 9.75E+08 l.36E+09 0.776 0.22 +1 65 Section A2 to A 1 Position 65 8.86E+08 l.23E+09 0.705 0.29 +l 66 Section A2 to A 1 Position 66 9.75E+08 1.36E+09 0.776 0.22 +l 67 Section A2 to A 1 Position 67 l.09E+09 1.52E+09 0.868 0.13 +l 68 Section A2 to A 1 Position 68 l.06E+09 l.48E+09 0.844 0.16 +l 69 Section A2 to Al Position 69 l.08E+09 l.50E+09 0.860 0.14 +l 70 Section A2 to A 1 Position 70 l.17E+09 l.63E+09 0.931 0.07 +l 71 Section A2 to A 1 Position 71 l.06E+09 l.48E+09 0.844 0.16 +l 72 Section A2 to A 1 Position 72 l.06E+09 l.48E+09 0.844 0.16 +l 73 Section A2 to A 1 Position 73 9.42E+08 1.31E+09 0.750 0.25 +l 74 Section A2 to Al Position 74 9.12E+08 l.27E+09 0.726 0.27 +l 75 Section A2toA1 Position 75 8.02E+08 l.12E+09 0.638 0.36 +l 76 Section A2 to Al Position 76 8.27E+08 l.15E+09 0.658 0.34 +l 77 Section A2 to A 1 Position 77 9.56E+08 l.33E+09 0.761 0.24 +l 78 Section A2 to A 1 Position 78 l.02E+09 l.42E+09 0.812 0.19 +l 79 Section A2 to A 1 Position 79 l.03E+09 l.43E+09 0.820 0.18 +l 80 Section A2 to A 1 Position 80 7;50E+08 l.04E+09 0.597 0.40 +l 81 Section A2 to A 1 Position 81 l.57E+08 2.19E+08 0.125 0.88 +l 82 Section A2 to Al Position 82 l.18E+08 l.64E+08 0.094 0.91 +l 83 Section A2 to A 1 Position 83 9.56E+07 l.33E+08 0.076 0.92 +l 84 Section A2 to Al Position 84 7.90E+07 l.10E+08 0.063 0.94 +1 85 Section Al to Sump B Position Zero l.90E+09 2.65E+09 ' 1.513 (0.51) -1 86 Section Al to Sump B Position 1 l.91E+09 2.66E+09 1.521 (0.52) -1 87 Section A 1 to Sump B Position 2 l.88E+09 2.62E+09 1.497 (0.50) -1 88 Section Al to Sump B Position 3 l.91E+09 2.66E+09 1.521 (0.52) -1 89 Section A 1 to Sump B Position 4 l.85E+09 2.58E+09 1.473 (0.47) -1 90 Section Al to Sump B Position 5 l.98E+09 2.76E+09 1.576 (0.58) -1 91 Section A 1 to Sump B Position 6 l.33E+09 l.85E+09 1.059 (0.06) -1 92 Section A 1 to Sump B Position 7 5.01E+08 6.98E+08 0.399 0.60 +l 93 Section A 1 to Sump B Position 8 3.61E+08 5.03E+08 0.287 0.71 +l
[66]
FRS RELEASE RECORD ~
. =ZlON$OLJ!I!Q!:§=
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Number of positive differences (S+) _ _8_7_ _
Critical Value - - -
55 - -
Survey Unit MEETS the Acceptance Criteria
[67]
FRS RELEASE RECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 051198
~
=ZIONSOLUTIONSur=__ ~
*-*** -*----- -:~:-:_:-:.=_~~- --==~-=-::*su~pl!t.~111~~ (~:in])~j1oor-praiu)--- sum!Iiar-Yorsurveyfiaul*--*-::_*=-=:-::=:--=::~: *-~= =~-=-~::-:~ -~-=---*-:-*-:::;
Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit m2
- - -8.756 ----
Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _9_0_ _ _ ft Maximum SOF Observed -----'-'l."-50"-4'-"8_ __
Mean of Total Activity Results --"'l."""3""'-E""+...c0~9_ _ (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test _ _ _0_.8_4_0_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (pCi) (mCil (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 7.24E+08 6.34E+09 6.34E+OO 2.25E+03 0.00282 l.l lE-02 0.07038 Cs-134 5.0IE+06 4.38E+07 4.38E-02 l.56E+03 0.00003 l.60E-02 0.00070 Cs-137 2.IOE+08 l.84E+09 l.84E+OO 8.22E+02 0.00224 3.04E-02 0.05597 Ni-63 3.68E+o8 3.22E+09 3.22E+OO 8.52E+04 0.00004 2.94E-04 0.00095 Sr-90 4.79E+06 4.19E+07 4.19E-02 7.39E+Ol 0.00057 3.38E-01 0.01417 TOTAL 0.0057 0.14217 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _ _2_1_ _ _ ft Area of Pipe Not Surveyed _ _ _2_.0_4_ _ _ m2 ROC Mean Activity per Total Mean Total Mean BIL' for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (pCi) (mCi) (mCi) Inventory (rnrem/yr per mCi) mrem/yr Co-60 7.24E+08 7.82E+09 7.82E+OO 2.25E+03 0.00348 l.l IE-02 0.08680 Cs-134 5.0IE+06 5.41E+07 5.41E-02 l.56E+03 0.00003 l.60E-02 0.00086 Cs-137 2.10E+08 2.27E+09 2.27E+OO 8.22E+02 0.00276 3.04E-02 0.06903 Ni-63 3.68E+08 3.97E+09 3.97E+OO 8.52E+04 0.00005 2.94E-04 0.00117 Sr-90 4.79E+06 5.17E+07 5.17E-02 7.39E+Ol 0.00070 3.38E-01 0.01748 TOTAL 0.0070 0.17534
[68]
FRSRELEASERECORD ~
ZIONSOL!!IJ!l!J§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B. Pipe B - Sign Test Classification Type I error 0.05 Number of Measurements 90
- Pipe Measurement Location.* .. ,Gamma Result Total Activity SOF
- 1-Ws Sign' (pCi/m2) (pCi/m2 ) (Ws) 0 Section B5 to B4 Position Zero 4.06E+08 5.65E+08 0.325 0.68 +1 1 Section B5 to B4 Position 1 3.72E+08 5.18E+08 0.298 0.70 +l 2 Section B5 to B4 Position 2 3.61E+08 5.03E+08 0.289 0.71 +l 3 Section B5 to B4 Position 3 3.31E+08 4.61E+08 0.265 0.74 +1 4 Section B5 to B4 Position 4 2.84E+08 3.96E+08 0.227 0.77 +1 5 Section B5 to B4 Position 5 2.70E+08 3.76E+08 0.216 0.78 +l 6 Section B5 to B4 Position 6 2.70E+08 3.76E+08 0.216 0.78 +l 7 Section B5 to B4 Position 7 2.75E+08 3.83E+08 0.220 0.78 +l 8 Section B5 to B4 Position 8 2.52E+08 3.51E+08 0.202 0.80 +l 9 Section B5 to B4 Position 9 2.39E+08 3.33E+08 0.191 0.81 +1 10 Section B5 to B4 Position 10 2.65E+08 3.69E+08 0.212 0.79 +1 11 Section B5 to B4 Position 11 2.92E+08 4.07E+08 0.234 0.77 +1 12 Section B5 to B4 Position 12 3.14E+08 4.37E+08 0.251 0.75 +1 13 Section B5 to B4 Position 13 3.35E+08 4.67E+08 0.268 0.73 +1 14 Section B5 to B4 Position 14 3.78E+08 5.26E+08 0.303 0.70 +l 15 Section B5 to B4 Position 15 4.08E+08 5.68E+08 0.327 0.67 +l 16 Section B5 to B4 Position 16 4.07E+08
- 5.67E+08 0.326 0.67 +l 17 Section B5 to B4 Position 17 4.18E+08 5.82E+08 0.335 0.67 +1 18 Section B5 to B4 Position 18 2.47E+08 3.44E+08 0.198 0.80 +1 19 Section B5 to B4 Position 19 5.40E+07 7.52E+07 0.043 0.96 +l 20 Section B5 to B4 Position 20 3.43E+07 4.78E+07 0.027 0.97 +1 21 Section B3 to B2 Position Zero l.79E+09 2.49E+09 1.433 (0.43) -1 22 Section B3 to B2 Position 1 l.74E+09 2.42E+09 1.393 (0.39) -1 23 Section B3 to B2 Position 2 1.74E+09 2.42E+09 1.393 (0.39) -1 24 . Section B3 to B2 Position 3 l.72E+09 2.40E+09 1.377 (0.38) -1 25 Section B3 to B2 Position 4 l.72E+09 2.40E+09 1.377 (0.38) -1 26 Section B3 to B2 Position 5 l.86E+09 2.59E+09 1.489 (0.49) -1 27 Section B3 to B2 Position 6 l.88E+09 2.62E+09 1.505 (0.50) -1
. 28 Section B3 to B2 Position 7 l.80E+09 2.51E+09 1.441 (0.44) -1 29 Section B3 to B2 Position 8 l.72E+09 2.40E+09 1.377 (0.38) -1 30 Section B3 to B2 Position 9 l.71E+09 2.38E+09 1.369 (0.37) -1 31 Section B3 to B2 Position 10 l.69E+09 2.35E+09 1.353 (0.35) -1 32 Section B3 to B2 Position 11 l.72E+09 2.40E+09 1.377 (0.38) -1 33 Section B3 to B2 Position 12 l .57E+09 2.19E+09 1.257 (0.26) -1 34 Section B3 to B2 Position 13 l.72E+09 2.40E+09 1.377 (0.38) -1 35 Section B3 to B2 Position 14 l.50E+09 2.09E+09 1.201 (0.20) -1 36 Section B3 to B2 Position 15 l .52E+09 2.12E+09 1.217 (0.22) -1 37 Section B3 to B2 Position 16 l.52E+09 2.12E+09 .1.217 (0.22) -1 38 Section B3 to B2 Position 17 l.53E+09 2.13E+09 1.225 (0.22) -1 39 Section B3 to B2 Position 18 8.93E+08 1.24E+09 0.715 0.29 +1 40 Section B3 to B2 Position 19 3.65E+08 5.08E+08 0.292 0.71 +1 41 Section B3 to B2 Position 20 2.66E+08 3.70E+08 0.213 0.79 +l 42 Section B3 to B2 Position 21 6.33E+07 8.82E+07 0.051 0.95 +l 43 Section B2 to Bl Position Zero l.31E+09 l.82E+09 1.049 (0.05) -1 44 Section B2 to B 1 Position 1 l.07E+09 l.49E+09 0.856 0.14 +l 45 Section B2 to B 1 Position 2 l.15E+09 l.60E+09 0.920 0.08 +l 46 Section B2 to B 1 Position 3 l.14E+09 l.59E+09 0.912 0.09 +l
[69]
FRSRELEASERECORD ~
ZIONSOL!!I!Q!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Resu,lt Total Activity SOF
- Ripe Measurement Location 1-Ws Sign
,' (pCi/m 2) (pCi/m 2) , (Ws) 47 Section B2 to B 1 Position 4 l.20E+09 l.67E+09 0.960 0.04 +l 48 Section B2 to B 1 Position 5 l.25E+09 l.74E+09 1.000 (0.00) -1 49 Section B2 to B 1 Position 6 1.31E+09 l.82E+09 1.049 (0.05) -1 50 Section B2 to B 1 Position 7 l.19E+09 l.66E+09 0.952 0.05 +l 51 Section B2 to Bl Position 8 l.08E+09 l.50E+09 0.864 0.14 +l 52 Section B2 to BI Position 9 l.17E+09 l.63E+09 0.936 0.06 +1 53 Section B2 to B 1 Position I 0 l.18E+09 l.64E+09 0.944 0.06 +l 54 Section B2 to B 1 Position 11 l.29E+08 l.80E+08 0.103 0.90 +I 55 Section B2 to Bl Position 12 l.28E+08 1.78E+08 0.102 0.90 +l 56 Section B2 to B 1 Position 13 l.18E+09 1.64E+09 0.944 0.06 +l 57 Section B2 to B 1 Position 14 l.17E+09 l.63E+09 0.936 0.06 +I 58 Section B2 to B 1 Position 15 l.26E+09 l.75E+09 1.009 (0.01) -1 59 Section B2 to Bl Position 16 l.29E+09 l.80E+09 1.033 (0.03) -1 60 Section B2 to B 1 Position 17 1.37E+09 1.91E+09 1.097 (0.10) -1 61 Section B2 to B 1 Position 18 1.46E+09 2.03E+09 1.169 (0.17) -1 62 Section B2 to B 1 Position 19 , l.43E+09 l.99E+09 1.145 ' (0.14) -1 63 Section B2 to B 1 Position 20 l.41E+09 l.96E+09 1.129 (0.13) -1 64 Section B2 to Bl Position 21 l.38E+09 l.92E+09 1.105 (0.10) -1 65 Section B2 to BI Position 22 l.29E+09 l.80E+09 1.033 (0.03) -1 66 Section B2 to B 1 Position 23 l .23E+09 l.71E+09 0.984 0.02 +l 67 Section B2 to BI Position 24 l.22E+09 l.70E+09 0.976 0.02 +l 68 Section B2 to BI Position 25 l.21E+09 l.69E+09 0.968 O.Q3 +l 69 Section B2 to BI Position 26 l.30E+09 l.81E+09 1.041 (0.04) -1 70 Section B2 to B 1 Position 27 1.41E+09 l.96E+09 1.129 (0.13) -1 71 Section B2 to B 1 Position 28 l.27E+09 l.77E+09 1.017 (0.02) -1 72 Section B2 to B 1 Position 29 1.16E+09 l.62E+09 0.928 O.Q7 +I 73 Section B2 to Bl Position 30 8.92E+08 1.24E+09 0.714 0.29 +I 74 Section B2 to B 1 Position 31 5.75E+08 8.01E+08 0.460 0.54 +l 75 Section B2 to B 1 Position 32 2.97E+08 4.14E+08 0.238 0.76 +l 76 Section B2 to B 1 Position 33 3.68E+08 5.13E+08 0.295 0.71 +l 77 Section B2 to B 1 Position 34 3.14E+08 4.37E+08 0.251 0.75 +l 78 Section B 1 to Sump B Position Zero l.11E+09 l.55E+09 0.888 0.11 +I 79 Section B 1 to Sump B Position 1 1.05E+09 1.46E+09 0.840 0.16 +l 80 Section B 1 to Sump B Position 2 'l.03E+09 1.43E+09 0.824 0.18 +l 81 Section B 1 to Sump B Position 3 l.25E+09 l.74E+09 1.000 (0.00) -1 82 Section B 1 to Sump B Position 4 l.26E+09 1.75E+09 1.009 (0.01) -1 83 Section B 1 to Sump B Position 5 1.29E+09 l.80E+09 1.033 (0.03) -1 84 Section B 1 to Sump B Position 6 l.12E+09 l.56E+09 0.896 0.10 +l 85 Section B 1 to Sump B Position 7 1.41E+09 1.96E+09 1.129 (0.13) -1 86 Section B 1 to Sump B Position 8 1.09E+09 l.52E+09 0.872 0.13 +l 87 Section B 1 to Sump B Position 9 2.21E+08 3.08E+08 0.177 0.82 +l 88 Section Bl to Sump B Position 10 l.73E+08 2.41E+08 0.138 - 0.86 +l 89 Section B 1 to Sump B Position 11 1.71E+08 2.38E+08 0.137 0.86 +l Number of positive differences (S+) _ _5_4_ _
Critical Value - - -
Survey Unit MEETS the Acceptance Criteria
[70]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZlONSOLJl[!Ql'§iii=
SURVEY UNITS 05119A & 051198 L _:_~~~--=-,*--:-:-~~~--:=~-~ s~ml> B. Pip; c:.l~iilcliFloOrnnilii):SuiDD1iii:i~~~e;;n~1!1~---*~:=~~~---:=~==---~-:-- -~===*--~-~:~
Surveved Pipe- Calculation of Mean Activitv and Dose Accessible Area of STS Unit m2
- - -18.582 ----
Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _1_9_1_ _ _ ft Maximum SOF Observed 1.8662 Mean of Total Activity Results _ _l_.4_4_E_+0_9_ _ (pCilm2)
Percentage of Allowable Inventory for Sign Test ---'-l=.3-'-70'-'o/c-'-o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2) (oCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/vr Co-60 8.06E+o8 l.50E+l0 l.50E+Ol 2.25E+03 0.00666 l.l lE-02 0.16633 Cs-134 O.OOE+oO O.OOE+OO O.OOE+OO l.56E+03 0.00000 1.60E-02 0.00000 Cs-137 2.30E+08 4.28E+09 4.28E+OO 8.22E+02 0.00521 3.04E-02 0.13012 Ni-63 4.07E+o8 7.56E+09 7.56E+OO 8.52E+04 0.00009 2.94E-04 0.00222 Sr-90 l.53E+o5 2.85E+06 2.85E-03 7.39E+Ol 0.00004 3.38E-Ol 0.00096 TOTAL 0.0120 0.29963
[71]
FRSRELEASERECORD r:=-
ZIONSOL!!I!fl!':§*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe C - Sign Test Classification _l_ Type I error 0.05 Number of Measurements 191 GammaResult . Total Activity SOF
- , Pipe Measurem~nt* J:,9cation 1-Ws Sign.',
- . (pCi/in2) * (PCilm3) . (Ws} . ..
0 Section C8 to C7 Position 19 l.34E+08 l.87E+08 0.113 0.89 +l 1 Section C8 to C7 Position 18 9.32E+07 l.30E+08 0.079 0.92 +1 2 Section C8 to C7 Position 17 8.05E+07 l.12E+08 0.068 0.93 +l 3 Section C8 to C7 Position 16 2.10E+08 2.92E+08 0.177 0.82 +l 4 Section C8 to C7 Position 15 2.31E+08 3.22E+08 0.195 0.80 +l 5 Section C8 to C7 Position 14 l.69E+08 2.35E+08 0.143 0.86 +l 6 Section C8 to C7 Position 13 l.70E+08 2.37E+08 0.144 0.86 +1 7 Section C8 to C7 Position 12 l.74E+08 2.42E+08 0.147 0.85 +l 8 Section C8 to C7 Position 11 2.05E+08 2.86E+08 0.173 0.83 +l 9 Section C8 to C7 Position 10 2.03E+08 2.83E+08 0.171 0.83 +l 10 Section C8 to C7 Position 9 2.14E+08 2.98E+08 0.181 0.82 +l 11 Section C8 to C7 Position 8 2.l 7E+08 3.02E+08 0.183 0.82 +1 12 Section C8 to C7 Position 7 2.32E+08 3.23E+08 0.196 0.80 +I 13 Section C8 to C7 Position 6 2.28E+08 3.18E+08 0.193 0.81 +I 14 Section C8 to C7 Position 5 2.34E+08. 3.26E+08 0.198 0.80 +I 15 Section C8 to C7 Position 4 2.48E+08 3.45E+08 0.209 0.79 +l 16 Section C8 to C7 Position 3 2.75E+08 3.83E+08 0.232 0.77 +I 17 Section C8 to C7 Position 2 2.91E+08 4.05E+08 0.246 0.75 +l 18 Section C8 to C7 Position 1 2.19E+08 3.05E+08 0.185 0.82 +l 19 Section C8 to C7 Position 0 2.41E+08 3.36E+08 0.204 0.80 +I 20 Section C7 to C5 Position 26 8.56E+08 l.19E+09 0.723 0.28 +l 21 Section C7 to C5 Position 25 7.65E+08 l.07E+09 0.646 0.35 +I 22 Section C7 to C5 Position 24 9.55E+08 l .33E+09 0.806 0.19 +I 23 Section C7 to C5 Position 23 l.02E+09 I .42E+09 0.861 0.14 +l 24 Section C7 to C5 Position 22 8.86E+08 l.23E+09 0.748 0.25 +l 25 Section C7 to C5 Position 21 9.74E+08 l.36E+09 0.822 0.18 +I 26 Section C7 to C5 Position 20 9.16E+08 l.28E+09 0.774 0.23 +I 27 Section C7 to C5 Position 19 8.58E+08 1.19E+09 0.725 0.28 +l 28 Section C7 to C5 Position 18 8.75E+08 l.22E+09 0.739 0.26 +l 29 Section C7 to C5 Position 17 9.31E+08 l.30E+09 0.786 0.21 +l 30 Section C7 to C5 Position 16 l.IOE+09 l.53E+09 0.929 0.07 +l 31 Section C7 to C5 Position 15 l.02E+09 I .42E+09 0.861 0.14 +I 32 Section C7 to C5 Position 14 9.l 7E+08 l.28E+09 0.774 0.23 +l 33 Section C7 to C5 Position 13 7.96E+08 l.l 1E+09 0.672 0.33 +I 34 Section C7 to C5 Position 12 7.12E+08 9.92E+08 0.601 0.40 +I 35 Section C7 to C5 Position 11 6.65E+08 9.26E+08 0.562 0.44 +l 36 Section C7 to C5 Position 10 5.92E+08 8.24E+08 0.500 0.50 +l 37 Section C7 to C5 Position 9 4.86E+08 6.77E+08 0.410 0.59 +l 38 Section C7 to C5 Position 8 5.34E+08 7.44E+08 0.451 0.55 +I 39 Section C7 to C5 Position 7 5.52E+08 7.69E+08 0.466 0.53 +l 40 Section C7 to C5 Position 6 5.48E+08 7.63E+08 0.463 0.54 +I 41 Section C7 to C5 Position 5 5.45E+08 7.59E+08 0.460 0.54 +l 42 Section C7 to C5 Position 4 5.00E+08 6.96E+08 0.422 0.58 +l 43 Section C7 to C5 Position 3 4.60E+08 6.41E+08 0.388 0.61 +l 44 Section C7 to C5 Position 2 4.39E+08 6.l 1E+08 0.371 0.63 +l 45 Section C7 to C5 Position 1 2.04E+08 2.84E+08 0.172 0.83 +l 46 Section C7 to C5 Position 0 l.57E+08 2.19E+08 0.133 0.87 +l
[72]
FRSRELEASERECORD ~
ZIONSOLJ!I!!lt§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
- . :~*.*, . . . ,, *** \ *.* .*.J e:*'c:* .). **
. . * .* * .Gamfua-Resulf.
J>iRe., M~ureme1;1tI.:ocatio11
.... ., . , '\-'. : :~ **, *'
- aicii1ll1~)
47 Section C6 to C5 Position 21 4.10E+07 5.71E+07 0.035 0.97 +l 48 Section C6 to C5 Position 20 2.80E+07 3.90E+07 0.024 0.98 +1 49 Section C6 to C5 Position 19 2.90E+08 4.04E+08 0.245 0.76 +1 50 Section C6 to C5 Position 18 l.73E+08 2.41E+08 0.146 0.85 +1 51 Section C6 to C5 Position 17 l.79E+08 2.49E+08 0.151 0.85 +1 52 Section C6 to C5 Position 16 l.19E+08 l.66E+08 0.100 0.90 +1 53 Section C6 to C5 Position 15 l.58E+08 2.20E+08 0.133 0.87 +l 54 Section C6 to C5 Position 14 4.57E+08 6.36E+08 0.386 0.61 +1 55 Section C6 to C5 Position 13 8.33E+08 1.16E+09 0.703 0.30 +I 56 Section C6 to C5 Position 12 7.74E+08 l.08E+09 0.654 0.35 +i 57 Section C6 to C5 Position 11 6.36E+08 8.86E+08 0.537 0.46 +1 58 Section C6 to C5 Position 10 6.30E+08 8.77E+08 0.532 0.47 +I 59 Section C6 to C5 Position 9 l.10E+09 l.53E+09 0.929 0.07 +l 60 Section C6 to C5 Position 8 7.42E+08 l.03E+09 0.627 0.37 +I 61 Section C6 to C5 Position 7 4.86E+08 6.77E+08 0.410 0.59 +I 62 Section C6 to C5 Position 6 4.94E+08 6.88E+08 0.417 0.58 +I 63 Section C6 to C5 Position 5 6.59E+08 9.18E+08 0.556 0.44 +I 64 Section C6 to C5 Position 4 5.l 1E+08 7.12E+08 0.432 0.57 +I 65 Section C6 to C5 Position 3 3.38E+08 4.71E+08 0.285 0.71 +1 66 Section C6 to C5 Position 2 4.06E+08 5.65E+08 0.343 0.66 +1 67 Section C6 to C5 Position 1 4.73E+08 6.59E+08 0.399 0.60 +1 68 Section C6 to C5 Position 0 5.62E+08 7.83E+08 0.475 0.53 +1 69 Section C5 to C4 Position 25 9.15E+07 1.27E+08 0.077 0.92 +l 70 Section C5 to C4 Position 24 l.68E+08 2.34E+08 0.142 0.86 +I 71 Section C5 to C4 Position 23 7.29E+08 l.02E+09 0.616 0.38 +I 72 Section C5 to C4 Position 22 7.31E+08 l.02E+09 0.617 0.38 +I 73 Section C5 to C4 Position 21 7.79E+08 1.08E+09 0.658 0.34 +l.
74 Section C5 to C4 Position 20 7.24E+08 1.01E+09 0.611 0.39 +1 75 Section C5 to C4 Position 19 8.62E+08 l.20E+09 0.728 0.27 +I 76 Section C5 to C4 Position 18 7.90E+08 l.10E+09 0.667 0.33 +I 77 Section C5 to C4 Position 17 9.13E+08 1.27E+09 0.771 0.23 +I 78 Section C5 to C4 Position 16 9.70E+08 l.35E+09 0.819 0.18 +I 79 Section C5 to C4 Position 15 6.81E+08 9.48E+08 0.575 0.42 +1 80 Section C5 to C4 Position 14 5.98E+08 8.33E+08 0.505 0.50 +1 81 Section C5 to C4 Position 13 6.54E+08 9.l 1E+08 0.552 0.45 +1 82 Section C5 to C4 Position 12 6.86E+08 9.55E+08 0.579 0.42 +1 83 Section C5 to C4 Position 11 7.55E+08 l.05E+09 0.638 0.36 +1 84 Section C5 to C4 Position 10 8.12E+08 l.13E+09 0.686 0.31 +I 85 Section C5 to C4 Position 9 8.36E+08 l.16E+09 0.706 0.29 +I 86 Section C5 to C4 Position 8 8.32E+08 l.16E+09 0.703 0.30 +l 87 Section C5 to C4 Position 7 9.60E+08 l.34E+09 0.811 0.19 +l 88 Section C5 to C4 Position 6 l.03E+09 l.43E+09 0.870 0.13 +I 89 Section C5 to C4 Position 5 1.10E+09 l.53E+09 0.929 0.07 +l 90 Section C5 to C4 Position 4 l.19E+09 l.66E+09 1.005 (0.00) -1 91 Section C5 to C4 Position 3 l.06E+09 l.48E+09 0.895 0.10 +1 92 Section C5 to C4 Position 2 l.21E+09 l.69E+09 1.022 (0.02) -1 93 Section C5 to C4 Position 1 l.26E+09 l.75E+09 1.064 (0.06) -1 94 Section C5 to C4 Position 0 l.24E+09 l.73E+09 1.047 (0.05) -1 95 Section C4 to C3 Position 19 6.14E+07 8.55E+07 0.052 0.95 +1 96 Section C4 to C3 Position 18 8.70E+07 l.21E+08 0.073 0.93 +1
[73]
FRSRELEASERECORD ~
ZIONSOLJ/If!lt§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
.:r~p~ M~~µt~rl;~~:~t~~~~tjl f'(#.:,: ..
- Garrufia.Resuli . i.TotaJ1A:.9tivity * .JS()F . Sign .
.* .~... .. **.' (0Ci1~2) ** , * * .. cbc!/fu~):. .. *'(\Vs)'. . .. ]-.\\'.$
97 Section C4 to C3 Position 17 7.56E+08 l.05E+09 0.638 0.36 +l 98 Section C4 to C3 Position 16 8.71E+08 l.21E+09 0.736 0.26 +l 99 Section C4 to C3 Position 15 l.55E+09 2.16E+09 1.309 (0.31) -1 100 Section C4 to C3 Position 14 l.15E+09 1.60E+09 0.971 0.03 +l 101 Section C4 to C3 Position 13 8.07E+08 1.12E+09 0.681 0.32 +l 102 Section C4 to C3 Position 12 l.22E+09 1.70E+09 1.030 (0.03) -1 103 Section C4 to C3 Position 11 l.37E+09 l.91E+09 1.157 (0.16) -1 104 Section C4 to C3 Position 10 l.22E+09 l.70E+09 1.030 (0.03) -1 105 Section C4 to C3 Position 9 l.44E+09 2.01E+09 1.216 (0.22) -1 106 Section C4 to C3 Position 8 l.46E+09 2.03E+09 1.233 (0.23) -1 107 Section C4 to C3 Position 7 l.43E+09 l.99E+09 1.208 (0.21) -1 108 Section C4 to C3 Position 6 J.41E+09 1.96E+09 1.191 (0.19) -1 109 Section C4 to C3 Position 5 l.42E+09 L98E+09 1.199 (0.20) -1 110 Section C4 to C3 Position 4 1.52E+09 2.12E+09 1.284 (0.28) -1 111 Section C4 to C3 Position 3 l.43E+09 1.99E+09 1.208 (0.21) -1 112 Section C4 to C3 Position 2 l.43E+09 1.99E+09 1.208 (0.21) -1 113 Section C4 to C3 Position 1 1.54E+09 2.14E+09 1.300 (0.30) -1 114 Section C4 to C3 Position 0 l.67E+09 2.33E+09 1.410 (0.41) -1 115 Section C3 to C2 Position 24 9.77E+07 l.36E+08 0.083 0.92 +l 116 Section C3 to C2 Position 23 1.22E+08 1.70E+08 0.103 0.90 +l 117 Section C3 to C2 Position22 7.73E+08 1.08E+09 0.653 0.35 +l 118 Section C3 to C2 Position 21 l.40E+09 1.95E+09 1.182 (0.18) -1 119 Section C3 to C2 Position 20 l.37E+09 1.91E+09 1.157 (0.16) -1 120 Section C3 to C2 Position 19 l.34E+09 1.87E+09 1.132 (0.13) -1 121 Section C3 to C2 Position 18 1.27E+09 l.77E+09 1.072 (0.07) -1 122 Section C3 to C2 Position 17 l.22E+09 l.70E+09 1.030 (0.03) -1 123 Section C3 to C2 Position 16 l.26E+09 1.75E+09 1.064 (0.06) -1 124 Section C3 to C2 Position 15 l.22E+09 l.70E+09 1.030 (0.03) -1 125. Section C3 to C2 Position 14 l.18E+09 l.64E+09 0.996 0.00 +1 126 Section C3 to C2 Position 13 1.09E+09 l.52E+09 0.920 0.08 +1 127 Section C3 to C2 Position 12 1.41E+09 1.96E+09 1.191 (0.19) -1 128 Section C3 to C2 Position 11 l.32E+09 l.84E+09 1.115 (0.11) -1 129 Section C3 to C2 Position 10 l.21E+09 1.69E+09 1.022 (0.02) -1 130 Section C3 to C2 Position 9 1.25E+09 l.74E+09 1.056 (0.06) -1 131 Section C3 to C2 Position 8 l.42E+09 l.98E+09 1.199 (0.20) -1 132 Section C3 to C2 Position 7 l.24E+09 1.73E+09 1.047 (0.05) -1 133 Section C3 to C2 Position 6 l.28E+09 1.78E+09 1.081 (0.08) -1 134 Section C3 to C2 Position 5 l.23E+09 1.71E+09 1.039 (0.04) -1 135 Section C3 to C2 Position 4 l.39E+09 1.94E+09 1.174 (0.17) -1 136 Section C3 to C2 Position 3 l.39E+09 1.94E+09 1.174 (0.17) -1 137 Section C3 to C2 Position 2 l.31E+09 1.82E+09 1.106 (0.11) -1 138 Section C3 to C2 Position 1 1.29E+09 1.80E+09 1.089 (0.09) -1 139 Section C3 to C2 Position 0 1.45E+09 2.02E+09 1.224 (0.22) -1 140 Section C2 to Cl Position 17 9.44E+07 l.31E+08 0.080 0.92 +l 141 Section C2 to C 1 Position 16 l.03E+08 l.43E+08 0.087 0.91 +l 142 Section C2 to Cl Position 15 5.39E+08 7.51E+08 0.455 0.54 +1 143 Section C2 to Cl Position 14 l.68E+09 2.34E+09 1.419 (0.42) -1 144 Section C2 to Cl Position 13 l.39E+09 l.94E+09 1.174 (0.17) -1 145 Section C2 to Cl Position 12 l.38E+09 1.92E+09 1.165 (0.17) -1 146 Section C2 to C 1 Position 11 l.40E+09 1.95E+09 1.182 (0.18) -1
[74]
FRSRELEASERECORD ~
ZlONSOL!f]'lfl!YJ'
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
.". .. .. **.. **:** , (}ainll1a Result [.:;Total Acti~fr~:~ ***sop.:: ****. . . * *I
'~i~~-~~~~urem~h~ £~~afion~~~* ** .. *' ; ';
- foeViri~r . ** '(i>Cilm~r.* *. i*(w~{ 1*,: t-ws" * ;, .$i~**.
u ,, "'
147 Section C2 to Cl Position 10 1A2E+09 l.98E+09 1.199 (0.20) -1 148 Section C2 to Cl Position 9 l.47E+09 2.05E+09 1.241 (0.24) -1 149 Section C2 to Cl Position 8 l.33E+09 l.85E+09 1.123 (0.12) -1 150 Section C2 to Cl Position 7 1.42E+09 l.98E+09 1.199 (020) -1 151 Section C2 to Cl Position 6 l.41E+09 l.96E+09 1.191 (0.19) -1 152 Section C2 to Cl Position 5 .* l.54E+09 2.14E+09 1.300 (0.30) -1 153 Section C2 to Cl Position 4 l.46E+09 2.03E+09 1.233 (0.23) -1 154 Section C2 to Cl Position 3 l.53E+09 2.13E+09 1.292 (0.29) -1 155 Section C2 to Cl Position 2 l.53E+09 2.13E+09 1.292 (0.29) -1 156 Section C2 to C 1 Position 1 l.63E+09 2.27E+09 1.376 (0.38) ' -1 157 Section C2 to Cl Position 0 l.61E+09 2.24E+09 1.360 (0.36) -1 158 Section Cl to Sump B Position 32 7.86E+08 l.09E+09 0.664 0.34 +l 159 Section Cl to Sump B Position 31 9.50E+08 1.32E+09 0.802 0.20 +l 160 Section Cl to Sump B Position 30 l.16E+09 1.62E+09 0.980 0.02 +l 161 Section Cl to Sump B Position 29 l.91E+09 2.66E+09 1.613 (0.61) -1 162 Section Cl to Sump B Position 28 1.95E+09 2.72E+09 1.647 (0.65) -1 163 Section Cl to Sump B Position 27 l.99E+09 2.77E+09 1.680 (0.68) -1 164 Section Cl to Sump B Position 26 2.06E+09 2.87E+09 1.740 (0.74) -1 165 Section Cl to Sump B Position 25 2.05E+09 2.86E+09 1.731 (0.73) -1 166 Section Cl to Sump B Position 24 2.06E+09 2.87E+09 1.740 (0.74) -1 167 Section Cl to Sump B Position 23 2.03E+09 2.83E+09 1.714 (0.71) -1 168 Section Cl to Sump B Position 22 2.05E+09 2.86E+09 1.731 (0.73) -1 169 Section Cl to Sump B Position 21 2.08E+09 2.90E+09 1.756 (0.76) -1 170 Section Cl to Sump B Position 20 2.10E+09 2.92E+09 1.773 (0.77) -1 171 Section Cl to Sump B Position 19 2.10E+09 2.92E+09 1.773 (0.77) -1 172 Section Cl to Sump B Position 18 2.l 1E+09 2.94E+09 1.782 (0.78) -1 173 Section Cl to Sump B Position 17 2.16E+09 3.01E+09 1.824 (0.82) -1 174 Section Cl to Sump B Position 16 2.13E+09 2.97E+09 1.799 (0.80) -1 175 Section Cl to Sump B Position 15 2.16E+09 3.01E+09 1.824 (0.82) -1 176 Section Cl to Sump B Position 14 2.13E+09 2.97E+09 1.799 (0.80) -1 177 Section Cl to Sump B Position 13 2.17E+09 3.02E+09 1.832 (0.83) -1 178 Section Cl to Sump B Position 12 2.20E+09 3.06E+09 1.858 (0.86) -1 179 Section Cl to Sump B Position 11 2.19E+09 3.05E+09 1.849 (0.85) -1 180 Section Cl to Sump B Position 10 2.l 7E+09 3.02E+09 1.832 (0.83) -1 181 Section Cl to Sump B Position 9 2.16E+09 3.01E+09 1.824 (0.82) -1 182 Section Cl to Sump B Position 8 2.18E+09 3.04E+09 1.841 (0.84) -1 183 Section Cl to Sump B Position 7 2.21E+09 3.08E+09 1.866 (0.87) -1 184. Section Cl to Sump B Position 6 2.21E+09 3.08E+09 1.866 (0.87) -1 185 Section Cl to Sump B Position 5 2.20E+09 3.06E+09 1.858 (0.86) -1 186 Section Cl to Sump B Position 4 2.20E+09 3.06E+09 1.858 (0.86) -1 187 Section Cl to Sump B Position 3 2.20E+09 3.06E+09 1.858 (0.86) -1 188 Section Cl to Sump B Position 2 2.18E+09 3.04E+09 1.841 (0.84) -1 189 Section Cl to Sump B Position 1 2.18E+09 3.04E+09 1.841 (0.84) -1 190 Section Cl to Sump B Position 0 2.21E+09 3.08E+09 1.866 (0.87) -1 Number of positive differences (S+) _ _1_0_8_ _
Critical Value - -107 ---
Survey Unit MEETS the Acceptance Criteria
[75]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
- ""--~
SURVEY UNITS 05I I9A & 05I 198 L __:.._- . --= **~-=*---= :_..=:* ___..:.::L=-~--~~um~Ji:Pipe D(4,:~~_!I_oiir_~~int_§:~~~ry ~~~Q~:!>ata-=-~-=---~ '___::_:.-::== -~~-=~;:.~~---
. Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit --~4~.9~62_ _ _ m 2
Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _ 5_1_ _ _ ft Maximum SOF Observed 1.8448 Mean of Total Activity Results _ _6_._39_E_+_0_8_ _ (pCi/m2 )
Percentage of Allowable Inventory for Sign Test _ _ _0_.2_4_6_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) (mCi) Inventory (mrem/vr oer mCi) mrem/vr Co-60 3.57E+08 l.77E+09 l.77E+OO 2.25E+03 0.00079 l.l IE-02 0.01966 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 1.60E-02 0.00000 Cs-137 l.02E+08 5.06E+08 5.06E-Ol 8.22E+02 0.00062 3.04E-02 0.01538 Ni-63 1.80E+08 8.94E+08 8.94E-Ol 8.52E+04 0.00001 2.94E-04 0.00026 Sr-90 6.79E+04 3.37E+05 3.37E-04 7.39E+Ol 0.00000 3.38E-Ol 0.00011 TOTAL 0.0014 0.03541 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _ _ 3_0_ _ _ ft Area of Pipe Not Surveyed _ _ _2_.9_2_ _ _ m2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (oCi) (mCi) (mCi) Inventory ( mrem/vr oer mCi) mrem/vr Co-60 3.57E+08 2.81E+09 2.81E+OO 2.25E+03 0.00125 l.l IE-02 0.03122 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02. 0.00000 Cs-137 1.02E+08 8.03E+08 8.03E-Ol 8.22E+02 0.00098 3.04E-02 0.02442 Ni-63 l.80E+08 l.42E+09 1.42E+OO 8.52E+04 0.00002 2.94E-04 0.00042 Sr-90 6.79E+04 5.35E+05 5.35E-04 7.39E+Ol 0.00001 3.38E-Ol 0.00018 TOTAL 0.0023 0.05624
[76]
FRSRELEASERECORD ~
ZIONSOL!!J1Q!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe D - Sign Test Classification _I_ Type I error 0.05 Number of Measurements 51 Gamma Result 'Total Activity SOF*.
- *Pipe Measurement Location '+Ws Sign
., . ,, . * " . * <c:t \; .* ' ', . JpCilm2) ( pQi/m.2) . "(Ws) ,. *.
0 Section D4 to DI Position 0 6.I9E+08 8.62E+08 1.235 (0.23) -I I Section D4 to D 1 Position I 6.0IE+08 8.37E+08 I.199 (0.20) -1 2 Section D4 to DI Position 2 5.37E+08 7.48E+08 1.071 (0.07) -I 3 Section D4 to DI Position 3 5.25E+08 7.31E+08 1.047 (0.05) -I 4 Section D4 to DI Position 4 5.25E+08 7.31E+08 1.047 (0.05) -I 5 Section D4 to D 1 Position 5 5.00E+08 6.96E+08 0.997 0.00 +I 6 Section D4 to DI Position 6 4.35E+08 6.06E+08 0.868 0.13 +I 7 Section D4 to DI Position 7 4.02E+08 5.60E+08 0.802 0.20 +I 8 Section D4 to DI Position 8 3.93E+08 5.47E+08 0.784 0.22 +I 9 Section D4 to DI Position 9 4.09E+08 5.70E+08 0.8I6 0.18 +I IO Section D4 to DI Position I 0 7.62E+08 l.06E+09 I.520 (0.52) -I II Section D4 to DI Position I I 6.93E+08 9.65E+08 1.382 (0.38) -I I2 Section D4 to DI Position I2 6.14E+08 8.55E+08 1.225 (0.22) -I 13 Section D4 to DI Position I 3 5.25.E+08 7.31E+08 1.047 (0.05) -I I4 Section D4 to DI Position I 4 4.38E+08 6.10E+08 0.874 0.13 +I I5 Section D4 to DI Position 15 7.09E+08 9.87E+08 l.4I4 (0.41) -I I6 Section D4 to DI Position I6 7.30E+08 l.02E+09 I.456 (0.46) -I I7 Section D4 to DI Position I7 7.56E+08 l.05E+09 1.508 (0.5 I) -I I8 Section D4 to DI Position I 8 9.25E+08 I.29E+09 1.845 (0.84) -I I9 Section D4 to DI Position I 9 6.09E+08 8.48E+08 l.2I5 (0.21) -I 20 Section DI to Sump B Position Zero 4.24E+08 5.90E+08 0.846 0.15 +r 2I Section DI to Sump B Position I 3.88E+08 5.40E+08 0.774 0.23 +l 22 Section DI to Sump B Position 2 *3.58E+08 4.99E+08 0.7I4 0.29 +l 23 Section DI to Sump B Position 3 3.12E+08 4.35E+08 0.622 0.38 +I 24 Section DI to Sump B Position 4 3.58E+08 4.99E+08 0.7I4 0.29 +I 25 Section DI to Sump B Position 5 3.12E+08 4.35E+08 0.622 0.38 +I 26 Section DI to Sump B Position 6 2.79E+08 3.89E+08 0.556 0.44 +I 27 Section DI to Sump B Position 7 3.42E+08 4.76E+08 0.682 0.32 +l 28 Section DI to Sump B Position 8 4.24E+08 5.90E+08 0.846 0.15 +I 29 Section DI to Sump B Position 9 3.77E+08 5.25E+08 0.752 0.25 +I 30 Section DI to Sump B Position IO 3.53E+08 4.92E+08 0.704 0.30 +I 3I Section DI to Sump B Position I I 4.60E+08 6.41E+08 0.9I7 0.08 +I 32 Section Dl to Sump B Position I2 4.02E+08 5.60E+08 0.802 0.20 +I 33 Section D 1 to Sump B Position 13 3.80E+08 5.29E+08 0.758 0.24 +I 34 Section DI to Sump B Position I 4 3.52E+08 4.90E+08 0.702 0.30 +I 35 Section DI to Sump B Position I5 2.42E+08 3.37E+08 0.483 0.52 +l 36 Section DI to Sump B Position I 6 4.96E+08 6.91E+08 0.989 O.OI +l 37 Section DI to Sump B Position I 7 5.03E+08 7.0IE+08 1.003 (0.00) -I 38 Section D2 to Header Position Zero 5.77E+08 8.04E+08 1.151 (0.15) -I 39 Section D2 to Header Position I 5.38E+08 7.49E+08 I.073 (0.07) -I 40 Section D2 to Header Position 2 5.13E+08 7.14E+08 1.023 (0.02) -I 4I Section D2 to Header Position 3 4.53E+08 6.31E+08 0.903 0.10 +I 42 Section D2 to Header Position 4 3.65E+08 5.08E+08 0.728 0.27 +1 43 Section D2 to Header Position 5 3.99E+08 5.56E+08 0.796 0.20 +I 44 Section D2 to Header Position 6 5.22E+08 7.27E+08 1.041 (0.04) -1 45 Section D2 to Header Position 7 4.55E+08 6.34E+08 0.907 0.09 +1 46 Section D2 to Header Position 8 3.91E+08 5.45E+08 0.780 0.22 +l
[77]
FRS RELEASE RECORD ~
ZIONSOLJ!I.!Q~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- Pipe Measurement Location 1-Ws Sign.
(oCi/m2) (oCi/m2) (Ws) 47 Section D2 to Header Position 9 2.95E+08 4.l 1E+08 0.588 0.41 +l 48 Section 02 to Header Position 10 3.12E+08 4.35E+08 0.622 0.38 +l 49 Section D2 to Header Position 11 8.41E+07 l.17E+08 0.168 0.83 +l 50 Section D2 to Header Position 12 2.71E+07 3.77E+07 0.054 0.95 +l Number of positive differences (S+) _ _3_2_ _
Critical Value - - -
Survey Unit MEETS the Acceptance Criteria ,
[78]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
SURVEY UNITS 05119A & 051198 ~--°"""
r::-~==-: ~:2~~.:.. ,~ __:--:~ * ..*.'_:__:'.~=Sump B, Pipe E(4-lD~h F1~prn~2:-Jl_~ii.~'?! Sun:~ Data Surveved Pipe - Calculation of Mean Activitv and Dose
- ~--:_ *
- C._: ~=--.=--~-,-- *~* ,..,=~- ___ .:_,
2 Accessible Area of STS Unit - - - 17.706
m Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _l'-'8""2_ _ _ ft Maximum SOF Observed ----'2~.2"'5--'7..c.0_ __
Mean of Total Activity Results --=l.~36~E~+--'0~9_ _ (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test _ _ _l_.0_7_5_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 7.58E+08 l.34E+l0 l.34E+OI 2.25E+03 0.00597 I.I IE-02 0.14901 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 2.17E+08 3.83E+09 3.83E+OO 8.22E+02 0.00466 3.04E-02 0.11657 Ni-63 3.83E+08 6.77E+09 6.77E+OO 8.52E+04 0.00008 2.94E-04 0.00199 Sr-90 l.44E+05 2.55E+06 2.55E-03 7.39E+OI 0.00003 3.38E-OI 0.00086 TOTAL 0.0107 0.26844
[79]
FRSRELEASERECORD y:::=-
ZlONSOL!!I!f!!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe E - Sign Test Classification Type I error 0.05 Number of Measurements 182 Gamma Result Total ~ctivity SOF'
,,# , Pipe Measuremei;it,,L9cation i ,, 1-Ws Sign
- " (pCi/rri2) (oCi/ril2) , (Ws) 0 Section E5 to E4 Position Zero 6.09E+08 8.48E+08 0.625 0.38 +1 I Section E5 to E4 Position 1 6.39E+08 8.90E+08 0.656 0.34 +l 2 Section E5 to E4 Position 2 6.37E+08 8.87E+08 0.654 0.35 +1 3 Section E5 to E4 Position 3 5.18E+08 7.21E+08 0.531 0.47 +1 4 Section E5 to E4 Position 4 4.71E+08 6.56E+08 0.483 0.52 +1 5 Section E5 to E4 Position 5
- 7.71E+08 l.07E+09 0.791 0.21 +1 6 Section E5 to E4 Position 6 4.68E+08 6.52E+08 0.480 0.52 +1 7 Section E5 to E4 Position 7 4.23E+08 5.89E+08 0.434 0.S7 +1 8 Section ES to E4 Position 8 6.68E+08 9.30E+08 0.68S 0.31 +I 9 Section ES to E4 Position 9 7.30E+08 l.02E+09 0.749 0.2S +1 10 Section ES to E4 Position I 0 7.69E+08 l.07E+09 0.789 0.21 +1 11 Section ES to E4 Position 11 S.97E+08 8.31E+08 0.612 0.39 +1 12 Section ES to E4 Position 12 6.38E+08 8.89E+08 0.6SS 0.35 +1 13 Section ES to E4 Position 13 6.80E+08 9.47E+08 0.698 0.30 +1 14 Section E5 to E4 Position 14 6.79E+08 9.46E+08 0.697 0.30 +1 15 Section ES to E4 Position lS 6.7SE+08 9.40E+08 0.692 0.31 +l 16 Section ES to E4 Position 16 6.S9E+08 9.18E+08 0.676 0.32 +l 17 Section E5 to E4 Position 17 7.79E+08 l.08E+09 0.799 0.20 +l 18 Section ES to E4 Position 18 7.26E+08 l.01E+09 0.74S 0.26 +1 19 Section ES to E4 Position 19 7.39E+08 l.03E+09 0.7S8 0.24 +I 20 Section ES to E4 Position 20 6.48E+08 9.02E+08 0.665 0.34 +1 21 Section ES to E4 Position 21 6.06E+08 8.44E+08 0.622 0.38 +l 22 Section ES to E4 Position 22 S.71E+08 7.9SE+08 O.S86 0.41 +l 23 Section ES to E4 Position 23 S.61E+08 7.81E+08 O.S76 0.42 +l 24 Section ES to E4 Position 24 S.81E+08 8.09E+08 0.S96 0.40 +1 2S Section ES to E4 Position 2S 4.9SE+08 6.89E+08 O.S08 0.49 +l 26 Section ES to E4 Position 26 4.77E+08 6.64E+08 0.489 O.Sl +l 27 Section ES to E4 Position 27 4.37E+08 6.09E+08 0.448 O.S5 +l 28 Section ES to E4 Position 28 S.46E+08 7.60E+08 0.560 0.44 +I 29 Section E5 to E4 Position 29 6.91E+08 9.62E+08 0.709 0.29 +1 30 Section ES to E4 Position 30 4.0SE+08 S.64E+08 0.41S 0.58 +1 31 Section ES to E4 Position 31 4.06E+08 S.6SE+08 0.417 0.58 +1 32 Section ES to E4 Position 32 2.63E+07 3.66E+07 0.027 0.97 +1 33 Section ES to E4 Position 33 6.99E+07 9.73E+07 0.072 0.93 +l 34 Section E4 to E3 Position Zero 9.9SE+08 l.39E+09 1.021 (0.02) -1 3S Section E4 to E3 Position I 9.61E+08 l.34E+09 0.986 0.01 +1 36 Section E4 to E3 Position 2 l.21E+09 l.69E+09 1.241 (0.24) -1 37 Section E4 to E3 Position 3 l.16E+09 l.62E+09 1.190 (0.19) -1 38 Section E4 to E3 Position 4 1.13E+09 l.57E+09 1.159 (0.16) -1 39 Section E4 to E3 Position S l.26E+09 l.7SE+09 1.293 (0.29) -1 40 Section E4 to E3 Position 6 1.17E+09 l.63E+09 1.200 (0.20) -1 41 Section E4 to E3 Position 7 l.24E+09 l.73E+09 1.272 C0.27) -1 42 Section E4 to E3 Position 8 l.17E+09 l.63E+09 1.200 (0.20) -1 43 Section E4 to E3 Position 9 1.13E+09 l.S7E+09 l .1S9 (0.16) -1 44 Section E4 to E3 Position 10 l.04E+09 l.4SE+09 1.067 (0.07) -1 4S Section E4 to E3 Position 11 l.OSE+09 l.46E+09 1.077 (0.08) -1 46 Section E4 to E3 Position 12 9.89E+08 l.38E+09 l.OlS (0.01) -1
[80]
FRSRELEASERECORD ~
ZIONSOL!!IJ!!!J§,
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- . Pipe Measurement Location 1-Ws Sign
. (pCi/m2) (pCJm2) (Ws) 47 Section E4 to E3 Position 13 9.15E+08 1.27E+09 0.939 0.06 +l 48 Section E4 to E3 Position 14 9.87E+08 l.37E+09 1.013 (0.01) -1 49 Section E4 to E3 Position 15 1.05E+09 1.46E+09 1.077 (0.08) -1 50 Section E4 to E3 Position 16 1.04E+09 1.45E+09 1.067 (0.07) -1 51 Section E4 to E3 Position 17 9.99E+08 l.39E+09 1.025 (0.02) -1 52 Section E4 to E3 Position 18 9.46E+08 1.32E+09 0.971 0.03 +l 53 Section E4 to E3 Position 19 l.04E+09 1.45E+09 1.067 (0.07) -1 54 Section E4 to E3 Position 20 1.07E+09 l.49E+09 1.098 (0.10) -1 55 Section E4 to E3 Position 21 7.72E+08 1.08E+09 0.792 0.21 +l 56 Section E4 to E3 Position 22 7.71E+08 1.07E+09 0.791 0.21 +l 57 Section E4 to E3 Position 23 8.l IE+08 l.13E+09 0.832 0.17 +l 58 Section E4 to E3 Position 24 l.16E+09 1.62E+09 1.190 (0.19) -1 59 Section E4 to E3 Position 25 ' 6.60E+08 9.19E+08 0.677 0.32 +l 60 Section E4 to E3 Position 26 l.l IE+08 l.55E+08 0.114 0.89 +l 61 Section E4 to E3 Position 27 8.51E+07 l.19E+08 0.087 0.91 +l 62 Section E3 to E2 Position Zero 8.56E+08 l.19E+09 0.878 0.12 +1 63 Section E3 to E2 Position 1 8.53E+08 1.19E+09 0.875 0.12 +1 64 Section E3 to E2 Position 2 9.76E+08 1.36E+09 1.001 (0.00) -1 65 Section E3 to E2 Position 3 9.59E+08 1.34E+09 0.984 0.02 +l 66 Section E3 to E2 Position 4 8.44E+08 l.18E+09 0.866 0.13 +l 67 Section E3 to E2 Position 5 8.80E+08 l.23E+09 0.903 0.10 +l 68 Section E3 to E2 Position 6 9.67E+08 l.35E+09 0.992 0.01 +1 69 Section E3 to E2 Position 7 8.13E+08 l.13E+09 0.834 0.17 +l 70 Section E3 to E2 Position 8 7.90E+08 1.10E+09 0.810 0.19 +1 71 Section E3 to E2 Position 9 8.49E+08 l.18E+09 0.871 0.13 +l 72 Section E3 to E2 Position 10 8.21E+08 l.14E+09 0.842 0.16 +1 73 Section E3 to E2 Position 11 8.49E+08 l.18E+09 0.871 0.13 +1 74 Section E3 to E2 Position 12 9.84E+08 l.37E+09 1.010 (0.01) -1 75 Section E3 to E2 Position 13 9.91E+08 l.38E+09 1.017 (0.02) -1 76 Section E3 to E2 Position 14 1.0IE+09 l.41E+09 1.036 (0.04) -1 77 Section E3 to E2 Position 15 l.OIE+09 1.41E+09 1.036 (0.04) -1 78 Section E3 to E2 Position 16 l.11E+09 1.55E+09 1.139 (0.14) -1 79 Section E3 to E2 Position 17 1.18E+09 l.64E+09 1.211 (0.21) -1 80 Section E3 to E2 Position 18 l.30E+09 l.81E+09 1.334 (0.33) -1 81 Section E3 to E2 Position 19 l .05E+09 l.46E+09 1.077 (0.08) -1 82 Section E3 to E2 Position 20 9.52E+08 l.33E+09 0.977 0.02 +l 83 Section E3 to E2 Position 21 8.54E+08 l.19E+09 0.876 0.12 +1 84 Section E3 to E2 Position 22 8.78E+08 1.22E+09 0.901 0.10 +l 85 Section E3 to E2 Position 23 9.77E+08 l.36E+09 1.002 (0.00) -1 86 Section E3 to E2 Position 24 9.91E+08 l .38E+09 1.017 (0.02) -1 87 Section*E3 to E2 Position 25 8.66E+08 l.21E+09 0.888 0.11 +1 88 Section E3 to E2 Position 26 7.98E+08 l.1 IE+09 0.819 0.18 +1 89 Section E3 to E2 Position 27 7.43E+08 1.03E+09 0,762 0.24 +l 90 Section E3 to E2 Position 28 7.79E+08 1.08E+09 0.799 0.20 +1 91 Section E3 to E2 Position 29 7.74E+08 1.08E+09 0.794 0.21 +1 92 Section E3 to E2 Position 30 8.19E+08 l.14E+09 0.840 0.16 +l 93 Section E3 to E2 Position 31 1.05E+09 l.46E+09 1.077 (0.08) -1 94 Section E3 to E2 Position 32 3.15E+08 4.39E+08 0.323 0.68 +l 95 Section E3 to E2 Position 33 l.08E+08 l.50E+08 0.111 0.89 +l 96 Section E3 to E2 Position 34 l.32E+08 l.84E+08 0.135 0.86 +l
[81]
FRSRELEASERECORD ~
ZION$(JLJ!I.!fl!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B 97 Section E2 to El Position 1 2.03E+09 2.83E+09 2.083 (1.08) -1 98 Section E2 to El Position 2 2.08E+09 2.90E+09 2.134 (1.13) -1 99 Section E2 to El Position 3 2.10E+09 2.92E+09 2.154 (1.15) -1 100 Section E2 to El Position 4 2.11E+09 2.94E+09 2.165 (1.16) -1 101 Section E2 to E 1 Position 5 2.13E+09 2.97E+09 2.185 (1.19) -1 102 Section E2 to E 1 Position 6 2.14E+09 2.98E+09 2.195 (1.20) -1 103 Section E2 to El Position 7 2.14E+09 2.98E+09 2.195 (1.20) -1 104 Section E2 to E 1 Position 8 2. l 3E+09 2.97E+09 2.185 ( 1.19) -1 105 Section E2 to E 1 Position 9 2.09E+09 2.91E+09 2.144 (1.14) -1 106 Section E2 to E 1 Position 10 2.06E+09 2.87E+09 2.113 (I.II) -1 107 Section E2 to E 1 Position 11 2.05E+09 2.86E+09 2.103 (1.10) -1 108 Section E2 to E 1 Position 12 l.93E+09 2.69E+09 1.980 (0.98) -1 109 Section E2 to El Position 13 l.91E+09 2.66E+09
- 1.959 (0.96) -1 110 Section E2 to El Position 14 l.88E+09 2.62E+09 1.929 (0.93) -1 111 Section E2 to E 1 Position 15 l.86E+09 . 2.59E+09 1.908 (0.91) -1 112 Section E2 to El Position 16 l.80E+09 2.51E+09 1.847 (0.85) -1 113 Section E2 to El Position 17 l.79E+09 2.49E+09 1.836 (0.84) -1 114 Section E2 to E 1 Position 18 l.64E+09 2.28E+09 1.683 (0.68) -1 115 Section E2 to El Position 19 l.57E+09 2.19E+09 1.611 (0.61) -1 116 Section E2 to E 1 Position 20 l.40E+09 l.95E+09 1.436 (0.44) -1 117
- Section E2 to E 1 Position 21 l.51E+09 2.10E+09 1.549 (0.55) -1 118 Section E2 to El Position 22 l.45E+09 2.02E+09 1.488 (0.49) -1 119 Section E2 to E 1 Position 23 l.41E+09 l.96E+09 1.447 (0.45) -1 120 Section E2 to El Position 24 l.36E+09 l.89E+09 1.395 (0.40) -1 121 Section E2 to El Position 25 l.39E+09 1.94E+09 1.426 (0.43) -1 122 Section E2 to El Position 26 U1E+09 l.82E+09 1.344 (0.34) -1 123 Section E2 to E 1 Position 27 l.30E+09 l.81E+09 1.334 (0.33) -1 124 Section E2 to El Position 28 l.29E+09 l.80E+09 1.323 (0.32) -1 125 Section E2 to E 1 Position 29 l.18E+09 l.64E+09 1.211 (0.21) -1 126 Section E2 to El Position 30 l.04E+09 l.45E+09 1.067 (0.07) -1 127 Section E2toE1 Position 31 9~58E+08 l.33E+09 . 0.983 0.02 +1 128 Section E2 to El Position 32 9.31E+08 l.30E+09 0.955 0.04 +l 129 Section E2 to El Position 33 8.97E+08 l.25E+09 0,920 0.08 +l 130 Section E2 to E 1 Position 34 9.51E+08 l.32E+09 0.976 0.02 +1 131 Section E2 to El Position 35 8.81E+08 l.23E+09 0.904 0.10 +l 132 Section E2 to El Position 36 8.30E+08 l.16E+09 0.852 0.15 +l 133 Section E2 to El Position 37 8.37E+08 l.17E+09 0.859 0.14 +1 134 Section E2 to El Position 38 8.41E+08 1.17E+09 0.863 0.14 +l 135 Section E2 to El Position 39 7.97E+08 l.11E+09 0.818 0.18 +l 136 Section E2 to El Position 40 8.65E+08 l.20E+09 0.887 0.11 +1 137 Section E2 to El Position 41 9.51E+08 l.32E+09 0.976 0.02 +1 138 Section E2 to El Position 42 9.79E+08 l.36E+09 1.004 (0.00) -1 139 Section E2 to El Position 43 9.38E+08 l.31E+09 0.962 0.04 +1 140 Section E2 to El Position 44 l.26E+09 l.75E+09 1.293 (0.29) -1 141 Section E2 to El Position 45 9.39E+08 l.31E+09 0.963 0.04 +l 142 Section E2 to El Position 46 2.98E+08 4.15E+08 0.306 0.69 +l 143 Section E2 to El Position 47 2.03E+08 2.83E+08 0.208 0.79 +l 144 Section El to Sump B Position Zero 2.18E+09 3.04E+09 2.236 (1.24) -1 145 Section El to Sump B Position 1 2.20E+09 3.06E+09 2.257 (1.26) -1 146 Section El to Sump B Position 2 2.19E+09 3.05E+09 2.247 (1.25) -1
[82]
FRSRELEASERECORD ~
ZIONSOL!!I!Qt§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOP
- Pipe Measurement Location 1-Ws Sign (pCi/m2) foCi/m 2) (Ws) 147 Section El to Sump B Position 3 2.17E+09 3.02E+09 2.226 (1.23) -1 148 Section El to Sump B Position 4 2.l 7E+09 3.02E+09 2.226 (1.23) -1 149 Section El to Sumo B Position 5 2.17E+09 3.02E+09 2.226 (1.23) -1 150 Section El to Sumo B Position 6 2.l 7E+09 3.02E+09 2.226 (1.23) -1 151 Section E 1 to Sump B Position 7 2.19E+09 3.05E+09 2.247 (l.25) -1 152 Section E 1 to Sump B Position 8 2.19E+09 3.05E+09 2.247 (1.25) -1 153 Section E 1 to Sump B Position 9 2.14E+09 2.98E+09 2.195 (l .20) -1 154 Section El to Sump B Position 10 2.00E+09 2.79E+09 2.052 (1.05) -1 155 Section EI to Sump B Position 11 2.04E+09 2.84E+09 2.093 (1.09) -1 156 Section El to Sump B Position 12 2.14E+09 2.98E+09 2.195 (1.20) -1 157 Section El to Sump B Position 13 l.54E+09 2.14E+09 1.580 (0.58) -1 158 Section El to Sump B Position 14 5.84E+08 8.13E+08 0.599 0.40 +1 159 Section El to Sump B Position 15 5.31E+08 7.40E+08 0.545 0.46 +1 160 Section E6 to E5 Position Zero 4.03E+08 5.61E+08 0.413 0.59 +1 161 Section E6 to E5 Position 1 3.98E+08 5.54E+08 0.408 0.59 +1 162 Section E6 to E5 Position 2 3.32E+08 4.62E+08 0.341 0.66 +l 163 Section E6 to E5 Position 3 3.41E+08 4.75E+08 0.350 0.65 +l 164 Section E6 to E5 Position 4 2.79E+08 3.89E+08 0.286 0.71 +1 165 Section E6 to E5 Position 5 2.61E+08 3.63E+08 0.268 0.73 +l 166 Section E6 to E5 Position 6 2.34E+08 3.26E+08 0.240 0.76 +1 167 Section E6 to E5 Position 7 2.43E+08 3.38E+08 0.249 0.75 +1 168 Section E6 to E5 Position 8 2.44E+08 3.40E+08 0.250 0.75 +l 169 Section E6 to E5 Position 9 2.40E+08 3.34E+08 0.246 0.75 +l 170 Section E6 to E5 Position 10 2.69E+08 3.75E+08 0.276 0.72 +J, 171 Section E6 to E5 Position 11 3.08E+08 4.29E+08 0.316 0.68 +1 172 Section E6 to E5 Position 12 2.48E+08 3.45E+08 0.254 0.75 +l 173 Section E6 to E5 Position 13 2.35E+08 3.27E+08 0.241 0.76 +1 174 Section E6 to E5 Position 14 9.56E+07 l.33E+08 0.098 0.90 +1 175 Section E6 to E5 Position 15 5.75E+07 8.01E+07 0.059 0.94 +1 176 Section E6 to E5 Position 16 4.86E+07 6.77E+07 0.050 0.95 +l 177 Section E6 to E5 Position 17 5.22E+07 7.27E+07 0.054 0.95 +l 178 Section E6 to E5 Position 18 6.58E+07 9.16E+07 0.068 0.93 +l 179 Section E6 to E5 Position 19 l.05E+08 1.46E+08 0.108 0.89 +l 180 Section E6 to E5 Position 20 7.14E+07 9.94E+07 0.073 0.93 +l 181 Section E6 to E5 Position 21 3.60E+08 5.01E+08 0.369 0.63 +l Number of positive differences (S+) 105
- Critical Value 102 Survey Unit MEETS the Acceptance Criteria
[83]
FRS RELEASE RECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
~
M_. . .
ZIONSOLUTIONSur
r~-~~C":*--~~~-=~~==-: .: -~~== ~~--*=,!~p !f..~!f:@-in§"~J<.1°-~i:P~~F~u"!~i~-!!s_~~i~~~:.:.:._' -=:~=:._: ~ * --=-=----::=._=~~=-==~=}
Surveved Pipe- Calculation of Mean Activitv and Dose Accessible Area of STS Unit --~2~6~.7~0~5_ _ _ m 2
Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _ 18_3_ _ _ ft Maximum SOF Observed _ _ _ l._07_2_6_ __
Mean of Total Activity Results _ _2_._28_E_+_0_9_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _2_.9_7_6_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2) (oCil (mCi) (mCil Inventory (mremlvr oer mCi) mrem/vr Co-60 l.27E+09 3.40E+l0 3.40E+Ol 2.25E+03 0.01511 l. l lE-02 0.37745 Cs-134 0.00E+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 3.64E+o8 9.71E+09 9.71E+OO 8.22E+02 0.01182 3.04E-02 0.29527 Ni-63 6.43E+08 l.72E+l0 l.72E+Ol 8.52E+04 0.00020 2.94E-04 0.00505 Sr-90 2.42E+05 6.47E+06 6.47E-03 7.39E+Ol 0.00009 3.38E-Ol 0.00219 TOTAL 0.0272 0.67995
[84]
FRSRELEASERECORD ~
ZIONSOLY.IlQ!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B. Pipe~ - Sign Test Classification _l_ Type I error 0.05 Number of Measurements 183 Gamma Result Total Activity SOF.
- Pipe Measurement Location 1-Ws Sign
- . (pCi/m 2) (pCi/m2) (Ws) .
0 Section F6 to F5 Position Zero *1.82E+09 2.53E+09 1.017 (0.02) -1 1 Section F6 to F5 Position 1 l.80E+09 2.51E+09 1.006 (0.01) -1 2 Section F6 to F5 Position 2 1.76E+09 2.45E+09 0.983 0.02 +l 3 Section F6 to F5 Position 3 1.78E+09 2.48E+09 0.994 O.Ql +l 4 Section F6 to F5 Position 4 l.36E+09 l.89E+09 0.760 0.24 +l 5 Section F6 to F5 Position 5 4.41E+08 6.14E+08 0.246 0.75 +l 6 Section F6 to F5 Position 6 3.70E+08 5.15E+08 0.207 0.79 +1 7 Section F6 to F5 Position 7 1.99E+08 2.77E+08 0. 111 0.89 +l 8 Section F5 to F4 Position Zero 1.69E+09 2.35E+09 0.944 0.06 +1 9 Section F5 to F4 Position 1 . 1.76E+09 2.45E+09 0.983 0.02 +l 10 Section F5 to F4 Position 2 1.80E+09 2.51E+09 1.006 (0.01) -1 11 Section F5 to F4 Position 3 I.79E+09 2.49E+09 1.000 0.00 +l 12 Section F5 to F4 Position 4 I.70E+09 2.37E+09 0.950 0.05 +l 13 Section F5 to F4 Position 5 1.71E+09 2.38E+09 0.955 0.04 +l 14 Section F5 to F4 Position 6 1.75E+09 2.44E+09 0.978 0.02 +l 15 Section F5 to F4 Position 7 1.72E+09 2.40E+09 0.961 0.04 +1 16 Section F5 to F4 Position 8 1.70E+09 2.37E+09 0.950 0.05 +l 17 Section F5 to F4 Position 9 1.74E+09 2.42E+09 0.972 0.03 +l 18 Section F5 to F4 Position 10 1.74E+09 2.42E+09 0.972 0.03 +l 19 Section F5 to F4 Position 11 1.70E+09 2.37E+09 0.950 0.05 +1 20 Section F5 to F4 Position 12 I.70E+09 2.37E+09 0.950 0.05 +I 21 Section F5 to F4 Position 13 1.61E+09 2.24E+09 0.899 0.10 +1 22 Section F5 to F4 Position 14 1.58E+09 2.20E+09 0.883 0.12 +l 23 Section F5 to F4 Position 15 1.47E+09 2.05E+09 0.821 0.18 +1 24 Section F5 to F4 Position 16 1.54E+09 2.14E+09 0.860 0.14 +1 25 Section F5 to F4 Position 17 1.51E+09 2.IOE+09 0.844 0.16 +1 26 Section F5 to F4 Position 18 1.55E+09 2.16E+09 0.866 0.13 +1 27 Section F5 to F4 Position 19 1.65E+09 2.30E+09 0.922 0.08 +1 28 Section F5 to F4 Position 20 I.76E+09 2.45E+09 0.983 0.02 +1 29 Section F5 to F4 Position 21 1.72E+09 2.40E+09 0.961 0.04 +I 30 Section F5 to F4 Position 22 I.71E+09 2.38E+09 0.955 0.04 +1 31 Section F5 to F4 Position 23 I.71E+09 2.38E+09 0.955 0.04 +I 32 Section F5 to F4 Position 24 1.78E+09 2.48E+09 0.994 0.01 +I 33 Section F5 to F4 Position 25 1.81E+09 2.52E+09 1.011 (0.01) -I 34 Section F5 to F4 Position 26 1.87E+09 2.60E+09 1.045 (0.04) -1 35 Section F5 to F4 Position 27 I.92E+09 2.67E+09 1.073 (0:07) -I 36 Section F5 to F4 Position 28 1.86E+09 2.59E+09 1.039 (0.04) -I 37 Section F5 to F4 Position 29 1.84E+09 2.56E+09 1.028 (0.03) -I 38 Section F5 to F4 Position 30 1.82E+09 2.53E+09 1.017 (0.02) -I 39 Section F5 to F4 Position 31 l.86E+09 2.59E+09 1.039 (0.04) -I 40 Section F5 to F4 Position 32 1.86E+09 2.59E+09 1.039 (0.04) -1 41 Section F5 to F4 Position 33 l.85E+09 2.58E+09 1.034 (0.03) -I 42 Section F5 to F4 Position 34 1.85E+09 2.58E+09 1.034 (0.03) -I 43 Section F5 to F4 Position 35 I.86E+09 2.59E+09 1.039 (0.04) -I 44 Section F5 to F4 Position 36 1.86E+09 2.59E+09 1.039 (0.04) -I 45 Section F5 to F4 Position 37 1.86E+09 2.59E+09 1.039 (0.04) -I 46 Section F5 to F4 Position 38 1.86E+09 2.59E+09 1.039 (0.04) -I
[85]
FRSRELEASERECORD ~
ZIONSOL!fI!!!!Y§.
Al)XILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B c *oamma Result , Total Activity' *soR
'P-i~eMeiis~~iherit;I:~catiO~'. *:
t-- ,,, t. ~ /*: 1
.t """,/_ ':'"'
- 2 l:ws- Si ri
- *~-*!
- ' - \L '"\",: ,,,~ ', '"\~~-':*,-;~ '",:~~;c.*'~ .- ,~;\ ;,"".'" ,*
-- . (pCi/m 2} ' .. (pCi/m ') . *" (Ws). -*
47 Section F5 to F4 Position 39 l.86E+09 2.59E+09 1.039 (0.04) -1 48 Section F5 to F4 Position 40 l.86E+09 2.59E+09 1.039 (0.04) -1 49 Section F5 to F4 Position 41 l.84E+09 2.56E+09 1.028 (0.03) -1 50 Section F5 to F4 Position 42 l.87E+09 2.60E+09 1.045 (0.04) -1 51 Section F5 to F4 Position 43 l.86E+09 2.59E+09 1.039 (0.04) -1 52 Section F5 to F4 Position 44 l.83E+09 2.55E+09 1.022 (0.02) -1 53 Section F5 to F4 Position 45 l.85E+09 2.58E+09 1.034 (0.03) -1 54 Section F5 to F4 Position 46 l.80E+09 2.51E+09 1.006 (0.01) -1 55 Section F5 to F4 Position 47 6.20E+08 8.63E+08 0.346 0.65 +1 56 Section F5 to F4 Position 48 2.28E+08 3.18E+08 0.127 0.87 +l 57 Section F5 to F4 Position 49 l.92E+08 2.67E+08 0.107 0.89 +1 58 Section F4 to F3 Position Zero l.80E+09 2.51E+09 1.006 (0.01) -1 59 Section F4 to F3 Position 1 l.85E+09 2.58E+09 1.034 (0.03) -1 60 Section F4 to F3 Position 2 1.77E+09 2.47E+09 0.989 0.01 +l 61 Section F4 to F3 Position 3 l.75E+09 2.44E+09 0.978 0.02 +l 62 Section F4 to F3 Position 4 l.75E+09 2.44E+09 0.978 0.02 +1 63 Section F4 to F3 Position 5 l.75E+09 2.44E+09 0.978 0.02 +l 64 Section F 4 to F3 Position 6 l.67E+09 2.33E+09 0.933 0.07 +l
- 65 Section F 4 to F3 Position 7 l.68E+09 2.34E+09 0.939 0.06 +1 66 Section F4 to F3 Position 8 l.66E+09 2.31E+09 0.927 0.07 +l 67 Section F4 to F3 Position 9 l.59E+09 2.21E+09 0.888 0.11 +1 68 Section F4 to F3 Position 10 l.57E+09 2.19E+09 0.877 0.12 +1 69 Section F4 to F3 Position 11 l .60E+09 2.23E+09 0.894 0.11 +l 70 Section F4 to F3 Position 12 l.58E+09 2.20E+09 0.883 0.12 +1 71 Section F4 to F3 Position 13 l.68E+09 2.34E+09 0.939 0.06 +1 72 Section F4 to F3 Position 14 1.58E+09 2.20E+09 0.883 0.12 +l 73 Section F4 to F3 Position 15 l.68E+09 2.34E+09 0.939 0.06 +l 74 Section F4 to F3 Position 16 l.75E+09 2.44E+09 0.978 0.02 +l 75 Section F4 to F3 Position 17 1.73E+09 2.41E+09 0.966 0.03 +l 76 Section F4 to F3 Position 18 l.71E+09 2.38E+09 0.955 0.04 +l 77 Section F4 to F3 Position 19 l.75E+09 2.44E+09 0.978 0.02 +1 78 Section F4 to F3 Position 20 1.74E+09 2.42E+09 0.972 0.03 +l 79 Section F4 to F3 Position 21 l.77E+09 2.47E+09 0.989 O.Ql +l 80 Section F4 to F3 Position 22 l.83E+09 2.55E+09 1.022 (0.02) -1 81 Section F4 to F3 Position 23 l.82E+09 2.53E+09 1.017 (0.02) -1 82 Section F4 to F3 Position 24 l.63E+09 2.27E+09 0.911 0.09 +l 83 Section F4 to F3 Position 25 6.63E+08 9.23E+08 0.370 0.63 +l 84 Section F4 to F3 Position 26 5.70E+08 7.94E+08 0.318 0.68 +1 85 Section F 4 to F3 Position 27 4.28E+08 5.96E+08 0.239 0.76 +l 86 Section F3 to F2 Position Zero l.84E+09 2.56E+09 1.028 (0.03) -1 87 Section F3 to F2 Position 1 l.86E+09 2.59E+09 1.039 (0.04) -1 88 Section F3 to F2 Position 2 l.87E+09 2.60E+09 1.045 (0.04) -1 89 Section F3 to F2 Position 3 l.88E+09 2.62E+09 1.050 (0.05) -1 90 Section F3 to F2 Position 4 l.88E+09 2.62E+09 1.050 (0.05) -1 91 Section F3 to F2 Position 5 l.89E+09 2.63E+09 1.056 (0.06) -1 92 Section F3 to F2 Position 6 l.88E+09 2.62E+09 1.050 (0.05) -1 93 Section F3 to F2 Position 7 l.86E+09 2.59E+09 1.039 (0.04) -1 94 Section F3 to F2 Position 8 l.85E+09 2.58E+09 1.034 (0.03) -1 95 Section F3 to F2 Position 9 l.82E+09 2.53E+09 1.017 (0.02) -1 96 Section F3 to F2 Position 10 l.83E+09 2.55E+09 1.022 (0.02) -1
[86]
FRSRELEASERECORD ~
ZIONSOLJ!I!Q!J§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- . J>ipe Measurement Location 1-Ws Sign (pCi/m2) (pCi/m2) I (Ws) 97 Section F3 to F2 Position 11 l.82E+09 2.53E+09 1.017 <0.02) -1 98 Section F3 to F2 Position 12 l.82E+09 2.53E+09 1.017 <0.02) -1 99 Section F3 to F2 Position 13 l.82E+09 2.53E+09 1.017 (0.02) -1 100 Section F3 to F2 Position 14 l.82E+09 2.53E+09 1.017 (0.02) -1 101 Section F3 to F2 Position 15 l.82E+09 2.53E+09 1.017 <0.02) -1 102 Section F3 to F2 Position 16 l.82E+09 2.53E+09 1.017 (0.02) -1 103 Section F3 to F2 Position 17 l.84E+09 2.56E+09 1.028 (0.03) -1 104 Section F3 to F2 Position 18 l.84E+09 2.56E+09 1.028 <0.03) -1 105 Section F3 to F2 Position 19 l.85E+09 2.58E+09 1.034 (0.03) -1 106 Section F3 to F2 Position 20 l.85E+09 2.58E+09 1.034 (0.03) -1 107 Section F3 to F2 Position 21 l.84E+09 2.56E+09 1.028 (0.03) -I 108 Section F3 to F2 Position 22 l.85E+09 2.58E+09 1.034 (0.03) -1 109 Section F3 to F2 Position 23 l.84E+09 2.56E+09 1.028 (0.03) -1 110 Section F3 to F2 Position 24 l.84E+09 2.56E+09 1.028 (0.03) -1 111 Section F3 to F2 Position 25 l.84E+09 2.56E+09 1.028 (0.03) -1 112 Section F3 to F2 Position 26 l.83E+09 2.55E+09 1.022 (0.02) . -1 113 Section F3 to F2 Position 27 l.82E+09 2.53E+09 1.017 (0.02) -1 114 Section F3 to F2 Position 28 l .83E+09 2.55E+09 1.022 (0.02) -1 115 Section F3 to F2 Position 29 l .83E+09 2.55E+09 1.022 (0.02) -1 116 Section F3 to F2 Position 30 l.83E+09 2.55E+09 1.022 (0.02) -1 117 Section F3 to F2 Position 31 l.81E+09 2.52E+09 1.011 (0.01) -1 118 Section F2 to Fl Position Zero l.84E+09 2.56E+09 1.028 (0.03) -1 119 Section F2 to Fl Position 1 l.75E+09 2.44E+09 0.978 0.02 +l 120 Section F2 to Fl Position 2 l.76E+09 2.45E+09 0.983 0.02 +l 121 Section F2 to Fl Position 3 l.74E+09 2.42E+09 0.972 0.03 +l 122 Section F2 to Fl Position 4 l.77E+09 2.47E+09 0.989 O.ol +l 123 Section F2 to Fl Position 5 l.79E+09 2.49E+09 1.000 0.00 +1 124 Section F2 t_o Fl Position 6 l.78E+09 2.48E+09 0.994 O.ol +l 125 Section F2 to Fl Position 7 l.80E+09 2.51E+09 1.006 (0.01) -1 126 Section F2 to F 1 Position 8 l.80E+09 2.51E+09 1.006 (0.01) -1 127 Section F2 to F 1 Position 9 l.79E+09 2.49E+09 1.000 0.00 +l 128 Section F2 to Fl Position 10 l.79E+09 2.49E+09 1.000 0.00 +l 129 Section F2 to Fl Position 11 l.78E+09 2.48E+09 0.994 0.01 +1 130 Section F2 to Fl Position 12 l.76E+09 2.45E+09 0.983 0.02 +l 131 Section F2 to Fl Position 13 l.77E+09 2.47E+09 0.989 0.01 +l 132 Section F2 to Fl Position 14 l.79E+09 2.49E+09 1.000 0.00 +l 133 Section F2 to Fl Position 15 l.82E+09 2.53E+09 1.017 (0.02) -1 134 Section F2 to F 1 Position 16 l.79E+09 2.49E+09 1.000 0.00 +l 135 Section F2 to F 1 Position 17 l.79E+09 2.49E+09 1.000 0.00 +l 136 Section F2 to Fl Position 18 l.79E+09 2.49E+09 1.000 0.00 +l 137 Section F2 to Fl Position 19 l.79E+09 2.49E+09 1.000 0.00 +l 138 Section F2 to Fl Position 20 l.76E+09 2.45E+09 0.983 0.02 +l 139 Section F2 to Fl Position 21 l.77E+09 2.47E+09 0.989 0.01 +l 140 Section F2 to Fl Position 22 l.77E+09 2.47E+09 0.989 O.Ql +l 141 Section F2 to Fl Position 23 l.76E+09 2.45E+09 0.983 0.02 +l 142 Section F2 to Fl Position 24 l.80E+09 2.51E+09 1.006 (0.01) -1 143 Section F2 to F 1 Position 25 l.80E+09 2.51E+09 1.006 (0.01) -1 144 Section F2 to Fl Position 26 l.80E+09 2.51E+09 1.006 (0.01) -1 145 Section F2 to Fl Position 27 l.79E+09 2.49E+09 1.000 0.00 +l 146 Section F2 to Fl Position 28 l.78E+09 2.48E+09 0.994 0.01 +l
[87]
FRSRELEASERECORD ~
ZIONSOLJ!l!!l!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result. Total Activity SOF
- Pipe Measurement Location 1-Ws Sign
.. (pCi/m 2) (pCi/m 2) (Ws) 147 Section F2 to F 1 Position 29 l.80E+09 2.51E+09 1.006 (0.01) 148 Section F2 to Fl Position 30 l.75E+09 2.44E+09 0.978 0.02 +l 149 Section F2 to FI Position 31 1.76E+09 2.45E+09 0.983 0.02 +l 150 Section F2 to Fl Position 32 l.75E+09 2.44E+09 0.978 0.02 +l 151 Section F2 to FI Position 33 l.77E+09 2.47E+09 0.989 0.01 +I 152 Section F2 to FI Position 34 l.78E+09 2.48E+09 0.994 O.Ql +I 153 Section F2 to Fl Position 35 l.78E+09 2.48E+09 0.994 0.01 +I 154 Section F2 to Fl Position 36 l.79E+09 2.49E+09 1.000 0.00 +l 155 Section F2 to Fl Position 37 l.78E+09 2.48E+09 0.994 0.01 +I 156 Section F2 to Fl Position 38 l.78E+09 2.48E+09 0.994 0.01 +I 157 Section F2 to Fl Position 39 l.78E+09 2.48E+09 0.994 0.01 +I 158 Section F2 to Fl Position 40 l.79E+09 2.49E+09 1.000 0.00 +I 159 Section F2 to FI Position 41 l.78E+09 2.48E+09 0.994 0.01 +l 160 Section F2 to Fl Position 42 l.77E+09 2.47E+09 0.989 0.01 +I 161 Section F2 to Fl Position 43 l.75E+09 2.44E+09 0.978 0.02 +I 162 Section F2 to FI Position 44 l.76E+09 2.45E+09 0.983 0.02 +I 163 Section F2 to Fl Position 45 l.80E+09 2.51E+09 1.006 (0.01) -1 164 Section F2 to FI Position 46 l.81E+09 2.52E+09 1.011 (0.01) -1 165 Section F2 to Fl Position 47 l.69E+09 2.35E+09 0.944 0.06 +I 166 Section F2 to FI Position 48 6.77E+08 9.43E+08 0.378 0.62 +I 167 Section F2 to FI Position 49 5.36E+08 7.46E+08 0.299 0.70 +I 168 Section F2 to Fl Position 50 6.34E+08 8.83E+08 0.354 0.65 +I 169 Section F2 to FI Position 51 6.05E+08 8.43E+08 0.338 0.66 +l 170 Section F2 to FI Position 52 3.46E+08 4.82E+08 0.193 0.'81 +I 171 Section FI to Sump B Position Zero l.69E+09 2.35E+09 0.944 0.06 +l 172 Section FI to* Sump B Position I l.74E+09 2.42E+09 0.972 0.03 +l 173 Section F 1 to Sump B Position 2 l.75E+09 2.44E+09 0.978 0.02 +I 174 Section FI to Sump B Position 3 l.84E+09 2.56E+09 1.028 (0.03) -1 175 Section FI to Sump B Position 4 l.88E+09 2.62E+09 1.050 (0.05) -1 176 Section F 1 to Sump B Position 5 l.75E+09 2.44E+09 0.978 0.02 +l IT! Section FI to Sump B Position 6 l.40E+09 l.95E+09 0.782 0.22 +I 178 Section F 1 to Sump B Position 7 6.77E+08 9.43E+08 0.378 0.62 +I .
179 Section F 1 to Sump B Position 8 5.28E+08 7.35E+08 0.295 0.71 +I 180 Section FI to Sump B Position 9 4.98E+08 6.94E+08 0.278 0.72 +I 181 Section FI to Sump B Position I 0 4.96E+08 6.91E+08 0.277 0.72 +I 182 Section FI to Sump B Position 11 4.55E+08 6.34E+08 0.254 0.75 +I Number of positive differences (S+) _ _1_10_ _
~ritical Value _ _1_03_ _
Survey Unit MEETS the Acceptance Criteria
[88]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLJ/,l!Q!Y§;;F SURVEY UNITS 05! 19A & 05119B
--,----=:=:-:_-::=~-==-==-===:- __-:-:~~=~§~~1>_~;::-~iP_t;G(4=fii~!!1JorDr:il!!>-:§umiit:~ijois_!~ij]i~t_:i =-==-=-~-- *:*~~-~--:=:~~~:~===*--~-*
Surveyed Pipe - Calculation of Mean Activitv and Dose Accessible Area of SIS Unit -----'-'8."--56~1_ _ _ m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _8~8_ _ _ ft Ma-..:imum SOF Observed _ _ _2_.2_6_88_ __
Mean of Total Activity Results _ _l_.4_3_E_+_09_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _0_.5_50_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC Ci/m2 Ci mCi mCi Inventory mremfyr er mCi mrem!Yr Co-60 7.99E+o8 6.84E+09 6.84E+OO 2.25E+03 0.00304 J.l IE-02 0.07591 Cs-134 O.OOE+OO O.OOE+OO 0.00E+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 2.28E+08 l.95E+09 l.95E+OO 8.22E+02 0.00238 3.04E-02 0.05938 Ni-63 4.03E+08 3.45E+09 3.45E+OO 8.52E+04 0.00004 2.94E-04 0.00101 Sr-90 l.52E+05 l.30E+06 l.30E-03 7.39E+Ol 0.00002 3.38E-Ol 0.00044 TOTAL 0.0055 0.13675
[89]
FRSRELEASERECORD .-:::::=-
Zl0i'\!SOL!ll!Q~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B ,
Sump B. Pipe G - Sign Test Classification _1_ Type I error 0.05 Number of Measurements 88 Gamma;Result zTotalActivity ***SOF
- Pjpe 'MeaSurement Locatio£l' 1-Ws Sign (oci1~2) (oCi/m2) (Ws) 0 Section G3 to G2 Position 0 4.45E+08 6.20E+08 0.433 0.57 +1 1 Section G3 to G2 Position 1 4.09E+08 5.70E+08 0.398 0.60 +1 2 Section G3 to G2 Position 2 3.79E+08 5.28E+08 0.369 0.63 +l 3 Section G3 to G2 Position 3 3.67E+08 5.11E+08 0.357 0.64 +1 4 Section G3 to G2 Position 4 4.14E+08 5.77E+08 0.403 0.60 +1 5 Section G3 to G2 Position 5 3.92E+08 5.46E+08 0.382 0.62 +1 6 Section G3 to G2 Position 6 3.81E+08 5.31E+08 0.371 0.63 +1 7 Section G3 to G2 Position 7 3.98E+08 5.54E+08 0.388 0.61 +1 8 Section G3 to G2 Position 8 3.90E+08 5.43E+08 0.380 0.62 +1 9 Section G3 to G2 Position 9 3.60E+08 5.01E+08 0.351 0.65 +l 10 Section G3 to G2 Position 10 4.40E+08 6.13E+08 0.428 0.57 +l 11 Section G3 to G2 Position 11 4.24E+08 5.90E+08 0.413 0.59 +l 12 Section G3 to G2 Position 12 4.13E+08 5.75E+08 0.402 0.60 +1 13 Section -03 to G2 Position 13 4.99E+08 6.95E+08 0.486 0.51 +l 14 Section G3 to G2 Position 14 4.53E+08 6.31E+08 0.441 0.56 +l 15 Section G3 to G2 Position 15 5.36E+08 7.46E+08 0.522 0.48 +l 16 Section G3 to G2 Position 16 6.07E+08 8.45E+08 0.591 0.41 +1 17 Section G3 to G2 Position 17 5.61E+08 7.81E+08 0.546 0.45 +l 18 Section G3 to G2 Position 18 5.70E+08 7.94E+08 0.555 0.44 +l 19 Section G3 to G2 Position 19 6.51E+08 9.07E+08 0.634 0.37 +1 20 Section G3 to G2 Position 20 5.56E+08 7.74E+08 0.541 0.46 +1 21 Section G3 to G2 Position 21 6.06E+08 8.44E+08 0.590 0.41 +1 22 Section G3 to G2 Position 22 5.56E+08 7.74E+08 0.541 0.46 +1 23 Section G3 to G2 Position 23 5.23E+08 7.28E+08 0.509 0.49 +1 24 Section G3 to G2 Position 24 6.02E+08 8.38E+08 0.586 0.41 +l 25 Section G3 to G2 Position 25 5.02E+08 6.99E+08 0.489 0.51 +1 26 Section G3 to G2 Position 26 3.15E+08 4.39E+08 0.307 0.69 +l 27 Section G3 to G2 Position 27 1.41E+08 l.96E+08 0.137 0.86 +1 28 Section G2 to G 1 Position Zero l.82E+09 2.53E+09 1.772 (0.77) -1 29 Section G2 to G 1 Position 1 l.88E+09 2.62E+09 1.831 (0.83) -1 30 Section G2 to G 1 Position 2 l.90E+09 2.65E+09 1.850 (0.85) -1 31 Section G2 to G 1 Position 3 1.89E+09 2.63E+09 1.840 (0.84) -1 32 Section G2 to G 1 Position 4 l.76E+09 2.45E+09 1.714 (0.71) -1 33 Section G2 to G 1 Position 5 1.77E+09 2.47E+09 1.724 (0.72) -1 34 Section G2 to G 1 Position 6 l.65E+09 2.30E+09 1.607 (0.61) -1 35 Section G2 to G 1 Position 7 l.69E+09 2.35E+09 1.646 (0.65) -1 36 Section G2 to G 1 Position 8 l.57E+09 2.19E+09 1.529 (0.53) -1 37 Section G2 to G 1 Position 9 l.46E+09 2.03E+09 1.422 (0.42) -1 38 Section G2 to G 1 Position 10 l.43E+09 l.99E+09 1.392 (0.39) -1 39 Section G2 to G 1 Position 11 l.39E+09 l.94E+09 1.353 (0.35) -1 40 Section G2 to G 1 Position 12 l.40E+09 l.95E+09 1.363 (0.36) -1 41 Section G2 to G 1 Position 13 l.29E+09 l.80E+09 1.256 (0.26) -1 42 Section G2 to G 1 Position 14 l.30E+09 l.81E+09 1.266 (0.27) -1 43 Section G2 to Gl Position 15 1.22E+09 l.70E+09 1.188 (0.19) -1 44 Section G2 to G 1 Position 16 l.21E+09 l.69E+09 1.178 (0.18) -1 45 Section G2 to G 1 Position 17 1.22E+09 l.70E+09 1.188 (0.19) -1 46 Section G2 to G 1 Position 18 l.07E+09 1.49E+09 1.042 (0.04) -1
[90]
FRSRELEASERECORD ~
ZIONSOL!!I!fl!Y§.*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- Pipe Measurement Location 1-Ws Sign
. **:.** (pCi/m2) (pCi/J:rh .(Ws) . '
47 Section G2 to G1 Position 19 9.84E+08 l.37E+09 0.958 0.04 +1 48 Section G2 to G 1 Position 20 9.98E+08 l.39E+09 0.972 0.03 +l 49 Section G2 to G1Position21 l.02E+09 1.42E+09 0.993 0.01 +l 50 Section G2 to G 1 Position 22 l.01E+09 l.41E+09 0.983 0.02 +l 51 Section G2 to G 1 Position 23 9.31E+08 1.30E+09 0.907 0.09 +l 52 Section G2 to G 1 Position 24 9.21E+08 1.28E+09 0.897 0.10 +1 53 Section G2 to G 1 Position 25 9.82E+08 1.37E+09 0.956 0.04 +1 54 Section G2 to G 1 Position 26 9.l 7E+08 1.28E+09 0.893 0.11 +1 55 Section G2 to G 1 Position 27 9.27E+08 1.29E+09 0.903 0.10 +l 56 Section G2 to G 1 Position 28 8.23E+08 1.15E+09 0.801 0.20 +1 57 Section G2 to G 1 Position 29 7.93E+08 l.IOE+09 0.772 0.23 +1 58
- Section G2 to G 1 Position 30 7.54E+08 l.05E+09 0.734 0.27 +1 59 Section G2 to G 1 Position 31 7.74E+08 l.08E+09 0.754 0.25 +I 60 Section G2 to G 1 Position 32 7.63E+08 1.06E+09 0.743 0.26 ,+I 61 Section G2 to G 1 Position 33 7.92E+08 l.IOE+09 0.771 0.23 +I 62 Section G2 to G 1 Position 34 7.40E+08 1.03E+09 .. 0.721 0.28 +I 63 Section G2 to G 1 Position 35 7.29E+08 . 1.02E+09 0.710 0.29 +I 64 Section G2 to G 1 Position 36 7.28E+08 1.01E+09 0.709 0.29 +I 65 Section G2 to G1 Position 37 6.93E+08 9.65E+08 0.675 0.33 +l 66 Section G2 to GI Position 38 6.61E+08 9.21E+08 0.644 0.36 +I 67 Section G2 to G 1 Position 39 7.09E+08 9.87E+08 0.690 0.31 +1 68 Section G2 to G 1 Position 40 6.34E+08 8.83E+08 0.617 0.38 +1 69 Section G2 to G 1 Position 41 7.40E+08 1.03E+09 0.721 0.28 +l 70 Section G2 to G 1 Position 42 l.97E+08 2.74E+08 0.192 0.81 +l 71 Section G2 to GI Position 43 J.94E+08 2.70E+08 0.189 0.81 +1 72 Section G 1 to Sump B Position Zero 2.l 7E+09 3.02E+09 2.113 (1.11) -1 73 Section G 1 to Sump B Position I 2.20E+09 3.06E+09 2.142 (1.14) -1 74 Section G 1 to Sump B Position 2 2.26E+09 3.15E+09 2.201 (1.20) -1 75 Section G 1 to Sump B Position 3 2.29E+09 3.19E+09 2.230 (1.23) -1 76 Section G 1 to Sump B Position 4 2.29E+09 3.19E+09 2.230 (1.23) -1 77 Section G 1 to Sump B Position 5 2.33E+09 3.24E+09 2.269 (1.27) -1 78 Section Gl to Sump B Position 6 2.33E+09 3.24E+09 2.269 (1.27) -1 79 Section G 1 to Sump B Position 7 2.32E+09 3.23E+09 2.259 (1.26) -1 80 Section G 1 to Sump B Position 8 2.30E+09 3.20E+09 2.240 (1.24) -1 81 Section G 1 to Sump B Position 9 2.25E+09 3.13E+09 2.191 (1.19) -1 82 Section G1 to Sump B Position 10 2.19E+09 3.05E+09 2.132 (l.13) -I 83 Section G 1 to Sump B Position 11 2.25E+09 3.13E+09 2.191 (1.19) -1 84 Section G1 to Sump B Position 12 l.75E+09 2.44E+09 1.704 (0.70) -1 85 Section G1 to Sump B Position 13 l.22E+08 l.70E+08 0.119 0.88 +1 86 Section GI to Sump B Position 14 5.73E+07 7.98E+07 0.056 0.94 +1 87 Section GI to Sump B Position 15 4.01E+07 5.58E+07 0.039 0.96 +1 Number of positive differences (S+) _ _5_6_ _
Critical Value - - - 52 - -
Survey Unit MEETS the Acceptance Criteria
[91]
FRS RELEASE RECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 051198 Surveved Pipe - Calculation of Mean Activitv and Dose 2
Accessible Area ofSTS Unit ------'-3-'-'.7-'-9-'-4_ _ _ m Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed ----'-3~9_ _ _ ft Maximum SOF Observed 1.6753 Mean of Total Activity Results _ _ _ l._5_3E_+_0_8_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _0_.6_1_0_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (oCi) (mCi) (mCi) Inventory ( rnrem/vr oer mCi) rnrem/vr Co-60 8.53E+08 3.24E+09 3.24E+OO 2.25E+03 0.00144 l.l IE-02 0.03592 Cs-134 O.OOE+OO O.OOE+OO 0;00E+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 2.44E+08 9.24E+08 9.24E-Ol 8.22E+02 0.00112 3.04E-02 0.02810 Ni-63 4.30E+08 l.63E+09 l.63E+OO 8.52E+04 0.00002 2.94E-04 0.00048 Sr-90 l.62E+05 6.16E+05 6.16E'04 7.39E+Ol 0.00001 3.38E-Ol 0.00021 TOTAL 0.0026 0.06471 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _3_5_ _ _ ft Area of Pipe Not Surveyed _ _ _3_.4_1_ _ _ m 2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (pCi) (mCi) (mCi) Inventory ( rnrem/vr oer mCi) mrem/vr Co-60 8.53E+08 6.14E+09 6.14E+OO 2.25E+03 0.00273 l.l IE-02 0.06816 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 2.44E+08 l.75E+09 l.75E+OO 8.22E+02 0.00213 3.04E-02 0.05332 Ni-63 4.30E+o8 3.IOE+09 3.IOE+OO 8.52E+04 0.00004 2.94E-04 0.00091 Sr-90 l.62E+05 l.l 7E+06 l.17E-03 7.39E+Ol 0.00002 3.38E-Ol 0.00039 TOTAL 0.0049 0.12279
[92]
FRSRELEASERECORD ~
ZIONSOLJlI!flf§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B. Pipe H - Sign Test Classification Type I error 0.05 Number of Measurements 39 Gamma Result Total Activity SOF
- Pipe Measuremei;it Location 1-Ws Sign
.. (oCi/m2) (pCi/m2) (WsY* .
0 Section H3 to H2 Position Zero l.11E+09 l.55E+09 0.816 0.18 +I I Section H3 to H2 Position I 8.95E+08 l.25E+09 0.658 0.34 +I 2 Section H3 to H2 Position 2 7.00E+08 9.75E+08 0.514 0.49 +I 3 Section H3 to H2 Position 3 6.40E+08 8.91E+08 0.470 0.53 +I 4 Section H3 to H2 Position 4 8.05E+08 l.12E+09 0.592 0.41 +I 5 Section H3 to H2 Position 5 7.90E+08 l.10E+09 0.580 0.42 +1 6 Section H3 to H2 Position 6 1.l 1E+09 l.55E+09 0.816 0.18 +1 7 Section H3 to H2 Position 7 l.29E+09 l.80E+09 0.948 0.05 +I 8 Section H3 to H2 Position 8 1.10E+09 l.53E+09 0.808 0.19 +1 9 Section H3 to H2 Position 9 l.03E+09 1.43E+09 0.757 0.24 +I 10 Section H3 to H2 Position 10 l.35E+09 l.88E+09 0.992 0.01 +I 11 Section H3 to H2 Position I I l.06E+09 1.48E+09 0.779 0.22 +1 I2 Section H3 to H2 Position I2 8.85E+08 1.23E+09 0.650 0.35 +1 13 Section H3 to H2 Position 13 7.87E+08 1.10E+09 0.578 0.42 +I 14 Section H3 to H2 Position 14 6.82E+08 9.50E+08 0.50I 0.50 +I 15 Section H3 to H2 Position I 5 6.l 7E+08 8.59E+08 0.453 0.55 +1 I6 Section H3 to H2 Position 16 6.34E+08 8.83E+08 0.466 0.53 +I 17 Section H3 to H2 Position I 7 7.38E+08 l.03E+09 . 0.542 0.46 +I 18 Section H3 to H2 Position I 8 6.08E+08 8.47E+08 0.447 0.55 +I 19 Section H3 to H2 Position 19 2.93E+08 4.08E+08 0.215 0.78 +1 20 Section H3 to H2 Position 20 4.50E+07 6.27E+07 0.033 0.97 +1 2I Section H3 to H2 Position 2I 8.80E+07 1.23E+08 0.065 0.94 +I 22 Section H3 to H2 Position 22 9.95E+07 l.39E+08 0.073 0.93 +I 23 Section H 1 to Sump B Position Zero 1.85E+09 2.58E+09 1.359 (0.36) -1 24 Section Hl to Sump B Position I 1.80E+09 2.51E+09 1.323 (0.32) -I 25 Section HI to Sump B Position 1 1.90E+09 2.65E+09 1.396 (0.40) -I 26 Section HI to Sump B Position 2 1.95E+09 2.72E+09 1.433 (0.43) -I 27 Section HI to Sump B Position 3 1.95E+09 2.72E+09 1.433 (0.43) -1 28 Section HI to Sump B Position 4 2.08E+09 2.90E+09 1.528 (0.53) -1 29 Section HI to Sump B Position 5 2.20E+09 3.06E+09 1.6I 7 (0.62) -1 30 Section HI to Sump B Position 6 2.28E+09 3.18E+09 I.675 (0.68) -1 3I Section HI to Sump B Position 7 2.06E+09 2.87E+09 1.514 (0.5 I) -I 32 Section HI to Sump B Position 8 2.00E+09 2.79E+09 1.470 (0.47) -I 33 Section HI to SU:mp B Position 9 1.81E+09 2.52E+09 1.330 (0.33) -I 34 Section HI to Sump B Position 10 1.57E+09 2.19E+09 I.I54 (0.15) -I 35 Section HI to Sump B Position I 1 1.46E+09 2.03E+09 I.073 (0.07) -1 36 Section HI to Sump B Position 12 3.84E+08 5.35E+08 0.282 0.72 +1 37 Section Hl to Sump B Position I3 6.20E+07 8.63E+07 0.046 0.95 +1 38 Section HI to Sump B Position I4 5.50E+07 7.66E+07 0.040 0.96 +I Number of positive differences (S+) 26 Critical Value 25 Survey Unit MEETS the Acceptance Criteria
[93]
FRSRELEASERECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLl!I!Q!Y§u;=
SURVEY UNITS 05119A & 05119B
- * ** *'-*~--§~'!e:~ !i~_.J_~_!n~h_!I~~);>~~>.:::~~~~~!.§_~!Y :Dita ~ ____]_:__~:-----'- --'--~_: __;:_-~~~~~~- _-_ J Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit m2
- - -10.945 ----
Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _ 7_5_ _ _ ft Maximum SOF Observed - - - 1.4580 Mean of Total Activity Results --"'l.-'-6~1E"-+--'0-'-9_ _ (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test --~0~.8~9-'-3~%~--
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 8.99E+08 9.84E+09 9.84E+OO 2.25E+03 0.00437 l.l IE-02 0.10922 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 2.57E+08 2.81E+09 2.81E+OO 8.22E+02 0.00342 3.04E-02 0.08544 Ni-63 4.54E+08 4.97E+09 4.97E+OO 8.52E+04 0.00006 2.94E-04 0.00146 Sr-90 l.71E+05 l.87E+06 l.87E-03 7.39E+Ol 0.00003 3.38E-Ol 0.00063 TOTAL 0.0079 0.19675
[94]
FRSRELEASERECORD ~
ZIONSOLJ!Il!l!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B. Pipe J - Sign Test Classification Type I error 0.05 Number of Measurements 75 Gamma Result Total Activify SOP
- Pipe Measurement Location 1-Ws Sign '
(pCi/m2) (pCi/m2) , (Ws) 0 Section J2 to J3 Position Zero l.90E+09 2.65E+09 1.450 (0.45) -1 I Section J2 to J3 Position I l.86E+09 2.59E+09 1.420 (0.42) -1 2 Section J2 to J3 Position 2 l.91E+09 2.66E+09 1.458 (0.46) -1 3 Section J2 to J3 Position 3 l.89E+09 2.63E+09 1.443 (0.44) -1 4 Section J2 to J3 Position 4 l.87E+09 2.60E+09 1.427 (0.43) -1 5 Section J2 to J3 Position 5 l.87E+09 2.60E+09 1.427 (0.43) -1 6 Section J2 to J3 Position 6 l.78E+09 2.48E+09 1.359 (0.36) -1 7 Section J2 to J3 Position 8 4.81E+08 6.70E+08 0.367 0.63 +l 8 Section J2 to J3 Position 9 3.65E+08 5.08E+08 0.279 0.72 +l 9 Section J3 to J1 Position Zero l.31E+09 l.82E+09 1.000 0.00 +I 10 Section J3 to J1 Position 1 l.32E+09 l.84E+09 1.008 (0.0l) -1 11 Section J3 to J1 Position 2 l.29E+09 l.80E+09 0.985 0.02 +l 12 Section J3 to J1 Position 3 l.31E+09 l.82E+09 1.000 0.00 +l 13 Section J3 to J1 Position 4 l.30E+09 l.81E+09 0.992 O.Ql +I 14 Section J3 to JI Position 5 l.25E+09 l.74E+09 0.954 0.05 +I
. 15 Section J3 to JI Position 6 l.27E+09 l.77E+09 0.969 0.03 +1 16 Section J3 to JI Position 7 l.13E+09 l.57E+09 0.863 0.14 +1 17 Section J3 to J1 Position 8 l.19E+09 l.66E+09 0.908 0.09 +l 18 Section J3 to J1 Position 9 l.07E+09 l.49E+09 0.817 0.18 +1 19 Section J3 to J1 Position I 0 9.55E+08 l.33E+09 0.729 0.27 +1 20 Section J3 to J1 Position 11 l.03E+09 l.43E+09 0.786 0.21 +1 21 Section J3 to JI Position 12 9.27E+08 1.29E+09 0.708 0.29 +1 22 Section J3 to J1 Position 13 8.37E+08 l.17E+09 0.639 0.36 +1 23 Section J3 to J1 Position 14 7.53E+08 l.05E+09 0.575 0.43 +l 24 Section J3 to J1 Position 15 6.37E+08 8.87E+08 0.486 0.51 +l 25 Section J3 to J1 Position 16 6.29E+08 8.76E+08 0.480 0.52 +1 26 Section J3 to J1 Position 17 6.21E+08 8.65E+08 0.474 0.53 +1 27 Section J3 to J1 Position 18 5.71E+08 7.95E+08 0.436 0.56 +l 28 Section J3 to J1 Position 19 5.90E+08 8.22E+08 0.450 0.55 +l 29 Section J3 to J1 Position 20 6.79E+08 9.46E+08 0.518 0.48 +l 30 Section J3 to J1 Position 21 5.88E+08 8.19E+08 0.449 0.55 +1 31 Section J3 to J1 Position 22 6.59E+08 9.18E+08 0.503 0.50 +l 32 Section J3 to J1 Position 23 6.55E+08 9.12E+08 0.500 0.50 +l 33 Section J3 to J1 Position 24 7.12E+08 9.92E+08 0.544 0.46 +1 34 Section J3 to J1 Position 25 7.38E+08 l.03E+09 0.563 0.44 +I 35 Section J3 to J1 Position 26 7.68E+08 l.07E+09 0.586 0.41 +l 36 Section J3 to J 1 Position 27 8.69E+08 l.21E+09 0.663 0.34 +I 37 Section J3 tb J1 Position 28 9.63E+08 l.34E+09 0.735 0.26 +l 38 Section J3 to J1 Position 29 l.09E+09 l.52E+09 0.832 0.17 +1 39 Section J3 to J1 Position 30 l.37E+09 l.91E+09 1.046 (0.05) -1 40 Section J3 to JI Position 31 l.09E+09 l.52E+09 0.832 0.17 +1 41 Section J3 to J1 Position 32 l.31E+09 1.82E+09 1.000 0.00 +1 42 Section J3 to J1 Position 33 l.54E+09 2.14E+09 1.176 (0.18) -1 43 Section J3 to J 1 Position 34 l.59E+09 2.21E+09 1.214 (0.21) -1 44 Section J3 to J1 Position 35 l.67E+09 2.33E+09 1.275 (0.27) -1 45 Section J3 to Jl Position 36 l.67E+09 2.33E+09 1.275 (0.27) -1 46 Section J3 to Jl Position 37 l.67E+09 2.33E+09 1.275 (0.27) -1
[95]
FRSRELEASERECORD ~
ZIONSOLJ!I.!Qrf§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEYUNITS05119A&05119B .
Gamma Result. Total Activity SOF
- Pipe Measurement Location 1-Ws Sign (oCi/m2) . (oCi/m 2) (Ws) 47 Section J3 to J1 Position 38 l.67E+09 2.33E+09 1.275 (0.27) -I 48 Section J3 to J1 Position 39 l.73E+09 2.41E+09 1.321 (0.32) -I 49 Section J3 to J1 Position 40 l.68E+09 2.34E+09 I.282 (0.28) -I 50 Section J3 to JI Position 41 l.74E+09 2.42E+09 1.328 (Q.33) -1 5I Section J3 to J1 Position 42 l.70E+09 2.37E+09 1.298 (0.30) -I 52 Section J3 to J1 Position 43 I.80E+09 2.5IE+09 1.374 (0.37) -I 53 Section J3 to JI Position 44 l.88E+09 2.62E+09 I.435 (0.44) -I 54 Section J3 to JI Position 45 l.83E+09 2.55E+09 1.397 (0.40) -1 55 Section J3 to JI Position 46 l.60E+09 2.23E+09 l.22I (0.22) -1 56 Section J3 to J1 Position 47 2.80E+08 3.90E+08 0.214 0.79 +1 57 Section JI to Sump B Position Zero l.IOE+09 l .53E+09 0.840 0.16 +I 58 Section JI to Sump B Position I 6.28E+08 8.75E+08 0.479 0.52 +I 59 Section J1 to Sump B Position 2 5.32E+08 7.41E+08 0.406 0.59 +I 60 Section JI to Sump B Position 3 6.29E+08 8.76E+08 0.480 0.52 +l 61 Section J1 to Sump B Position 4 7.00E+08 9.75E+08 0.534 0.47 +l 62 Section JI to Sump B Position 5 8.13E+08 l.13E+09 0.62I 0.38 +l 63 Section JI to Sump B Position 6 8.46E+08 l.18E+09 0.646 0.35 +1 64 Section J1 to Sump B Position 7 9.06E+08 l.26E+09 0.692 0.31 +I 65 Section J1 to Sump B Position 8 l.18E+09 I.64E+09 0.90I 0.10 +1 66 Section JI to Sump B Position 9 l.80E+09 2.51E+09 1.374 (0.37) -I 67 Section JI to Sumo B Position IO l.86E+09 2.59E+09 1.420 (0.42) -I 68 Section JI to Sumo B Position I I l.90E+09 2.65E+09 1.450 (0.45) -I 69 Section J1 to Sumo B Position I2 l.67E+09 2.33E+09 1.275 (0.27) -I 70 Section JI to Sumo B Position 13 l.33E+09 l.85E+09 l.OI5 (0.02) -I 71 Section J1 to Sump B Position 14 l.05E+09 I.46E+09 0.802 0.20 +1 72 Section J1 to Sump B Position 15 l.16E+08 l.62E+08 0.089 0.91 +1 73 Section JI to Sump B Position 16 9.08E+07 l.26E+08 0.069 0.93 +l 74 Section JI to Sump B Position 17 7.87E+07 l.10E+08 0.060 0.94 +l Number of positive differences (S+) _ _4_7_ _
Critical Value _ _4-=-=5'---
Survey Unit MEETS the Acceptance Criteria
[96]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLJ!Jlf!!Y§iii=
SURVEY UNITS 051 !9A & 051198 E-----~-: , *, ; ',' __,_,_-_: *-~ ', ~,_§_ump ~f!Pj~4-incb Floor D..rui}-Summary of SurveiEt!a_ _: ___* _, c~ i ,,'~ ~--~:-~"'~~ :_ __ :;-,:~=** -~~J Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit _ _ _4"".-'-67"'0_ _ _ m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _4~8_ _ _ ft Maximum SOF Observed _ _ _l_.5_7_00_ __
Mean of Total Activity Results _ _7_.6_2_E_+_08_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _0_.1_80_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (pCi) (mCi) (mCi) Inventory ( mreffi/vr per men mrem/vr Co-60 4.25E+08 l.99E+09 l.99E+OO 2.25E+03 0.00088 l.l IE-02 0.02205 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 1.22E+08 5.67E+08 5.67E-Ol 8.22E+02 0.00069 3.04E-02 0.01725 Ni-63 2.15E+08 l.OOE+09 l.OOE+OO 8.52E+04 0.00001 2.94E-04 0.00029 Sr-90 8.09E+04 3.78E+05 3.78E-04 7.39E+Ol 0.00001' 3.38E-01 0.00013 TOTAL 0.0016 0.03972
[97]
FRSRELEASERECORD ~
ZIONSOL!!IJQ!Y§*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe K - Sign Test Classification _ l_ Type I error 0.05 Number of Measurements 48 Gamma Result
- Total Activity SOF
- Pipe M~asutement Location 1-Ws Sign
'0 -,~
. < (oCi/m2)* * \. . ( oCifni2) CWs),
0 Section K2 to Kl Position Zero 5.63E+08 7.84E+08 0.909 0.09 +l 1 Section K2 to Kl Position 1 5.43E+08 7.56E+08 0.877 0.12 +l 2 Section K2 to Kl Position 2 4.99E+08 6.95E+08 . 0.806 0.19 +l 3 Section K2 to Kl Position 3 4.55E+08 6.34E+08 0.735 0.27 +l 4 Section K2 to Kl Position 4 4.42E+08 6.16E+08 0.714 0.29 +l 5 Section K2 to K 1 Position 5 4.76E+08 6.63E+08 0.769 0.23 +1 6 Section K2 to K 1 Position 6 5.81E+08 8.09E+08 0.938 0.06 +l 7 Section K2 to Kl Position 7 5.98E+08 8.33E+08 0.966 0.03 +l 8 Section K2 to K 1 Position 8 5.65E+08 7.87E+08 0.913 0.09 +l 9 Section K2 to K 1 Position 9 5.21E+08 7.26E+08 0.842 0.16 +l 10 Section K2 to Kl Position 10 4.31E+08 6.00E+08 0.696 0.30 +l 11 Section K2 to K 1 Position 11 5.04E+08 7.02E+08 0.814 0.19 +l 12 Section K2 to Kl Position 12 5.18E+08 7.21E+08 0.837 0.16 +l 13 Section K2 to Kl Position 13 5.25E+08 7.31E+08 0.848 0.15 +l 14 Section K2 to K 1 Position 14 5.90E+08 8.22E+08 0.953 0.05 +l 15 Section K2 to Kl Position 15 7.12E+08 9.92E+08 1.150 (0.15) -1 16 Section K2 to Kl Position 16 7.84E+08 1.09E+09 1.266 (0.27) -1 17 Section K2 to Kl Position 17 8.28E+08 1.15E+09 1.337 (0.34) -1 18 Section K2 to Kl Position 18 7.86E+08 1.09E+09 1.270 (0.27) -1 19 Section K2 to Kl Position 19 7.78E+08 1.08E+09 1.257 (0.26) -1 20 Section K2 to Kl Position 20 9.28E+08 1.29E+09 1.499 (0.50) -1 21 Section K2 to Kl Position 21 6.56E+08 9.14E+08 1.060 (0.06) -1 22 Section K2 to Kl Position 22 4.87E+08 6)8E+08 0.787 0.21 +l 23 Section K2 to Kl Position 23 6.98E+07 9.72E+07 0.113 0.89 +1 24 Section K2 to Kl Position 24 6.98E+07 9.72E+07 0.113 0.89 +l 25 Section K2 to Kl Position 25
- 6.84E+07 9.53E+07 0.110 0.89 +l 26 Section K2 to Kl Position 26 8.97E+07 1.25E+08 0.145 0.86 +l 27 Section K2 to Kl Position 27 6.69E+07 9.32E+07 0.108 0.89 +1 28 Section K2 to Kl Position 28 2.00E+07 2.79E+07 0.032 0.97 +l 29 Section Kl to Sump B Position Zero 9.09E+08 1.27E+09 1.468 (0.47) -1 30 Section Kl to Sump B Position 1 9.72E+08 l.35E+09 1.570 <0.57) -1 31 Section Kl to Sump B Position 2 9.26E+08 l.29E+09 1.496 <0.50) -1 32 Section Kl to Sump B Position 3 9.32E+08 l.30E+09 1.505 <0.51) -1 33 Section Kl to Sump B Position 4 9.34E+08 l.30E+09 1.509 <0.51) -1 34 Section Kl to Sump .B Position 5 8.61E+08 1.20E+09 1.391 (0.39) -1 35 Section Kl to Sump B Position 6 7.77E+08 1.08E+09 1.255 (0.26) -1 36 Section Kl to Sump B Position 7 7.49E+08 l.04E+09 1.210 (0.21) -1 37 Section Kl to Sump B Position 8 6.53E+08 9.09E+08 1.055 <0.05) -1 38 Section K2 to Sump B Position 9 6.46E+08 9.00E+08 1.043 <0.04) -1 39 Section K2 to Sump B Position 10 6.14E+08 8.55E+08 0.992 0.01 +l 40 Section K2 to Sump B Position 11 5.24E+08 7.30E+08 0.846 0.15 +l 41 Section K2 to Sumo B Position 12 4.87E+08 6.78E+08 0.787 0.21 +l 42 Section K2 to Sumo B Position 13 4.55E+08 6.34E+08 0.735 0.27 +l 43 Section K2 to Sump B Position 14 4.85E+08 6.75E+08 0.783 0.22 +l 44 Section K2 to Sump B Position 15 4.40E+08 6.13E+08 0.711 0.29 +l 45 Section K2 to Sump B Position 16 4.48E+08 6.24E+08 0.724 0.28 +l 46 Section K2 to Sump B Position 17 2.66E+08 3.70E+08 0.430 0.57 +l
[98]
FRSRELEASERECORD ~
ZIONSOLJ!I!Qri§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B 47 Section K2 to Sum B Position 18 0.97 +1 Number of positive differences (S+) 31 Critical Value 30 Survey Unit MEETS the Acceptance Criteria
[99]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc=
~-.,.,,...
SURVEY UNITS 05119A & 05119B Surveyed Pipe - Calculation of Mean Activity and Dose 2
Accessible Area ofSTS Unit ----"-18'"'".0'""'9"""6_ _ _ m Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed ---~18~6_ _ _ ft Mmdmum SOF Observed _ _ _3_._24_6_6_ __
Mean of Total Activity Results _ _ _ 9._53_E_+_0_8_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _l_.)_-3_8_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (oCil lmCil (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 3.39E+08 6.13E+09 6.13E+OO 2.25E+03 0.00272 l.l IE-02 0.06800 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 4.44E+08 8.03E+09 8.03E+OO 8.22E+02 0.00977 3.04E-02 0.24415 Ni-63 l.71E+o8 3.09E+09 3.09E+OO 8.52E+04 0.00004 2.94E-04 0.00091 Sr-90 2.96E+05 5.35E+06 5.35E-03 7.39E+Ol 0.00007 3.38E-Ol 0.00181 TOTAL 0.0126 0.31487 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _ _6_7_ _ _ ft Area of Pipe Not Surveyed _ _ _3_.9_9_ _ _ m 2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (pCi) (mCil (mCi) Inventory ( mrem/vr oer mCi) mrem/yr Co-60 3.39E+08 7.48E+09 7.48E+OO 2.25E+03 0.00332 l.l IE-02 0.08298 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 4.44E+08 9.80E+09 9.80E+OO 8.22E+02 0.01192 3.04E-02 0.29797 Ni-63 l.71E+o8 3.77E+09 3.77E+OO 8.52E+04 0.00004 2.94E-04 0.00111 Sr-90 2.96E+o5 6.53E+06 6.53E-03 7.39E+Ol 0.00009 3.38E-Ol 0.00221 TOTAL 0.0154 0.38427
[100]
FRSRELEASERECORD ~
ZIONSOL!!I!fl!Y§'
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B. Pipe L - Sign Test Classification Type I error 0.05 Number of Measurements 186 Gamma Result Total Activity SOF
- Pipe Measurement. Location .. 1-Ws Sign
..* * (oCi/m2) (oCi/m2) * (Ws) 0 Section L9 to L 7 Position Zero 2.67E+08 3.25E+08 0.341 0.66 +1 1 Section L9 to L7 Position 1 2.97E+08 3.62E+08 0.380 0.62 +l 2 Section L9 to L 7 Position 2 3.17E+08 3.86E+08 0.405 0.59 +l 3 Section L9 to L 7 Position 3 3.70E+08 4.51E+08 0.473 0.53 +1 4 Section L9 to L7 Position 4 3.60E+08 4.39E+08 0.460 0.54 +I 5 Section L9 to L7 Position 5 3.35E+08 4.08E+08 0.428 0.57 +1*
6 Section L9 to L 7 Position 6 2.45E+08 2.99E+08 0.313 0.69 +1 7 Section L9 to L 7 Position 7 l.97E+08 2.40E+08 0.252 0.75 +1 8 Section L9 to L 7 Position 8 3.26E+08 3.97E+08 0.417 0.58 +l 9 Section L9 to L 7 Position 9 3.31E+08 4.03E+08 0.423 0.58 +I 10 Section L9 to L 7 Position 10 3.57E+08 4.35E+08 0.456 0.54 +l 11 Section L9 to L7 Position 11 . 3.71E+08 4.52E+08 0.474 0.53 +I 12 Section L9 to L7 Position 12 3.84E+08 4.68E+08 0.491 0.51 +l 13 Section L9 to L7 Position 13 4.19E+08 5.11E+08 0.536 0.46 +l 14 Section L9 to L7 Position 14 5.14E+08 6.26E+08 0.657 0.34 +1 15 Section L9 to L7 Position 15 3.77E+08 4.59E+08 0.482 0.52 +1 16 Section L9 to L 7 Position 16 2.93E+08 3.57E+08 0.375 0.63 +l 17 Section L9 to L 7 Position 17 2.40E+08 2.92E+08 0.307 0.69 +l 18 Section L9 to L 7 Position 18 2.81E+08 3.42E+08 0.359 0.64 +1 19 Section L9 to L7 Position 19 2.65E+08 3.23E+08 0.339 0.66 +1 20 Section L9 to L 7 Position 20 2.03E+08 2.47E+08 0.259 0.74 +1 21 Section L9 to L 7 Position 21 2.29E+08 2.79E+08 0.293 0.71 +l 22 Section L9 to L 7 Position 22 2.09E+08 2.55E+08 0.267 0.73 +l 23 Section L9 to L7 Position 23 l.86E+08 2.27E+08 0.238 0.76 +1 24 Section L9 to L7 Position 24 2.34E+08 2.85E+08 0.299 0.70 +1 25 Section L9 to L 7 Position 25 2.30E+08 2.80E+08 0.294 0.71 +l 26 Section L9 to L 7 Position 26 4.69E+07 5.72E+07 0.060 0.94 +l 27 Section L9 to L7 Position 27 l.29E+08 1.57E+08 0.165 0.84 +1 28 Section L 7 to L6 Position Zero 2.99E+08 3.64E+08 0.382 0.62 +l 29 Section L 7 to L6 Position 1 2.91E+08 3.55E+08 0.372 0.63 +1 30 Section L 7 to L6 Position 2 3.19E+08 3.89E+08 0.408 0.59 +l 31 Section L 7 to L6 Position 3 2.67E+08 3.25E+08 0.341 0.66 +l 32 Section L 7 to L6 Position 4 2.72E+08 3.31E+08 0.348 0.65 +l 33 Section L 7 to L6 Position 5 2.48E+08 3.02E+08 0.317 0.68 +1 34 Section L 7 to L6 Position 6 2.56E+08 3.12E+08 0.327 0.67 +1 35 Section L 7 to L6 Position 7 2.53E+08 3.08E+08 0.323 0.68 +1 36 Section L 7 to L6 Position 8 3.32E+08 4.05E+08 0.424 o:58 +1 37 Section L 7 to L6 Position 9 3.15E+08 3.84E+08 0.403 0.60 +1 38 Section L 7 to L6 Position 10 3.30E+08 4.02E+08 0.422 0.58 +1 39 Section L 7 to L6 Position 11 3.14E+08 3.83E+08 0.401 0.60 +1 40 Section L 7 to L6 Position 12 3.05E+08 3.72E+08 0.390 0.61 +1 41 Section L 7 to L6 Position 13 3.25E+08 3.96E+08 0.415 0.58 +l 42 Section L 7 to L6 Position 14 2.85E+08 3.47E+08 0.364 0.64 +l 43 Section L 7 to L6 Position 15 3.16E+08 3.85E+08 0.404 0.60 +l 44 Section L 7 to L6 Position 16 4.14E+08 5.05E+08 0.529 0.47 +l 45 Section L 7 to L6 Position 17 4.30E+08 5.24E+08 0.550 0.45 +1 46 Section L 7 to L6 Position 18 4.21E+08 5.13E+08 0.538 0.46 +1
[101]
I I
I FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B
.,: *~
Sign,
'\ '. ~ ',e; 47 Section L7 to L6 Position 19 4.67E+08 5.69E+08 0.597 0.40 +1 48 Section L 7 to L6 Position 20 4.1 OE+08 5 .OOE+08 0.524 0.48 +1 49 Section L7 to L6 Position 21 3.93E+08 4.79E+08 0.502 0.50 +1 50 Section L7 to L6 Position 22 4.38E+08 5.34E+08 0.560 0.44 +l 51 Section L7 to L6 Position 23 3.l 7E+08 3.86E+08 0.405 0.59 +l 52 Section L7 to L6 Position 24 5.11 E +08 6.23E +08 0.653 0.35 +1 53 Section L7 to L6 Position 25 5.41E+08 6.59E+08 0.692 0.31 +1 54 Section L7 to L6 Position 26 4.41E+08 5.37E+08 0.564 0.44 +1 55 Section L7 to L6 Position 27 5.12E+08 6.24E+08 0.654 0.35 +1 56 Section L7 to L6 Position 28 5.09E+08 6.20E+08 0.651 0.35 +1 57 Section L7 to L6 Position 29 5.09E+08 6.20E+08 0.651 0.35 +1 58 Section L7 to L6 Position 30 4.89E+08 5.96E+08 0.625 0.37 +l 59 Section L7 to L6 Position 31 5.29E+08 6.45E+08 0.676 0.32 +l 60 Section L7 to L6 Position 32 4.98E+08 6.07E+08 0.637 0.36 +I 61 Section L7 to L6 Position 33 4.47E+08 5.45E+08 0.571 0.43 +1 62 Section L7 to L6 Position 34 4.0IE+08 4.89E+08 0.513 0.49 +l 63 Section L7 to L6 Position 35 3.96E+08 4.83E+08 0.506 0.49 +1 64 Section L 7 to L6 Position 36 3.78E+08 4.61E+08 0.483 0.52 +1 65 Section L7 to L6 Position 37 4.19E+08 5.11E+08 0.536 0.46 +1 66 Section L 7 to L6 Position 3 8 4.05E+08 4.94E+08 0.518 0.48 +1 67 Section L 7 to L6 Position 39 3.89E+08 4.74E+08 0.497 0.50 +1 68 Section L7 to L6 Position 40 3.89E+08 4.74E+08 0.497 0.50 +l 69 Section L6 to L5 Position Zero 4.90E+08 5.97E+08 0.626 0.37 +1 70 Section L6 to L5 Position I 3.18E+08 3.88E+08 0.406 0.59 +1 71 Section L6 to L5 Position 2 3.04E+08 3.70E+08 0.389 0.61 +1 72 Section L6 to L5 Position 3 3.87E+08 4.72E+08 0.495 0.51 +1 73 Section L6 to L5 Position 4 3.19E+08 3.89E+08 0.408 0.59 +I 74 Section L6 to L5 Position 5 2.52E+08 3.07E+08 0.322 0.68 +I 75 Section L6 to L5 Position 6 2.81E+08 3.42E+08 0.359 0.64 +I 76 Section L6 to L5 Position 7 2.49E+08 3.03E+08 0.318 0.68 +I 77 Section L6 to L5 Position 8 2.49E+08 3.03E+08 0.318 0.68 +I 78 Section L6 to L5 Position 9 2.54E+08 3.10E+08 0.325 0.68 +I 79 Section L6 to L5 Position 10 2.96E+08 3.61E+08 0.378 0.62 +1 80 Section L6 to L5 Position 11 2.74E+08 3.34E+08 0.350 0.65 +1 81 Section L6 to L5 Position 12 2.46E+08 3.00E+08 0.314 0.69 +1 82 Section L6 to L5 Position 13 2.43E+08 2.96E+08 0.311 0.69 +1 83 Section L6 to L5 Position 14 2.22E+08 2.71E+08 0.284 0.72 +1 84 Section L6 to L5 Position 15 2.64E+08 3.22E+08 0.337 0.66 +1 85 Section L6 to L5 Position 16 2.20E+08 2.68E+08 0.281 0.72 +l 86 Section L6 to L5 Position 17 2.12E+08 2.58E+08 0.271 0.73 +I 87 Section L6 to L5 Position 18 2.54E+08 3.10E+08 0.325 0.68 +1 88
- Section L6 to L5 Position 19 3.08E+08 3.75E+08 0.394 0.61 +1 89 Section L6 to L5 Position 20 2.89E+08 3.52E+08 0.369 0.63 +I 90 Section L6 to L5 Position 21 3.02E+08 3.68E+08 0.386 0.61 +l 91 Section L6 to L5 Position 22 3.00E+08 3.66E+08 0.383 0.62 +I 92 Section L6 to L5 Position 23 2.85E+08 3.47E+08 0.364 0.64 +l 93 Section L6 to L5 Position 24 3.00E+08 3.66E+08 0.383 0.62 +I 94 Section L6 to L5 Position 25 2.78E+08 3.39E+08 0.355 0.64 +I 95 Section L6 to L5 Position 26 2.45E+08 2.99E+08 0.313 0.69 +I 96 Section L6 to L5 Position 27 8.72E+07 l.06E+08 0.111 0.89 +1
[102]
FRSRELEASERECORD ~
ZIONSOL!!Il!!t§*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- Pipe Measurement.Location 1-Ws Sign (pCi/m2) (pCi/m 2) (Ws) 97 Section L6 to L5 Position 28 3.72E+07 4.53E+07 0.048 0.95 +l 98 Section L5 to LI Header Position Zero l.59E+09 l.94E+09 '2.032 (1.03) -1 99 Section L5 to Ll Header Position 1 l.61E+09 l.96E+09 2.058 (l.06) -1 IOO Section L5 to LI Header Position 2 l.47E+09 l.79E+09 1.879 (0.88) -1 101 Section L5 to L 1 Header Position 3 l.37E+09 l.67E+09 1.751 (0.75) -1 102 Section L5 to LI Header Position 4 l.53E+09 l.86E+09 1.956 (0.96) -I 103 Section L5 to LI Header Position 5 l.49E+09 l.82E+09 I.905 (0.90) -1 I04 Section L5 to LI Header Position 6 l.48E+09 l.80E+09 1.892 (0.89) -I I05 Section L5 to LI Header Position 7 l.43E+09 l.74E+09 1.828 (0.83) -I I06 Section L5 to LI Header Position 8 l.45E+09 I.77E+09 I.853 (0.85) -I 107 Section L5 to LI Header Position 9 I.53E+09 I.86E+09 1.956 (0.96) -I I08 Section L5 to Ll Header Position IO l.54E+09 l.88E+09 I.968 (0.97) -I I09 Section L5 to Ll Header Position I I l.63E+09 I.99E+09 2.083 (1.08) -I I IO Section L5 to L1 Header Position I2 l.10E+09 I.34E+09 I .406 (0.4I) -I III Section L5 to Ll Header Position 13 6.74E+08 8.21E+08 0.86I 0.14 +I I I2 Section L5 to Ll Header Position I4 7.00E+08 8.53E+08 0.895 0.1 I +I 113 Section L5 to L 1 Header Position I 5 5.85E+08 7.I3E+08 0.748 0.25 +l I I4 Section L5 to LI Header Position I 6 6.68E+08 8.I4E+08 0.854 0.I5 +l Il5 Section L5 to LI Header Position I 7 4.94E+08 6.02E+08 0.63I 0.37 +I 116 Section L5 to LI Header Position I 8 4.99E+08 6.08E+08 0.638 0.36 +1 I I7 Section L5 to L 1 Header Position I 9 5.02E+08 6.12E+08 0.642 0.36 +1 II8 Section L5 to L 1 Header Position 20 5.49E+08 6.69E+08 0.702 0.30 +1 119 Section L5 to Ll Header Position 21 6.41E+08 7.81E+08 0.8I9 0.18 +1 I20 Section L5 to L 1 Header Position 22 5.21E+08 6.35E+08 0.666 0.33 +l 121 Section L5 to LI Header Position 23 4.91E+08 5.98E+08 0.628 0.37 +l 122 Section L5 to LI Header Position 24 4.70E+08 . 5.73E+08 0.60I 0.40 +I 123 Section L5 to L.l Header Position 25 4.39E+08 5.35E+08 0.56I 0.44 +l 124 Section L5 to Ll Header Position 26 3.92E+08 4.78E+08 0.501 0.50 +I 125 Section L5 to L 1 Header Position 27 4.08E+08 4.97E+08 0.522 0.48 +l 126 Section L5 to L 1 Header Position 28 3.93E+08 4.79E+08 0.502 0.50 +l 127 Section L5 to Ll Header Position 29 3.58E+08 4.36E+08 0.458 0.54 +I 128 Section L5 to LJ Header Position 30 4.47E+08 5.45E+08 0.571 0.43 +l 129 Section L5 to L 1 Header Position 31 3.93E+08 4.79E+08 0.502 0.50 +1 I30 Section L5 to L 1 Header Position 32 3.77E+08 4.59E+08 0.482 0.52 +I 131 Section L5 to Ll Header Position 33 3.88E+08 4.73E+08 0.496 0.50 +l I32 Section L5 to LI Header Position 34 4.27E+08 5.20E+08 0.546 0.45 +I I33 Section L5 to LI Header Position 35 4.21E+08 5.13E+08 0.538 0.46 +I 134 Section L5 to LI Header Position 36 3.89E+08 4.74E+08 0.497 0.50 +I I35 Section L5 to LI Header Position 37 3.89E+08 4.74E+08 0.497 0.50 +I 136 Section L5 to LI Header Position 38 3.26E+08 3.97E+08 0.4I7 0.58- +I I37 Section L5 to LI Header Position 39 3.24E+08 3.95E+08 0.4I4 0.59 +I I38 Section L5 to LI Header Position 40 4.47E+08 5.45E+08 0.57I 0.43 +I 139 Section L5 to L 1 Header Position 4 I 3.36E+08 4.09E+08 0.429 0.57 +l I40 Section L5 to L 1 Header Position 42 3.28E+08 4.00E+08 0.4I9 0.58 +1 141 Section L5 to Ll Header Position 43 2.72E+08 3.31E+08 0.348 0.65 +1 142 Section L5 to L 1 Header Position 44 2.76E+08 3.36E+08 0.353 0.65 +1 143 Section L5 to Ll Header Position 45 1.75E+08 2.I3E+08 0.224 0.78 +l 144 Section L5 to LI Header Position 46 4.07E+08 4.96E+08 0.520 0.48 +l I45 Section L3 to L2 Position Zero 2.52E+09 3.07E+09 3.221 (2.22) -1 146 Section L3. to L2 Position 1 2.54E+09 3.10E+09 3.247 (2.25) -1
[103]
FRSRELEASERECORD ~
ZIONSOLJ!I!Q~*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activ~ty SOF
- Pip~ Measureme~.t 1oc,ation 1-Ws Sign (pCi/m2)* (pCi/m 2) . .'(Ws) 147 Section 13 to 12 Position 2 2.53E+09 3.08E+09 3.234 (2.23) -1 148 Section 13 to 12 Position 3 2.49E+09 3.03E+09 3.183 (2.18) -1 149 Section 13 to L2 Position 4 2.49E+09 3.03E+09 3.183 (2.18) -1 150 Section 13 to L2 Position 5 2.52E+09 3.07E+09 3.221 (2.22) -1 151 Section 13 to L2 Position 6 2.49E+09 3.03E+09 3.183 (2.18) -1 152 Section 13 to 12 Position 7 2.47E+09 3.01E+09 3.157 (2.16) -1 153 Section L3 to L2 Position 8 2.48E+09 3.02E+09 3.170 (2.17) -1 154 Section L3 to L2 Position 9 2.50E+09 3.05E+09 3.195 (2.20) -1 155 Section L3 to L2 Position 10 2.50E+09 3.05E+09 3.195 (2.20) -1 156 Section L3 to L2 Position 11 2.07E+09 2.52E+09 2.646 (1.65) -1 157 Section L3 to L2 Position 12 2.00E+09 2.44E+09 2.556 (L56) -1 158 Section L3 to L2 Position 13 l.97E+09 2.40E+09 2.518 (1.52) -1 159 Section L3 to L2 Position 14 l.43E+09 l.74E+09 1.828 (0.83) -1 160 Section Ll to Sump B Position Zero l.60E+09 l.95E+09 2.045 (1.05) -1 161 Section Ll to Sump B Position I l.58E+09 l.93E+09 2.020 (1.02) -1 162 Section Ll to Sump B Position 2 l.69E+09 2.06E+09 2.160 (1.16) -1 163 Section LI to Sump B Position 3 l.66E+09 2.02E+09 2.122. (l.12) -1 164 Section Ll to Sump'B Position 4 l.66E+09 2.02E+09 2:122 (1.12) -1 165 Section LI to. Sump B Position 5 l.66E+09 2.02E+09 2.122 (1.12) -1 166 Section Ll to Sump B Position 6 1.63E+09 l.99E+09 2.083 (1.08) -1 167 Section Ll to Sump B Position 7 l.79E+09 2.18E+09 2.288 (l.29) -1 168 Section LI to Sump B Position 8 l.72E+09 2.10E+09 2.198 (1.20) -1 169 Section LI to Sump B Position 9 1.89E+09 2.30E+09 2.416 (1.42) -1 170 Section LI to Sump B Position 10 l.88E+09 2.29E+09 2.403 (1.40) -1 171 Section Ll to Sump B Position 11 l.86E+09 2.27E+09 2.377 (1.38) -1 172 Section Ll to Sump B Position 12 l.89E+09 2.30E+09 2.416 (1.42) -1 173 Section Ll to Sump B Position 13 l.96E+09 2.39E+09 2.505 ( 1.51) -1 174 Section LI to Sump B Position 14 l.90E+09 2.32E+09 2.429 (1.43) -1 175 Section LI to Sump B Position 15 l.86E+09 2.27E+09 2.377 (1.38) -1 176 Section Ll to Sump B Position 16 1.76E+09 2.14E+09 2.250 (1.25) -1 177 Section Ll to Sump B Position 17 2.08E+09 2.53E+09 2.659 (1.66) -1 178 Section Ll to Sump B Position 18 2.24E+09 2.73E+09 2.863 (1.86) -1 179 Section Ll to Sump B Position 19 2.26E+09 2.75E+09 2.889 (1.89) -1 180 Section Ll to Sump B Position 20 2.20E+09 2.68E+09 2.812 (1.81) -1 181 Section Ll to Sump B Position 21 2.04E+09 2.49E+09 2.608 (1.61) -1 182 Section Ll to Sump B Position 22 2.22E+09 2.71E+09 2.838 (1.84) -1 183 Section Ll to Sump B Position 23 l.37E+09 l.67E+09 1.751 (0.75) -1 184 Section Ll to Sump B Position 24 2.39E+08 2.91E+08 0.305 0.69 +I 185 Section Ll to Sump B Position 25 l.95E+08 2.38E+08 0.249 0.75 +I Number of positive differences (S+) _ _1_34_ _
Critical Value - -104 ---
Survey Unit MEETS the Acceptance Criteria
[104]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLI.fl!Q!Y§U&=
SURVEY UNITS 05119A & 051198
-= _S_D_IJ!.P}J._ ~p~ _l\_1J4:i~b_]!:ll_l?r)?~~ ~u~m~~?f_~n_iy~y J?'.!~a._--*~=~--~-~--- *~ .: ___ :::~_- ___ -~-~ __:c,, ~=::~ -=~
Surveved Pipe - Calculation of Mean Activitv and Dose
- J 2
Accessible Area of STS Unit
- - -2.432 ---- m NumberofMeasurements Taken in Survey Unit/Feet of Pipe Surveyed ----'2""5_ _ _ ft Maximum SOF Observed ---'l-"'.9-'-3~b'----~
Mean of Total Activity Results _ _4~.6'--l~E_+0~8~- (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test _ _ _0_.0~92_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activitv Building Allowable ROC (oCi/m2 ) (oCil CmCi) (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 l.64E+08 3.98E+08 3.98E-OI 2.25E+03 0.00018 1.1 lE-02 0.00442 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 2.14E+08 5.22E+08 5.22E-01 8.22E+02 0.00063 3.04E-02 0.01586 Ni-63 8.26E+07 2.01E+08 2.0lE-01 8.52E+04 0.00000 2.94E-04 0.00006 Sr-90 l.43E+o5 3.47E+05 3.47E-04 7.39E+Ol 0.00000 3.38E-01 0.00012 TOTAL 0.0008 0.02045
[105]
FRSRELEASERECORD ~
ZIONSOL_l!I!f!~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe M - Sign Test Classification _l_ Type I error 0.05 Number of Measurements 25 Gamma Result *Total Activity SOF
- Pipe Measurement Location 1-Ws Sign (pCi/m2) foCi/m 2) (Ws) _
0 Section M2 to Sump B Position Zero 8.23E+08 l.OOE+09 1.931 (0.93) -1 1 Section M2 to Sump B Position 1 7.53E+08 9.18E+08 1.767 (0.77) -1 2 Section M2 to Sump B Position 2 6.23E+08 7.59E+08 1.462 (0.46) -1 3 Section M2 to Sump B Position 3 7.70E+08 9.38E+08 1.807 (0.81) -1 4 Section M2 to Sump B Position 4 4.45E+08 5.42E+08 1.044 (0.04) -1 5 Section M2 to Sump B Position 5 4.26E+08 5.19E+08 1.000 0.00 +l 6 Section M2 to Sump B Position 6 4.83E+08 5.89E+08 1.134 (0.13) -1 7 Section M2 to Sump B Position 7 4.26E+08 5.19E+08 1.000 0.00 +l 8 Section M2 to Sump B Position 8 4.23E+08 5.16E+08 0.993 0.01 +l 9 Section M2 to Sump B Position 9 4.08E+08 4.97E+08 0.958 0.04 +l 10 Section M2 to Sump B Position 10 3.54E+08 4.31E+08 0.831 0.17 +1 11 Section M2 to Sump B Position 11 3.46E+08 4.22E+08 0.812 0.19 +1 12 Section M2 to Sump B Position 12 3.46E+08 4.22E+08 0.812 0.19 +1 13 Section M2 to Sump B Position 13 3.38E+08 4.12E+08 0.793 0.21 +1 14 Section M2 to Sump B Position 14 3.35E+08 4.08E+08 0.786. 0.21 +l 15 Section M2 to Sump B Position 15 3.28E+08 4.00E+08 0.770 0.23 +l 16 Section M2 to Sump B Position 16 3.10E+08 3.78E+08 0.728 0.27 +l 17 Section M2 to Sump B Position 17 2.87E+08 3.50E+08 0.674 0.33 +1 18 Section M2 to Sump B Position 18 2.85E+08 3.47E+08 0.669 0.33 +1 19 Section M2 to Sump B Position 19 2.35E+08 2.86E+08 0.552 0.45 +l 20 Section M2 to Sump B Position 20 2.47E+08 3.01E+08 0.580 0.42 +l 21 Section M2 to Sump B Position 21 3.27E+08 3.99E+08 0.767 0.23 +l 22 Section M2 to Sump B Position 22 8.28E+07 l.01E+08 0.194 0.81 +l 23 Section M2 to Sump B Position 23 2.24E+07 2.73E+07 0.053 0.95 +1 24 Section M2 to Sump B Position 24 2.89E+07 3.52E+07 0.068 0.93 +1 Number of positive differences (S+) 19 Critical Value 17 Survey Unit MEETS the Acceptance Criteria
[106]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSur=
~-""-
SURVEY UNITS 05119A & 05119B
- -:-~ *:,_--=~ ~-**---*
0
._.*..~.~ - ~ Si!~ii*li, Pi11ERf6*illCii!'!~iirn~~~iDE!:!9'.~~~!!!iQ.!!a_:~-:~=~ ~:- * '~=~--**- -.-~~~-:**=~~;_:_--:~ :=:=~*
Surveved Pipe- Calculation of Mean Activitv and Dose Accessible Area of STS Unit _ _ _5_.2_5_4_ _ _ m 2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _ _3_6_ _ _ ft Ma,..imum SOF Observed
- - -6.3299 Mean of Total Activity Results _ _1_.8_4_E_+_09_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _0_.7_07_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (oCi) (mCi) (mCi) Inventory ( mrem/vr per mCi) mrem/vr Co-60 6.52E+08 3.43E+09 3.43E+OO 2.25E+03 0.00152 1.1 lE-02 0.03803 Cs-134 0.00E+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 8.55E+08 4.49E+09 4.49E+OO 8.22E+02 0.00546 3.04E-02 0.13655 Ni-63 3.29E+08 l.73E+09 l.73E+OO 8.52E+04 0.00002 2.94E-04 0.00051 Sr-90 5.69E+o5 2.99E+06 2.99E-03 7.39E+Ol 0.00004 3.38E-Ol 0.00101 TOTAL 0.0070 0.17609
[107]
FRSRELEASERECORD ~
ZIONSOLJ!!!Qt§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B. Pipe N - Sign Test Classification _I_ Type I error 0.05 Number of Measurements 36 Gamma Result Total Activity SOF
- . Pipe Me31itirement Location
1-Ws Sign
- ' (pCi/m 2) (pCi/m2 ) (Ws),
0 Section N2 to Sump B Position Zero l.82E+09 2.22E+09 1.204 (0.20) -I I Section N2 to Sump B Position I l.89E+09 2.30E+09 1.250 (0.25) -1 2 Section N2 to Sump B Position 2 l.61E+09 l.96E+09 1.065 (0.06) -1 3 Section N2 to Sump B Position 3 l.83E+09 2.23E+09 1.210 (0.21) -1 4 Section N2 to Sump B Position 1 l.74E+09 2.12E+09 1.151 (0.15) -1 5 Section N2 to Sump B Position 4 l.74E+09 2.12E+09 1.151 (0.15) -1 6 Section N2 to Sump B Position 5 l.76E+09 2.14E+09 1.164 (0.16) -1 7 Section N2 to Sump B Position 6 l.50E+09 l.83E+09 0.992 0.01 +l 8 Section N2 to Sump B Position 7 l.61E+09 l.96E+09 1.065 (0.06) -1 9 Section N2 to Sump B Position 8 1.49E+09 l.82E+09 0.986 0.01 +l 10 Section N2 to Sump B Position 9 l.51E+09 1.84E+09 0.999 0.00 +I 11 Section N2 to Sump B Position I 0 l.53E+09 l.86E+09 1.012 (0.0 I) -1 12 Section N2 to Sump B Position 11 l.58E+09 l.93E+09 1.045 (0.05) -1 13 Section N2 to Sump B Position 12 1.42E+09 l.73E+09 0.939 0.06 +1 14 Section N2 to Sump B Position 13 l.36E+09 l.66E+09 0.900 0.10 +l 15 Section N2 to Sump B Position 14 l.51E+09 l.84E+09 0.999 0.00 +1 16 Section N2 to Sump B Position 15 l .49E+09 l.82E+09 0.986 0.01 +1 17 Section N2 to Sump B Position 16 l.41E+09 l.72E+09 0.933 0.07 +1 18 Section N2 to Sump B Po'sition 17 l.38E+09 l.68E+09 0.913 0.09 +l 19 Section N2 to Sump B Position 18 l.35E+09 l.65E+09 0.893 0.11 +1 20 Section N2 to Sump B Position 19 l.20E+09 l.46E+09 0.794 0.21 +l 21 Section N2 to Sump B Position 20 l.04E+09 l.27E+09 0.688 0.31 +1 22 Section N2 to Sump B Position 21 l.03E+09 1.26E+09 0.681 0.32 +1 23 Section N2 to Sump B Position 22 9.93E+08 l.21E+09 0.657 0.34 +1 24 Section N2 to Sump B Position 23 9.75E+08 1.19E+09 0.645 0.36 +1 25 Section N2 to Sump B Position 24 9.49E+08 l.16E+09 0.628 0.37 +1 26 Section N2 to Sump B Position 25 9.62E+08 1.17E+09 0.636 0.36 +1 27 Section N2 to Sump B Position 26 9.67E+08 l.18E+09 0.640 0.36 +1 28 Section N2 to Sump B Position 27 9.57E+09 1.17E+10 6.330 (5.33) -1 29 Section N2 to Sump B Position 28 9.39E+08 1.14E+09 0.621 0.38 +l 30 Section N2 to Sump B Position 29 8.85E+08 l.08E+09 0.585 0.41 +l 31 Section N2 to Sump B Position 30 8.56E+08 l.04E+09 0.566 0.43' +1 32 Section N2 to Sump B Position 31 8.48E+08 l.03E+09 0.561 0.44 +1 33 Section N2 to Sump B Position 32 8.12E+08 9.90E+08 0.537 0.46 +1 34 Section N2 to Sump B Position 33 4.95E+08 6.03E+08 0.327 0.67 +l 35 Section N2 to Sump B Position 34 2.04E+08 2.49E+08 0.135 0.87 +l Number of positive differences (S+) 25 Critical Value 23 Survey Unit MEETS the Acceptance Criteria
[108]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONS-w=.
""'~-~
SURVEY UNITS 05119A & 051198
- =._su.!!!ii B, Pipe P (4-iilch :Fi~'!!: Dmiil)--Summal")_'._of Su~I Data.:..:_:~-~- . .* -, ~:..:= _: ~.::.:_*=--=~=~=- _.
0 Surveved Pipe- Calculation of Mean Activitv and Dose Accessible Area of STS Unit _ _........:..:7.c...78:::3:....__ _ m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _.::c80:....__ _ ft Ma,.imum SOP Observed _ _....:2:.::.2::..:1..::.69'----
2 Mean of Total Activity Results _ _1:..:.*;:..:16'-=E'-+""'09'--- (pCi/m )
Percentage of Allowable Inventory for Sign Test _ _....:0-'-'.6-"-5'-9o/i'-"o--
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2 ) (nCn !mCi) lmCi) Inventory (rnrem/vr ner men mrem/vr Co-60 4.12E+08 3.21E+09 3.21E+OO 2.25E+03 0.00142 l.1 lE-02 0.03558 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 1.60E-02 0.00000 Cs-137 5.40E+08 4.20E+09 4.20E+OO 8.22E+02 0.00511 3.04E-02 0.12775 Ni-63 2.08E+08 l.62E+09 l.62E+OO 8.52E+04 0.00002 2.94E-04 0.00048 Sr-90 3.60E+05 2.80E+06 2.80E-03 7.39E+OI 0.00004 3.38E-OI 0.00095 TOTAL 0.0066 0.16475
[109]
FRSRELEASERECORD ~
ZIONSOLJ!I.!Q!Y.§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump 8, Pipe P - Sign Test Classification _1_ Type I error 0.05 Number of Measurements 80 Gamma Result Total 'Activity SOF..
.. Pipe Measurem~nt Lodation (oCi/m2) (oCi/m2 ) (Ws) l~Ws Sign 0 Section P2 to Sump B Position Zero l.25E+09 l.52E+09 1.313 (0.31) -1 1 Section P2 to Sump B Position 1 l.26E+09 l.54E+09 1.324 (0.32) -1 2 Section P2 to Sump B Position 2 l.20E+09 l.46E+09 1.261 (Q.26) -1 3 Section P2 to Sumo B Position 3 1.13E+09 l.38E+09 1.187 (Q.19) -1 4 Section P2 to Sumo B Position 4 1.18E+09 l.44E+09 1.240 (Q.24) -1 5 Section P2 to Sumo B Position 5 l.04E+09 1.27E+09 1.093 (Q.09) -1 6 Section P2 to Sumo B Position 6 7.74E+08 9.43E+08 0.813 0.19 +1 7 Section P2 to Sumo B Position 7 7.77E+08 9.47E+08 0.816 0.18 +l 8 Section P2 to Sumo B Position 8 7.39E+08 9.01E+08 0.776 0.22 +1 9 Section P2 to Sumo B Position 9 6.50E+08 7.92E+08 0.683 0.32 +1 10 Section P2 to Sumo B Position 10 6.13E+08 7.47E+08 0.644 0.36 +l 11 Section P2 to Sumo B Position 11 6.26E+08 7.63E+08 0.658 0.34 +1 12 Section P2 to Sumo B Position 12 5.59E+08 6.81E+08 0.587 0.41 +1 13 Section P2 to Sumo B Position 13 6.20E+08 7.56E+08 0.651 0.35 +1 14 Section P2 to Sumo B Position 14 8.21E+08 l.OOE+09 0.863 0.14 +1 15 Section P2 to Sumo B Position 15 6.14E+08 7.48E+08 0.645 0.35 +1 16 Section P2 to Sumo B Position 16 6.47E+08 7.89E+08 0.680 0.32 +1 17 Section P2 to Sumo B Position 17 5.38E+08 6.56E+08 0.565 0.43 +l 18 Section P2 to Sumo B Position 18 4.69E+08 5.72E+08 0.493 0.51 +1 19 Section P2 to Sump B Position 19 5.66E+08 6.90E+08 0.595 0.41 +l 20 Section P2 to Sump B Position 20 4.94E+08 6.02E+08 0.519 0.48 +l 21 Section P2 to Sump B Position 21 4.90E+08 5.97E+08 0.515 0.49 +1 22 Section P2 to Sump B Position 22 4.93E+08 6.01E+08 0.518 0.48 +1 23 Section P2 to Sump B Position 23 3.68E+08 4.48E+08 0.387 0.61 +l 24 Section P2 to Sumo B Position 24 3.60E+08 4.39E+08 0.378 0.62 +l
- 25 Section P2 to Sumo B Position 25 3.96E+08 4.83E+08 0.416 0.58 +1 26 Section P2 to Sumo B Position 26 3.53E+08 4.30E+08 0.371 0.63 +1 27 Section P2 to Sumo B Position 27 3.02E+08 3.68E+08 0.317 0.68 +1 28 Section P2 to Sumo B Position 28 3.52E+08 4.29E+08 0.370 0.63 +1 29 Section P2 to Sumo B Position 29 3.68E+08 4.48E+08 0.387 0.61 +1 30 Section P2 to Sumo B Position 30 3.83E+08 4.67E+08 0.402 0.60 +1 31 Section P2 to Sumo B Position 31 4.97E+08 6.06E+08 0.522 0.48 +1 32 Section P2 to Sumo B Position 32 4.90E+08 5.97E+08 0.515 0.49 +1 33 Section P2 to Sumo B Position 33 4.58E+08 5.58E+08 0.481 0.52 +1 34 Section P2 to Sumo B Position 34 4.48E+08 5.46E+08 0.471 0.53 +1 35 Section P2 to Sumo B Position 35 4.12E+08 5.02E+08 0.433 0:51 +l 36 Section P2 to Sumo B Position 36 4.53E+08 5.52E+08 0.476 0.52 +l 37 Section P2 to Sumo B Position 37 4.97E+08 6.06E+08 0.522 0.48 +l 38 Section P2 to Sumo B Position 38 5.31E+08 6.47E+08 0.558 0.44 +1 39 Section P2 to Sumo B Position 39 7.25E+08 8.84E+08 0.762 0.24 +l 40 Section P2 to Sumo B Position 40 7.57E+08 9.23E+08 0.795 0.20 +1 41 Section P2 to Sumo B Position 41 8.58E+08 l.05E+09 0.901 0.10 +1 42 Section P2 to Sumo B Position 42 3.89E+08 4.74E+08 0.409 0.59 +1 43 Section P2 to Sump B Position 43 6.25E+07 7.62E+07 0.066 0.93 +l 44 Section P2 to Sump B Position 44 9.10E+07 1.l 1E+08 0.096 0.90 +l 45 Section P2 to Sump B Position 45 9.09E+07 1.11E+08 0.096 0.90 +l 46 Section Sumo B to P 1 Position Zero 7.44E+08 9.07E+08 0.782 0.22 +l
[ 11 O]
FRSRELEASERECORD ~
ZlONSOL_ll!!Q!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result . *Total AC:tivity SOF
- Pipe Measurement Location 1-Ws Sign (pCi/m2) (pCi/m2 ) (Ws) 47 Section Sump B to Pl Position 1 7.82E+08 9.53E+08 0.822 0.18 +l 48 Section Sump B to P 1 Position 2 7.64E+08 9.31E+08 0.803 0.20 +l 49 Section Sump B to Pl Position 3 7.40E+08 9.02E+08 0.778 0.22 +l 50 Section Sump B to Pl Position 4 7.31E+08 8.91E+08 0.768 0.23 +l 51 Section Sump B to Pl Position 5 7.58E+08 9.24E+08 0.796 0.20 +l 52 Section Sump B to Pl Position 6 7.86E+08 9.58E+08 0.826 0.17 +l 53 Section Sump B to Pl Position 7 8.60E+08 1.05E+09 0.904 0.10 +l 54 Section Sump B to P 1 Position 8 9.02E+08 1.10E+09 0.948 0.05 +l 55 Section Sump B to Pl Position 9 9.03E+08 1.10E+09 0.949 0.05 +l 56 Section Sump B to P 1 Position 10 l.15E+09 1.40E+09 1.208 (0.21) -1 57 Section Sump B to P 1 Position 11 l.30E+09 1.58E+09 1.366 (0.37) -1 58 Section Sump B to Pl Position 12 l .33E+09 1.62E+09 1.397 (0.40) -1 59 Section Sump B to P 1 Position 13 1.31E+09 1.60E+09 1.376 (0.38) -1 60 Section Sump B to Pl Position 14 l.32E+09 l.61E+09 1.387 (0.39) -1 61 Section Sump B to Pl Position 15 1.31E+09 1.60E+09 1.376 (0.38) -1 62 Section Sump B to Pl Position 16 l.32E+09 l.61E+09 1.387 (0.39) -1 63 Section Sump B to Pl Position 17 l.50E+09 1.83E+09 1.576 (0.58) -1 64 Section Sump B to P 1 Position 18 l.61E+09 l.96E+09 . 1.692 (0.69) -1 65 Section Sump B to Pl Position 19_ 1.61E+09 1.96E+09 1.692 (0.69) -1 66 Section-suriilYB to Pl-Position 20 1.64E+09 2.00E+09 1.723 (0.72) -1 67 Section Sump B to Pl Position 21 1.74E+09 2.12E+09 1.828 (0.83) -1 68 Section Sump B to P 1 Position 22 l.87E+09 2.28E+09 1.965 (0.96) -1 69 Section Sump B to Pl Position 23 1.95E+09 2.38E+09 2.049 (1.05) -1 70 Section Sump B to Pl Position 24 2.00E+09 2.44E+09 2.101 (1.10) -1 71 Section Sump B to Pl Position 25 2.04E+09 2.49E+09 2.143 (1.14) -1 72 Section Sump B to P 1 Position 26 2.11E+09 2.57E+09 2.217 (1.22) -1 73 Section Sump B to Pl Position 27 2.02E+09 2.46E+09 2.122 (1.12) -1 74 Section Sump B to Pl Position 28 2.11E+09 2.57E+09 2.217 (1.22) -1 75 Section Sump B to Pl Position 29 2.07E+09 2.52E+09 2.175 (1.17) -1 76 Section Sump B to Pl Position 30 2.04E+09 2.49E+09 2.143 (1.14) -1 77 Section Sump B to P 1 Position 31 2.07E+09 2.52E+09 2.175 (1.17) -1 78 Section Sump B to Pl Position 32 l.98E+09 2.41E+09 2.080 (1.08) -1 79 Section Sump B to Pl Position 33 l .58E+09 1.93E+09 1.660 (0.66) -1 Number of positive differences (S+) _ _5_0_ _
Critical Value - - -
Survey Unit MEETS the Acceptance Criteria
[ 111]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSUi=
. k.~~
SURVEY UNITS 05119A & 05119B c~~;~.:~I:.S:'.:';£,~I~I:~=~==~-:Ii:==~~ji,!p~~ell{FJ!i~~:F~rl>~~E8-0~1P~IL~~~~I~I::c~2;,.:::.,::.'=3=~~~:...:.~~~:-:_:.* ****.'.*~1~:~~~
Surveved Pipe - Calculation of Mean Activitv and Dose Accessible Area of STS Unit _ _ _6_._90_7_ _ _ m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _7_1_ _ _ ft Maximum SOF Observed 2.0495 Mean of Total Activity Results _ _7_.0_4_E_+0_8_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _0_.3_7,_-o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2 ) (oCi) (mCi) (mCD Inventory (mrem/vr oer mCi) mrem/yr Co-60 2.50E+08 l.73E+09 l.73E+OO 2.25E+03 0.00077 l.1 lE-02 0.01916 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 1.60E-02 0.00000 Cs-137 3.28E+08 2.26E+09 2.26E+OO 8.22E+02 0.00275 3.04E-02 0.06880 Ni-63 J.26E+o8 8.71E+08 8.71E-01 8.52E+04 0.00001 2.94E-04 0.00026 Sr-90 2.18E+05 l.51E+06 l.5JE-03 7.39E+Ol 0.00002 3.38E-Ol 0.00051 TOTAL 0.0036 0.08872
[112]
FRSRELEASERECORD ~
ZmNSOL!!Il!l!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe R - Sign Test Classification _l_ Type I error 0.05 Number of Measurements 71 Gamma Result Total Activity SOF
- Pipe Measureme~t Location 1-Ws Sign
'< \ (oCi/m2) (pCi/m2) (Ws)
0 Section R3 to R2 Position Zero 4.58E+08 5.58E+08 0.751 0.25 +I 1 Section R3 to R2 Position I 4.46E+08 5.44E+08 0.731 0.27 +I 2 Section R3 to R2 Position 2 4.73E+08 5.76E+08 0.776 0.22 +I 3 Section R3 to R2 Position 3 6.04E+08 7.36E+08 0.990 O.QI +I 4 Section R3 to R2 Position 4 5.57E+08 6.79E+08 0.913 0.09 +I 5 Section R3 to R2 Position 5 3.75E+08 4.57E+08 0.615 0.39 +I 6 Section R3 to R2 Position 6 5.l 7E+08 6.30E+08 0.848 0.15 +I 7 Section R3 to R2 Position 7 4.65E+08 5.67E+08 0.762 0.24 +l 8 Section R3 to R2 Position 8 5.26E+08 6.41E+08 0.862 0.14 +l 9 Section R3 to R2 Position 9 3.93E+08 4.79E+08 0.644 0.36 +l 10 Section R3 to R2 Position I 0 5.07E+08 6.18E+08 0.831 0.17 +l 11 Section R3 to R2 Position 11 5.03E+08 6.13E+08 0.825 0.18 +I 12 Section R3 to R2 Position 12 4.89E+08 5.96E+08 0.802 0.20 +I 13 Section R3 to R2 Position 13 3.98E+08 4.85E+08 0.653 0.35 +l 14 Section R3 to R2 Position 14 5.90E+08 7.19E+08 0.967 0.03 +l 15 Section R3 to R2 Position 15 l.31E+08 1.60E+08 0.215 0.79 +l 16 Section R3 to R2 Position 16 l.02E+08 1.24E+08 0.167 0.83 +l 17 Section R3 to R2 Position 17 8.63E+07 l.05E+08 0.141 0.86 +l 18 Section R2 to Sump B Position' Zero l.13E+09 1.38E+09 1.853 (0.85) -1 19 Section R2 to Sump B Position 1 l.06E+09 l.29E+09 1.738 (0.74) -1 20 Section R2 to Sump B Position 2 9.30E+08 1.13E+09 1.525 (0.52) -1 21 Section R2 to Sump B Position 3 8.36E+08 1.02E+09 1.371 (0.37) -1 22 Section R2 to Sump B Position 4 7.92E+08 9.65E+08 1.299 (0.30) -1 23 Section R2 to Sump B Position 5 7.05E+08 8.59E+08 1.156 (0.16) -1 24 Section R2 to Sump B Position 6 6.61E+08 8.06E+08 1.084 (0.08) -1 25 Section R2 to Sump B Position 7 7.40E+08 9.02E+08 1.213 ' (0.21) -1 26 Section R2 to Sump B Position 8 7.09E+08 8.64E+08 1.162 (0.16) -1 27 Section R2 to Sump B Position 9 7.82E+08 9.53E+08 1.282 (0.28) -I 28 Section R2 to Sump B Position 10 7.06E+08 8.60E+08 1.158 (0.16) -I 29 Section R2 to Sump B Position 11 6.37E+08 7.76E+08 1.044 (0.04) -1 30 Section R2 to Sump B Position 12 5.91E+08 7.20E+08 0.969 0.03 +l 31 Section R2 to Sump B Position 13 5.73E+08 6.98E+08 0.939 0.06 +I 32 Section R2 to Sump B Position 14 5.50E+08 6.70E+08 0.902 0.10 +I 33 Section R2 to Sump B Position 15 5.96E+08 7.26E+08 0.977 0.02 +1 34 Section R2 to Sump B Position 16 5.92E+08 7.21E+08 0.971 0.03 +1 35 Section R2 to Sump B Position 17 5.90E+08 7.19E+08 0.967 0.03 +I 36 Section R2 to Sump B Position 18 5.84E+08 7.12E+08 0.958 0.04 +I 37 Section R2 to Sump B Position 19 5.73E+08 6.98E+08 0.939 0.06 +l 38 Section R2 to Sump B Position 20 5.19E+08 6.33E+08 0.851 0.15 +1 39 Section R2 to Sump B Position 21 5.87E+08 7.15E+08 0.962 0.04 +I 40 Section R2 to Sump B Position 22 7.10E+08 8.65E+08 1.164 (0.16) -1 41 Section R2 to Sump B Position 23 6.54E+08 7.97E+08 1.072 (0.07) -1 42 Section R2 to Sump B Position 24 5.15E+08 6.28E+08 0.844 0.16 +I 43 Section R2 to Sump B Position 25 5.28E+08 6.43E+08 0.866 0.13 +I 44 Section R2 to Sump B Position 26 5.88E+08 7.17E+08 0.964 0.04 +I 45 Section R2 to Sump B Position 27 7.46E+08 9.09E+08 1.223 (0.22) -1 46 Section R2 to Sump B Position 28 5.92E+08 7.21E+08 0.971 O.Q3 +l
[113]
FRS RELEASE RECORD ~
ZIONSOL_l!I!Q!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- Pipe Measurement Location , 1-Ws Sign (pcl/m2) (pCi/m2) (Ws) 47 Section R2 to Sump B Position 29 5.10E+08 6.22E+08 0.836 0.16 +l 48 Section R2 to Sump B Position 30 l.25E+09 l.52E+09 2.050 (1.05) -1 49 Section R2 to Sump B Position 31 6.11E+08 7.45E+08 1.002 (0.00) -1 50 Section R2 to Sump B Position 32 6.41E+08 7.81E+08 1.051 (0.05) -1 51 Section R2 to Sump B Position 33 7.23E+08 8.81E+08 1.185 (0.19) -1 52 Section R2 to Sump B Position 34 7.15E+08 8.71E+08 1.172 (0.17) -1 53 Section R2 to Sump B Position 35 6.72E+08 8.19E+08 1.102 (0.10) -1 54 Section R2 to Sump B Position 36 6.80E+08 8.29E+08 1.115 (0.11) -1 55 Section R2 to Sump B Position 37 6.29E+08 7.67E+08 1.031 (0.03) -1 56 Section R2 to Sump B Position 38 6.39E+08 7.79E+08 1.048 (0.05) -1 57 Section R2 to Sump B Position 39 6.24E+08 7.60E+08 1.023 (0.02) -1 58 Section R2 to Sump B Position 40 6.36E+08 7.75E+08 1.043 (0.04) -1 59 Section R2 to Sump B Position 41 6.08E+08 7.41E+08 0.997 0.00 +l 60 Section R2 to Sump B Position 42 5.99E+08 7.30E+08 0.982 0.02 +l 61 Section R2 to Sump B Position 43 6.09E+08 7.42E+08 0.999 0.00 +l 62 Section R2 to Sump B Position 44 5.98E+08 7.29E+08 0.980 0.02 +l 63 Section R2 to Sump B Position 45 7.79E+08 9.49E+08 1.277 (0.28) -1 64 Section R2 to Sump B Position 46 9.87E+08 l.20E+09 1.618 (0.62) -1 65 Section R2 to Sump B Position 47 5.09E+08 6.20E+08 0.835 0.17 +1 66 Section R2 to Sump B Position 48 l.34E+08 l.63E+08 0.220 0.78 +l 67 Section R2 to Sump B Position 49 l.14E+08 1.39E+08 0.187 0.81 +l 68 Section R2 to Sump B Position 50 l.13E+08 l.38E+08 0.185 0.81 +l 69 Section R2 to Sump B Position 51 l.13E+08 l.38E+08 0.185 0.81 +l 70 Section R2 to Sump B Position 52 l.14E+08 l.39E+08 0.187 0.81 +1 Number of positive differences (S+) _ _4_3_ _
Critical Value - - -
Survey Unit MEETS the Acceptance Criteria
[114]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Surveved Pipe - Calculation of Mean Activity and Dose Accessible Area of STS Unit - - - 20.868 m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed ------'l-'-43"----- ft Maximum SOF Observed ----'l"'.7-'-9"-50'------
Mean of Total Activity Results -----'3~.4_2--'E-'-+~08'----- (pCi/m 2
)
Percentage of Allowable Inventory for Sign Test _ _ _0_.7_37_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 l.21E+08 2.54E+09. 2.54E+OO 2.25E+03 0.00113 l.l lE-02 0.02814 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 l.59E+08 3.32E+09 3.32E+OO 8.22E+02 0.00404 3.04E-02 0.10105 Ni-63 6.13E+07 l.28E+09 l.28E+OO 8.52E+04 0.00002 2.94E-04 0.00038 Sr-90 l.06E+05 2.21E+06 2.21E-03 7.39E+Ol 0.00003 3.38E-Ol 0.00075 TOTAL 0.0052 0.13032 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _,_-9_ _ _ ft Area of Pipe Not Surveyed _ _ _8_.6_1_ _ _ m2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activitv Building Allowable ROC (oCi/m2 ) (oCi) (mCi) !mCi) Inventory (mrem/vr per mCi) mrem/vr Co-60 l.21E+08 3.58E+09 3.58E+OO 2.25E+03 0.00159 l.l lE-02 0.03975 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 _ 0.00000 l.60E-02 0.00000 Cs-137 1.59E+08 4.70E+09 4.70E+OO 8.22E+02 0.00571 3.04E-02 0.14274 Ni-63 6.13E+07 l.81E+09 l.81E+OO 8.52E+04 0.00002 2.94E-04 0.00053 Sr-90 l.06E+05 3.13E+06 3.13E-03 7.39E+OI 0.00004 3.38E-Ol 0.00106 TOTAL 0.0074 0.18408
[115]
FRSRELEASERECORD ;::::==-
ZIONSOLJ!!J!l!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 051.19A & 05119B Sump B, Pipe S - Sign Test Classification Type I error 0.05 Number of Measurements 143 Gamma Result Total Activity SOF
- Pipe Measurement Location 1-Ws Sign*
- . (pCi/m 2) (pCi/m2 ) (Ws): '
0 Section S3 to S 1 Position Zero l.76E+08 2.14E+08 0.627 0.37 +1 1 Section S3 to S 1 Position 1 2.76E+08 3.36E+08 0.983 0.02 +1 2 Section S3 to S 1 Position 2 2.34E+08 2.85E+08 0.833 0.17 +l 3 Section S3 to S1 Position 3 2.49E+08 3.03E+08 0.887 0.11 +1 4 Section S3 to S 1 Position 4 2.71E+08 3.30E+08 0.965 0.03 +l 5 Section S3 to S 1 Position 5 2.44E+08 2.97E+08 0.869 0.13 +1 6 Section S3 to S 1 Position 6 2.39E+08 2.91E+08 0.851 0.15 +1 7 Section S3 to S 1 Position 7 2.33E+08 2.84E+08 0.830 0.17 +1 8 Section S3 to S1 Position 8 2.36E+08 2.88E+08 0.841 0.16 +1 9 Section S3 to S 1 Position 9 2.18E+08 2.66E+08 0.776 0.22 +l 10 Section S3 to S 1 Position 10 2.26E+08 2.75E+08 0.805 0.20 +1 11 Section S3 to S 1 Position 11 2.24E+08 2.73E+08 0.798 0.20 +l 12 Section S3 to Sl Position 12 2.18E+08 2.66E+08 0.776 0.22 +l 13 Section S3 to S 1 Position 13 2.12E+08 2.58E+08 0.755 0.24 +1 14 Section S3 to SI Position 14 2.14E+08 2.61E+08 0.762 0.24 +l 15 Section S3 to SI Position 15 2.18E+08 2.66E+08 0.776 0.22 +1 16 Section S3 to SI Position 16 2.20E+08 2.68E+08 0.784 0.22 +I 17 Section S3 to S 1 Position 17 2.15E+08 2.62E+08 0.766 0.23 +I 18 Section S3 to S 1 Position 18 2.13E+08 2.60E+08 0.759 0.24 +1 19 Section S3 to S 1 Position 19 2.09E+08 2.55E+08 0.744 0.26 +I 20 Section S3 to Sl Position 20 2.07E+08 2.52E+08 0.737 0.26 +I 21 Section S3 to Sl Position 21 2.l 1E+08 2.57E+08 0.751 0.25 +1 22 Section S3 to SI Position 22 2.08E+08 2.53E+08 0.741 0.26 +I 23 Section S3 to SI Position 23 2.04E+08 2.49E+08 0.727 0.27 +1 24 Section S3 to SI Position 24 2.05E+08 2.50E+08 0.730 0.27 +1 25 Section S3 to S 1 Position 25 2.22E+08 2.71E+08 0.791 0.21 +1 26 Section S3 to S 1 Position 26 2.33E+08 2.84E+08 0.830 0.17 +I 27 Section S3 to S 1 Position 27 2.56E+08
- 3.12E+08 0.912 0.09 +1 28 Section S3 to SI Position 28 2.72E+08 3.31E+08 0.969 0.03 +1 29 Section S3 to Sl Position 29 2.35E+08 2.86E+08 0.837 0.16 +I 30 Section S3 to SI Position 30 2.31E+08 2.82E+08 0.823 0.18 +I 31 Section S3 to SI Position 31 2.26E+08 2.75E+08 0.805 0.20 +I 32 Section S3 to SI Position 32 2.77E+08 3.38E+08 0.987 0.01 +1 33 Section S3 to Sl Position 33 2.94E+08 3.58E+08 1.047 (0.05) -1 34 Section S3 to S1 Position 34 3.42E+08 4.17E+08 1.218 (0.22) -1 35 Section S3 to Sl Position 35 3.56E+08 4.34E+08 1.268 (0.27) -1 36 Section S3 to Sl Position 36 3.41E+08 4.16E+08 1.214 (0.21) -I 37 Section S3 to SI Position 37 2.93E+08 3.57E+08 1.044 (0.04) -1 38 Section S3 to SI Position 38 2.50E+08 3.05E+08 0.890 0.11 +I 39 Section S3 to SI Position 39 2.47E+08 3.01E+08 0.880 0.12 +1 40 Section S3 to S 1 Position 40 2.48E+08 3.02E+08 0.883 0.12 +1 41 Section S3 to Sl Position 41 2.36E+08 2.88E+08 0.841 0.16 +1 42 Section S3 to SI Position 42 2.15E+08 2.62E+08 0.766 0.23 +l 43 Section S3 to SI Position 43 2.10E+08 2.56E+08 0.748 0.25 +I 44 Section S3 to SI Position 44 2.13E+08 2.60E+08 0.759 0.24 +I 45 Section S3 to SI Position 45 2.07E+08 2.52E+08 0.737 0.26 +1 46 Section S3 to S 1 Position 46 2.09E+08 2.55E+08 0.744 0.26 +I
[116]
FRSRELEASERECORD ~
=ZIONSOLYI!Q!:§='
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- __pipe Meas!lremen_t Location_ 1-Ws Sign -
- (oGi/m2) foCi/m 2) fWs) 47 Section S3 to SI Position 47 2.10E+08 2.56E+08 0.748 0.25 +1 48 Section S3 to S 1 Position 48 2.08E+08 2.53E+08 0.741 0.26 +1 49 Section S3 to S 1 Position 49 2.07E+08 2.52E+08 0.737 0.26 +1 50 Section S3 to S 1 Position 50 2.07E+08 2.52E+08 0.737 0.26 +I 51 Section S3 to SI Position 51 '2.31E+08 2.82E+08 0.823 0.18 +I 52 Section S3 to SI Position 52 l.83E+08 2.23E+08 0.652 0.35 +1 53 Section S3 to SI Position 53 l.91E+08 2.33E+08 0.680 0.32 +1 54 Section S3 to SI Position 54 l.90E+08 2.32E+08 o_.677 0.32 +I 55 Section S3 to Sl Position 55 l.91E+08 2.33E+08 0.680 0.32 +1 56 Section S3 to Sl Position 56 l.80E+08 2.19E+08 0.641 0.36 +l 57 Section S3 to S 1 Position 57 l.79E+08 2.18E+08 0.638 0.36 +l 58 Section S2 to Sumo B Position Zero 3.97E+08 4.84E+08 1.414 (0.41) -I 59 Section S2 to Sumo B Position 1 3.77E+08 4.59E+08 1.343 <0.34) -I 60 Section S2 to Sumo B Position 2 3.27E+08 3.99E+08 1.165 (0.16) -I 61 Section S2 to Sumo B Position 3 2.53E+08 3.08E+08 0.901 0.10 +1 62 Section S2 to Sumo B Position 4 2.27E+08 2.77E+08 0.808 0.19 +1 63 Section S2 to Sumo B Position 5 2.08E+08 2.53E+08 0.741 0.26 +I 64 Section S2 to Sumo B Position 6 2.69E+08 3.28E+08 0.958 0.04 +I 65 Section S2 to Sumo B Position 7 2.14E+08 2.61E+08 0.762 0.24 +1 66 Section S2 to Sumo B Position 8 3.08E+08 3.75E+08 1.097 (0.10) -1 67 Section S2 to Sumo B Position 9 2.81E+08 3.42E+08 1.001 (0.00) -I 68 Section S2 to Sumo B Position 10 3.IOE+08 3.78E+08 1.104 (0.10) -I 69 Section S2 to Sumo B Position 11 2.75E+08 3.35E+08 0.979 0.02 +I 70 Section S2 to Sumo B Position 12 2.87E+08 3.50E+08 1.022 (0.02) -I 71 Section S2 to Sump B Position 13 2.15E+08 2.62E+08 0.766 0.23 +l 72 Section S2 to Sump B Position 14 2.25E+08 2.74E+08 0.801 0.20 +l 73 Section S2 to Sump B Position 15 2.81E+08 3.42E+08 1.001 (0.00) -1 74 Section S2 to Sump B Position 16 2.51E+08 3.06E+08 0.894 0.11 +I 75 Section S2 to Sump B Position 17 3.82E+08 4.66E+08 1.361 (0.36) -1 76 Section S2 to Sump B Position 18 4.00E+08 4.87E+08 1.425 (0.42) -1 77 Section S2 to Sump B Position 19 3.70E+08 4.51E+08 1.318 f0.32) -1 78 Section S2 to Sumo B Position 20 3.69E+08 4.50E+08 1.314 (0.31) -1 79 Section S2 to Sumo B Position 21 3.46E+08 4.22E+08 1.232 f0.23) -1 80 Section S2 to Sumo B Position 22 3.50E+08 4.27E+08 1.247 (0.25) -1 81 Section S2 to Sumo B Position 23 3.32E+08 4.05E+08 1.182 (0.18) -1 82 Section S2 to Sumo B Position 24 2.67E+08 3.25E+08 0.951 0.05 +l 83 Section S2 to Sumo B Position 25 2.69E+08 3.28E+08 0.958 0.04 +1 84 Section S2 to Sump B Position 26 2.72E+08 3.31E+08 0.969 0.03 +l 85 Section S2 to Sump B Position 27 3.09E+08 3.77E+08 1.101 (0.10) -1 86 Section S2 to Sump B Position 28 3.22E+08 3.92E+08 1.147 (0.15) -1 87 Section S2 to Sump B Position 29 3.49E+08 4.25E+08 1.243 (0.24) -1 88 Section S2 to Sump B Position 30 3.28E+08 4.00E+08 1.168 f0.17) -1 89 Section S2 to Sump B Position 31 2.90E+08 3.53E+08 1.033 - f0.03) -1 90 Section S2 to Sump B Position 32 3.49E+08 4.25E+08 1.243 (0.24) -1 91 Section S2 to Sumo B Position 33 2.82E+08 3.44E+08 1.004 (0.00) -1 92 Section S2 to Sumo B Position 34 2.62E+08 3.19E+08 0.933 0.07 +1 93 Section S2 to Sumo B Position 35 2.52E+08 3.07E+08 0.898 0.10 +1 94 Section S2 to Sump B Position 36 2.73E+08 3.33E+08 0.972 0.03 +I 95 Section S2 to Sump B Position 37 2.50E+08 3.05E+08 0.890 0.11 +l 96 Section S2 to Sumo B Position 38 2.42E+08 2.95E+08 0.862 0.14 +l
[117]
FRSRELEASERECORD ~
ZIONSOL!!I!Qt§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- Pipe Measurement Location 1-Ws Sign (oCi/m2) <oCi/rrh (Ws) 97 Section S2 to Sump B Position 39 2.37E+08 2.89E+08 0.844 0.16 +I 98 Section S2 to Sump B Position 40 2.21E+08 2.69E+08 0.787 0.2I +I 99 Section S2 to Sump B Position 4I 2.I6E+08 2.63E+08 0.769 0.23 +I 100 Section S2 to Sumo B Position 42 2.30E+08 2.80E+08 0.8I9 0.18 +I IOI Section S2 to Sump B Position 43 2.38E+08 2.90E+08 0.848 0.15 +I 102 Section S2 to Sump B Position 44 l.88E+08 2.29E+08 0.670 0.33 +1 I03 Section S2 to Sump B Position 45 2.04E+08 2.49E+08 0.727 0.27 +1 I04 Section S2 to Sump B Position 46 2.23E+08 2.72E+08 0.794 0.21 +I I05 Section S2 to Sump B Position 47 5.22E+07 6.36E+07 0.186 0.8I +I I06 Section S2 to Sump B Position 48 l.30E+07 l.58E+07 0.046 0.95 +I 107 Section S2 to Sump B Position 49 2.05E+07 2.50E+07 0.073 0.93 +I I08 Section S2 to Sump B Position 50 l.96E+07 2.39E+07 0.070 0.93 +I 109 Section S2 to Sump B Position 5 I 2.l 1E+07 2.57E+07 O.D75 0.92 +1 I I0 Section S2 to Sump B Position 52 I.63E+07 l.99E+07 0.058 0.94 +I III Section S2 to Sump B Position 53 I .25E+07 l.52E+07 0.045 0.96 +I II2 Section S2 to Sump B Position 54 I.24E+07 l.51E+07 0.044 0.96 +I 113 Section S2 to Sump B Position 55 l.42E+07 l.73E+07 0.05I 0.95 +1 I I4 Sump B to SI Position Zero 4.28E+08 5.22E+08 1.524 (0.52) -I II5 Sump B to S 1 Position I 4.22E+08 5.14E+08 1.503 (0.50) -I II6 Sump B to SI Position 2 4.29E+08 5.23E+08 I.528 (0.53) -I 117 Sump B to SI Position 3 4.30E+08 5.24E+08 l.53I (0.53) -1 1T8 Sumo B to -s 1 Position 4 4.24E+08 5.l 7E+08 I .5IO (0.5I) -1 II9 Sump B to SI Position 5 4.35E+08 5.30E+08 1.549 (0.55) -I 120 Sump B to SI Position 6 4.44E+08 5.41E+08 l.58I (0.58) -I I21 Sump B to S 1 Position 7 _ 4.43E+08 5.40E+08 1.578 (0.58) -1 122 Sump B to S 1 Position 8 4.44E+08 5.41E+08 1.581 (0.58) -1 123 Sump B to S 1 Position 9 4.55E+08 5.55E+08 l.62I (0.62) -I 124 Sump B to S 1 Position 10 4.54E+08 5.53E+08 l.6I 7 (0.62) -I 125 Sump B to S 1 Position I I 4.43E+08 5.40E+08 1.578 (0.58) -1 126 Sump B to SI Position 12 4.48E+08 5.46E+08 1.596 - (0.60) -1 127 Sump B to SI Position 13 4.59E+08 5.59E+08 1.635 (0.63) -1 128 Sump B to SJ Position 14 4.55E+08 5.55E+08 l.62I (0.62) -1 129 Sump B to S 1 Position 15 4.~8E+08 5.58E+08 1.631 (0.63) -1 130 Sump B to S 1 Position 16 4.55E+08 5.55E+08 I .621- (0.62) -1 131 Sump B to S 1 Position 17 4.54E+08 5.53E+08 I.6I 7 (0.62) -1 132 Sump B to S 1 Positi'on 18 4.57E+08 5.57E+08 1.628 (0.63) -I 133 Sump B to Sl Position 19 4.61E+08 5.62E+08 1.642 (0.64) -I 134 Sump B to SI Position 20 4.65E+08 5.67E+08 1.656 (0.66) -I 135 Sump B to SI Position 21 4.68E+08 5.70E+08 1.667 (0.67) -I 136 Sump B to S 1 Position 22 4.76E+08 5.80E+08 1.695 (0.70) -I 137 Sump B to SI Position 23 4.85E+08 5.91E+08 1.727 (0.73) -I 138 Sump B to S 1 Position 24 4.84E+08 5.90E+08 1.724 (0.72) -1 139 Sump B to S 1 Position 25 4.90E+08 5.97E+08 1.745 (0.75) -I I40 Sump B to SI Position 26 5.04E+08 6.14E+08 1.795 (0.80) -I 141 Sump B to SI Position 27 - 5.03E+08 6.13E+08 1.791 (0.79) -1 I42 Sumo B to S 1 Position 28 4.99E+08 6.08E+08 1.777 (0.78) -1
[ 1I8]
FRS RELEASE RECORD r=-
ZlQNSOLJ!.Jl!l!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Number of positive differences (S+) _ _8_7_ _
Critical Value 81 Survey Unit MEETS the Acceptance Criteria
[119]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONS;,,,-
SURVEY UNITS 05119A & 05119B ~---
Surveyed Pipe - Calculation of Mean Activill' and Dose 2
Accessible Area of STS Unit _ _ _l'-4"'.2""'0--'4___ m Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _l'-4--'6_ _ _ ft Maximum SOF Observed --~3~*~17--'6~9_ __
Mean of Total Activity Results _ _4_._07_E_+_0_8_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _0_.4_2_2_%_ __
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCi) mrem/yr Co-60 l.44E+08 2.05E+09 2.0SE+OO 2.25E+03 0.00091 I.I IE-02 0.02276 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 l.60E-02 0.00000 Cs-137 !.89E+08 2.69E+09 2.69E+OO 8.22E+02 0.00327 3.04E-02 0.08173 Ni-63 7.29E+07 l.03E+09 *1.03E+OO 8.52E+04 0.00001 2.94E-04 0.00030 Sr-90 l.26E+05 l.79E+06 l.79E-03 7.39E+Ol 0.00002 3.38E-Ol 0.00061 TOTAL 0.0042 0.10540
[120]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe T - Sign Test Classification _ l_ Type I error 0.05 Number of Measurements 146 Gamma Result . Total Activity SOP
- *Pipe Measurement Location 1-Ws Sign
-- (pCi/m2)_ (pCi/m2). (Ws) 0 Section T6 to F 4 Position Zero 2.19E+08 2.67E+08 0.656 0.34 +l 1 Section T6 to T4 Position I l.84E+08 2.24E+08 0.551 0.45 +I 2 Section T6 to T4 Position 2 2.15E+08 2.62E+08 0.644 0.36 +I 3 Section T6 to T4 Position 3 2.04E+08 2.49E+08 0.611 0.39 +I 4 Section T6 to T4 Position 4 2.55E+08 3.l IE+08 0.764 0.24 +I 5 Section T6 to T4 Position 5 2.69E+08 3.28E+08 0.806 0.19 +I 6 Section T6 to T4 Position 6 3.26E+08 3.97E+08 0.977 0.02 +1 7 Section T6 to T4 Position 7 l.65E+08 2.0IE+08 0.495 0.51 +I 8 Section T6 to T4 Position 8 l.85E+07 2.25E+07 0.055 0.94 +1 9 Section T6 to T4 Position 9 3.34E+07 4.07E+07 0.100 0.90 +I 10 Section T6 to 'T4 Position 10 7.12E+07 8.68E+07 0.213 0.79 +1 11 Section T5 to Main Hdr Position Zero 3.48E+08 4.24E+08 1.043 (0.04) -1 12 Section T5 to Main Hdr Position I 3.06E+08 3.73E+08 0.917 0.08 +l 13 Section T5 to Main Hdr Position 2 2.22E+08 2.71E+08 0.665 0.33 +1 14 Section T5 to Main Hdr Position 3 3.91E+08 4.77E+08 1.172 (0.17) -1 15 Section T5 to Main Hdr Position 4 5.39E+08 6.57E+08 1.615 (0.62) -1 16 Section T5 to Main Hdr Position 5 6.25E+08 7.62E+08 1.873 (0.87) -I 17 Section T5 to Main Hdr Position 6 6.13E+08 7.47E+08 1.837 (0.84) -I 18 Section T5 to Main Hdr Position 7 4.59E+08 5.59E+08 1.376 (0.38) -1 19 Section T5 to Main Hdr Position 8 - 2.37E+08 2.89E+08 0.710 0.29 +1 20 Section T5 to Main Hdr Position 9 7.10E+07 8.65E+07 0.213 0.79 +I 21 Section T5 to Main Hdr Position I 0 5.40E+07 6.58E+07 0.162 0.84 +1 22 Section T5 to Main Hdr Position 11 8.70E+07 l.06E+08 0.261 0.74 +I 23 Section T4 to T3 Position Zero 2.79E+08 3.40E+08 0.836 0.16 +I 24 Section T4 to T3 Position 1 3.53E+08 4.30E+08 1.058 (0.06) -I 25 Section T4 to T3 Position 2 3.18E+08 3.88E+08 0.953 0.05 +l 26 Section T4 to T3 Position 3 3.48E+08 4.24E+08 1.043 (0.04) -1 27 Section T4 to T3 Position 4 2.73E+08 3.33E+08 0.818 0.18 +I 28 Section T4 to T3 Position 5 2.69E+08 3.28E+08 0.806 0.19 +I 29 Section T4 to T3 Position 6 3.02E+08 3.68E+08 0.905 0.09 +I 30 Section T4 to T3 Position 7 3.74E+08 4.56E+08 1.121 (0.12) -I 31 Section T4 to T3 Position 8 4.83E+08 5.89E+08 1.448. (0.45) -I 32 Section T4 to T3 Position 9 4.91E+08 5.98E+08 1.472 (0.47) -I 33 Section T4 to T3 Position I 0 4.44E+08 5.41E+08 1.331 (0.33) -I 34 Section T4 to T3 Position 11 3.89E+08 4.74E+08 1.166 (0.17) -1 35 Section T4 to T3 Position 12 5.12E+08 6.24E+08 1.535 (0.53) -I 36 Section T4 to T3 Position 13 3.47E+08 4.23E+08 1.040 (0.04) -1 37 Section T4 to T3 Position 14 3.87E+08 4.72E+08 1.160 (0.16) -I 38 Section T 4 to T3 Position 15 3.80E+08 4.63E+08 1.139 (0.14) -I 39 Section T4 to T3 Position 16 3.64E+08 4.44E+08 1.091 (0.09) -I 40 Section T4 to T3 Position 17 3.40E+08 4.14E+08 1.019 (0.02) -I 41 Section T 4 to T3 Position 18 3.33E+08 4.06E+08 0.998 0.00 +I 42 Section T 4 to T3 Position 19 3.73E+08 4.55E+08 1.118 (0.12) -I 43 Section T4 to T3 Position 20. 3.74E+08 4.56E+08 1.121 (0.12) -1 44 Section T4 to T3 Position 21 3.37E+08 4.1 IE+08 1.010 (0.01) -1 45 Section T4 to T3 Position 22 3.47E+08 4.23E+08 1.040 (0.04) -I 46 Section T4 to T3 Position 23 3.09E+08 3.77E+08 0.926 0.07 +I
[121]
FRSRELEASERECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- -Pipe Measurement Location r~ws Sigri (pCi/m 2) (pCi/m 2) (Ws) 47 Section T4 to T3 Position 24 3.20E+08 3.90E+08 0.959 0.04 +l 48 Section T4 to T3 Position 25 2.80E+08 3.41E+08 0.839 0.16 +l 49 Section T4 to T3 Position 26 3.22E+08 3.92E+08 0.965 0.03 +l 50 Section T4 to T3 Position 27 2.82E+08 3.44E+08 0.845 0.15 +l 51 Section T4 to T3 Position 28 2.54E+08 3.10E+08 0.761 0.24 +l 52 Section T4 to T3 Position 29 2.45E+08 2.99E+08 0.734 0.27 +l 53 Section T4 to T3 Position 30 2.05E+08 2.50E+08 0.614 0.39 +l 54 Section T4 to T3 Position 31 2.04E+08 2.49E+08 0.611 0.39 +1 55 Section T4 to T3 Position 32 2.09E+08 2.55E+08 0.626 0.37 +l 56 Section T4 to T3 Position 33 l.95E+08 2.38E+08 0.584 0.42 +l 57 Section T4 to T3 Position 34 2.16E+08 2.63E+08 0.647 0.35 +l 58 Section T4 to T3 Position 35 2.40E+08 2.92E+08 0.719 0.28 +1 59 Section T4 to T3 Position 36 - 2.50E+08 3.05E+08 0.749 0.25 +1 60 Section T4 to T3 Position 37 2.57E+08 3.13E+08 0.770 0.23 +l 61 Section T4 to T3 Position 38 2.66E+08 3.24E+08 0.797 0.20 +l 62 Section T4 to T3 Position 39 2.66E+08 3.24E+08 0.797. 0.20- +l 63 Section T4 to T3 Position 40 2.96E+08 3.61E+08 0.887 0.11 +l 64 Section T4 to T3 Position 41 l.84E+08 2.24E+08 0.551 0.45 +l 65 Section T4 to T3 Position 42 l.38E+08 l.68E+08 0.414 0.59 +l 66 Section T4 to T3 Position 43 l.66E+08 2.02E+08 0.498 0.50 +l 67 Section T4 to T3 Position 44 l.74E+08 2.12E+08 0.521 0.48 +1 68 Section T4 to T3 Position 45 l.91E+08 2.33E+08 0.572 0.43 +1 69 Section T4 to T3 Position 46 l.92E+08 2.34E+08 0.575 0.42 +l 70 Section T4 to T3 Position 47 2.22E+08 2.71E+08 0.665 0.33 +l 71 Section T4 to T3 Position 48 l.96E+08 2.39E+08 0.587 0.41 +l 72 Section T4 to T3 Position 49 2.08E+08 2.53E+08 0.623 0.38 +l 73 Section T4 to T3 Position 50 3.07E+08 3.74E+08 0.920 0.08 +1 74 Section T4 to T3 Position 51 3.05E+08 3.72E+08 0.914 0.09 +1 75 Section T4 to T3 Position 52 3.76E+08 4.58E+08 1.127 (0.13) -1 76 Section T4 to T3 Position 53 3.71E+08 4.52E+08 1.112 (0.11) -1 77 Section T4 to T3 Position 54 l.08E+08 l.32E+08 0.324 0.68 +l 78 Section T4 to T3 Position 55 2.30E+07 2.80E+07 0.069 0.93 +l 79 Section T4 to T3 Position 56 l.94E+07 2.36E+07 0.058 0.94 +1 80 Section T3 to Tl Position Zero l.06E+09 l.29E+09 3.177 (2.18) -1 81 Section T3 to Tl Position 1 7.64E+08 9.31E+08 2.290 (1.29) -1 82 Section T3 to Tl Position 2 7.93E+08 9.66E+08 2.377 (1.38) -1 83 Section T3 to Tl Position 3 7.05E+08 8.59E+08 2.113 (1.11) -1 84 Section T3 to Tl Position 4 6.64E+08 8.09E+08 1.990 (0.99) -1 85 Section T3 to Tl Position 5 6.13E+08 7.47E+08 1.837 (0.84) -1 86 Section T3 to Tl Position 6 6.23E+08 7.59E+08 1.867 (0.87) -1 87 Section T3 to Tl Position 7 6.33E+08 7.71E+08 1.897 (0.90) -1 88 Section T3 to Tl Position 8 6.02E+08 7.34E+08 1.804 (0.80) -1 89 Section T3 to Tl Position 9 5.98E+08 7.29E+08 1.792 (0.79) -1 90 Section T3 to T 1 Position 10 5.24E+08 6.39E+08 1.570 (0.57) -1 91 Section T3 to Tl Position 11 5.52E+08 6.73E+08 1.654 (0.65) -1 92 Section T3 to Tl Position 12 6.16E+08 7.51E+08 1.846 (0.85) -1 93 Section T3 to Tl Position 13 4.63E+08 5.64E+08 1.388 (0.39) -1 94 Section T3 to Tl Position 14 4.09E+08 4.98E+08 1.226 (0.23) -1 95 Section T3 to Tl Position 15 5.04E+08 6.14E+08 1.511 (0.51) -1 96 Section T3 to Tl Position 16 4.71E+08 5.74E+08 1.412 (0.41) -1
[122]
FRSRELEASERECORD ~
ZIONSOL!!I!f!~*
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE
. SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- Pipe Measurement Location 1-\Vs *Sign ..
.. <oCi/m2*) (oCi/m2) .* (Ws):
97 Section T3 to Tl Position 17 3.64E+08 4.44E+08 1.091 (0.09) -1 98 Section T3 to Tl Position 18 3.40E+08 4.14E+08 1.019 <0.02) -I 99 Section T3 to Tl Position 19 4.42E+08 5.39E+08 1.325 <0.32) -1 100 Section T3 to Tl Position 20 3.89E+08 4.74E+08 1.166 (0.17) -1 101 Section T3 to Tl Position 21 4.25E+08 5.18E+08 1.274 (0.27) -1 102 Section T3 to Tl Position 22 4.82E+08 5.87E+08 1.445 (0.44) -1 103 Section T3 to Tl Position 23 4.05E+08 4.94E+08 1.214 (0.21) -1 104 Section T3 to Tl Position 24 3.00E+08 3.66E+08 0.899 0.10 +1 105 Section T3 to Tl Position 25 3.0IE+08 3.67E+08 0.902 0.10 +1 106 Section T3 to Tl Position 26 3.0IE+08 3.67E+08 0.902 0.10 +1 107 Section T3 to Tl Position 27 3.14E+08 3.83E+08 0.941 0.06 +1 108 Section T3 to Tl Position 28 2.60E+08 3.l 7E+08 0.779 0.22 +1 109 Section T3 to Tl Position 29 2.75E+08 3.35E+08 0.824 0.18 +I 110 Section T3 to Tl Position 30 2.78E+08 3.39E+08 0.833 0.17 +I 111 Section T3 to Tl Position 31 2.69E+08 3.28E+08 0.806 0.19 +I 112 Section T3 to Tl Position 32 2.68E+08 3.27E+08 0.803 0.20 +l 113 Section T3 to Tl Position 33 2.79E+08 3.40E+08 0.836 0.16 +l 114 Section T3 to Tl Position 34
- 2.87E+08 3.50E+08 0.860 0.14 +1 115 Section T3 to Tl Position 35 2.81E+08 3.42E+08 0.842 0.16 +1 116 Section T3 to Tl Position 36 2.77E+08 3.38E+08 0.830 0.17 +1 117 Section T3 to Tl Position 37 2.87E+08 3.50E+08 0.860 0.14 +I 118 Section T3 to Tl Position 38 2.78E+08 3.39E+08 0.833 0.17 +l 119 Section T3 to Tl Position 39 2.79E+08 3.40E+08 0.836 0.16 +1 120 Section T3 to Tl Position 40 2.99E+08 3.64E+08 0.896 0.10 +1 121 Section T3 to Tl Position 41 3.03E+08 3.69E+08 0.908 0.09 +l 122 Section T3 to Tl Position 42 3.22E+08 3.92E+08 0.965 0.03 +1 123 Section T3 to Tl Position 43 3.32E+08 4.05E+08 0.995 0.00 +1 124 Section T3 to Tl Position 44 3.23E+08 3.94E+08 0.968 0.03 +I 125 Section T3 to Tl Position 45 3.26E+08 3.97E+08 0.977 0.02 +1 126 Section T3 to Tl Position 46 2.65E+08 3.23E+08 0.794 0.21 +1 127 Section T3 to Tl Position 47 2.93E+08 3.57E+08 0.878 0.12 +1 128 Section T3 to Tl Position 48 2.54E+08 3.IOE+08 0.761 0.24 +1 129 Section T3 to Tl Position 49 2.48E+08 3.02E+08 0.743 0.26 +l 130 Section T3 to Tl Position 50 2.37E+08 2.89E+08 0.710 0.29 +1 131 Section T3 to Tl Position 52 3.05E+08 3.72E+08 0.914 0.09 +1 132 Section T3 to Tl Position 53 3.77E+08 4.59E+08 1.130 (0.13) -1 133 Section T3 to Tl Position 54 4.60E+08 5.61E+08 1.379 <0.38) -1 134 Section T3 to Tl Position 55 4.51E+08 5.50E+08 1.352 <0.35) -1 135 Section T3 to Tl Position 56 3.62E+08 4.41E+08 1.085 <0.08) -1 136 Section T3 to Tl Position 57 l.62E+08 1.97E+08 0.486 0.51 +1 137 Section T3 to Tl Position 58 7.55E+07 9.20E+07 0.226 0.77 +l 138 Section T3 to Tl Position 59 l.06E+08 1.29E+08 0.318 0.68 +l 139 Section T3 to Tl Position 60 4.20E+07 5.12E+07 0.126 0.87 +l 140 Section Tl to Sumo B Position Zero 8.74E+08 l.07E+09 2.619 (1.62) *-1 141 Section Tl to Sumo B Position 1 l.04E+09 l.27E+09 3.117 (2.12) -I 142 Section Tl to Sump B Position 2 9.99E+08 1.22E+09 2.994 (1.99) -I 143 Section Tl to Sump B Position 3 l.19E+08 1.45E+08 0.357 0.64 +I 144 Section Tl to Sump B Position 4 2.37E+07 2.89E+07 0.071 0.93 +1 145 Section Tl to Sumo B Position 5 l.48E+07 1.80E+07 0.044 0.96 +l
[123]
FRSRELEASERECORD ~
ZIONSOL!l!lfl~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Number of positive differences (S+) _ _9_0_ _
Critical Value - - -
83 - -
Survey Unit MEETS the Acceptance Criteria
[124]
- ~
FRS RELEASE RECORD AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLJ!I!Qr!§uc=
SURVEY UNITS 05119A & 05119B t ,, ' - - ....
. . --~~--* -~-*_*----
L.._, ___ Sump B, Pipe U (6-iuch Floor Drnln}- Summ!!_I]'. of~!!..ti_ey ~.!_a-~=-_:_-=- ____2_ _:::__ =~=-- __ :_~-~:.-*.
Surveyed Pipe - Calculation of Mean Activity and Dose Accessible Area of STS Unit --~l~l=.3~83~-- m 2
Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed _ _ _7~8_ _ _ ft Maximum SOF Observed _ _ _3_.5_4_78_ __
Mean of Total Activity Results _ _4_.9_l_E_+_0_8_ _ (pCi/m2 )
Percentage of Allowable Inventory for Sign Test _ _ _0_.6_7,_-o/t_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2) (pCi) (mCi) (mCi) Inventory (mrem/yr per mCil mrem/vr Co-60 1.74E+o8 l.99E+09 l.99E+OO 2.25E+03 0.00088 l.l lE-02 0.02204 Cs-134 O.OOE+oO O.OOE+OO O.OOE+OO l.56E+03 0.00000 1.60E-02 0.00000 Cs-137 2.29E+o8 2.60E+09 2.60E+OO 8.22E+02 0.00317 3.04E-02 0.07912 Ni-63 8.80E+o7 l.OOE+09 l.OOE+OO 8.52E+04 0.00001 2.94E-04 0.00029 Sr-90 l.52E+o5 l.73E+06 l.73E-03 7.39E+OI 0.00002 3.38E-01 0.00059 TOTAL 0.0041 0.10204 Adjustment for Inaccessible Pipe Feet of Pipe Not Surveyed _ _ _5_1_ _ _ ft Area of Pipe Not Surveyed _ _ _ 7_.4_4_ _ _ m2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2) (oCi) (mCil (mCil Inventory ( mrem/vr oer mCil mrem/yr Co-60 l.74E+08 3.28E+09 3.28E+OO 2.25E+03 0.00146 1.1 lE-02 0.03644 Cs-134 O.OOE+OO O.OOE+OO O.OOE+OO l.56E+03 0.00000 I.60E-02 0.00000 Cs-137 2.29E+08 4.30E+09 4.30E+OO 8.22E+02 0.00524 3.04E-02 0.13086 Ni-63 8.80E+07 l.66E+09 l.66E+OO 8.52E+04 0.00002 2.94E-04 0.00049 Sr-90 l.52E+05 2.87E+06 2.87E-03 7.39E+Ol 0.00004 3.38E-01 0.00097 TOTAL 0.0068 0.16876
[125]
FRSRELEASERECORD ~
ZIONSOL!!I!fl!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Sump B, Pipe U - Sign Test Classification _1_ Type I error 0.05 Number of Measurements 78 Gamma Result
- Total Activity SOF
- Pi~e Measu~ement Location 1-Ws Si&n (oCi/m2) (pCi/m2 ) (Ws) 0 Section U2 to UI Position Zero 3.39E+08 4.13E+08 0.841 0.16 +1 1 Section U2 to Ul Position 1 3.16E+08 3.85E+08 0.784 0.22 +I 2 Section U2 to U 1 Position 2 3.31E+08 4.03E+08 0.821 0.18 +l 3 Section U2 to Ul Position 3 3.06E+08 3.73E+08 0.759 0.24 +1 4 Section U2 to U 1 Position 4 3.35E+08 4.08E+08 0.831 0.17 +1 5 Section U2 to U 1 Position 5 3.72E+08 4.53E+08 0.923 0.08 +1 6 Section U2 to UI Position 6 3.57E+08 4.35E+08 0.886 0.11 +1 7 Section U2 to Ul Position 7 3.32E+08 4.05E+08 0.824 0.18 +1 8 Section U2 to UI Position 8 3.38E+08 4.12E+08 0.839 0.16 +1 9 Section U2 to U 1 Position 9 3.54E+08 4.31E+08 0.878 0.12 +l 10 Section U2 to U 1 Position I 0 3.42E+08 4.17E+08 0.849 0.15 +l 11 Section U2 to U 1 Position 11 2.93E+08 3.57E+08 0.727 0.27 +l 12 Section U2 to Ul Position 12 2.91E+08 3.55E+08 0.722 0.28 +I 13 Section U2 to U 1 Position 13 3.41E+08 4.16E+08 0.846 0.15 +1 14 Section U2 to U 1 Position 14 3.48E+08 4.24E+08 0.863 o.r4 +l 15 Section U2 to U 1 Position 15 3.51E+08 4.28E+08 0.871 0.13 +1 16 Section U2 to U 1 Position 16 3.51E+08 4.28E+08 0.871 0.13 +1 17 Section U2 to Ul Position 17 3.39E+08 4.13E+08 0.841 0.16 +l 18 Section U2 to UI Position 18 3.26E+08 3.97E+08 0.809 0.19 +l 19 Section U2 to Ul Position 19 3.18E+08 3.88E+08 0.789 0.21 +1 20 Section U2 to UI Position 20 3.08E+08 3.75E+08 0.764 0.24 +1 21 Section U2 to U1 Position 21 2.88E+08 3.51E+08 0.715 0.29 +l 22 Section U2 to U 1 Position 22 3.53E+08 4.30E+08 0.876 0.12 +1 23 Section U2 to U 1 Position 23 3.15E+08 3.84E+08 0.782 0.22 +1 24 Section U2 to U1 Position 24 3.14E+08 3.83E+08 0.779 0.22 +1 25 Section U2 to U1 Position 25 3.20E+08 3.90E+08 0.794 0.21 +I 26 Section U2 to U 1 Position 26 3.12E+08 3.80E+08 0.774 0.23 +1 27 Section U2 to Ul Position 27 3.28E+08 4.00E+08 0.814 0.19 +1 28 Section U2 to U 1 Position 28 3.60E+08 4.39E+08 0.893 0.11 +1 29 Section U2 to U 1 Position 29 3.73E+08 4.55E+08 0.925 0.07 +1 30 Section U2 to Ul Position 30 3.87E+08 4.72E+08 0.960 0.04 +I 31 Section U2 to UI Position 31 3.86E+08 4.70E+08 0.958 0.04 +I 32 Section U2 to UI Position 32 3.92E+08 4.78E+08 0.973 0.03 +I 33 Section U2 to Ul Position 33 3.52E+08 4.29E+08 0.873 0.13 +I 34 Section U2 to Ul Position 34 3.38E+08 4.12E+08 0.839 0.16 +1 35 Section U2 to U1 Position 35 3.07E+08 3.74E+08 0.762 0.24 +l 36 Section U2 to U1 Position 36 3.16E+08 3.85E+08 0.784 0.22 +l 37 Section U2 to UI Position 37 3.06E+08 3.73E+08 0.759 0.24 +I 38 Section U2 to U1 Position 38 3.05E+08 3.72E+08 0.757 0.24 +1 39 Section U2 to Ul Position 39 3.04E+08 3.70E+08 0.754 0.25 +I 40 Section U2 to UI Position 40 3.08E+08 3.75E+08 0.764 0.24 +I 41 Section U2 to Ul Position 41 3.08E+08 3.75E+08 0.764 0.24 +l 42 Section U2 to Ul Position 42 3.l 7E+08 3.86E+08 0.786 0.21 +l 43 Section U2 to Ul Position 43 3.08E+08 3.75E+08 0.764 0.24 +1 44 Section U2 to U1 Position 44 3.01E+08 3.67E+08 0.747 0.25 +l 45 Section U2 to Ul Position 45 3.12E+08 3.80E+08 0.774 0.23 +l 46 Section U2 to U 1 Position 46 2.86E+08 3.49E+08 0.710 0.29 +1
[126]
FRSRELEASERECORD ~
ZIONSOL!l!!Q!Y.§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- . Pipe Measurement Location l"WS Sign (pCi/m2) (pCi/m 2) . (Ws) 47 Section U2 to Ul Position 47 3.06E+08 3.73E+08 0.759 0.24 +1 48 Section U2 to Ul Position 48 2.96E+08 3.61E+08 0.734 0.27 +l 49 Section U2 to Ul Position 49 3.02E+08 3.68E+08 0.749 0.25 +l 50 Section U2 to Ul Position 50 3.34E+08 4.07E+08 0.829 0.17 +l 51 Section U2 to Ul Position 51 2.80E+08 3.41E+08 0.695 0.31 +l 52 Section U2 to Ul Position 52 3.80E+08 4.63E+08 0.943 0.06 +l 53 Section U2 to Ul Position 53 3.86E+08 4.70E+08 0.958 0.04 +l 54 Section U2 to U 1 Position 54 3.67E+08 4.47E+08 0.911 0.09 +l 55 Section U2 to Ul Position 55 3.65E+08 4.45E+08 0.906 0.09 +l 56 Section U2 to Ul Position 56 7.73E+08 9.42E+08 1.918 (0.92) -1 57 Section U2 to U 1 Position 57 8.03E+08 9.79E+08 1.992 (0.99) -1 58 Section U2 to Ul Position 58 4.28E+08 5.22E+08 1.062 (0.06) -1 59 Section U2 to Ul Position 59 3.46E+08 4.22E+08 0.858 0.14 +l 60 Section U2 to U 1 Position 60 3.65E+08 4.45E+08 0.906 0.09 +l 61 Section U2 to Ul Position 6 I 3.62E+08 4.41E+08 0.898 0.10 +l 62 Section U2 to U1 Position 62 4.10E+08 5.00E+08 1.017 (0.02) -1 63 Section U2 to U 1 Position 63 3.75E+08 4.57E+08 0.930 0.07 +l 64 Section U2 to U 1 Position 64 4.06E+08 4.95E+08 1.007 (0.01) -1 65 Section U2 to U 1 Position 65 4.09E+08 4.98E+08 1.015 (0.01) -1 66 Section U2 to Ul Position 66 4.59E+08 5.59E+08 1.139 (0.14) -1 67 Section U2 to U 1 Position 67 2.60E+08 3.l 7E+08 0.645 0.35 +l 68 Section U2 to Ul Position 68 l .05E+08 l.28E+08 0.261 0.74 +l 69 Section U2 to U 1 Position 69 l .OOE+08 l.22E+08 0.248 0.75 +l 70 Section U2 to Ul Position 70 l.01E+08 1.23E+08 0:251 0.75 +l 71 Section Ul to Sump B Position Zero l.23E+09 l.50E+09 3.052 (2.05) -1 72 Section Ul to Sump B Position 1 l.10E+09 l.34E+09 2.729 (1.73) -1 73 Section Ul to Sump B Position 2 l.02E+09 l.24E+09 2.531 (1.53) -1 74 Section Ul to Sump B Position 3 l.16E+09 l.41E+09 2.878 (1.88) -1 75 Section Ul to Sump B Position 4 l.43E+09 l.74E+09 3.548 (2.55) -1 76 Section Ul to Sump B Position 5 9.81E+08 l.20E+09 2.434 (1.43) -I 77 Section Ul to Sump B Position 6 3.16E+08 3.85E+08 0.784 0.22 +l Number of positive differences (S+) _ _6_5_ _
Critical Value - - -
Survey Unit MEETS the Acceptance Criteria
[127]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSiii=
l/lt>I--°""'"'"'"
SURVEY UNITS 05119A & 05119B MEAN ACTIVITY from Unit 1 RHR Floor Drain Pipe - Sump A, Pipe B)
ROC Mean Activity per Adjusted BIL/STS Fraction of SOF Total Activity ROC Area Allowable (oCi/m2 ) (oCi/m2) Inventory (pCi/m2)
Co-60 2.15E+o8 2.89E+09 0.0742894 Cs-134 4.l IE+05 2.00E+09 0.0002050 Cs-137 9.69E+08 l.06E+09 0.9176306 0.999913 l.29E+09 Ni-63 l.08E+o8 l.09E+l l 0.0009901 Sr-90 6.45E+o5 9.49E+07 0.0067978 Adjustment for Inaccessible Pipe Area of STS Unit _ _ _l 7_._66_ _ _ m2 Linear Feet of Inaccessible Pipe _ _ _3_6_3_ _ _ ft Ma...:imum SOF Observed 0.999913 Mean of Total Activity Results _ _ _ l._29_E_+_0_9_ _ (pCi/m2)
Percentage of Allowable Inventory for Sign Test ---'2'"".2"'6'"'"9-'-%~--
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) (mCi) Inventory ( mrem/yr per mCi) mrem/yr Co-60 2.15E+08 3.79E+09 3.79E+OO 2.25E+03 0.00169 l.l lE-02 0.04209 Cs-134 4.l 1E+05 7.26E+06 7.26E-03 l.56E+03 0.00000 l.60E-02 0.00012 Cs-137 9.69E+08 l.71E+l0 l.71E+OI 8.22E+02 0.02082 3.04E-02 0.52020 Ni-63 l.08E+08 l.91E+09 l.91E+OO 8.52E+04 0.00002 2.94E-04 0.00056 Sr-90 6.45E+05 l.14E+07 l.14E-02 7.39E+Ol 0.00015 3.38E-Ol 0.00385 TOTAL 0.0227 0.56682
[128]
MEAN ACTIVITY from Unit 2 RHR Floor Drain Pioe - Sump A, Pipe Kl ROC Mean Activity per Adjusted BIL/STS Fraction of SOF Total Activity ROC Area Allowable (pCi/m2) (pCi/m2 ) Inventory (pCi/m 2)
Co-60 3.03E+08 4.08E+09 0.0742955 Cs-134 5.79E+05 2.83E+09 0.0002050 Cs-137 1.37E+09 l.49E+09 0.9177056 0.999995 1.82E+09 Ni-63 l.53E+08 l.54E+l 1 0.0009902 Sr-90 9.IOE+05 1.34E+08 0.0067984 Adjustment for Inaccessible Pipe 2
Area of STS Unit
- - -6.57---- m Linear Feet oflnaccessible Pipe _ _ _.c.13""'5'--- ft Maximum SOF Observed --~0~.9~9~99~9~5_ _
Mean of Total Activity Results ___1_.8_2_E+_0_9_ _ (pCi/m 2)
Percentage of Allowable Inventory for Sign Test _ _ _1_._19_0_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m 2) (oCil (mCil (mCil Inventory (mrem/vr oer mCil mrem/vr Co-60 3.03E+08 l.99E+09 l.99E+OO 2.25E+03 0.00088 l.l IE-02 0.02207 Cs-134 5.79E+05 3.80E+06 3.80E-03 l.56E+03 0.00000 l.60E-02 0.00006 Cs-137 1.37E+09 8.97E+09 8.97E+OO 8.22E+02 0.01092 3.04E-02 0.27280 Ni-63 l.53E+08 1.00E+09 1.00E+OO 8.52E+04 0.00001 2.94E-04 0.00030 Sr-90 9.10E+05 5.98E+06 5.98E-03 7.39E+Ol 0.00008 3.38E-01 0.00202 TOTAL 0.0119 0.29725
[129]
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONSuc= ""--c._...
SURVEY UNITS 05119A & 05119B
- -==-~-=~:.~-~~:~~==: *:.:.~---~~=:=:!J.'.1~~_:2 E_91J_ip_m!n_! !?~in~ _(6-~n_ch2_!'_ip_e !J ::- S.1J!1_1_1!1~~<<_>f S.1J~YJ?~1~-=-=-~= =-*=-~-=:=~=-=~~~-=-
Surveved Pipe - Calculation of Mean Activitv and Dose
- = ~~-:-=-
Accessible Area of STS Unit - - - 26.J 12 m2 Number of Measurements Taken in Survey Unit/Feet of Pipe Surveyed -----'1-'-79'---- ft Ma,,;imum SOF Observed ---'3-'-.4-'8_47'-----
Mean of Total Activity Results ----'3-'-.)-'-8-'E_+-'-07'--- (pCi/m2)
Percentage of Allowable Inventory for Sign Test _ _ _0_.0_89_o/c_o_ _
ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (pCi/m2) (pCi) (mCi) (mCi) Inventory ( mrem/yr per mCi) mrem/yr Co-60 1.26E+07 3.28E+08 3.28E-OI 2.25E+03 0.00015 I.I IE-02 0.00364 Cs-134 2.08E+05 5.43E+06 5.43E-03 l.56E+03 0.00000 l.60E-02 0.00009 Cs-137 l.64E+07 4.28E+08 4.28E-01 8.22E+02 0.00052 3.04E-02 0.01302 Ni-63 6.42E+06 l.68E+08 l.68E-01 8.52E+04 0.00000 2.94E-04 0.00005 Sr-90 1.93E+05 5.05E+06 5.05E-03 7.39E+OI 0.00007 3.38E-OI 0.00171 TOTAL 0.0007 0.01851 Adjustment for Inaccessible Pipe FeetofPipeNotSurveyed _ _ _ _ 3_6_ _ _ ft Area of Pipe Not Surveyed _ _ _5_.2_5_ _ _ m2 ROC Mean Activity per Total Mean Total Mean BIL for Auxiliary Mean Fraction of Dose Factors Mean Dose per ROC Activity for Pipe Activity Building Allowable ROC (oCi/m2) <oCi) (mCil (mCi) Inventory (mrem/yr per mCil mrem/vr Co-60 1.26E+o7 3.94E+08 3.94E-Ol 2.25E+03 0.00018 I.I IE-02 0.00438 Cs-134 2.08E+o5 6.52E+06 6.52E-03 l.56E+03 0.00000 l.60E-02 0.00010 Cs-137 l.64E+07 5.14E+08 5.14E-OI 8.22E+02 0.00063 3.04E-02 0.01564 Ni-63 6.42E+06 2.0IE+08 2.0IE-01 8.52E+04 0.00000 2.94E-04 0.00006 Sr-90 l.93E+05 6.06E+06 6.06E-03 7.39E+OI 0.00008 3.38E-01 0.00205 TOTAL 0.0009 0.02223
[130]
FRSRELEASERECORD ~
ZlONSOLJ[!J!lfVS
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Unit 2 6-inch Eguipment Drain Pipe B- Sign Test Classification _1_* Type I error O.OS Number of Measurements 179 Gamma Result Total Activity SOF
- Pipe Measurement Location (pCi/m2 ). 1-Ws Sign (pCi/m2) (Ws) 0 Section BS to B4 Header Position Zero 2.20E+07 2.68E+07 0.691 0.31 +1 1 Section BS to B4 Header Position 1 2.21E+07 2.69E+07 0.694 0.31 +1 2 Section BS to B4 Header Position 2 2.22E+07 2.71E+07 0.697 0.30 +l 3 Section BS to B4 Header Position 3 2.24E+07 2.73E+07 0.703 0.30 +1 4 Section BS to B4 Header Position 4 2.33E+07 2.84E+07 0.731 0.27 +l s Section BS to B4 Header Position S 2.33E+07 2.84E+07 0.731 0.27 +1 6 Section BS to B4 Header Position 6 2.43E+07 2.96E+07 0.763 0.24 +1 7 Section BS to B4 Header Position 7 2.6SE+07 3.23E+07 0.832 0.17 +l 8 Section BS to B4 Header Position 8 3.03E+07 3.69E+07 0.9Sl O.OS +l 9 Section BS to B4 Header Position 9 2.98E+07 3.63E+07 0.936 0.06 +l 10 Section BS to B4 Header Position 10 2.64E+07 3.22E+07 0.829 0.17 +1 11 Section BS to B4 Header Position 11 2.93E+07 3.S7E+07 0.920 0.08 +l 12 Section BS to B4 Header Position 12 3.22E+07 3.92E+07 1.011 (0.01) -1 13 Section BS to B4 Header Position 13 3.32E+07 4.0SE+07 1.042 (0.04) -1 14 Section BS to B4 Header Position 14 3.26E+07 3.97E+07 1.023 (0.02) -1 lS Section BS to B4 Header Position lS' 3.49E+07 4.2SE+07 1.096 (0.10) -1 16 Section BS to B4 Header Position 16 3.70E+07 4.SlE+07 1.162 (0.16) -1 17 Section BS to B4 Header Position 17 3.39E+07 4.13E+07 1.064 (0.06) -1 18 Section BS to B4 Header Position 18 3.18E+07 3.88E+07 0.998 0.00 +1 19 Section BS to B4 Header Position 19 2.98E+07 3.63E+07 0.936 0.06 +l
. 20 Section BS to B4 Header Position 20 2.83E+07 3.4SE+07 0.888 0.11 +1 21 Section BS to B4 Header Position 21 2.62E+07 3.19E+07 0.823 0.18 +l 22 Section BS to B4 Header Position 22 2.73E+07 3.33E+07 0.8S7 0.14 +l 23 Section BS to B4 Header Position 23 2.46E+07 3.00E+07 0.772. 0.23 +l 24 Section BS to B4 Header Position 24 2.43E+07 2.96E+07 0.763 0.24 +1 2S Section BS to B4 Header Position 2S 2.77E+07 3.38E+07 0.870 0.13 +1 26 Section BS to B4 Header Position 26 4.82E+07 S.87E+07 1.S13 (0.S l) -1 27 Section BS to B4 Header Position 27 l.03E+07 1.26E+07 0.323 0.68 +l 28 Section BS to B4 Header Position 28 6.76E+07 8.24E+07 2.122 (1.12) -1 29 Section BS to B4 Header Position 29 4.21E+07 S.13E+07 1.322 (0.32) -1 30 Section BS to B4 Header Position 30 3.08E+07 3.7SE+07 0.967 0.03 +1 31 Section BS to B4 Header Position 31 2.12E+07 2.S8E+07 0.666 0.33 +l 32 Section BS to B4 Header Position 32 1.48E+07 1.80E+07 0.46S O.S4 +1 33 Section BS to B4 Header Position 33 l.4SE+07 l.77E+07 0.4ss* O.S4 +l 34 Section BS to B4 Header Position 34 1.41E+07 l.72E+07 0.443 O.S6 +l 3S Section BS to B4 Header Position 3S l.34E+07 1.63E+07 0.421 0.S8 +l 36 Section BS to B4 Header Position 36 1.94E+07 2.36E+07 0.609 0.39 +1 37 Section BS to B4 Header Position 37 2.92E+07 3.S6E+07 0.917 0.08 +l 38 Section BS to B4 Header Position 38 4.41E+07 S.37E+07 1.384 (0.38) -1 39 Section BS to B4 Header Position 39 1.40E+07 1.71E+07 0.440 O.S6 +I 40 Section BS to B4 Header Position 40 1.64E+07 2.00E+07 0.SlS 0.49 +l 41 Section B4 to B3 Header Position Zero l.OOE+08 l.22E+08 3.139 (2.14) -1 42 Section B4 to B3 Header Position 1 S.01E+07 6.l 1E+07 l.S73 (O.S7) -1 43 Section B4 to B3 Header Position 2 3.31E+07 4.03E+07 1.039 (0.04) -1 44 Section B4 to B3 Header Position 3 2.20E+07 2.68E+07 0.691 0.31 +l 4S Section B4 to B3 Header Position 4 2.24E+07 2.73E+07 0.703 0.30 +l 46 Section B4 to B3 Header Position S 2.10E+07 2.S6E+07 0.6S9 0.34 +l
[131]
FRSRELEASERECORD ~
ZlONSOLJl!lfl"!YJ
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity. SOP
- Pipe Measurement Location 1-Ws Sign (pCi/m 2) (pCi/m2) (Ws) 47 Section B4 to B3 Header Position 6 2.09E+07 2.55E+07 0.656 0.34 +l 48 Section B4 to B3 Header Position 7 2.44E+07 2.97E+07 0.766 0.23 +I 49 Section B4 to B3 Header Position 8 2.44E+07 2.97E+07 0.766 0.23 +I 50 Section B4 to B3 Header Position 9 2.44E+07 2.97E+07 0.766 0.23 +l 51 Section B4 to B3 Header Position 10 2.54E+07 3.10E+07 0.797 0.20 +l 52 Section B4 to B3 Header Position 11 2.47E+07 3.01E+07 0.775 0.22 +1 53 Section B4 to B3 Header Position 12 2.43E+07 2.96E+07 0.763 0.24 +1 54 Section B4 to B3 Header Position 13 2.44E+07 2.97E+07 0.766 0.23 +l 55 Section B4 to B3 Header Position 14 2.55E+07 3.l 1E+07 0.801 0.20 +1 56 Section B4 to B3 Header*Position 15 2.37E+07 2.89E+07 0.744 0.26 +1 57 Section B4 to B3 Header Position 16 2.20E+07 2.68E+07 0.691 0.31 +1 58 Section B4 to B3 Header Position 17 2.24E+07 2.73E+07 0.703 0.30 +1 59 Section B4 to B3 Header Position 18 2.19E+07 2.67E+07 0.688 0.31 +1 60 Section B4 to B3 Header Position 19 2.55E+07 3.l 1E+07 0.801 0.20 +1 61 Section B4 to B3 Header Position 20 2.11E+07 2.57E+07 0.662 0.34 +l 62 Section B4 to B3 Header Position 21 2.14E+07 2.61E+07 0.672 0.33 +l 63 Section B4 to B3 Header Position 22 2.31E+07 2.82E+07 0.725 0.27 +I 64 Section B4 to B3 Header Position 23 l.47E+07 !.79E+07 0.461 0.54 +1 65 Section B4 to B3 Header Position 24 1.19E+07 l.45E+07 0.374 0.63 +I 66 Section B4 to B3 Header Position 25 1.47E+07 1.79E+07 0.461 0.54 +l 67 Section B4 to B3 Header Position 26 l.84E+07 2.24E+07 0.578 0.42 +l 68 Section B4 to B3 Header Position 27 l.98E+07 2.41E+07 0.622 0.38 +l 69 Section B4 to B3 Header Position 28 2.04E+07 2.49E+07 0.640 0.36 +I 70 Section B4 to B3 Header Position 29 2.43E+07 2.96E+07 0.763 0.24 +1 71 Section B3 to B Header Position Zero 4.28E+07 5.22E+07 1.344 (0.34) -1 72 Section B3 to B Header Position 1 3.63E+07 4.42E+07 1.140 (0.14) -1 73
- Section B3 to B Header Position 2 2.60E+07 3.l 7E+07 0.816 0.18 +l 74 Section B3 to B Header Position 3 4.16E+07 5.07E+07 1.306 (0.31) -1 75 Section B3 to B Header Position 4 3.41E+07 4.16E+07 1.071 (0.07) -1 76 Section B3 to B Header Position 5 3.33E+07 4.06E+07 1.045 (0.05) -1 77 Section B3 to B Header Position 6 2.74E+07 3.34E+07 0.860 0.14 +1 78 Section B3 to B Header Position 7 2.93E+07 3.57E+07 0.920 0.08 +1 79 Section B3 to B Header Position 8 2.59E+07 3.16E+07 0.813 0.19 +1 80 Section B3 to B Header Position 9 2.74E+07 3.34E+07 0.860 0.14 +l 81 Section B3 to B Header Position 10 2.68E+07 3.27E+07 0.841 0.16 +1 82 Section B3 to B Header Position 11 2.56E+07 3.12E+07 0.804 0.20 +1 83 Section B3 to B Header Position 12 2.46E+07 3.00E+07 0.772 0.23 +1 84 Section B3 to B Header Position 13 2.42E+07 2.95E+07 0.760 0.24 +1 85 Section B3 to B Header Position 14 2.40E+07 2.92E+07 0.753 0.25 +1 86 Section B3 to B Header Position 15 2.54E+07 3.10E+07 0.797 0.20 +l 87 Section B3 to B Header Position 16 2.59E+07 3.16E+07 0.813 0.19 +I 88 Section B3 to B Header Position 17 2.66E+07 3.24E+07 0.835 0.16 +1 89 Section B3 to B Header Position 18 2.36E+07 2.88E+07 0.741 0.26 +l 90 Section B3 to B Header Position 19 2.36E+07 2.88E+07 0.741 0.26 +l 91 Section B3 to B Header Position 20 2.19E+07 2.67E+07 0.688 0.31 +I 92 Section B3 to B Header Position 21 2.05E+07 2.50E+07 0.644 0.36 +l 93 Section B3 to B Header Position 22 l.73E+07 2.11E+07 0.543 0.46 +l 94 Section B3 to B Header Position 23 l.54E+07 1.88E+07 0.483 0.52 +l 95 Section B3 to B Header Position 24 l.53E+07 l.86E+07 0.480 0.52 +l 96 Section B3 to B Header Position 25 1.31E+07 l.60E+07 0.411 0.59 +l
[132]
FRSRELEASERECORD ~
ZIONSOL§.I!Qr§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity SOF
- Pipe Measurement Location 1-Ws Sign
(~Ci/m 2 ) (pCi/m 2) (Ws) 97 Section B3 to B Header Position 26 l.30E+07 l.58E+07 0.408 0.59 +l 98 Section B3 to B Header Position 27 l.18E+07 l.44E+07 0.370 0.63 +l 99 Section B3 to B Header Position 28 l.09E+07 l.33E+07 0.342 0.66 +l 100 Section B3 to B Header Position 29 l.09E+07 l.33E+07 0.342 0.66 +l 101 Section B3 to B Header Position 30 l.06E+07 l.29E+07 0.333 0.67 +l 102 Section B3 to B Header Position 31 l.13E+07 l.38E+07 0.355 0.65 +I 103 Section B3 to B Header Position 32 l.23E+07 l.50E+07 0.386 0.61 +l 104 Section B3 toB Header Position 33 l.07E+07 l.30E+07. 0.336 0.66 +l 105 Section B3 to B Header Position 34 9.61E+06 l.17E+07 0.302 0.70 +l 106 Section B3 to B Header Position 35 8.75E+06 l.07E+07 0.275 0.73 +l 107 Section B3 to B Header Position 36 l.01E+07 l .23E+07 0.317 0.68 +l 108 Section B3 to B Header Position 37 l.16E+07 l.41E+07 0.364 0.64 +l 109 Section B3 to B Header Position 38 2.73E+07 3.33E+07 0.857 0.14 +I 110 Section B3 to B Header Position 39 2.86E+07 3.49E+07 0.898 0.10 +I 111 Section B3 to B Header Position 40 l.93E+07 2.35E+07 0.606 0.39 +I 112 Section B3 to B Header Position 41 l.20E+07 1.46E+07 0.377 0.62 +l 113 Section B3 to B Header Position 42 9.99E+06 l.22E+07 0.314 0.69 +l 114 Section B3 to B Header Position 43 l.03E+07 l.26E+07 0.323 0.68 +l 115 Section B3 to B Header Position 44 l.24E+07 l.51E;+-07 0.389 0.61 +I 116 Section B3 to B Header Position 45 l.12E+07 l.36E+07 0.352 0.65 +l 117 Section B3 to B Header Position 46 9.49E+06 l.16E+07 0.298 0.70 +l 118 Section B3 to B Header Position 47 8.70E+06 l.06E+07 0.273 0.73 +l 119 Section B3 to B Header Position 48 8.10E+06 9.87E+06 0.254 0.75 +l 120 Section B3 to B Header Position 49 8.37E+06 l.02E+07 0.263 0.74 +l 121 Section B3 to B Header Position 50 9.61E+06 l.17E+07 0.302 0.7.0 +I 122 Section.B3 to B Header Position 51 1.11E+08 l.35E+08 3.485 (2.48) -I 123 Section B 1 to B2 Position Zero 5.47E+07 6.67E+07 1.717 (0.72) -I 124 Section B 1 to B2 Position 1 5.32E+07 6.48E+07 1.670 (0.67) -I 125 Section BI to B2 Position 2 5.12E+07 6.24E+07 1.607 (0.61) -1 126 Section BI to B2 Position 3 5.22E+07 6.36E+07 1.639 (0.64) -I 127 Section B 1 to B2 Position 4 5.72E+07 6.97E+07 1.796 (0.80) -I 128 Section B 1 to B2 Position 5 5.49E+07 6.69E+07 1.724 (0.72) -1 129 Section BI to B2 Position 6 5.79E+07 7.06E+07 1.818 (0.82) -I 130 Section B 1 to B2 Position 7 5.78E+07 7.04E+07 1.815 (0.81) -1 131 Section BI to B2 Position 8 5.80E+07 7.07E+07 1.821 (0.82) -I 132 Section B 1 to B2 Position 9 5.35E+07 6.52E+07 1.680 (0.68) -1 133 Section B 1 to B2 Position 10 5.62E+07 6.85E+07 1.764 (0.76) -1 134 Section B 1 to B2 Position 11 6.02E+07 7.34E+07 1.890 (0.89) -1 135 Section Bl to B2 Position 12 6.21E+07 7.57E+07 1.950 (0.95) -1 136 Section BI to B2 Position 13 6.45E+07 7.86E+07 2.025 (1.02) -1 137 Section B 1 to B2 Position 14 5.92E+07 7.21E+07 1.859 (0.86) -I 138 Section B 1 to B2 Position 15 4.69E+07 5.72E+07 1.472 (0.47) -I 139 Section B2 to EDCT Position Zero 3.l 1E+07 3.79E+07 0.976 0.02 +1 140 Section B2 to EDCT Position 1 3.90E+07 4.75E+07 1.224 (0.22) -1 141 Section B2 to EDCT Position 2 3.86E+07 4.70E+07 1.212 (0.21) -1 142 Se_ction B2 to EDCT Position 3 3.92E+07 4.78E+07 1.231 (0.23) -I 143 Section B2 to EDCT Position 4 3.55E+07 4.33E+07 1.114 (0.11) -1 144 Section B2 to EDCT Position 5 3.69E+07 4.50E+07 1.158 (0.16) -1 145 Section B2 to EDCT Position 6 4.40E+07 5.36E+07 1.381 (0.38) -1 146 Section B2 to EDCT Position 7 3.03E+07 3.69E+07 0.951 0.05 +l
[133]
FRSRELEASERECORD ~
ZIONSOL!JJ:!!l!Y§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Gamma Result Total Activity *soF
- 1~ws
- Pipe MeasurementLocation . (pCi/~~) Sign (pCi/m 2) (Ws) 147 Section B2 to EDCT Position 8 3.08E+07 3.75E+07 0.967 0.03 +l 148 Section B2 to EDCT Position 9 3.09E+07 3.77E+07 0.970 0.03 +l 149 Section B2 to EDCT Position 10 2.93E+07 3.57E+07 0.920 0.08 +1 150 Section B2 to EDCT Position 11 3.19E+07 3.89E+07 1.001 (0.00) -1 151 Section B2 to EDCT Position 12 3.36E+07 4.09E+07 1.055 (0.05) -1 152 Section B2 to EDCT Position 13 3.52E+07 4.29E+07 1.105 (0.11) -1 153 Section B2 to EDCT Position 14 3.71E+07 4.52E+07 1.165 (0.16) -1 154 Section B2 to EDCT Position 15 4.16E+07 5.07E+07 1.306 (0.31) -1 155 Section B2 to EDCT Position 16 5.12E+07 6.24E+07 1.607 (0.61) -1 156 Section B2 to EDCT Position 17 6.63E+07 8.08E+07 2.081 (1.08) -1 157 Section B2 to EDCT Position 18 4.09E+07 4.98E+07 1.284 (0.28) -1 158 Section B2 to EDCT Position 19 3.18E+07 3.88E+07 0.998 0.00 +l 159 Section B2 to EDCT Position 20 2.94E+07 3.58E+07 0.923 0.08 +l 160 Section B2 to EDCT Position 21 2.99E+07 3.64E+07 0.939 0.06 +l 161 Section B2 to EDCT Position 22 3.03E+07 3.69E+07 0.951 0.05 +l 162 Section B2 to EDCT Position 23 3.23E+07 3.94E+07 1.014 (0.01) -1 163 Section B2 to EDCT Position 24 3.03E+07 3.69E+07 0.951 0.05 +l 164 Section B2 to EDCT Position 25 3.32E+07 4.05E+07 1.042 (0.04) -1 165 Section B2 to EDCT Position 26 2.95E+07 3.60E+07 0.926 0.07 +1 166 Section B2 to EDCT Position 27 2.78E+07 3.39E+07 0.873 0.13 +l 167 Section B2 to EDCT Position 28 2.88E+07 3.51E+07 0.904 0.10 +l 168 Section B2 to EDCT Position 29 3.12E+07 3.80E+07 0.979 0.02 +l 169 Section B2 to EDCT Position 30 3.16E+07 3.85E+07 0.992 0.01 +1 170 Section B2 to EDCT Position 31 2.85E+07 3.47E+07 0.895 0.11 +l 171 Section B2 to EDCT Position 32 2.77E+07 3.38E+07 0.870 0.13 +1 172 Section B2 to EDCT Position 33 2.74E+07 3.34E+07 0.860 0.14 +l 173 Section B2 to EDCT Position 34 3.22E+07 3.92E+07 1.011 (0.01) -1 174 Section B2 to EDCT Position 35 2.84E+07 3.46E+07 . 0.892 0.11 +1 175 Section B2 to EDCT Position 36 3.52E+07 4.29E+07 1.105 (0.11) -1 176 Section B2 to EDCT Position 37 4.56E+07 5.56E+07 1.432 (0.43) -1 177 Section B2 to EDCT Position 38 2.39E+07 2.91E+07 0.750 0.25 +1 178 Section B2 to EDCT Position 39 2.27E+07 2.77E+07 0.713 0.29 +l Number of positive differences (S+) _ _1_2_5_ _
Critical Value 101 Survey Unit MEETS the Acceptance Criteria
[134]
14.3 ATTACHMENT 3 QC DATA
FRSRELEASERECORD ~
ZIONSOLJ!I!Qt§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B Auxili~ry Building Embedded Drain Pipe-QC Agreement QC QC PASS?
SUMP PIPE OPENING READING RATIO READING Al 767725 769860 0.997 YES A2 650115 649774 1.001 YES A
1003739 1018824 0.985 YES A3 891478 891377 1.000 YES Bl 828239 829078 0.999 YES 24509 37518 0.653 YES B
B2 801882 800652 1.002 YES 572766 572025 1.001 YES c Cl . 1110064 1109540 1.000 YES DI 760300 781099 0.973 YES D3 1280200 1274872 1.004 YES 864290 864718 1.000 YES D6 548523 541667 1.013 YES D
443731 442456 1.003 YES 569858 570379 0.999 YES D4 523863 525121 0.998 YES 884551 884432 1.000 YES El 1217802 1216788 1.001 YES E4 1060456 1060895 1.000 YES E
1083198 1084004 0.999 YES E5 1110851 1109796 1.001 YES Fl 968954 1014797 0.955 YES F2 1192538 1203019 0.991 YES F3 1139432 1222786 0.932 YES F4 388070 386461 1.004 YES F
Fl4 . 865083 866290 0.999 YES Fl2 1134703 1181988 0.960 YES 851918 852302 1.000 YES F8 1234461 1233424 1.001 YES GI 821083 821031 1.000 YES G G2 802433 802920 0.999 YES G3 584637 585605 0.998 YES H HI 156963 159934 0.981 YES 12 126325 128178 0.986 YES 15 287955 290823 0.990 YES 1
1197443 1198987 0.999 YES J4 521541 523494 0.996 YES Kl 512842 511740 1.002 YES K
K2 1226888 1226661 1.000 YES Al 1269480 1280472 0.991 YES 707970 707202 1.001 YES A 638338 612005 1.043 YES A2 576415 565315 1.020 YES a 711550 711254 1.000 YES 754238 753316 1.001 YES Bl 1.002 YES 993453 991328 B
673021 676113 0.995 YES B2 YES 719157 718334 1.001
[135]
FRSRELEASERECORD ~
ZIONSOL!!.I!fl!J§
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B SUMP P{PE QC RATIQ
- orENING... READING QCPASSi READING ..
844691 844179 1.001 YES B3 944640 943S21 1.001 YES B (cont) 223944 229763 0.97S YES BS 198S91 197484 1.006 YES D D4 704S39 706S72 0.997 YES 114S616 1143698 . 1.002 YES El 12S3826 12S3326 1.000 YES 170984 172646 0.990 YES E2 S38076 S3241S 1.011 YES 722179 706086 1.023 YES E S67916 S67706 1.000 YES E3 602826 60200S 1.001 YES 442298 443311. 0.998 YES E4 710312 71199S 0.998 YES ES S076SO S06329 1.003 YES E6 132S37 143180 0.926 YES Fl IOS62SO 107S843 0.982 YES 13370S3 1336040 1.001 YES F2 1348348 1347962 1.000 YES F3 1388693 1383S23 1.004 YES F
F4 1319293 131974S 1.000 YES 1321723 1320820 1.001 YES FS 1286707 1323341 0.972 YES F6 132330S 1322270 1.001 YES GI 1260149 12S80S9 1.002 YES B (cont) 399361 399722 0.999 YES G G2 64S880 64662S 0.999 YES G3 36818S 369090 0.998 YES Hl 117712S 1178266 0.999 YES
' H H3 16S739 166S8S 0.99S YES JI 3S8237 3S9439 0.997 YES J2 1409200 1389S09 1.014 YES J 1029892 1030S69 0.999 YES J3 479060 478930 1.000 YES 969S41 967997 1.002 YES Kl Sl2842 Sl 1740 1.002 YES K
K2 4398S7 446391 0.98S YES 1022977 1023080 1.000 YES LI 1042617 1041121 1.001 YES L3 1370438 137234S 0.999 YES 19S713 18Sl77 l.OS7 YES L LS 303376 303903 0.998 YES 148S86 147164 1.010 YES L6 183S70 183142 1.002 YES L9 187031 187700 0.996 YES 190246 1896S9 1.003 YES M M2 343122 371099 0.92S YES 706297 706974 0.999 YES N N2 1207689 12099S8 0.998 YES p Pl 88S497 88637S 0.999 YES
[136]
FRSRELEASERECORD ~
ZIONSOL!!I!Q~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE SURVEY UNITS 05119A & 05119B.
READING' Pl (cont) 496344 503512 0.986 YES P (cont) 437986 456651 0.959 YES P2 341962 337834 1.012 YES 376876 360303 1.046 YES R2 R 345798 345619 1.001 YES R3 237474 238755 0.995 YES 2050169 2043675 1.003 YES 1959811 1961018 0.999 YES Sl 183529 183419 1.001 YES s 153105 152633 1.003 YES S2 137601 137583 1.000 YES 185676 186196 0.997 YES S3
.. :g (cont) 155653 156198 0.997 YES Tl 481264 483085 0.996 YES 43288 43038 1.006 YES 216203 217251 0.995 YES T2 159061 159430 0.998 YES T
222899 222792 1.000 YES 300377 300793 0.999 YES 169855 170372 0.997 YES T4 293534 292611 1.003 YES U1 1073030 1072867 1.000 YES 260030 260346 0.999 YES u U2 228254 224100 1.019 YES 238797 238902 1.000 YES Bl 38561 38590 0.999 YES 20394 20434 0.998 YES 82
' 29668 29301 1.013 YES 196969 222117 0.887 YES 83 EQ B 224035 224491 0.998 YES 17176 16801 1.022 YES 84 16455 16332 1.008 YES 18653 18688 0.998 YES 85 22347 22265 1.004 YES
[137]
-- -**~-------------
14.4 ATTACHMENT 4 INSIGNIFICANT DOSE CONTRIBUTOR ANALYSIS
FRS RELEASE RECORD ~
AUXILIARY BUILDING EQUIPMENT AND FLOOR DRAIN PIPE =ZIONSOLUTIONS<ii=
... ( _ _ c._.,.
SURVEY UNITS 05119A & 051198 Auxiliary Building Embedded Drain Pipe -Analysis of Dose Contribution from Insignificant Radionuclides Com~ osite Sample ABCD-01
- Adjusted Aux Bldg BDF'.
- Dose Result' MDC >l\IDC Results 'Mixture : Percent of Dose *
- Uncertainty (pCi/<>m\ (0Ci/2m) <0C:it2m) (mrem/vr/mCi) (mrem/vr)
H-3 7.44E+Ol l.28E+Ol l.86E+Ol Yes 7.44E+OI 0.065% 6.21E-03 4.04E-06 0.0192%
C-14 3.47E+02 7.17E+OO 4.93E+OO Yes 3.47E+02 0.304% 6.49E-02 l.97E-04 0.9346%
Fe-55 -2.21E+Ol 6.55E+Ol 9.83E+Ol No 9.83£+01 0.086% 8.09E-07 6.96E-10 0.0000%
Ni-59 9.00E+ol 2.91E+o2 4.58E+02 No 4.58£+02 0.401% l.35E-04 5.42E-07 0.0026%
Co-60 2.76E+04 2.31E+o3 1.15E+03 Yes 2.76E+04 24.188% l.08E-02 2.61E-03 12.3819%
Ni-63 1.39E+04 9.29E+OI 2.39E+OI Yes 1.39E+04 12.207% 2.86E-04 3.49E-05 0.1655%
Sr-90 4.57E+01 7.63E+OO 8.84E+OO Yes 4.57E+01 0.040% 3.29E-OI l.32E-04 0.6243%
Nb-94 1.16E+02 2.21E+o2 2.58E+02 No 2.58£+02 0.226% l.41E-02 3.18E-05 0.1509%
Tc-99 2.85E+01 8.51E+o0 l.36E+OI Yes 2.85E+01 0.025% l.48E-OI 3.69E-05 0.1748%
Ag-!08m 1.18E+o2 l.90E+02 2.65E+02 No 2.65£+02 0.232% l.78E-02 4.13E-05 0.1957%
Sb-125 6.90E+02 7.03E+o2 l.OIE+03 No 1.01£+03 0.887% l.32E-02 1.17E-04 0.5551%
Cs-134 6.86E+OI l.72E+02 2.48E+02 No 2.48£+02 0.217% l.56E-02 3.39E-05 .0.1605%
Cs-137 6.86E+04 6.03E+03 l.49E+03 Yes 6.86E+04 60.086% 2.96E-02 l.78E-02' 84.2998%
Pm-147 2.66E+01 8.95E+o0 1.42E+OI Yes 2.66E+01 0.023% 3.0IE-05 7.0IE-09 0.0000%
Eu-152 -6.50E+02 8.36E+02 4.96E+02 No 4.96£+02 0.434% 5.08E-03 2.21E-05 0.1045%
Eu-154 L33E+02 3.97E+02 2.53E+02 No 2.53£+02 0.222% 5.63E-03 l.25E-05 0.0591%
Eu-155 -l.04E+02 2.90E+02 3.02E+02 No 3.02£+02 0.264% 2.91E-04 7.69E-07 0.0036%
No-237 5.37E-OI 6.IOE-01 8.08E-01 No Pu-238 1.97E+OO l.23E+o0 8.81E-OI Yes 1.97E+OO 0.002% 2.l IE-01 3.63E-06 0.0172%
Pu-239/240 1.44E+OO 1.04E+OO 7.69E-Ol Yes 1.44E+OO 0.001% 2.61E-OI 3.30E-06 0.0156%
Pu-241 2.47E+OI 5.24E+OI 8.88E+OI No 8.88£+01 0.078% 4.58E-03 3.56E-06 0.0169%
Am-241 1.0lE+Ol 2.52E+o0 8.03E-OI Yes 1.0lE+Ol 0.009% 2.58E-OI 2.28E-05 0.1081%
Am-243 l.80E-OI 3.43E-OI 6.35E-OI No 6.35£-01 0.001% 2.64E-OI l.47E-06 0.0070%
Cm-243/244 2.63E+OO I.I 9E+OO 9.79E-OI Yes 2.63E+OO 0.002% 2.69E-02 6.18E-07 0.0029%
l.14E+05 100.000% 2.l lE-02 100%
Insignificant Contribution (incl. H-3, Eu-152 & Eu-154) 2.3679%
Note 1 - BDF for Auxiliary Building Basements from ZionSolutions TSD 14-019, "Radionuclides of Concern for Soil and Basement Fill Model Source Terms"