|
---|
Category:Fire Protection Plan
MONTHYEARML22105A0922022-04-0808 April 2022 Attachment 5 - Gpu Nuclear Calculation 4440-7380-90-017, Revision 3, Pdms SAR Section 8.2.5 Fire Analysis Source Terms ML22105A0902021-12-0909 December 2021 Attachment 4 - RSCS Technical Support Document (Tsd) No. 21-077 Rev 00 TMI-2 Source Term Limitations and Administrative Controls for the TMI-2 Decommissioning Fire Protection Program ML18120A0262018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar) Vol. 2. Attachment 3-7C ML18120A0252018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar) Vol. 2. Attachment 3-7B ML18120A0242018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar) Vol. 2. Attachment 3-7A ML18120A0232018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar) Vol. 2. Attachment 3-6Q to 3-6R ML18120A0222018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar) Vol. 2. Attachment 3-6N to 3-6P ML18120A0212018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar) Vol. 2. Attachment 3-6F to 3-6M ML18120A0202018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar) Vol. 2. Attachment 3-6A to 3-6E ML18120A0192018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar)Vol. 2. Attachment 3-5O to 3-5R ML18120A0182018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar)Vol. 2. Attachment 3-5K to 3-5N ML18120A0172018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report (Fhar)Vol. 2. Attachment 3-5I to 3-5J ML18120A0162018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 2, Attachment 3-5A to 3-5H ML18120A0152018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 2, Attachment 3-4 ML18120A0142018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 2, Attachment 3-3 ML18120A0132018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 2, Attachment 3-1 ML18120A0122018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 2, Attachment 3-0 ML18120A0112018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 2, Cover Page ML18120A0102018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Chapter 6B ML18120A0092018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Chapter 6A ML18120A0082018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Chapter 5 ML18120A0072018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Chapter 4B ML18120A0062018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Chapter 4A ML18120A0052018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Chapter 3 ML18120A0042018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Chapter 2 ML18120A0032018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Chapter 1 ML18120A0022018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Intro - Table of Contents ML18120A0012018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Intro - Summary of Change ML18120A0002018-04-0606 April 2018 Revision 28 to Fire Hazards Analysis Report, Volume 1, Cover Page ML16130A1512016-04-11011 April 2016 TMI Fhar Volume 1 (001) Cover Page ML16130A1522016-04-11011 April 2016 TMI Fhar Volume 1 (002) Intro- Summary of Change ML16130A1662016-04-11011 April 2016 TMI Fhar Volume 2 (005) Attachment 3-4 ML16130A1592016-04-11011 April 2016 TMI Fhar Volume 1 (010) Chapter 6A ML16130A1532016-04-11011 April 2016 TMI Fhar Volume 1 (003) Intro - Table of Contents ML16130A1542016-04-11011 April 2016 TMI Fhar Volume 1 (004) Chapter 1 ML16130A1622016-04-11011 April 2016 TMI Fhar Volume 2 (001) Cover Page ML16130A1752016-04-11011 April 2016 TMI Fhar Volume 2 (014) Attachment 3-7A ML16130A1612016-04-11011 April 2016 TMI Fhar Volume 1 (011) Chapter 6B ML16130A4732016-04-11011 April 2016 1-FHA-001, Sheet Na, Rev 008, Fire Area Layout Legend and Notes ML16130A4982016-04-11011 April 2016 1-FHA-044, Sheet Na, Rev 005, Fire Area Layout Diesel Generator Bldg Plan Floor El 305 Ft - 0 in ML16130A5172016-04-11011 April 2016 1-FHA-036, Sheet Na, Rev 017, Fire Area Layout Control Twr Plan FLR El 355 Ft - 0 in 380 Ft 0 in ML16130A4802016-04-11011 April 2016 1-FHA-007, Sheet Na, Rev 007, Fire Area Layout Turbine Bldg Plan Floor Elevation 355 Ft. - 0 in ML16130A1772016-04-11011 April 2016 TMI Fhar Volume 2 (016) Attachment 3-7C ML16130A1762016-04-11011 April 2016 TMI Fhar Volume 2 (015) Attachment 3-7B ML16130A1502016-04-11011 April 2016 TMI Fhar Volume 1 (005) Chapter 2 ML16130A5162016-04-11011 April 2016 1-FHA-035, Sheet Na, Rev 017, Fire Area Layout CR Tower Pln Floor El 322 Ft - 0 in and 338 Ft - 6 ML16130A1782016-04-11011 April 2016 TMI Fhar Volume 2 (017) Attachment 3-8 ML16130A4752016-04-11011 April 2016 1-FHA-003, Sheet Na, Rev 009, Fire Area Layout Turbine Bldg Plan Floor El 305 Ft - 0 in ML16130A1682016-04-11011 April 2016 TMI Fhar Volume 2 (007) Attachment 3-5I to 3-5J ML16130A4792016-04-11011 April 2016 1-FHA-006, Sheet Na, Rev 008, Fire Area Layout Turbine Bldg Plan Floor El 355 Feet - 0 Inches 2022-04-08
[Table view] |
Text
ATTACHMENT 3-7CMANUAL ACTIONS AND REPAIRS REQUIRED FOR COLD SHUTDOWN IN ANYFIRE AREA/ZONE(NOTE 4)SHEET1FHAR3-7C.docRev.27System Function(1)Condition whichrequires action(Equipment Failure)(2)Applicable FireArea / Zones(3)Manual Actionor Repair(3)Action or Repair Required (Note 1)(4)Locationwhere Actionor Repair isPerformed(5)TimeRequirement(6)TimeRequirementBasisCommentsActionRepairDecay HeatRemovalDR-P-1A is notremotely operableISPH-FZ-2XX1) Repair control cable LR24 by lifting and taping allconductors.2) Start DR-P-1A at 1R 480V switchgear.ISPH-FZ-1Prior to initiatingDHRDecay HeatRemovalDR-P-1B is notremotely operableISPH-FZ-1XX1) Repair control cables LT21 and LT24 by liftingand taping all conductors.2) Start DR-P-1B at 1T 480V switchgear.ISPH-FZ-2Prior to initiatingDHRDecay HeatRemovalDC-P-1A and DC-P-1Bnot remotely operableAB-FZ-7XRepair power cable LP2 for DC-P-1A or LS2 forDC-P-1B by splicing in a new power cable.AB-FZ-7Prior to initiatingDHRRepair restores control room orlocal switchgear operation.Decay HeatRemovalDH-P-1A is notremotely operableCB-FA-2bXRepair control cable MD63 by lifting and taping allconductors.CB-FA-3aPrior to initiatingDHRRepair restores control room orlocal switchgear operation.Decay HeatRemovalDH-P-1B is notremotely operableAB-FZ-5FH-FZ-1XRepair power cable ME6 for DH-P-1B by splicing ina new power cable.FH-FZ-2FH-FZ-1AB-FZ-4AB-FZ-5Prior to initiatingDHRRepair restores control room orlocal switchgear operation.Decay HeatRemovalDH-V-1 and DH-V-2are not remotelyoperableCB-FA-2c, CB-FA-2e, CB-FA-3c, CB-FA-3d, CB-FA-4b,FH-FZ-1, FH-FZ-2FH-FZ-5,RB-FZ-1aRB-FZ-1b, RB-FZ-1cRB-FZ-1e, RB-FZ-2TB-FA-1XLocally open DH-V-1 and DH-V-2RB-FZ-1eRB-FZ-1cPrior to initiatingDHRDecay HeatRemovalDH-V-3 remoteoperation isunavailable.AB-FZ-4, CB-FA-2cCB-FA-2e, CB-FA-3cCB-FA-3d, CB-FA-4bFH-FZ-1, FH-FZ-5XLocally open DH-V-3AB-FZ-466 Hours(Note 3)ECR 09-00527Decay HeatRemovalDH-V-4A is notremotely operableAB-FZ-6CB-FA-2bXManually open DH-V-4AAB-FZ-4Prior to initiatingDHRDecay HeatRemovalDH-V-4B is notremotely operableAB-FZ-4, AB-FZ-5AB-FZ-6a,CB-FA-2dCB-FA-2f, CB-FA-3cCB-FA-3d, CB-FA-4bFH-FZ-1XManually open DH-V-4BAB-FZ-466 Hours(Note 3)Decay HeatRemovalBS-V-3A fails openAB-FZ-6CB-FA-2bXLocally close BS-V-3AAB-FA-1Prior to initiatingDHRDecay HeatRemovalBS-V-3B fails open.AB-FZ-5, AB-FZ-6aCB-FA-2d, CB-FA-2fCB-FA-3c, CB-FA-3dCB-FA-4b, FH-FZ-1XLocally close BS-V-3BAB-FZ-266 Hours(Note 3)Decay HeatRemovalDH-V-7A fails openAB-FZ-6XLocally close DH-V-7AAB-FZ-4Prior to initiatingDHR ATTACHMENT 3-7CMANUAL ACTIONS AND REPAIRS REQUIRED FOR COLD SHUTDOWN IN ANYFIRE AREA/ZONE(NOTE 4)SHEET1FHAR3-7C.docRev.27System Function(1)Condition whichrequires action(Equipment Failure)(2)Applicable FireArea / Zones(3)Manual Actionor Repair(3)Action or Repair Required (Note 1)(4)Locationwhere Actionor Repair isPerformed(5)TimeRequirement(6)TimeRequirementBasisCommentsActionRepairDecay HeatRemovalDR-P-1A is notremotely operableISPH-FZ-2XX1) Repair control cable LR24 by lifting and taping allconductors.2) Start DR-P-1A at 1R 480V switchgear.ISPH-FZ-1Prior to initiatingDHRDecay HeatRemovalDR-P-1B is notremotely operableISPH-FZ-1XX1) Repair control cables LT21 and LT24 by liftingand taping all conductors.2) Start DR-P-1B at 1T 480V switchgear.ISPH-FZ-2Prior to initiatingDHRDecay HeatRemovalDC-P-1A and DC-P-1Bnot remotely operableAB-FZ-7XRepair power cable LP2 for DC-P-1A or LS2 forDC-P-1B by splicing in a new power cable.AB-FZ-7Prior to initiatingDHRRepair restores control room orlocal switchgear operation.Decay HeatRemovalDH-P-1A is notremotely operableCB-FA-2bXRepair control cable MD63 by lifting and taping allconductors.CB-FA-3aPrior to initiatingDHRRepair restores control room orlocal switchgear operation.Decay HeatRemovalDH-P-1B is notremotely operableAB-FZ-5FH-FZ-1XRepair power cable ME6 for DH-P-1B by splicing ina new power cable.FH-FZ-2FH-FZ-1AB-FZ-4AB-FZ-5Prior to initiatingDHRRepair restores control room orlocal switchgear operation.Decay HeatRemovalDH-V-1 and DH-V-2are not remotelyoperableCB-FA-2c, CB-FA-2e, CB-FA-3c, CB-FA-3d, CB-FA-4b,FH-FZ-1, FH-FZ-2FH-FZ-5,RB-FZ-1aRB-FZ-1b, RB-FZ-1cRB-FZ-1e, RB-FZ-2TB-FA-1XLocally open DH-V-1 and DH-V-2RB-FZ-1eRB-FZ-1cPrior to initiatingDHRDecay HeatRemovalDH-V-3 remoteoperation isunavailable.AB-FZ-4, CB-FA-2cCB-FA-2e, CB-FA-3cCB-FA-3d, CB-FA-4bFH-FZ-1, FH-FZ-5XLocally open DH-V-3AB-FZ-466 Hours(Note 3)ECR 09-00527Decay HeatRemovalDH-V-4A is notremotely operableAB-FZ-6CB-FA-2bXManually open DH-V-4AAB-FZ-4Prior to initiatingDHRDecay HeatRemovalDH-V-4B is notremotely operableAB-FZ-4, AB-FZ-5AB-FZ-6a,CB-FA-2dCB-FA-2f, CB-FA-3cCB-FA-3d, CB-FA-4bFH-FZ-1XManually open DH-V-4BAB-FZ-466 Hours(Note 3)Decay HeatRemovalBS-V-3A fails openAB-FZ-6CB-FA-2bXLocally close BS-V-3AAB-FA-1Prior to initiatingDHRDecay HeatRemovalBS-V-3B fails open.AB-FZ-5, AB-FZ-6aCB-FA-2d, CB-FA-2fCB-FA-3c, CB-FA-3dCB-FA-4b, FH-FZ-1XLocally close BS-V-3BAB-FZ-266 Hours(Note 3)Decay HeatRemovalDH-V-7A fails openAB-FZ-6XLocally close DH-V-7AAB-FZ-4Prior to initiatingDHR