ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 1a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
RCS INVENTORY & PRESSURE CONTROL MAKEUP PUMP B,
C A,
B A,
C B
B, C
C A
A, C
C B,
C A,
C B
B A
A B A B A B
A B,
C B,
C B,
C A=MU-P-1A, B=MU-P-1C, C=MU-P-1B (NOTE 4)
MU PUMP SUCTION FLOW PATH B
B M
A A
A B
B A
A B A B A B
A B
B B
A = MU-V-14A, B = MU-V-14B RCS MAKEUP FLOW PATH B
A M
A B
B A
A B A B A B
A B
B B
A = MU-V-16A or B B = MU-V-16C or D MU PUMP MIN FLOW PATH M
M M
M M
M M M M M M M
M M
M LETDOWN M M M
M M
X M
X X
M M
M M
M M
M M M M M
M M
M M
TERMINATE UNCONTROLLED LETDOWN 1
1 1
1 1
1 1
F 1
1 1
1 1
1 1
1 1
1 2
2 3
1 2
1 1
1 2
1 2
1 1
1 1=MU-V-3, 2=MU-V-2A/B, 3=MU-V-4/5 PRESSURIZER HEATERS R
B A
A B A B A B
A B
B B
A=RC-GRP-8, B=RC-GRP-9 PORV PROTECTION 1
2 2
1 1
2 1
2 2
2 2
2 1=RC-RV-2, 2=RC-V-2 RAPID DEPRESSURIZATION PROTECTION T
A A
T B A
T A T A B
A B
B B
A=RC-V-1, B=RC-V-3, T=TRIP RCP RC PUMP TRIP CAPABILITY M
P P
RC PUMP SEAL COOLING SEAL INJECTION A A AB C AB A A
A A
A AB C
B A
AB C
AB C
AB C
NOTE 3 ISOLATE CONTROLLED BLEED OFF FLOW TO MU TANK B
A B
B B
B A A
B A
X X
X A = MU-V-25, B= MU-V-26 (AIR IS NOT REQD for ISOLATION)
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
RCS HEAT REMOVAL H= HPI COOLING EMERGENCY FEEDWATER TURBINE DRIVEN PUMP P
P EMERGENCY FEEDWATER MOTOR DRIVEN PUMPS B
B A
B A B A B
A B
B B
A = EF-P-2A AVAILABLE B = EF-P-2B AVAILABLE EFW CONTROL VALVES TO OTSG A AND OTSG B 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A M B
B B
WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE B = EF-V-30B and EF-V-30D AVAILABLE ISOLATE MAIN FEEDWATER T
T T
T T T T
T V V V T V
V T P P
T= TRIP MFW PUMPS, V=CLOSE FW VALVES OTSG PRESSURE CONTROL (HSD FUNCTION) 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A M
M M
2A M
M B
WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE MS-V-4A/B HSD AVAILABILITY ISOLATE STEAM DUMP TO CONDENSER 1
1 1
1 1
2 2
2 2
2 1=MS-V-8A AND 8B NOT AVAILABLE 2=MS-V-3A, 3B, 3C, 3D, 3E or 3F AFFECTED NORMAL INSTRUMENT AIR X X X
X X
X X
X X
X X
X B
B IA COMPRESSOR X
B A
X A X A B
A B
B B
COPPER AIR LINES/FITTINGS X X X
X X
X X
X X
X 2 HR. BACKUP AIR DECAY HEAT REMOVAL SYSTEM B A A
A B
B A
F B
A B
B A
A B A B A B
A B
B B
AVAILABLE AFTER MANUAL ALIGNMENT OF VALVES
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
DECAY HEAT CLOSED CYCLE B A B
B A
F B
A B
B A
B A B A B
A B
B B
DECAY HEAT RIVER WATER B
A B
B A
A B A B A B
A B
B B
TEMPERATURE INDICATION WHEN OPERATING DHR B,I A, I I
I I B,I A,I I A,I I A.I B,I B,I B,I B B
A = DH2-TE-1 B = DH2-TE-2 I = BIRO INCORE TEMPERATURE COMPONENT COOLING SYSTEMS INTERMEDIATE COOLING PUMP B
A X
B B
A B A B A B
A B
B B
IC VALVES M M M
M X
M X
M M
M M
M M
M M M M M M
M IC-V-2, 3, 4 NUCLEAR SERVICE CLOSED COOLING PUMP B,
C B,
C A
F B
B A
B A, C
B, C
A, C
B A
B B
B A=NS-P-1A, B=NS-P-1C, C=NS-P-1B F=A OR B IS AVAILABLE NUCLEAR RIVER WATER PUMP A,
B A,
B B,
C A,
C B,
C B,
C R
A B,
C A C A B,
C A
B B
B A=NR-P-1A, B=NR-P-1C C=NR-P-1B, R = NR-P-1B (NOTE 5)
NR VALVES M
M M
M M
M M
M M
M NR-V-4A, 4B, 15A, 15B ISPH VENTILATION B
A B
B A
B A B A B
L L
L L
L = PORTABLE VENTILATION INSTRUMENTATION REACTIVITY B
B A
A B A B A B
B B
A=NI-11 B=NI-12 RC OUTLET TEMPERATURE B
B, N
A, N
A, N
B A, N B A, N
B, N
B, N
N, B
A, B
A, B
A=RC-TE-958 B=RC-TE-960 N=RC4A/B-TE-1/4 RC INLET TEMPERATURE B
B, N
A, N
A, N
B A, N B A, N
B, N
B, N
B, N
A, B
A, B
A=RC-TE-959 B=RC-TE-961 N=RC5A/B-TE-2/4 RCS PRESSURE B
B A
A B A B A B
B B,
C B,
C A=RC3A-PT-3 B=RC-PT-949 C=RC-PT-963 (RSD ONLY)
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
PZR LEVEL (TEMPERATURE COMPENSATED)
B N
B N B N B
B B
B=RC-LT-777 W/RC2-TE-2 N=RC1-LT-1 OR LT-3 W/RC2-TE-1 OR 2 SG-A LEVEL B
B A
A B A B A B
A=FW-LT-775 B=FW-LT-789 SG-B LEVEL B
B A
A B A B A B
B, N
B A=FW-LT-788 N=FW-LT-1052 W/
B=FW-LT-776 FW-TE-1050 & MS-PT-1184 SG-A PRESSURE B
B, N
B A, N B A, N
B, N
A A
A=MS-PT-950 B=MS-PT-1180 N=SP6A-PT-1/2 SG-B PRESSURE B
B, N
A, N
A, N
B A, N B N B
B B=MS-PT-951 A=MS-PT-1184 N=SP6B-PT-1/2 BWST LEVEL A
B B
B A
B A B A B
B, L
B B
B A=DH-LT-808 B=DH-LT-809 AC ELECTRICAL POWER DIESEL GENERATOR B
B A
B A B A B
A B
B B
4160V SWGR B
B A
B A B A B
A B
B B
480V SWGR @ CONTROL BLDG B
B A
B A B A B
A B
B B
480V SWGR @ SCREEN HOUSE B
A B
B A
A B A B A B
A B
B B
B A
B A B A B
A B
B B
480V ESV MCC B,
C C
A, C
B, C
B, C
A, C
A, B
B, C A B, C
A, C
B, C
C, A
B, C
B, C
B, C
480V MCC @ SCREEN HOUSE B
A B
B A
A B A B A B
A B
B B
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
INVERTER B,
D, V
A, C,
N, V
B, D,
V A,
C, N
B, D,
V A,
C, N
N=EE-INV-1E V=EE-INV-1F 120VAC Panels VBA, VBB, VBC, VBD, ATA, and ATB B,
D A,
C, N
B, D
A, C,
N B,
D A,
C, N
A=VBA, B=VBB, C=VBC, D=VBD N=ATA AND ATB ESAS ACTUATION ESAS (TRAIN A)
X X
X X
X X
X X
X X X X
X X
X X = Actuation Potential (NOTE 2)
ESAS (TRAIN B)
X X
X X
X X X X X X
X X
X X = Actuation Potential (NOTE 2)
DC ELECTRICAL POWER BATTERY CHARGER B,
D B,
D A,
C B,
D A,
C B,
D A,
C B,
D A,
C B,
D B,
D B,
D MAIN PANEL B
A, B
A, B
B A B, C
A, C
A = EED-PNL-1A C = EED-PNL-1M B = EED-PNL-1B ES DIST PNL @ CONTROL BLDG B
B A B A A = EED-PNL-1E B = EED-PNL-1F ES DIST PNL @ DG BLDG B
B A B A A = EED-PNL-1P B = EED-PNL-1Q
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 1b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 RCS INVENTORY & PRESSURE CONTROL MAKEUP PUMP B A B A, C
A, C
B C
C A=MU-P-1A, B=MU-P-1C, C=MU-P-1B (NOTE 4)
MU PUMP SUCTION FLOW PATH B A B A A
B A = MU-V-14A, B = MU-V-14B RCS MAKEUP FLOW PATH B A B A A
B A = MU-V-16A or B B = MU-V-16C or D MU PUMP MIN FLOW PATH M
RESTORE LETDOWN M M M M M
M M
M M
M M
M M
M M
M M
M X
M M
M TERMINATE UNCONTROLLED LETDOWN 1
1 F
1 1
1 1
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1=MU-V-3, 2=MU-V-2A/B, 3=MU-V-4/5 PRESSURIZER HEATERS B A A
X X
X A=RC-GRP-8, B=RC-GRP-9 PORV PROTECTION 1
1 2
2 1=RC-RV-2, 2=RC-V-2 RAPID DEPRESSURIZATION PROTECTION B A T A A
B T
T T T
B A=RC-V-1, B=RC-V-3, T=TRIP RCP RC PUMP TRIP CAPABILITY X
RC PUMP SEAL COOLING SEAL INJECTION B A AB C AC A A
C AB A A
A A
A A
A A
A A
A NOTE 3 ISOLATE CONTROLLED BLEED OFF FLOW TO MU TANK B
X A A
B B
B A = MU-V-25, B= MU-V-26 (AIR is NOT REQD for ISOLATION)
RCS HEAT REMOVAL H
H H= HPI COOLING EMERGENCY FEEDWATER X
M
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 TURBINE DRIVEN PUMP EMERGENCY FEEDWATER -
MOTOR DRIVEN PUMP B A X
EFW CONTROL VALVES TO OTSG A AND OTSG B M 2A 2A 2A 2A M 2A M M 2A 2A 2A M
2A 2A 2A 2A WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE ISOLATE MAIN FEEDWATER T T T T T
T T
T T
T T
T F
T= TRIP MFW PUMPS, V=CLOSE FW VALVES OTSG PRESSURE CONTROL (HSD FUNCTION) 2A 2A 2A 2A 2A M 2A M M 2A 2A M 2A 2A 2A 2A M
WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE MS-V-4A/B HSD AVAILABILITY ISOLATE STEAM DUMP TO CONDENSER 1
1 1
1 1
1 1
2 1=MS-V-8A AND 8B NOT AVAILABLE 2=MS-V-3A, 3B, 3C, 3D, 3E or 3F AFFECTED NORMAL INSTRUMENT AIR X X X X X
X X
X X
X X
X X
X X
X IA COMPRESSOR B A A
X A
X B
X COPPER AIR LINES/FITTINGS X X X X X
X X
X X
X X
X X
X X
X 2 HR. BACKUP AIR X
X X
DECAY HEAT REMOVAL SYSTEM B A B A A
B B
A AVAILABLE AFTER MANUAL ALIGNMENT OF VALVES DECAY HEAT CLOSED CYCLE B A B A A
B B
A DECAY HEAT RIVER WATER B A B A A
B B
A TEMPERATURE INDICATION WHEN OPERATING DHR L A L B,I A,BA,BA,BA,B A,BA,BA,B A = DH2-TE-1, B = DH2-TE-2, I = BIRO INCORE TEMPERATURE COMPONENT COOLING SYSTEMS
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 INTERMEDIATE COOLING PUMP B A B A B
M IC VALVES M M M M M
M M
M M
M M
M M
M M
M X
M IC-V-2, 3, 4 NUCLEAR SERVICE CLOSED COOLING PUMP B A, C B A B
A=NS-P-1A, B=NS-P-1C, C=NS-P-1B NUCLEAR RIVER WATER PUMP B,
C A B A, C
A B,
C B
A A,
B A=NR-P-1A, B=NR-P-1C, C=NR-P-1B NR VALVES M
M M
M M
M M
NR-V-4A, 4B, 15A, 15B ISPH VENTILATION B A L A A A
B L
L L
L = PORTABLE VENTILATION INSTRUMENTATION REACTIVITY B A A
A B
A=NI-11 B=NI-12 RC OUTLET TEMPERATURE N
B, N
B, N
B B, N
B A=RC-TE-958 B=RC-TE-960 N=RC4A/B-TE-1/4 RC INLET TEMPERATURE N
B, N
B, N
B B, N
A, B
B, N
B, N
A=RC-TE-959 B=RC-TE-961 N=RC5A/B-TE-2/4 RC PRESSURE A
B B
B B
B B
A=RC3A-PT-3 B=RC-PT-949 C=RC-PT-963 (RSD ONLY)
PZR LEVEL (TEMP. COMPENSATED)
N N
N N
N N N
B=RC-LT-777 W/RC2-TE-2 N=RC1-LT-1 OR 3 W/RC2-TE-1 OR 2 SG-A LEVEL A
A A
A=FW-LT-775 B=FW-LT-789 SG-B LEVEL B
B B
A=FW-LT-788 B=FW-LT-776
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 SG-A PRESSURE A,
N A,
N A
A A
A=MS-PT-950 B=MS-PT-1180 N=SP6A-PT-1/2 SG-B PRESSURE B,
N B,
N B,
N B
B B=MS-PT-951 A=MS-PT-1184 N=SP6B-PT-1/2 BWST LEVEL B
B L
A=DH-LT-808 B=DH-LT-809 AC ELECTRICAL POWER DIESEL GENERATOR B A 4160 V SWGR B A 480 V SWGR @ CONTROL BLDG B A 480 V SWGR @ SCREEN HOUSE B A B A A
B B
A 480 V ES MCC B A 480 V ESV MCC B,
C A,
C B A, C
B, C
480 V MCC @ SCREEN HOUSE B A B A A
B B
A INVERTER N=EE-INV-1E, V=EE-INV-1F 120VAC Panels VBA, VBB, VBC, VBD, ATA, and ATB A=VBA, B=VBB, C=VBC, D=VBD N=ATA AND ATB
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 ESAS ACTUATION ESAS (TRAIN A)
X X X
X X
X X
X X = Actuation Potential (NOTE 2)
ESAS (TRAIN B)
X X X
X X
X X
X X = Actuation Potential (NOTE 2)
DC ELECTRICAL POWER BATTERY CHARGER MAIN PANEL A = EED-PNL-1A C = EED-PNL-1M B = EED-PNL-1B ES DIST PNL @ CONTROL BLDG A = EED-PNL-1E B = EED-PNL-1F ES DIST PNL @ DG BLDG B A A = EED-PNL-1P B = EED-PNL-1Q
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 1a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
RCS INVENTORY & PRESSURE CONTROL MAKEUP PUMP B,
C A,
B A,
C B
B, C
C A
A, C
C B,
C A,
C B
B A
A B A B A B
A B,
C B,
C B,
C A=MU-P-1A, B=MU-P-1C, C=MU-P-1B (NOTE 4)
MU PUMP SUCTION FLOW PATH B
B M
A A
A B
B A
A B A B A B
A B
B B
A = MU-V-14A, B = MU-V-14B RCS MAKEUP FLOW PATH B
A M
A B
B A
A B A B A B
A B
B B
A = MU-V-16A or B B = MU-V-16C or D MU PUMP MIN FLOW PATH M
M M
M M
M M M M M M M
M M
M LETDOWN M M M
M M
X M
X X
M M
M M
M M
M M M M M
M M
M M
TERMINATE UNCONTROLLED LETDOWN 1
1 1
1 1
1 1
F 1
1 1
1 1
1 1
1 1
1 2
2 3
1 2
1 1
1 2
1 2
1 1
1 1=MU-V-3, 2=MU-V-2A/B, 3=MU-V-4/5 PRESSURIZER HEATERS R
B A
A B A B A B
A B
B B
A=RC-GRP-8, B=RC-GRP-9 PORV PROTECTION 1
2 2
1 1
2 1
2 2
2 2
2 1=RC-RV-2, 2=RC-V-2 RAPID DEPRESSURIZATION PROTECTION T
A A
T B A
T A T A B
A B
B B
A=RC-V-1, B=RC-V-3, T=TRIP RCP RC PUMP TRIP CAPABILITY M
P P
RC PUMP SEAL COOLING SEAL INJECTION A A AB C AB A A
A A
A AB C
B A
AB C
AB C
AB C
NOTE 3 ISOLATE CONTROLLED BLEED OFF FLOW TO MU TANK B
A B
B B
B A A
B A
X X
X A = MU-V-25, B= MU-V-26 (AIR IS NOT REQD for ISOLATION)
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
RCS HEAT REMOVAL H= HPI COOLING EMERGENCY FEEDWATER TURBINE DRIVEN PUMP P
P EMERGENCY FEEDWATER MOTOR DRIVEN PUMPS B
B A
B A B A B
A B
B B
A = EF-P-2A AVAILABLE B = EF-P-2B AVAILABLE EFW CONTROL VALVES TO OTSG A AND OTSG B 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A M B
B B
WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE B = EF-V-30B and EF-V-30D AVAILABLE ISOLATE MAIN FEEDWATER T
T T
T T T T
T V V V T V
V T P P
T= TRIP MFW PUMPS, V=CLOSE FW VALVES OTSG PRESSURE CONTROL (HSD FUNCTION) 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A M
M M
2A M
M B
WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE MS-V-4A/B HSD AVAILABILITY ISOLATE STEAM DUMP TO CONDENSER 1
1 1
1 1
2 2
2 2
2 1=MS-V-8A AND 8B NOT AVAILABLE 2=MS-V-3A, 3B, 3C, 3D, 3E or 3F AFFECTED NORMAL INSTRUMENT AIR X X X
X X
X X
X X
X X
X B
B IA COMPRESSOR X
B A
X A X A B
A B
B B
COPPER AIR LINES/FITTINGS X X X
X X
X X
X X
X 2 HR. BACKUP AIR DECAY HEAT REMOVAL SYSTEM B A A
A B
B A
F B
A B
B A
A B A B A B
A B
B B
AVAILABLE AFTER MANUAL ALIGNMENT OF VALVES
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
DECAY HEAT CLOSED CYCLE B A B
B A
F B
A B
B A
B A B A B
A B
B B
DECAY HEAT RIVER WATER B
A B
B A
A B A B A B
A B
B B
TEMPERATURE INDICATION WHEN OPERATING DHR B,I A, I I
I I B,I A,I I A,I I A.I B,I B,I B,I B B
A = DH2-TE-1 B = DH2-TE-2 I = BIRO INCORE TEMPERATURE COMPONENT COOLING SYSTEMS INTERMEDIATE COOLING PUMP B
A X
B B
A B A B A B
A B
B B
IC VALVES M M M
M X
M X
M M
M M
M M
M M M M M M
M IC-V-2, 3, 4 NUCLEAR SERVICE CLOSED COOLING PUMP B,
C B,
C A
F B
B A
B A, C
B, C
A, C
B A
B B
B A=NS-P-1A, B=NS-P-1C, C=NS-P-1B F=A OR B IS AVAILABLE NUCLEAR RIVER WATER PUMP A,
B A,
B B,
C A,
C B,
C B,
C R
A B,
C A C A B,
C A
B B
B A=NR-P-1A, B=NR-P-1C C=NR-P-1B, R = NR-P-1B (NOTE 5)
NR VALVES M
M M
M M
M M
M M
M NR-V-4A, 4B, 15A, 15B ISPH VENTILATION B
A B
B A
B A B A B
L L
L L
L = PORTABLE VENTILATION INSTRUMENTATION REACTIVITY B
B A
A B A B A B
B B
A=NI-11 B=NI-12 RC OUTLET TEMPERATURE B
B, N
A, N
A, N
B A, N B A, N
B, N
B, N
N, B
A, B
A, B
A=RC-TE-958 B=RC-TE-960 N=RC4A/B-TE-1/4 RC INLET TEMPERATURE B
B, N
A, N
A, N
B A, N B A, N
B, N
B, N
B, N
A, B
A, B
A=RC-TE-959 B=RC-TE-961 N=RC5A/B-TE-2/4 RCS PRESSURE B
B A
A B A B A B
B B,
C B,
C A=RC3A-PT-3 B=RC-PT-949 C=RC-PT-963 (RSD ONLY)
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
PZR LEVEL (TEMPERATURE COMPENSATED)
B N
B N B N B
B B
B=RC-LT-777 W/RC2-TE-2 N=RC1-LT-1 OR LT-3 W/RC2-TE-1 OR 2 SG-A LEVEL B
B A
A B A B A B
A=FW-LT-775 B=FW-LT-789 SG-B LEVEL B
B A
A B A B A B
B, N
B A=FW-LT-788 N=FW-LT-1052 W/
B=FW-LT-776 FW-TE-1050 & MS-PT-1184 SG-A PRESSURE B
B, N
B A, N B A, N
B, N
A A
A=MS-PT-950 B=MS-PT-1180 N=SP6A-PT-1/2 SG-B PRESSURE B
B, N
A, N
A, N
B A, N B N B
B B=MS-PT-951 A=MS-PT-1184 N=SP6B-PT-1/2 BWST LEVEL A
B B
B A
B A B A B
B, L
B B
B A=DH-LT-808 B=DH-LT-809 AC ELECTRICAL POWER DIESEL GENERATOR B
B A
B A B A B
A B
B B
4160V SWGR B
B A
B A B A B
A B
B B
480V SWGR @ CONTROL BLDG B
B A
B A B A B
A B
B B
480V SWGR @ SCREEN HOUSE B
A B
B A
A B A B A B
A B
B B
B A
B A B A B
A B
B B
480V ESV MCC B,
C C
A, C
B, C
B, C
A, C
A, B
B, C A B, C
A, C
B, C
C, A
B, C
B, C
B, C
480V MCC @ SCREEN HOUSE B
A B
B A
A B A B A B
A B
B B
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5a LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A
A A
A A
A A
A A
A A
A A
C C
C C
C C C C C
C C
C C
C C
C B B B B B B
B B
B B
B B
B B
B B
I I
B B
B B
B B B B B
B B
B B
B B
B T
T F F F F F F
F F
F F
F F
F F
F F
F F
F F
F F F F F
F F
F F
F F
F A Z Z Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
F F
A A A
A A A A A A
A A
A A
A Z
Z Z
Z 1
2 1
2 2
2 3
4 5
6 6
7 8
9 1
1 1
2 2
2 2
2 2 2
3 3 3
3 4
4 5 5
SYSTEMS /FUNCTIONS a
b c
a 0
1 1 1 a
b c
d e
f g
a b c
d a
b a b
REMARKS a
INVERTER B,
D, V
A, C,
N, V
B, D,
V A,
C, N
B, D,
V A,
C, N
N=EE-INV-1E V=EE-INV-1F 120VAC Panels VBA, VBB, VBC, VBD, ATA, and ATB B,
D A,
C, N
B, D
A, C,
N B,
D A,
C, N
A=VBA, B=VBB, C=VBC, D=VBD N=ATA AND ATB ESAS ACTUATION ESAS (TRAIN A)
X X
X X
X X
X X
X X X X
X X
X X = Actuation Potential (NOTE 2)
ESAS (TRAIN B)
X X
X X
X X X X X X
X X
X X = Actuation Potential (NOTE 2)
DC ELECTRICAL POWER BATTERY CHARGER B,
D B,
D A,
C B,
D A,
C B,
D A,
C B,
D A,
C B,
D B,
D B,
D MAIN PANEL B
A, B
A, B
B A B, C
A, C
A = EED-PNL-1A C = EED-PNL-1M B = EED-PNL-1B ES DIST PNL @ CONTROL BLDG B
B A B A A = EED-PNL-1E B = EED-PNL-1F ES DIST PNL @ DG BLDG B
B A B A A = EED-PNL-1P B = EED-PNL-1Q
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 1b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 RCS INVENTORY & PRESSURE CONTROL MAKEUP PUMP B A B A, C
A, C
B C
C A=MU-P-1A, B=MU-P-1C, C=MU-P-1B (NOTE 4)
MU PUMP SUCTION FLOW PATH B A B A A
B A = MU-V-14A, B = MU-V-14B RCS MAKEUP FLOW PATH B A B A A
B A = MU-V-16A or B B = MU-V-16C or D MU PUMP MIN FLOW PATH M
RESTORE LETDOWN M M M M M
M M
M M
M M
M M
M M
M M
M X
M M
M TERMINATE UNCONTROLLED LETDOWN 1
1 F
1 1
1 1
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1=MU-V-3, 2=MU-V-2A/B, 3=MU-V-4/5 PRESSURIZER HEATERS B A A
X X
X A=RC-GRP-8, B=RC-GRP-9 PORV PROTECTION 1
1 2
2 1=RC-RV-2, 2=RC-V-2 RAPID DEPRESSURIZATION PROTECTION B A T A A
B T
T T T
B A=RC-V-1, B=RC-V-3, T=TRIP RCP RC PUMP TRIP CAPABILITY X
RC PUMP SEAL COOLING SEAL INJECTION B A AB C AC A A
C AB A A
A A
A A
A A
A A
A NOTE 3 ISOLATE CONTROLLED BLEED OFF FLOW TO MU TANK B
X A A
B B
B A = MU-V-25, B= MU-V-26 (AIR is NOT REQD for ISOLATION)
RCS HEAT REMOVAL H
H H= HPI COOLING EMERGENCY FEEDWATER X
M
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 TURBINE DRIVEN PUMP EMERGENCY FEEDWATER -
MOTOR DRIVEN PUMP B A X
EFW CONTROL VALVES TO OTSG A AND OTSG B M 2A 2A 2A 2A M 2A M M 2A 2A 2A M
2A 2A 2A 2A WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE ISOLATE MAIN FEEDWATER T T T T T
T T
T T
T T
T F
T= TRIP MFW PUMPS, V=CLOSE FW VALVES OTSG PRESSURE CONTROL (HSD FUNCTION) 2A 2A 2A 2A 2A M 2A M M 2A 2A M 2A 2A 2A 2A M
WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE MS-V-4A/B HSD AVAILABILITY ISOLATE STEAM DUMP TO CONDENSER 1
1 1
1 1
1 1
2 1=MS-V-8A AND 8B NOT AVAILABLE 2=MS-V-3A, 3B, 3C, 3D, 3E or 3F AFFECTED NORMAL INSTRUMENT AIR X X X X X
X X
X X
X X
X X
X X
X IA COMPRESSOR B A A
X A
X B
X COPPER AIR LINES/FITTINGS X X X X X
X X
X X
X X
X X
X X
X 2 HR. BACKUP AIR X
X X
DECAY HEAT REMOVAL SYSTEM B A B A A
B B
A AVAILABLE AFTER MANUAL ALIGNMENT OF VALVES DECAY HEAT CLOSED CYCLE B A B A A
B B
A DECAY HEAT RIVER WATER B A B A A
B B
A TEMPERATURE INDICATION WHEN OPERATING DHR L A L B,I A,BA,BA,BA,B A,BA,BA,B A = DH2-TE-1, B = DH2-TE-2, I = BIRO INCORE TEMPERATURE COMPONENT COOLING SYSTEMS
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 INTERMEDIATE COOLING PUMP B A B A B
M IC VALVES M M M M M
M M
M M
M M
M M
M M
M X
M IC-V-2, 3, 4 NUCLEAR SERVICE CLOSED COOLING PUMP B A, C B A B
A=NS-P-1A, B=NS-P-1C, C=NS-P-1B NUCLEAR RIVER WATER PUMP B,
C A B A, C
A B,
C B
A A,
B A=NR-P-1A, B=NR-P-1C, C=NR-P-1B NR VALVES M
M M
M M
M M
NR-V-4A, 4B, 15A, 15B ISPH VENTILATION B A L A A A
B L
L L
L = PORTABLE VENTILATION INSTRUMENTATION REACTIVITY B A A
A B
A=NI-11 B=NI-12 RC OUTLET TEMPERATURE N
B, N
B, N
B B, N
B A=RC-TE-958 B=RC-TE-960 N=RC4A/B-TE-1/4 RC INLET TEMPERATURE N
B, N
B, N
B B, N
A, B
B, N
B, N
A=RC-TE-959 B=RC-TE-961 N=RC5A/B-TE-2/4 RC PRESSURE A
B B
B B
B B
A=RC3A-PT-3 B=RC-PT-949 C=RC-PT-963 (RSD ONLY)
PZR LEVEL (TEMP. COMPENSATED)
N N
N N
N N N
B=RC-LT-777 W/RC2-TE-2 N=RC1-LT-1 OR 3 W/RC2-TE-1 OR 2 SG-A LEVEL A
A A
A=FW-LT-775 B=FW-LT-789 SG-B LEVEL B
B B
A=FW-LT-788 B=FW-LT-776
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 SG-A PRESSURE A,
N A,
N A
A A
A=MS-PT-950 B=MS-PT-1180 N=SP6A-PT-1/2 SG-B PRESSURE B,
N B,
N B,
N B
B B=MS-PT-951 A=MS-PT-1184 N=SP6B-PT-1/2 BWST LEVEL B
B L
A=DH-LT-808 B=DH-LT-809 AC ELECTRICAL POWER DIESEL GENERATOR B A 4160 V SWGR B A 480 V SWGR @ CONTROL BLDG B A 480 V SWGR @ SCREEN HOUSE B A B A A
B B
A 480 V ES MCC B A 480 V ESV MCC B,
C A,
C B A, C
B, C
480 V MCC @ SCREEN HOUSE B A B A A
B B
A INVERTER N=EE-INV-1E, V=EE-INV-1F 120VAC Panels VBA, VBB, VBC, VBD, ATA, and ATB A=VBA, B=VBB, C=VBC, D=VBD N=ATA AND ATB
ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5b LEGEND X
= NOT AVAILABLE P
= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A
- A TRAIN M
= AVAILABLE - MANUAL OPERATION (Outside Control Room)
B
- B TRAIN CR
= AVAILABLE - MANUAL OPERATION (In Control Room)
C
- C TRAIN 2A
= AVAILABLE FOR 2 HOURS D
- D TRAIN L
= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F
= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:
- 1. BLANK SPACE -ALL COMPONENTS AVAILABLE R
= Repair to restore function
- 2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
- 3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
- 5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F
F F
F F
I I
I I
I I
I I
I I
I I
R R
R R R R R
T Y
G G H H H H
H H
B B
B B
B B
B B
S S
S S
B B
B B B B B
B A
P P
P P
R F F F
F F
F F
F F
F F
F F
F F
F H
H H
H F
F F
F F
F F
F D
A A Z Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
Z Z
A F
F F
F 1
2 1
2 3
4 5
6 1
2 3
4 5
6 7
8 A Z
Z Z
1 1
1 1
1 2
3 1
SYSTEMS /FUNCTIONS a
b c
d e
REMARKS 2
1 2
3 ESAS ACTUATION ESAS (TRAIN A)
X X X
X X
X X
X X = Actuation Potential (NOTE 2)
ESAS (TRAIN B)
X X X
X X
X X
X X = Actuation Potential (NOTE 2)
DC ELECTRICAL POWER BATTERY CHARGER MAIN PANEL A = EED-PNL-1A C = EED-PNL-1M B = EED-PNL-1B ES DIST PNL @ CONTROL BLDG A = EED-PNL-1E B = EED-PNL-1F ES DIST PNL @ DG BLDG B A A = EED-PNL-1P B = EED-PNL-1Q