ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 1a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

RCS INVENTORY & PRESSURE CONTROL MAKEUP PUMP B,

C A,

B A,

C B

B, C

C A

A, C

C B,

C A,

C B

B A

A B A B A B

A B,

C B,

C B,

C A=MU-P-1A, B=MU-P-1C, C=MU-P-1B (NOTE 4)

MU PUMP SUCTION FLOW PATH B

B M

A A

A B

B A

A B A B A B

A B

B B

A = MU-V-14A, B = MU-V-14B RCS MAKEUP FLOW PATH B

A M

A B

B A

A B A B A B

A B

B B

A = MU-V-16A or B B = MU-V-16C or D MU PUMP MIN FLOW PATH M

M M

M M

M M M M M M M

M M

M LETDOWN M M M

M M

X M

X X

M M

M M

M M

M M M M M

M M

M M

TERMINATE UNCONTROLLED LETDOWN 1

1 1

1 1

1 1

F 1

1 1

1 1

1 1

1 1

1 2

2 3

1 2

1 1

1 2

1 2

1 1

1 1=MU-V-3, 2=MU-V-2A/B, 3=MU-V-4/5 PRESSURIZER HEATERS R

B A

A B A B A B

A B

B B

A=RC-GRP-8, B=RC-GRP-9 PORV PROTECTION 1

2 2

1 1

2 1

2 2

2 2

2 1=RC-RV-2, 2=RC-V-2 RAPID DEPRESSURIZATION PROTECTION T

A A

T B A

T A T A B

A B

B B

A=RC-V-1, B=RC-V-3, T=TRIP RCP RC PUMP TRIP CAPABILITY M

P P

RC PUMP SEAL COOLING SEAL INJECTION A A AB C AB A A

A A

A AB C

B A

AB C

AB C

AB AB AB C

AB C

NOTE 3 ISOLATE CONTROLLED BLEED OFF FLOW TO MU TANK B

A B

B B

B A A

B A

X X

X A = MU-V-25, B= MU-V-26 (AIR IS NOT REQD for ISOLATION)

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

RCS HEAT REMOVAL H= HPI COOLING EMERGENCY FEEDWATER TURBINE DRIVEN PUMP P

P EMERGENCY FEEDWATER MOTOR DRIVEN PUMPS B

B A

B A B A B

A B

B B

A = EF-P-2A AVAILABLE B = EF-P-2B AVAILABLE EFW CONTROL VALVES TO OTSG A AND OTSG B 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A M B

B B

WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE B = EF-V-30B and EF-V-30D AVAILABLE ISOLATE MAIN FEEDWATER T

T T

T T T T

T V V V T V

V T P P

T= TRIP MFW PUMPS, V=CLOSE FW VALVES OTSG PRESSURE CONTROL (HSD FUNCTION) 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A M

M M

2A M

M B

WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE MS-V-4A/B HSD AVAILABILITY ISOLATE STEAM DUMP TO CONDENSER 1

1 1

1 1

2 2

2 2

2 1=MS-V-8A AND 8B NOT AVAILABLE 2=MS-V-3A, 3B, 3C, 3D, 3E or 3F AFFECTED NORMAL INSTRUMENT AIR X X X

X X

X X

X X

X X

X B

B IA COMPRESSOR X

B A

X A X A B

A B

B B

COPPER AIR LINES/FITTINGS X X X

X X

X X

X X

X 2 HR. BACKUP AIR DECAY HEAT REMOVAL SYSTEM B A A

A B

B A

F B

A B

B A

A B A B A B

A B

B B

AVAILABLE AFTER MANUAL ALIGNMENT OF VALVES

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

DECAY HEAT CLOSED CYCLE B A B

B A

F B

A B

B A

B A B A B

A B

B B

DECAY HEAT RIVER WATER B

A B

B A

A B A B A B

A B

B B

TEMPERATURE INDICATION WHEN OPERATING DHR B,I A, I I

I I B,I A,I I A,I I A.I B,I B,I B,I B B

A = DH2-TE-1 B = DH2-TE-2 I = BIRO INCORE TEMPERATURE COMPONENT COOLING SYSTEMS INTERMEDIATE COOLING PUMP B

A X

B B

A B A B A B

A B

B B

IC VALVES M M M

M X

M X

M M

M M

M M

M M M M M M

M IC-V-2, 3, 4 NUCLEAR SERVICE CLOSED COOLING PUMP B,

C B,

C A

F B

B A

B A, C

B, C

A, C

B A

B B

B A=NS-P-1A, B=NS-P-1C, C=NS-P-1B F=A OR B IS AVAILABLE NUCLEAR RIVER WATER PUMP A,

B A,

B B,

C A,

C B,

C B,

C R

A B,

C A C A B,

C A

B B

B A=NR-P-1A, B=NR-P-1C C=NR-P-1B, R = NR-P-1B (NOTE 5)

NR VALVES M

M M

M M

M M

M M

M NR-V-4A, 4B, 15A, 15B ISPH VENTILATION B

A B

B A

B A B A B

L L

L L

L = PORTABLE VENTILATION INSTRUMENTATION REACTIVITY B

B A

A B A B A B

B B

A=NI-11 B=NI-12 RC OUTLET TEMPERATURE B

B, N

A, N

A, N

B A, N B A, N

B, N

B, N

N, B

A, B

A, B

A=RC-TE-958 B=RC-TE-960 N=RC4A/B-TE-1/4 RC INLET TEMPERATURE B

B, N

A, N

A, N

B A, N B A, N

B, N

B, N

B, N

A, B

A, B

A=RC-TE-959 B=RC-TE-961 N=RC5A/B-TE-2/4 RCS PRESSURE B

B A

A B A B A B

B B,

C B,

C A=RC3A-PT-3 B=RC-PT-949 C=RC-PT-963 (RSD ONLY)

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

PZR LEVEL (TEMPERATURE COMPENSATED)

B N

B N B N B

B B

B=RC-LT-777 W/RC2-TE-2 N=RC1-LT-1 OR LT-3 W/RC2-TE-1 OR 2 SG-A LEVEL B

B A

A B A B A B

A=FW-LT-775 B=FW-LT-789 SG-B LEVEL B

B A

A B A B A B

B, N

B A=FW-LT-788 N=FW-LT-1052 W/

B=FW-LT-776 FW-TE-1050 & MS-PT-1184 SG-A PRESSURE B

B, N

B A, N B A, N

B, N

A A

A=MS-PT-950 B=MS-PT-1180 N=SP6A-PT-1/2 SG-B PRESSURE B

B, N

A, N

A, N

B A, N B N B

B B=MS-PT-951 A=MS-PT-1184 N=SP6B-PT-1/2 BWST LEVEL A

B B

B A

B A B A B

B, L

B B

B A=DH-LT-808 B=DH-LT-809 AC ELECTRICAL POWER DIESEL GENERATOR B

B A

B A B A B

A B

B B

4160V SWGR B

B A

B A B A B

A B

B B

480V SWGR @ CONTROL BLDG B

B A

B A B A B

A B

B B

480V SWGR @ SCREEN HOUSE B

A B

B A

A B A B A B

A B

B B

480V ES MCC B

B A

B A B A B

A B

B B

480V ESV MCC B,

C C

A, C

B, C

B, C

A, C

A, B

B, C A B, C

A, C

B, C

C, A

B, C

B, C

B, C

480V MCC @ SCREEN HOUSE B

A B

B A

A B A B A B

A B

B B

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

INVERTER B,

D, V

A, C,

N, V

B, D,

V A,

C, N

B, D,

V A,

C, N

N=EE-INV-1E V=EE-INV-1F 120VAC Panels VBA, VBB, VBC, VBD, ATA, and ATB B,

D A,

C, N

B, D

A, C,

N B,

D A,

C, N

A=VBA, B=VBB, C=VBC, D=VBD N=ATA AND ATB ESAS ACTUATION ESAS (TRAIN A)

X X

X X

X X

X X

X X X X

X X

X X = Actuation Potential (NOTE 2)

ESAS (TRAIN B)

X X

X X

X X X X X X

X X

X X = Actuation Potential (NOTE 2)

DC ELECTRICAL POWER BATTERY CHARGER B,

D B,

D A,

C B,

D A,

C B,

D A,

C B,

D A,

C B,

D B,

D B,

D MAIN PANEL B

A, B

A, B

B A B, C

A, C

A = EED-PNL-1A C = EED-PNL-1M B = EED-PNL-1B ES DIST PNL @ CONTROL BLDG B

B A B A A = EED-PNL-1E B = EED-PNL-1F ES DIST PNL @ DG BLDG B

B A B A A = EED-PNL-1P B = EED-PNL-1Q

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 1b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 RCS INVENTORY & PRESSURE CONTROL MAKEUP PUMP B A B A, C

A, C

B C

C A=MU-P-1A, B=MU-P-1C, C=MU-P-1B (NOTE 4)

MU PUMP SUCTION FLOW PATH B A B A A

B A = MU-V-14A, B = MU-V-14B RCS MAKEUP FLOW PATH B A B A A

B A = MU-V-16A or B B = MU-V-16C or D MU PUMP MIN FLOW PATH M

RESTORE LETDOWN M M M M M

M M

M M

M M

M M

M M

M M

M X

M M

M TERMINATE UNCONTROLLED LETDOWN 1

1 F

1 1

1 1

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1=MU-V-3, 2=MU-V-2A/B, 3=MU-V-4/5 PRESSURIZER HEATERS B A A

X X

X A=RC-GRP-8, B=RC-GRP-9 PORV PROTECTION 1

1 2

2 1=RC-RV-2, 2=RC-V-2 RAPID DEPRESSURIZATION PROTECTION B A T A A

B T

T T T

B A=RC-V-1, B=RC-V-3, T=TRIP RCP RC PUMP TRIP CAPABILITY X

RC PUMP SEAL COOLING SEAL INJECTION B A AB C AC A A

C AB A A

A A

A A

A A

A A

A NOTE 3 ISOLATE CONTROLLED BLEED OFF FLOW TO MU TANK B

X A A

B B

B A = MU-V-25, B= MU-V-26 (AIR is NOT REQD for ISOLATION)

RCS HEAT REMOVAL H

H H= HPI COOLING EMERGENCY FEEDWATER X

M

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 TURBINE DRIVEN PUMP EMERGENCY FEEDWATER -

MOTOR DRIVEN PUMP B A X

EFW CONTROL VALVES TO OTSG A AND OTSG B M 2A 2A 2A 2A M 2A M M 2A 2A 2A M

2A 2A 2A 2A WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE ISOLATE MAIN FEEDWATER T T T T T

T T

T T

T T

T F

T= TRIP MFW PUMPS, V=CLOSE FW VALVES OTSG PRESSURE CONTROL (HSD FUNCTION) 2A 2A 2A 2A 2A M 2A M M 2A 2A M 2A 2A 2A 2A M

WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE MS-V-4A/B HSD AVAILABILITY ISOLATE STEAM DUMP TO CONDENSER 1

1 1

1 1

1 1

2 1=MS-V-8A AND 8B NOT AVAILABLE 2=MS-V-3A, 3B, 3C, 3D, 3E or 3F AFFECTED NORMAL INSTRUMENT AIR X X X X X

X X

X X

X X

X X

X X

X IA COMPRESSOR B A A

X A

X B

X COPPER AIR LINES/FITTINGS X X X X X

X X

X X

X X

X X

X X

X 2 HR. BACKUP AIR X

X X

DECAY HEAT REMOVAL SYSTEM B A B A A

B B

A AVAILABLE AFTER MANUAL ALIGNMENT OF VALVES DECAY HEAT CLOSED CYCLE B A B A A

B B

A DECAY HEAT RIVER WATER B A B A A

B B

A TEMPERATURE INDICATION WHEN OPERATING DHR L A L B,I A,BA,BA,BA,B A,BA,BA,B A = DH2-TE-1, B = DH2-TE-2, I = BIRO INCORE TEMPERATURE COMPONENT COOLING SYSTEMS

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 INTERMEDIATE COOLING PUMP B A B A B

M IC VALVES M M M M M

M M

M M

M M

M M

M M

M X

M IC-V-2, 3, 4 NUCLEAR SERVICE CLOSED COOLING PUMP B A, C B A B

A=NS-P-1A, B=NS-P-1C, C=NS-P-1B NUCLEAR RIVER WATER PUMP B,

C A B A, C

A B,

C B

A A,

B A=NR-P-1A, B=NR-P-1C, C=NR-P-1B NR VALVES M

M M

M M

M M

NR-V-4A, 4B, 15A, 15B ISPH VENTILATION B A L A A A

B L

L L

L = PORTABLE VENTILATION INSTRUMENTATION REACTIVITY B A A

A B

A=NI-11 B=NI-12 RC OUTLET TEMPERATURE N

B, N

B, N

B B, N

B A=RC-TE-958 B=RC-TE-960 N=RC4A/B-TE-1/4 RC INLET TEMPERATURE N

B, N

B, N

B B, N

A, B

B, N

B, N

A=RC-TE-959 B=RC-TE-961 N=RC5A/B-TE-2/4 RC PRESSURE A

B B

B B

B B

A=RC3A-PT-3 B=RC-PT-949 C=RC-PT-963 (RSD ONLY)

PZR LEVEL (TEMP. COMPENSATED)

N N

N N

N N N

B=RC-LT-777 W/RC2-TE-2 N=RC1-LT-1 OR 3 W/RC2-TE-1 OR 2 SG-A LEVEL A

A A

A=FW-LT-775 B=FW-LT-789 SG-B LEVEL B

B B

A=FW-LT-788 B=FW-LT-776

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 SG-A PRESSURE A,

N A,

N A

A A

A=MS-PT-950 B=MS-PT-1180 N=SP6A-PT-1/2 SG-B PRESSURE B,

N B,

N B,

N B

B B=MS-PT-951 A=MS-PT-1184 N=SP6B-PT-1/2 BWST LEVEL B

B L

A=DH-LT-808 B=DH-LT-809 AC ELECTRICAL POWER DIESEL GENERATOR B A 4160 V SWGR B A 480 V SWGR @ CONTROL BLDG B A 480 V SWGR @ SCREEN HOUSE B A B A A

B B

A 480 V ES MCC B A 480 V ESV MCC B,

C A,

C B A, C

B, C

480 V MCC @ SCREEN HOUSE B A B A A

B B

A INVERTER N=EE-INV-1E, V=EE-INV-1F 120VAC Panels VBA, VBB, VBC, VBD, ATA, and ATB A=VBA, B=VBB, C=VBC, D=VBD N=ATA AND ATB

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 ESAS ACTUATION ESAS (TRAIN A)

X X X

X X

X X

X X = Actuation Potential (NOTE 2)

ESAS (TRAIN B)

X X X

X X

X X

X X = Actuation Potential (NOTE 2)

DC ELECTRICAL POWER BATTERY CHARGER MAIN PANEL A = EED-PNL-1A C = EED-PNL-1M B = EED-PNL-1B ES DIST PNL @ CONTROL BLDG A = EED-PNL-1E B = EED-PNL-1F ES DIST PNL @ DG BLDG B A A = EED-PNL-1P B = EED-PNL-1Q

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 1a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

RCS INVENTORY & PRESSURE CONTROL MAKEUP PUMP B,

C A,

B A,

C B

B, C

C A

A, C

C B,

C A,

C B

B A

A B A B A B

A B,

C B,

C B,

C A=MU-P-1A, B=MU-P-1C, C=MU-P-1B (NOTE 4)

MU PUMP SUCTION FLOW PATH B

B M

A A

A B

B A

A B A B A B

A B

B B

A = MU-V-14A, B = MU-V-14B RCS MAKEUP FLOW PATH B

A M

A B

B A

A B A B A B

A B

B B

A = MU-V-16A or B B = MU-V-16C or D MU PUMP MIN FLOW PATH M

M M

M M

M M M M M M M

M M

M LETDOWN M M M

M M

X M

X X

M M

M M

M M

M M M M M

M M

M M

TERMINATE UNCONTROLLED LETDOWN 1

1 1

1 1

1 1

F 1

1 1

1 1

1 1

1 1

1 2

2 3

1 2

1 1

1 2

1 2

1 1

1 1=MU-V-3, 2=MU-V-2A/B, 3=MU-V-4/5 PRESSURIZER HEATERS R

B A

A B A B A B

A B

B B

A=RC-GRP-8, B=RC-GRP-9 PORV PROTECTION 1

2 2

1 1

2 1

2 2

2 2

2 1=RC-RV-2, 2=RC-V-2 RAPID DEPRESSURIZATION PROTECTION T

A A

T B A

T A T A B

A B

B B

A=RC-V-1, B=RC-V-3, T=TRIP RCP RC PUMP TRIP CAPABILITY M

P P

RC PUMP SEAL COOLING SEAL INJECTION A A AB C AB A A

A A

A AB C

B A

AB C

AB C

AB AB AB C

AB C

NOTE 3 ISOLATE CONTROLLED BLEED OFF FLOW TO MU TANK B

A B

B B

B A A

B A

X X

X A = MU-V-25, B= MU-V-26 (AIR IS NOT REQD for ISOLATION)

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

RCS HEAT REMOVAL H= HPI COOLING EMERGENCY FEEDWATER TURBINE DRIVEN PUMP P

P EMERGENCY FEEDWATER MOTOR DRIVEN PUMPS B

B A

B A B A B

A B

B B

A = EF-P-2A AVAILABLE B = EF-P-2B AVAILABLE EFW CONTROL VALVES TO OTSG A AND OTSG B 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A M B

B B

WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE B = EF-V-30B and EF-V-30D AVAILABLE ISOLATE MAIN FEEDWATER T

T T

T T T T

T V V V T V

V T P P

T= TRIP MFW PUMPS, V=CLOSE FW VALVES OTSG PRESSURE CONTROL (HSD FUNCTION) 2A 2A 2A 2A 2A 2A 2A 2A 2A 2A M

M M

2A M

M B

WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE MS-V-4A/B HSD AVAILABILITY ISOLATE STEAM DUMP TO CONDENSER 1

1 1

1 1

2 2

2 2

2 1=MS-V-8A AND 8B NOT AVAILABLE 2=MS-V-3A, 3B, 3C, 3D, 3E or 3F AFFECTED NORMAL INSTRUMENT AIR X X X

X X

X X

X X

X X

X B

B IA COMPRESSOR X

B A

X A X A B

A B

B B

COPPER AIR LINES/FITTINGS X X X

X X

X X

X X

X 2 HR. BACKUP AIR DECAY HEAT REMOVAL SYSTEM B A A

A B

B A

F B

A B

B A

A B A B A B

A B

B B

AVAILABLE AFTER MANUAL ALIGNMENT OF VALVES

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

DECAY HEAT CLOSED CYCLE B A B

B A

F B

A B

B A

B A B A B

A B

B B

DECAY HEAT RIVER WATER B

A B

B A

A B A B A B

A B

B B

TEMPERATURE INDICATION WHEN OPERATING DHR B,I A, I I

I I B,I A,I I A,I I A.I B,I B,I B,I B B

A = DH2-TE-1 B = DH2-TE-2 I = BIRO INCORE TEMPERATURE COMPONENT COOLING SYSTEMS INTERMEDIATE COOLING PUMP B

A X

B B

A B A B A B

A B

B B

IC VALVES M M M

M X

M X

M M

M M

M M

M M M M M M

M IC-V-2, 3, 4 NUCLEAR SERVICE CLOSED COOLING PUMP B,

C B,

C A

F B

B A

B A, C

B, C

A, C

B A

B B

B A=NS-P-1A, B=NS-P-1C, C=NS-P-1B F=A OR B IS AVAILABLE NUCLEAR RIVER WATER PUMP A,

B A,

B B,

C A,

C B,

C B,

C R

A B,

C A C A B,

C A

B B

B A=NR-P-1A, B=NR-P-1C C=NR-P-1B, R = NR-P-1B (NOTE 5)

NR VALVES M

M M

M M

M M

M M

M NR-V-4A, 4B, 15A, 15B ISPH VENTILATION B

A B

B A

B A B A B

L L

L L

L = PORTABLE VENTILATION INSTRUMENTATION REACTIVITY B

B A

A B A B A B

B B

A=NI-11 B=NI-12 RC OUTLET TEMPERATURE B

B, N

A, N

A, N

B A, N B A, N

B, N

B, N

N, B

A, B

A, B

A=RC-TE-958 B=RC-TE-960 N=RC4A/B-TE-1/4 RC INLET TEMPERATURE B

B, N

A, N

A, N

B A, N B A, N

B, N

B, N

B, N

A, B

A, B

A=RC-TE-959 B=RC-TE-961 N=RC5A/B-TE-2/4 RCS PRESSURE B

B A

A B A B A B

B B,

C B,

C A=RC3A-PT-3 B=RC-PT-949 C=RC-PT-963 (RSD ONLY)

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

PZR LEVEL (TEMPERATURE COMPENSATED)

B N

B N B N B

B B

B=RC-LT-777 W/RC2-TE-2 N=RC1-LT-1 OR LT-3 W/RC2-TE-1 OR 2 SG-A LEVEL B

B A

A B A B A B

A=FW-LT-775 B=FW-LT-789 SG-B LEVEL B

B A

A B A B A B

B, N

B A=FW-LT-788 N=FW-LT-1052 W/

B=FW-LT-776 FW-TE-1050 & MS-PT-1184 SG-A PRESSURE B

B, N

B A, N B A, N

B, N

A A

A=MS-PT-950 B=MS-PT-1180 N=SP6A-PT-1/2 SG-B PRESSURE B

B, N

A, N

A, N

B A, N B N B

B B=MS-PT-951 A=MS-PT-1184 N=SP6B-PT-1/2 BWST LEVEL A

B B

B A

B A B A B

B, L

B B

B A=DH-LT-808 B=DH-LT-809 AC ELECTRICAL POWER DIESEL GENERATOR B

B A

B A B A B

A B

B B

4160V SWGR B

B A

B A B A B

A B

B B

480V SWGR @ CONTROL BLDG B

B A

B A B A B

A B

B B

480V SWGR @ SCREEN HOUSE B

A B

B A

A B A B A B

A B

B B

480V ES MCC B

B A

B A B A B

A B

B B

480V ESV MCC B,

C C

A, C

B, C

B, C

A, C

A, B

B, C A B, C

A, C

B, C

C, A

B, C

B, C

B, C

480V MCC @ SCREEN HOUSE B

A B

B A

A B A B A B

A B

B B

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5a LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 A A A A A A

A A

A A

A A

A A

A A

A A

C C

C C

C C C C C

C C

C C

C C

C B B B B B B

B B

B B

B B

B B

B B

I I

B B

B B

B B B B B

B B

B B

B B

B T

T F F F F F F

F F

F F

F F

F F

F F

F F

F F

F F F F F

F F

F F

F F

F A Z Z Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

F F

A A A

A A A A A A

A A

A A

A Z

Z Z

Z 1

2 1

2 2

2 3

4 5

6 6

7 8

9 1

1 1

2 2

2 2

2 2 2

3 3 3

3 4

4 5 5

SYSTEMS /FUNCTIONS a

b c

a 0

1 1 1 a

b c

d e

f g

a b c

d a

b a b

REMARKS a

INVERTER B,

D, V

A, C,

N, V

B, D,

V A,

C, N

B, D,

V A,

C, N

N=EE-INV-1E V=EE-INV-1F 120VAC Panels VBA, VBB, VBC, VBD, ATA, and ATB B,

D A,

C, N

B, D

A, C,

N B,

D A,

C, N

A=VBA, B=VBB, C=VBC, D=VBD N=ATA AND ATB ESAS ACTUATION ESAS (TRAIN A)

X X

X X

X X

X X

X X X X

X X

X X = Actuation Potential (NOTE 2)

ESAS (TRAIN B)

X X

X X

X X X X X X

X X

X X = Actuation Potential (NOTE 2)

DC ELECTRICAL POWER BATTERY CHARGER B,

D B,

D A,

C B,

D A,

C B,

D A,

C B,

D A,

C B,

D B,

D B,

D MAIN PANEL B

A, B

A, B

B A B, C

A, C

A = EED-PNL-1A C = EED-PNL-1M B = EED-PNL-1B ES DIST PNL @ CONTROL BLDG B

B A B A A = EED-PNL-1E B = EED-PNL-1F ES DIST PNL @ DG BLDG B

B A B A A = EED-PNL-1P B = EED-PNL-1Q

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 1b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 RCS INVENTORY & PRESSURE CONTROL MAKEUP PUMP B A B A, C

A, C

B C

C A=MU-P-1A, B=MU-P-1C, C=MU-P-1B (NOTE 4)

MU PUMP SUCTION FLOW PATH B A B A A

B A = MU-V-14A, B = MU-V-14B RCS MAKEUP FLOW PATH B A B A A

B A = MU-V-16A or B B = MU-V-16C or D MU PUMP MIN FLOW PATH M

RESTORE LETDOWN M M M M M

M M

M M

M M

M M

M M

M M

M X

M M

M TERMINATE UNCONTROLLED LETDOWN 1

1 F

1 1

1 1

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1=MU-V-3, 2=MU-V-2A/B, 3=MU-V-4/5 PRESSURIZER HEATERS B A A

X X

X A=RC-GRP-8, B=RC-GRP-9 PORV PROTECTION 1

1 2

2 1=RC-RV-2, 2=RC-V-2 RAPID DEPRESSURIZATION PROTECTION B A T A A

B T

T T T

B A=RC-V-1, B=RC-V-3, T=TRIP RCP RC PUMP TRIP CAPABILITY X

RC PUMP SEAL COOLING SEAL INJECTION B A AB C AC A A

C AB A A

A A

A A

A A

A A

A NOTE 3 ISOLATE CONTROLLED BLEED OFF FLOW TO MU TANK B

X A A

B B

B A = MU-V-25, B= MU-V-26 (AIR is NOT REQD for ISOLATION)

RCS HEAT REMOVAL H

H H= HPI COOLING EMERGENCY FEEDWATER X

M

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 TURBINE DRIVEN PUMP EMERGENCY FEEDWATER -

MOTOR DRIVEN PUMP B A X

EFW CONTROL VALVES TO OTSG A AND OTSG B M 2A 2A 2A 2A M 2A M M 2A 2A 2A M

2A 2A 2A 2A WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE ISOLATE MAIN FEEDWATER T T T T T

T T

T T

T T

T F

T= TRIP MFW PUMPS, V=CLOSE FW VALVES OTSG PRESSURE CONTROL (HSD FUNCTION) 2A 2A 2A 2A 2A M 2A M M 2A 2A M 2A 2A 2A 2A M

WHEN 2HR AIR IS DEPLETED MANUAL CONTROL IS AVAILABLE MS-V-4A/B HSD AVAILABILITY ISOLATE STEAM DUMP TO CONDENSER 1

1 1

1 1

1 1

2 1=MS-V-8A AND 8B NOT AVAILABLE 2=MS-V-3A, 3B, 3C, 3D, 3E or 3F AFFECTED NORMAL INSTRUMENT AIR X X X X X

X X

X X

X X

X X

X X

X IA COMPRESSOR B A A

X A

X B

X COPPER AIR LINES/FITTINGS X X X X X

X X

X X

X X

X X

X X

X 2 HR. BACKUP AIR X

X X

DECAY HEAT REMOVAL SYSTEM B A B A A

B B

A AVAILABLE AFTER MANUAL ALIGNMENT OF VALVES DECAY HEAT CLOSED CYCLE B A B A A

B B

A DECAY HEAT RIVER WATER B A B A A

B B

A TEMPERATURE INDICATION WHEN OPERATING DHR L A L B,I A,BA,BA,BA,B A,BA,BA,B A = DH2-TE-1, B = DH2-TE-2, I = BIRO INCORE TEMPERATURE COMPONENT COOLING SYSTEMS

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 INTERMEDIATE COOLING PUMP B A B A B

M IC VALVES M M M M M

M M

M M

M M

M M

M M

M X

M IC-V-2, 3, 4 NUCLEAR SERVICE CLOSED COOLING PUMP B A, C B A B

A=NS-P-1A, B=NS-P-1C, C=NS-P-1B NUCLEAR RIVER WATER PUMP B,

C A B A, C

A B,

C B

A A,

B A=NR-P-1A, B=NR-P-1C, C=NR-P-1B NR VALVES M

M M

M M

M M

NR-V-4A, 4B, 15A, 15B ISPH VENTILATION B A L A A A

B L

L L

L = PORTABLE VENTILATION INSTRUMENTATION REACTIVITY B A A

A B

A=NI-11 B=NI-12 RC OUTLET TEMPERATURE N

B, N

B, N

B B, N

B A=RC-TE-958 B=RC-TE-960 N=RC4A/B-TE-1/4 RC INLET TEMPERATURE N

B, N

B, N

B B, N

A, B

B, N

B, N

A=RC-TE-959 B=RC-TE-961 N=RC5A/B-TE-2/4 RC PRESSURE A

B B

B B

B B

A=RC3A-PT-3 B=RC-PT-949 C=RC-PT-963 (RSD ONLY)

PZR LEVEL (TEMP. COMPENSATED)

N N

N N

N N N

B=RC-LT-777 W/RC2-TE-2 N=RC1-LT-1 OR 3 W/RC2-TE-1 OR 2 SG-A LEVEL A

A A

A=FW-LT-775 B=FW-LT-789 SG-B LEVEL B

B B

A=FW-LT-788 B=FW-LT-776

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 SG-A PRESSURE A,

N A,

N A

A A

A=MS-PT-950 B=MS-PT-1180 N=SP6A-PT-1/2 SG-B PRESSURE B,

N B,

N B,

N B

B B=MS-PT-951 A=MS-PT-1184 N=SP6B-PT-1/2 BWST LEVEL B

B L

A=DH-LT-808 B=DH-LT-809 AC ELECTRICAL POWER DIESEL GENERATOR B A 4160 V SWGR B A 480 V SWGR @ CONTROL BLDG B A 480 V SWGR @ SCREEN HOUSE B A B A A

B B

A 480 V ES MCC B A 480 V ESV MCC B,

C A,

C B A, C

B, C

480 V MCC @ SCREEN HOUSE B A B A A

B B

A INVERTER N=EE-INV-1E, V=EE-INV-1F 120VAC Panels VBA, VBB, VBC, VBD, ATA, and ATB A=VBA, B=VBB, C=VBC, D=VBD N=ATA AND ATB

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5b LEGEND X

= NOT AVAILABLE P

= PREMPTIVE ACTION PRIOR TO FIRE DAMAGE A

- A TRAIN M

= AVAILABLE - MANUAL OPERATION (Outside Control Room)

B

- B TRAIN CR

= AVAILABLE - MANUAL OPERATION (In Control Room)

C

- C TRAIN 2A

= AVAILABLE FOR 2 HOURS D

- D TRAIN L

= FUNCTION SATISFIED USING ALTERNATE TEMP EQUIPMENT F

= AVAILABLE - ONE or OTHER WILL BE AVAILABLE NOTES:

1. BLANK SPACE -ALL COMPONENTS AVAILABLE R

= Repair to restore function

2. REFER TO FIRE AREA/ZONE BASIS DOCUMENTS FOR SPECIFIC ESAS ACTUATION (4 PSIG, 1600 PSIG, 30 PSIG, LINE BREAK, BS PUMP START)
3. SI can be restored after a MUP is operating by performing all of the actions indicated: A - Block open MU-V-20, B - OPEN MU-V-76A/B, C - Throttle MU-V-90
4. MU-P-1B is AVAILABLE AFTER ES SELECT on 1E 4160V SWGR
5. NR-P-1B is AVAILABLE AFTER POWER TRANSFER to 1R 480V SWGR Rev. 27 D D F F

F F

F F

I I

I I

I I

I I

I I

I I

R R

R R R R R

T Y

G G H H H H

H H

B B

B B

B B

B B

S S

S S

B B

B B B B B

B A

P P

P P

R F F F

F F

F F

F F

F F

F F

F F

F H

H H

H F

F F

F F

F F

F D

A A Z Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

Z Z

A F

F F

F 1

2 1

2 3

4 5

6 1

2 3

4 5

6 7

8 A Z

Z Z

1 1

1 1

1 2

3 1

SYSTEMS /FUNCTIONS a

b c

d e

REMARKS 2

1 2

3 ESAS ACTUATION ESAS (TRAIN A)

X X X

X X

X X

X X = Actuation Potential (NOTE 2)

ESAS (TRAIN B)

X X X

X X

X X

X X = Actuation Potential (NOTE 2)

DC ELECTRICAL POWER BATTERY CHARGER MAIN PANEL A = EED-PNL-1A C = EED-PNL-1M B = EED-PNL-1B ES DIST PNL @ CONTROL BLDG A = EED-PNL-1E B = EED-PNL-1F ES DIST PNL @ DG BLDG B A A = EED-PNL-1P B = EED-PNL-1Q