L-16-165, Supplemental Information to Compliance with NRC Order EA-12-049

From kanterella
(Redirected from ML16127A454)
Jump to navigation Jump to search

Supplemental Information to Compliance with NRC Order EA-12-049
ML16127A454
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/06/2016
From: Hamilton D
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CAC MF0962, EA-12-049, L-16-165
Download: ML16127A454 (2)


Text

Perry Nuclear Power Plant FENOC P.O. Box 97 10 Center Road Perry, Ohio 44081 David B. Hamilton 440-280-5382 Vice President Fax: 440-280-8029 May 6, 2016 L-16-165 10 CFR 2.202 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Supplemental Information to Compliance with NRC Order EA-12-049 (CAC No. MF0962)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, to FirstEnergy Nuclear Operating Company (FENOC). This Order was effective immediately and directed FENOC to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event for the Perry Nuclear Power Plant (PNPP) as outlined in Attachment 2 of the Order. By letter dated August 20, 2015, FENOC provided the notification required by Section IV.C.3 of the Order that full compliance with the requirements described in Attachment 2 of the Order had been achieved for PNPP.

The following information is provided to supplement the notification.

During modification of the FLEX equipment storage area identified as FLEX Equipment Bay 1, ventilation was changed such that there is no longer forced ventilation provided.

No adverse environmental consequences are expected for the storage of equipment in this area based on weather conditions experienced during the plant life. The building construction for FLEX Equipment Bay 1 is similar to that of FLEX Equipment Bay 2. In addition, FLEX Equipment Bay 1 has a wall-mounted heater that provides additional margin for extreme cold outside temperatures, making the evaluation performed for FLEX Equipment Bay 2 bounding for FLEX Equipment Bay 1.

Perry Nuclear Power Plant L-16-165 Page 2 To clarify previously provided information, the time to boil the spent fuel pool down to 10 feet above the fuel racks is approximately 122 hours0.00141 days <br />0.0339 hours <br />2.017196e-4 weeks <br />4.6421e-5 months <br /> at Normal Decay Heat loads and approximately 47 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br /> at Maximum Decay Heat loads.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager-Fleet Licensing, at 330-315-6810.

I declare under penalty of perjury that the foregoing is true and correct. Executed on May C_, 2016.

Sincerely, David B. Hamilton cc: Director, Office of Nuclear Reactor Regulation (NRR)

NRC Region III Administrator NRC Resident Inspector NRC Project Manager