Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML13304B4452013-10-28028 October 2013 Revised License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Project stage: Request ML13351A3432013-12-19019 December 2013 Acceptance of Requested Licensing Action License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Project stage: Acceptance Review ML14127A4622014-05-12012 May 2014 Request for Additional Information Regarding License Amendment Request to Modify Specification 3.8.4 Setpoint Project stage: RAI MNS-14-045, Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 20132014-06-0303 June 2014 Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 2013 Project stage: Response to RAI ML14178B2322014-07-14014 July 2014 Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.3.2 Setpoint Project stage: RAI ML14231A6342014-09-10010 September 2014 Issuance of Amendments Regarding Technical Specification 3.8.4, DC Sources-Operating, Project stage: Approval ML15202A6612015-07-27027 July 2015 Acceptance Review of License Amendment Request Temporary Changes to Technical Specifications for Correction of Nuclear Service Water System Degraded Condition Project stage: Acceptance Review ML15196A3862015-08-0404 August 2015 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access To.. Project stage: Other MNS-15-062, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded Condition2015-08-11011 August 2015 Response to Request for Additional Information Regarding License Amendment Request (LAR) for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded Condition Project stage: Response to RAI ML15196A6162015-08-13013 August 2015 Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2 - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order Project stage: Other ML15243A4082015-08-28028 August 2015 NRR E-mail Capture - Draft RAI for Nsws Temp AOT Extension Project stage: Draft RAI ML15252A2762015-09-14014 September 2015 Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension Project stage: RAI MNS-15-073, Response to NRC Letter Dated August 27, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension2015-09-24024 September 2015 Response to NRC Letter Dated August 27, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension Project stage: Request MNS-15-078, Response to NRC Letter Dated September 14, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension2015-10-0808 October 2015 Response to NRC Letter Dated September 14, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension Project stage: Request ML15289A5552015-10-26026 October 2015 Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension Project stage: RAI ML15343A0122015-12-0707 December 2015 Response to NRC Letter Dated 10/26/2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension. Project stage: Request MNS-16-005, Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension2016-02-10010 February 2016 Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension Project stage: Response to RAI 2015-12-07
[Table View] |
|
---|
Category:Letter type:MNS
MONTHYEARMNS-18-044, Independent Spent Fuel Storage Installation (Isfsi), Submittal of 10 CFR 72.48 Summary Report from September 15, 2016 to July 26, 2018, No Changes, Tests, or Experiments2018-07-26026 July 2018 Independent Spent Fuel Storage Installation (Isfsi), Submittal of 10 CFR 72.48 Summary Report from September 15, 2016 to July 26, 2018, No Changes, Tests, or Experiments MNS-18-036, Redacted Response to the Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado Generated Missiles2018-07-0303 July 2018 Redacted Response to the Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado Generated Missiles MNS-18-042, Independent Spent Fuel Storage Installation (ISFSI)2018-06-28028 June 2018 Independent Spent Fuel Storage Installation (ISFSI) MNS-18-040, Submittal of Information Related to Pressurizer Surge and Spray Nozzle Thermal Sleeves Attachment Welds for License Renewal2018-06-26026 June 2018 Submittal of Information Related to Pressurizer Surge and Spray Nozzle Thermal Sleeves Attachment Welds for License Renewal MNS-18-039, Independent Spent Fuel Storage Installation (ISFSI)2018-06-19019 June 2018 Independent Spent Fuel Storage Installation (ISFSI) MNS-18-001, Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable2018-05-31031 May 2018 Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable MNS-18-030, 2017 Annual Radiological Environmental Operating Report2018-05-15015 May 2018 2017 Annual Radiological Environmental Operating Report MNS-18-029, Resolution of Commitments Related to Review Request for the Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227-A2018-05-0909 May 2018 Resolution of Commitments Related to Review Request for the Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227-A MNS-18-029, McGuire Nuclear Station, Units 1 and 2 - Resolution of Commitments Related to Review Request for the Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227-2018-05-0909 May 2018 McGuire Nuclear Station, Units 1 and 2 - Resolution of Commitments Related to Review Request for the Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227-A MNS-18-028, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report MNS-18-017, Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs2018-02-26026 February 2018 Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs MNS-18-018, McGuire, Units 1 & 2, Submittal of Emergency Plan Implementing Procedure Changes2018-02-22022 February 2018 McGuire, Units 1 & 2, Submittal of Emergency Plan Implementing Procedure Changes MNS-18-009, McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 18-12018-01-31031 January 2018 McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 18-1 MNS-18-003, End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports2018-01-11011 January 2018 End of Cycle 25 In-service and Steam Generator In-service Inspection Summary Reports MNS-17-050, Review Request for the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A2017-12-13013 December 2017 Review Request for the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A MNS-17-048, Response to Request for Additional Information License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-12-12012 December 2017 Response to Request for Additional Information License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies MNS-17-026, Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles2017-12-0808 December 2017 Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles MNS-17-042, McGuire Nuclear Station, Unit 1, Submittal of Cycle 26, Revision 0, Core Operating Limits Report2017-10-0909 October 2017 McGuire Nuclear Station, Unit 1, Submittal of Cycle 26, Revision 0, Core Operating Limits Report MNS-17-040, (Mns), Units 1 and 2 - Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force ..2017-09-27027 September 2017 (Mns), Units 1 and 2 - Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force .. MNS-17-038, Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate2017-09-25025 September 2017 Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate MNS-17-039, McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 17-12017-09-19019 September 2017 McGuire Nuclear Station, Units 1 and 2, Submittal of Emergency Plan, Revision 17-1 MNS-17-031, License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition2017-09-14014 September 2017 License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition MNS-17-037, Submittal of Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments During the Period from January 1, 2016 to March 31, 20172017-08-10010 August 2017 Submittal of Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments During the Period from January 1, 2016 to March 31, 2017 MNS-17-033, Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval2017-08-0202 August 2017 Snubber Program Plan for the Fourth Ten-Year Lnservice Testing (IST) Interval MNS-17-034, 16C4435-RPT-002, Rev. 1, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for McGuire Nuclear Station.2017-07-24024 July 2017 16C4435-RPT-002, Rev. 1, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for McGuire Nuclear Station. MNS-17-030, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-06-28028 June 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal MNS-17-023, Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-05-25025 May 2017 Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies MNS-17-016, Nuclear Regulatory Commission (NRC) Annual Commitment Change Report2017-05-18018 May 2017 Nuclear Regulatory Commission (NRC) Annual Commitment Change Report MNS-17-020, Transmittal of McGuire, Units 1 and 2, 2016 Annual Radiological Environmental Operating Report2017-05-0505 May 2017 Transmittal of McGuire, Units 1 and 2, 2016 Annual Radiological Environmental Operating Report MNS-17-019, McGuire Nuclear Station, Units 1 and 2 - Submittal of Annual Radioactive Effluent Release Report2017-04-28028 April 2017 McGuire Nuclear Station, Units 1 and 2 - Submittal of Annual Radioactive Effluent Release Report MNS-17-008, Letter of Intent to Submit Plant-Specific Reactor Vessel Internals Inspection Plans2017-02-23023 February 2017 Letter of Intent to Submit Plant-Specific Reactor Vessel Internals Inspection Plans MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-19019 December 2016 License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies MNS-16-091, License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity.2016-12-0808 December 2016 License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity. MNS-16-086, Emergency Plan, Revision 16-42016-12-0707 December 2016 Emergency Plan, Revision 16-4 MNS-16-078, Written Notification Joslyn Clark Overload Heater Element Part No. 24552016-10-19019 October 2016 Written Notification Joslyn Clark Overload Heater Element Part No. 2455 MNS-16-077, Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program2016-09-29029 September 2016 Responding to Request for Additional Information Related to License Amendment Request to Implement a Risk-informed Performance-Based Fire Protection Program MNS-16-070, Response to Request for Additional Information to Relief Request 16-MN-0032016-08-18018 August 2016 Response to Request for Additional Information to Relief Request 16-MN-003 MNS-16-060, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-18018 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident MNS-16-062, Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping2016-08-10010 August 2016 Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping MNS-16-046, License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity2016-06-30030 June 2016 License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity MNS-16-056, License Amendment Request, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval, Response to Request for Additional Information2016-06-30030 June 2016 License Amendment Request, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval, Response to Request for Additional Information MNS-16-053, Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping2016-06-23023 June 2016 Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping MNS-16-052, Supplement to License Amendment Request for the Removal of Superseded Technical Specification Requirements, Dated May 5, 2016, TAC Nos. MF7682 and MF76832016-06-16016 June 2016 Supplement to License Amendment Request for the Removal of Superseded Technical Specification Requirements, Dated May 5, 2016, TAC Nos. MF7682 and MF7683 MNS-16-042, Withdrawal of Relief Request Serial No. 15-MN-0022016-05-17017 May 2016 Withdrawal of Relief Request Serial No. 15-MN-002 MNS-16-020, License Amendment Request Removal of Superseded Technical Specification Requirements2016-05-0505 May 2016 License Amendment Request Removal of Superseded Technical Specification Requirements MNS-16-041, Supplement to Final Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051..2016-05-0505 May 2016 Supplement to Final Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and with Order EA-12-051.. MNS-16-036, Relief Request 16-MN-001, Limited Weld Examinations2016-04-28028 April 2016 Relief Request 16-MN-001, Limited Weld Examinations MNS-16-039, Submittal Revising Attachment s of License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program2016-04-26026 April 2016 Submittal Revising Attachment s of License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program MNS-16-026, Transmittal of Updated Final Safety Analysis Report, Revision 192016-04-0505 April 2016 Transmittal of Updated Final Safety Analysis Report, Revision 19 MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.2016-03-24024 March 2016 License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. 2018-07-03
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report2023-03-16016 March 2023 Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds2023-02-28028 February 2023 Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)2023-02-15015 February 2023 End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology2022-04-0707 April 2022 Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative2022-01-31031 January 2022 Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative RA-21-0259, Response to Request for Additional Information for Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/ Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-10-0404 October 2021 Response to Request for Additional Information for Request to Use Provisions of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/ Replacement Activities in Accordance with 10 CFR 50.55a(g)(4 RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-21-0017, Response to Request for Additional Information Re License Amendment Request to Revise Tech Spec 3.8.1 to Reduce Emergency Diesel Generator Maximum Steady State Voltage2021-01-29029 January 2021 Response to Request for Additional Information Re License Amendment Request to Revise Tech Spec 3.8.1 to Reduce Emergency Diesel Generator Maximum Steady State Voltage RA-20-0087, Response to Request for Additional Information Regarding Request for Alternative in Accordance with 10CFR 50.55a(z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period2020-04-0202 April 2020 Response to Request for Additional Information Regarding Request for Alternative in Accordance with 10CFR 50.55a(z)(1) to Delay the Update of the ASME Code of Record for the First Inspection Period RA-19-0189, Supplement to Response for Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.12019-04-0808 April 2019 Supplement to Response for Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 RA-19-0004, Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 22019-03-0707 March 2019 Response to NRC for Additional Information (RAI) Regarding License Amendment Request Proposing Changes to the Technical Specifications 3.8.1 for Catawba Nuclear Station, Units 1 and 2 RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) RA-19-0005, Response to NRC Request for Additional Information Regarding Review Request of the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A2019-01-30030 January 2019 Response to NRC Request for Additional Information Regarding Review Request of the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A RA-18-0229, Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.12018-12-0303 December 2018 Response to NRC Request for Additional Information Regarding License Amendment Request Proposing Changes to the Technical Specification 3.8.1 RA-18-0213, Response to the Second Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado-Generated Missiles2018-11-0101 November 2018 Response to the Second Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado-Generated Missiles ML18191A5642018-07-10010 July 2018 Attachment 3 - Response to NRC Request for Additional Information MNS-18-036, Redacted Response to the Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado Generated Missiles2018-07-0303 July 2018 Redacted Response to the Request for Additional Information Regarding the License Amendment Request to Revise the Licensing Bases for Protection from Tornado Generated Missiles ML20052D9362018-07-0303 July 2018 Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density MNS-17-048, Response to Request for Additional Information License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-12-12012 December 2017 Response to Request for Additional Information License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML17349A1572017-12-12012 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications to Address the 'A' Train Nuclear Service Water System Non-Conforming Condition RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001)2017-08-0909 August 2017 Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) RA-17-0035, Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating.2017-07-20020 July 2017 Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating. MNS-17-030, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-06-28028 June 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal RA-17-0030, Response to Request for Additional Information Regarding Application to Reverse Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers2017-06-0808 June 2017 Response to Request for Additional Information Regarding Application to Reverse Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers MNS-17-023, Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-05-25025 May 2017 Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies CNS-16-066, Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task..2016-10-20020 October 2016 Stations - Supplemental Information Regarding Reevaluated Seismic Hazard Screening and Prioritization Results - Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.. ML16294A2542016-10-13013 October 2016 Response to Request for Additional Information Regarding Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping RA-16-0035, Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation2016-10-0303 October 2016 Response to Request for Additional Information (RAI) Regarding Application for Emergency Operations Facility (EOF) Consolidation ML16244A0602016-08-18018 August 2016 Response to Request for Addition Information to RR 16-MN-003 MNS-16-070, Response to Request for Additional Information to Relief Request 16-MN-0032016-08-18018 August 2016 Response to Request for Additional Information to Relief Request 16-MN-003 MNS-16-060, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-18018 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML16230A0062016-08-11011 August 2016 Response to Request for Additional Information Regarding License Amendment Request to Technical Specification 3.6.13, Ice Condenser Doors RA-16-0027, Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations2016-07-14014 July 2016 Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations MNS-16-056, License Amendment Request, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval, Response to Request for Additional Information2016-06-30030 June 2016 License Amendment Request, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval, Response to Request for Additional Information MNS-16-023, Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request for Control Room Chilled Water System Technical Specifications2016-03-16016 March 2016 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request for Control Room Chilled Water System Technical Specifications ML16056A2422016-02-18018 February 2016 Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Change the Emergency Plan to Upgrade Emergency Action Levels Based on NEI 99-01, Revision 6 MNS-16-005, Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension2016-02-10010 February 2016 Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension MNS-16-008, Expedited Seismic Evaluation Process (ESEP) Closeout, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2016-02-0404 February 2016 Expedited Seismic Evaluation Process (ESEP) Closeout, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. MNS-16-009, Response to NRC Letter Dated December 9, 2015, Request for Additional Information Regarding Request for Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19(c)2016-02-0404 February 2016 Response to NRC Letter Dated December 9, 2015, Request for Additional Information Regarding Request for Exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 74.19(c) RA-16-0006, Response to NRC Request for Additional Information (RAI) Regarding Application to Use Alternate Fission Gas Gap Release Fractions2016-02-0101 February 2016 Response to NRC Request for Additional Information (RAI) Regarding Application to Use Alternate Fission Gas Gap Release Fractions MNS-16-003, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation2016-01-0707 January 2016 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation ML15343A0122015-12-0707 December 2015 Response to NRC Letter Dated 10/26/2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension. MNS-15-093, Response to Request for Additional Information Regarding License Amendment Request Regarding Residual Heat Removal System2015-11-13013 November 2015 Response to Request for Additional Information Regarding License Amendment Request Regarding Residual Heat Removal System MNS-15-078, Response to NRC Letter Dated September 14, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension2015-10-0808 October 2015 Response to NRC Letter Dated September 14, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension MNS-15-077, Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2015-10-0808 October 2015 Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. 2023-07-07
[Table view] |
Text
SENERGYS DUKE Steven Vice D. capps President McGuire Nuclear Station Duke Energy MG0IVP I 12700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Steven.Capps@duke-energy.com 10 CFR 50.90 February 10, 2016 Serial: MNS-1 6-005 U.S. Nuclear Regulatory Commission Washington, DC 20555-001 ATTENTION: Document Control Desk Duke Energy Carolinas, LLC (Duke Energy)
McGuire Nuclear Station, Units I and 2 Docket Nos. 50-369 and 50-370 Renewed License Nos. NPF-9 and NPF-17
Subject:
Response to Request for Additional Information (RAI) during January 12, 2016, NRC teleconference pertaining to "McGuire Nuclear Station, Units 1 AND 2:
License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension (TAC NOS. MF2983 AND MF2984)"
References:
- 1. Duke Energy Letter dated June 30, 2015, "License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (NSWS) Degraded Condition" (ADAMS Accession No. ML15191A025)
- 2. Nuclear Regulatory Commission (NRC) Letter dated July 27, 2015, "McGuire Nuclear Station, Units 1 and 2 - Acceptance Review of License Amendment Request RE:
Temporary Changes to Technical Specifications for Correction of Nuclear Service Water System Degraded Condition (TAO NOS. MF6409 AND MF641 0)" (ADAMS Accession No. ML15202A661)
- 3. Duke Energy Letter dated August 11, 2015, "Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (NSWS) Degraded Condition (TAC Nos. MF6409 and ME 6410)" (ADAMS Accession No. ML15247A066)
- 4. NRC Letter dated August 27, 2015, "McGuire Nuclear Station, Units 1 AND 2: Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension (TAC NOS. MF2983 AND MF2984)"
(ADAMS Accession No. ML15237A416)
US Nuclear Regulatory Commission February 10, 2016 Page 2
- 5. Duke Energy Letter dated September 24, 2015, "Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (NSWS) Degraded Condition (MF2983 AND MF2984)" (ADAMS Accession No. ML15275A155)
- 6. NRC Letter dated September 14, 2015, "McGuire Nuclear Station, Units 1 AND 2:
Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension (TAC NOS. MF2983 AND MF2984)" (ADAMS Accession No. ML15252A276)
- 7. Duke Energy Letter dated October 08, 2015, "Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (NSWS) Degraded Condition (MF2983 AND MF2984)" (ADAMS Accession No. ML15313A174)
- 8. NRC Letter dated October 26, 2015, "McGuire Nuclear Station, Units I AND 2: Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension (TAC NOS. MF2983 AND MF2984)"
(ADAMS Accession No. ML15289A555)
- 9. Duke Energy Letter dated December 7, 2015, "Response to Request for Additional Information Regarding License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (NSWS) Degraded Condition (MF2983 AND MF2984)" (ADAMS Accession No. ML15343A012)
By letter dated June 30, 2015 (Reference 1), Duke Energy requested a license amendment for the Renewed Facility Operating Licenses (FOL) and Technical Specifications (TS) for the McGuire Nuclear Station, Units 1 and 2, to allow temporary changes to TS 3.5.2, Emergency Core Cooling System (ECCS) - Operating; TS 3.6.6, Containment Spray System (CSS); TS 3.7.5, Auxiliary Feedwater (AFW) System; TS 3.7.6, Component Cooling Water (CCW) System; TS 3.7.7, Nuclear Service Water System (NSWS); TS 3.7.9, Control Room Area Ventilation System (CRAVS); TS 3.7.11, Auxiliary Building Filtered Ventilation Exhaust System (ABEVES);
and TS 3.8.1, AC Sources- Operating.
By letter dated August 11, 2015 (Reference 3), Duke Energy responded to NRC letter dated July 27, 2015 (Reference 2), request for additional information (RAI) needed for completion of NRC staff review of the proposed license amendment request (LAR).
By letter dated September 24, 2015 (Reference 5), Duke Energy responded to NRC letter dated August 27, 2015 (Reference 4), RAI needed for completion of NRC staff review of the proposed LAR.
US Nuclear Regulatory Commission February 10, 2016 Page 3 By letter dated October 08, 2015 (Reference 7), Duke Energy responded to NRC letter dated September 14, 2015 (Reference 6), RAI needed for completion of NRC staff review of the proposed LAR,.
By letter dated December 07, 2015 (Reference 9), Duke Energy responded to NRC letter dated October 26, 2015 (Reference 8), RAI needed for completion of NRC staff review of the proposed LAR.
During a teleconference between the NRC and Duke Energy on January 12, 2016, the NRC provided Duke Energy an additional RAI needed for completion of the NRC staff review of the LAR. The enclosure provides the NRC RAI questions and Duke Energy's response to the RAI questions.
There are no new regulatory commitments with this submittal. Commitment 32 has been revised to reflect that the breaker for 0RN-7A motor operator will be removed from its cubicle to prevent operation of 0RN-7A as discussed with the NRC during the November 17, 2015 phone conference. The commitments and compensatory actions shown in Attachment 1 represent the final list of commitments as amended during the RAI process. The footnote for each of the affected Technical Specifications will include a reference to this correspondence (MNS-16-005) in order to link the commitments identified in Attachment 1 to the approved license amendment.
The June 30, 2015, LAR concluded that the proposed change presents No Significant Hazards Considerations and does not require an environmental assessment. This conclusion has not changed as a result of the RAI responses in the enclosure.
Pursuant to 10 CFR 50.91, a copy of this LAR has been forwarded to the appropriate North Carolina state officials.
Please direct any comments or questions regarding this submittal to George Murphy at (980) 875-5715.
I declare under penalty of perjury that the foregoing is true and correct. Executed on February 10, 2016.
Sincerely, Steven D. Capps
Enclosure:
Response to Request for Additional Information
US Nuclear Regulatory Commission February 10, 2016 Page 4 cc w/
Enclosure:
C. Haney Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station G. E. Miller, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 W. L. Cox, Ill, Section Chief North Carolina Department of Environment and Natural Resources Division of Environmental Health Radiation Protection Section 1645 Mail Service Center Raleigh, NC 27699-1645
ENCLOSURE Response to Request for Additional Information
Response to Request for Additional Information REQU EST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO A LICENSE AMENDMENT REQUEST SUPPORTING CORRECTION OF A NUCLEAR SERVICE WATER SYSTEM DEGRADED CONDITION DUKE ENERGY CAROLINAS. LLC MCGU IRE NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-369 AND 50-370 By letter dated June 30, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15191A025), Duke Energy Carolinas, LLC (Duke Energy) submitted a license amendment request (LAR,) to temporarily change McGuire Nuclear Station (MNS), Units 1 and 2, Technical Specifications (TSs) for correction of a degraded condition affecting the 'A' Train of the nuclear service water system (NSWS). The requested amendment would temporarily change the following TSs to allow the inoperability of the 'A' Train of the NSWS for a total of up to 14 days: TS 3.5.2, Emergency Core Cooling System (ECCS) -
Operating; TS 3.6.6, Containment Spray System (CSS); TS 3.7.5, Auxiliary Feedwater (AFW)
System; TS 3.7.6, Component Cooling Water (CCW) System; TS 3.7.7, Nuclear Service Water System (NSWS); TS 3.7.9, Control Room Area Ventilation System (CRAVS); TS 3.7.11, Auxiliary Building Filtered Ventilation Exhaust System (ABEVES), and TS 3.8.1, AC Sources-Operating. The 'A' Train of the shared NSWS would be inoperable while the safety-related supply from the MNS Nuclear Service Water Pond was drained and isolated to correct a degraded condition affecting that line.
The NRC staff has determined the following additional information is necessary to support completion of its technical review:
SBPB-RAI-004 The LAR includes the potential activity to install a piping penetration in the drained section of the NSWS within the auxiliary building if required for personnel access to remove suspected blockage. In SBPB-RAI-003, the NRC staff requested additional information on how using the single valve 0RN-7A for isolation was consistent with defense-in-depth. Duke's response to SBPB-RAI-003 discussed administrative controls that would be used to maintain the valve in the closed position, commitments supporting isolation of the 'A' Train NSWS supply piping from Lake Norman (Commitments 13 and 32), and commitments regarding protection of the Standby Shutdown Facility and associated systems (Commitment 21). Commitment 5 was unchanged,
~but identified that FLEX strategies would be available for implementation as additional defense-in-depth on both units.
Commitments 13 and 32 discuss provisions for dedicated personnel to identify excessive leakage, attempt to close the manway, and notify the control room of the need to isolate the 'A' Train NSWS if the manway cannot be closed. However, the reliability of these actions does not appear commensurate with the risk associated with excessive leakage. Commitments 5 and 21 suggest the availability of the SSF and FLEX capabilities to provide defense in depth. Address the accessibility of equipment necessary to implement safe shutdown via the SSF and FLEX assuming the equipment in the vicinity of the auxiliary building manway is unavailable due to flooding.
Page 2 of 4
Response to Request for Additional Information Duke Energy Response to SBPB-RAI-004:
The question includes two separate issues and the response will address each of them separately:
- 1. Commitments 13 and 32 discuss provisions for dedicated personnel to identify excessive leakage, attempt to close the manway, and notify the control room of the need to isolate the 'A' Train NSWS if the manway cannot be closed. However, the reliability of these actions does not appear commensurate with the risk associated with excessive leakage.
Response
In addition to the use of dedicated personnel to identify excessive leakage and notify the control room, existing plant equipment would trigger an alarm in the control room in response to a level rise in the 'A' and 'B' Ground Water System (WZ) sumps. Each sump includes an 'A' and 'B' WZ sump pump. The 'B' WZ sump is physically located in the same auxiliary building room as the potential open manway.
Existing Alarm Response procedures for each unit provide actions for responding to the WZ Sump level alarms. The alarm response includes actions up to and including the swapping of Nuclear Service Water (NSW) Trains and entering the plant flooding procedure for mitigation of flooding.
A rise in WZ sump level would trigger the following response:
- a. WZ sump high level would actuate an Operator Aid Computer (OAC) alarm in the control room
- b. 'A' WZ sump pump starts on Hi level
- c. If level continues to rise the 'B' WZ pump will start at Hi Hi level
- d. Control room alarm window 02 will light up and the annunciator response actions will be performed.
- e. In addition to the above response there are status lights in the control room that light up whenever a WZ sump pump is running.
The WZ sump level control and alarm system is inspected and functionally checked on a three year frequency. The preventive maintenance (PM) activity includes calibration of the level switch, functional testing of the sump pumps and verification that the control room annunciator alarms in response to a rising level in the WZ sump.
- 2. Commitments 5 and 21 suggest the availability of the SSF and FLEX capabilities to provide defense in depth. Address the accessibility of equipment necessary to implement safe shutdown via the SSF and FLEX assuming the equipment in the vicinity of the auxiliary building manway is unavailable due to flooding.
Response
The intent of Commitments 5 and 21 with respect to the SSF and FLEX capabilities were for defense in depth support for a loss of NSW. These commitments are not intended to support a response to flooding in the auxiliary building.
Page 3 of 4
Response to Request for Additional Information SBPB-RAI-005 The LAR includes changes to Technical Specifications that include a note referencing commitments described in MNS LAR submittal correspondence letter MNS-15-026. These are no longer the most recent commitments. Clearly indicate that the TS note will be updated to reference the~final regulatory commitments.
Duke Energy Response to SBPB-RAI-005:
Duke Energy will update the TS note to represent the final regulatory commitments. A copy of the final commitment table is included in this RAI response. Pending no further changes the TS note will reference this correspondence (MNS-16-005).
Page 4 of 4
ATTACHMENT 1 Regulatory Commitments
REGULATORY COMMITMENTS - Final The following table identifies those actions committed to by Duke Energy in this document. Any other statements made in this licensing submittal are provided for informational purposes only and are not considered to be regulatory commitments. Please direct any questions you may have in this matter to George Murphy at 980-875-5715.
- REGULATORY COMMITMENTS 1 The 'A' Train NSWS pumps will remain aligned to Lake Norman during the extended CT until the system is ready for post maintenance testing.
2 Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS piping from the SNSWP is not available will be evaluated for impact on the ability of the system to operate while taking suction from the Lake Norman Low Level Intake (LLI) and will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time.
3 The 'B' Train NSWS will be placed in its ESFAS alignment to the SNSWP water source with the 'B' Train pumps in standby prior to starting the LAIR activity and remain in this alignment until the 'A' Train NSWS SNSWP water source is restored and ready for post maintenance testing.
4 Procedures will be established to provide an additional defense in depth contingency that could be used in the event of an extremely low probability of a loss of the Lake Norman water source due to a seismic event. The procedures will ensure that system operation is maintained within design limits (less than or equal to 2 NSWS pumps running on a header), control of maximum system flow, and that system configuration prevents interaction of the degraded equipment with the functional equipment.
5 Fukushima Response FLEX modifications will be installed and the FLEX strategies will be available for implementation as additional defense-in-depth on both units.
6 During the period in which the 'A' NSWS suction path from the SNSWP is non-functional, no discretionary maintenance or discretionary testing will be planned on the following:
- The 'A' Train of NSWS excluding the activities described in the LAR for the 'A' Train NSWS piping to the SNSWP.
7 A condition in which repairs could impact the ability of an SSC to perform its Safety Function would result in termination of activities. The inspection may identify a condition that cannot be resolved within the 14 day completion time. Should such a condition be identified then the system will be restored to its current OBDN condition.
If the ROV survey presents any opportunities for a less intrusive or less time consuming solution for addressing the OBDN condition, then these opportunities will be pursued, as appropriate.
8 In an activity planned to be performed separate from the 14 day completion time repair activity, 0RN-7A will be tested for leakage and adjusted if necessary to minimize leakage.
9 In an activity planned to be performed separate from the 14 day completion time repair activity the SNSWP isolation flange will be test fitted to the 'A' SNSWP pipe.
10 Procedure guidance will establish controls to limit evacuation air pressure to less than a predetermined value in order to prevent air intrusion into the operating NSWS.
11 Dedicated personnel with procedure guidance will be provided to close the NSWS access manway in the auxiliary building in the event of any of the following:
- An Engineered Safety Feature (ESF) actuation
- Entry into RP/0/A/5700/006 Natural Disasters
- Entry into RP/0/A/5700/007 Earthquake 12 This activity will be controlled under the Infrequently Performed Test or Evolution (IPTE) process defined in Fleet Directive AD-OP-ALL-I106, "Conduct of Infrequently Performed Tests or Evolutions", and Duke Energy's Work Management and Execution procedures.
13 During periods when the auxiliary building NSWS piping manway is open, dedicated personnel having communication to the main control room with procedures to continuously monitor and respond to 0RN-7A leakage will be in place. If leakage increases and reaches the pre-determined leak rate limit, the repair activity will be stopped, and the manway will be closed. If conditions prevent the prompt closure of the manway, then operations will place the 'B' NSWS train in operation, secure 'A' NSWS operations and isolate the 'A' NSWS train to stop the leakage as follows:
If the manway cannot be immediately closed then perform the following actions to isolate the flowpath from Lake Norman within 15 minutes:
- Stop the A NSWS pumps from the control room
- Close 0RN-12AC and 0RN-13A from the control room to isolate the flowpath from Lake Norman
- Start B Train NSWS pumps Page 3 of 6
14 If the NSWS piping manway in the auxiliary building is opened then prior to the breach of the NSWS piping an evaluation of 0RN-7A leakage will be performed to validate proper isolation and that leakage is within acceptable limits.
15 McGuire will communicate with the Transmission Control Center (TCC) to ensure that the McGuire Control Room is notified in the event of potential grid disturbances in order that an appropriate plant response can be formulated.
16 The Work Control Center or 0CC will monitor weather forecasts and radar during the activities that require the NSWS piping personnel access points to be open to assess the potential for severe weather conditions (tornado, thunderstorms).
17 Training will be provided in accordance with the Systematic Approach to Training (SAT) process to Operations personnel on this TS change and the associated evolution to inspect and correct the degraded condition in the 'A' NSWS supply piping from the SNSWP.
18 Operations will review applicable abnormal operating procedures related to the response to an earthquake, the loss of the Lake Norman and the loss of NSWS prior to making 'A' NSWS suction path from the SNSWP inoperable and each shift until
'A' Train NSWS operability is restored.
19 The repair work on the NSWS 'A' Train suction from the SNSWP will be scheduled during a period in which hurricanes and tornadoes have a lower likelihood of occurrence.
20 The Outage Command Center (OCC) will be manned while performing the activities authorized by this amendment.
Page 4 of 6
21 The following list of equipment will be protected:
- Auxiliary Building WZ Sump and equipment supporting function of sump
- SSF including Standby Makeup pumps for Unit 1 and Unit 2
- Unit 1 Containment Ventilation Cooling Water System (RV)
- Unit 2 Containment Ventilation Cooling Water System (RV) 22 If required to be installed the new personnel access opening to be located on the 'A' Train NSWS piping in the auxiliary building will be designed and installed in accordance with the Engineering Change Process.
23 Foreign Material Exclusion (FME) will be controlled during the proposed activities in accordance with AD-MN-ALL-0002, Foreign Material Exclusion (EME). Any debris resulting from the obstruction removal activity will be mechanically cleaned out before the system is closed for return to service per FME plan developed in accordance with the above procedure. The system will be video inspected and reversed flushed from the LLI to the SNSWP with isolation to downstream components to force any sediment back to the SNSWP.
24 Following 'A' Train NSWS restoration, testing will be performed to verify that the as left NSWS performance meets or exceeds pre-activity performance including 'A' Train NSW pump NPSH conditions.
25 Prior to entering the 14 day CT perform an evaluation to ensure that there will be no anticipated impact to 'A' NSWS water supply from the LLI from Alewife fish the during 14 day CT.
Page 5 of 6
26 The new personnel access piping opening (in the auxiliary building) will be controlled by using procedures developed or revised for this purpose to maintain positive control of the opening and to prevent an unmonitored release.
27 The ERAT program includes the option to use a SSA (Safety Significant Activity) code which will cause the risk condition color to be "YELLOW". MNS will use this code during the activities described in this LAR.
28 Designated operators will be available to execute the manual actions associated with aligning the affected unit's 'A' Train NSWS pump to the 'B' NSWS SNSWP via the Main Supply Crossover piping.
29 If the contingency personnel access opening is installed, then Security personnel will establish the proper controls and compensatory measures prescribed by security procedures and the security plan.
30 In support of the contingency the following conditions will be established before the start of activities in the LAR:
- The 'A' valve (0RN-14A) will be opened prior to the evolution and power will be removed from the valve operator.
- The 'B' valve (0RN-15B) will be maintained closed with the ESFAS signal from each unit blocked prior to the evolution. Maintaining 0RN-1 5B closed with power removed satisfies operability requirements for the 'B' Train NSWS.
The 'B' valve (0RN-1 5B) can be opened from the control room after power is restored if conditions warrant the use of this contingency.
31 Operations will utilize the concurrent dual verification process when operating 0RN-7A.
32 Ini order to prevent inadvertent operation of 0RN-7A, MNS will perform the following actions to ensure that the position of this valve is physically restrained with several barriers in place to prevent operation or movement of the valve while the NSWS piping access manway in the auxiliary building is open:
- The operating hand wheel for 0RN-7A will be in the closed position and restrained with a lock and tag.
- A mechanical stem locking device will be installed on 0RN-7A to prevent ANY movement of the valve disk.
- Electrical isolation of the 0RN-7A motor operator will be established by removing its electrical supply breaker from its MOO cubical, and the cubicle door tagged to prevent installation of the breaker while the auxiliary building manway is open.
- A dedicated person with no other duties will be stationed in the room where 0RN-7A and the access manway are located to monitor for 0RN-7A leakage and to prevent anyone from operating 0RN-7A while the NSWS piping
_____manway is open.
Page 6 of 6