MONTHYEARML13304B4452013-10-28028 October 2013 Revised License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Project stage: Request ML13351A3432013-12-19019 December 2013 Acceptance of Requested Licensing Action License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Project stage: Acceptance Review ML14127A4622014-05-12012 May 2014 Request for Additional Information Regarding License Amendment Request to Modify Specification 3.8.4 Setpoint Project stage: RAI MNS-14-045, Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 20132014-06-0303 June 2014 Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 2013 Project stage: Response to RAI ML14178B2322014-07-14014 July 2014 Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.3.2 Setpoint Project stage: RAI ML14231A6342014-09-10010 September 2014 Issuance of Amendments Regarding Technical Specification 3.8.4, DC Sources-Operating, Project stage: Approval ML15202A6612015-07-27027 July 2015 Acceptance Review of License Amendment Request Temporary Changes to Technical Specifications for Correction of Nuclear Service Water System Degraded Condition Project stage: Acceptance Review ML15196A3862015-08-0404 August 2015 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Project stage: Other MNS-15-062, Response to Request for Additional Information Regarding License Amendment Request (LAR) for Temporary Changes to Technical Specifications for Correction of an a Train Nuclear Service Water System (Nsws) Degraded Condition2015-08-11011 August 2015 Response to Request for Additional Information Regarding License Amendment Request (LAR) for Temporary Changes to Technical Specifications for Correction of an a Train Nuclear Service Water System (Nsws) Degraded Condition Project stage: Response to RAI ML15196A6162015-08-13013 August 2015 Duke Energy Carolinas, LLC, McGuire Nuclear Station, Units 1 and 2 - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order Project stage: Other ML15237A4162015-08-27027 August 2015 Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension Project stage: RAI ML15243A4082015-08-28028 August 2015 NRR E-mail Capture - Draft RAI for Nsws Temp AOT Extension Project stage: Draft RAI ML15252A2762015-09-14014 September 2015 Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension Project stage: RAI MNS-15-073, Response to NRC Letter Dated August 27, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension2015-09-24024 September 2015 Response to NRC Letter Dated August 27, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension Project stage: Request MNS-15-078, Response to NRC Letter Dated September 14, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension2015-10-0808 October 2015 Response to NRC Letter Dated September 14, 2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension Project stage: Request ML15289A5552015-10-26026 October 2015 Request for Additional Information Regarding License Amendment Request Nuclear Service Water System Allowed Outage Time Extension Project stage: RAI ML15343A0122015-12-0707 December 2015 Response to NRC Letter Dated 10/26/2015, Request for Additional Information Regarding License Amendment Request, Nuclear Service Water System Allowed Outage Time Extension Project stage: Request MNS-16-005, Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension2016-02-10010 February 2016 Response to Request for Additional Information (RAI) During January 12, 2016, NRC Teleconference Pertaining to License Amendment Request for Nuclear Service Water System Allowed Outage Time Extension Project stage: Response to RAI 2015-12-07
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Steven D. Capps Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078-8985 May 12, 2014
SUBJECT:
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2: REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO MODIFY TECHNICAL SPECIFICATION 3.8.4 SETPOINT (TAC NOS. MF2983 AND MF2984)
Dear Mr. Capps:
By letter dated October 28, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13304B445), Duke Energy Carolinas, LLC (the licensee) submitted a license amendment request, which requested to modify Technical Specification 3.8.4, "DC Sources-Operating." Specifically, the proposed change would allow a one-time extension of the completion time for required action A.2.2 to support battery replacement.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The.:
enclosed document describes this request for additional information (RAI). On May 6, 2014, the Duke staff indicated that a response to the RAI would be provided by June 6, 2014.
- If you have any questions, please call me at 301-415-2481.
Docket Nos. 50-369 and 50-370
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv G. Edward Miller, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
REQUEST FOR ADDITIONAL INFORMATION MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 PROPOSED CHANGES TO TECHNICAL SPECIFICATION 3.8.4 ONE-TIME EXTENSION OF REQUIRED ACTION A.2.2 COMPLETION TIME DOCKET NOS. 50-369 AND 50-370 By letter dated October 28, 2013, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML133048445), Duke Energy Carolinas (Duke) submitted a license
- amendment request (LAR) to amend the Technical Specifications (TS) 3.8.4, "DC Sources-Operating," for McGuire Nuclear Station, Units 1 and 2, in support of plant modifications to replace existing shared vital batteries while at power. In order for the NRC staff to complete its review of the LAR, the following additional information is requested.
- 1. On page 2 of Attachment 1 of the LAR, the licensee stated that about 50% of the vital batteries cells are affected by positive post seal nut and jar lid cracking. Please discuss available mitigation strategies/further maintenance that will be used on the new batteries to prevent this potential failure mechanism.
- 2. On page 8 of Attachment 1 of the LAR, the licensee stated that the new vital batteries are essentially the same as the existing batteries with the exception of the new ones being rated 1944 ampere hours instead of 1945 ampere hours at the 8-hour discharge.
Please explain why reducing the ampere hours rating does not impact the existing design/licensing basis margins for DC power system.
- 3. On page 1 0 of Attachment 1 of the LAR, the licensee stated that a temporary charger will be installed to maintain the temporary battery at 132 volts DC. The temporary charger will have a disconnect to electrically isolate it from the temporary battery and the DC bus. Describe the design and capability of the temporary battery charger, including how it will be connected to a Class 1 E supply, if needed. Also, please explain whether the temporary battery charger will impact the emergency diesel generator loading.
Enclosure