Letter Sequence Approval |
---|
|
|
MONTHYEARCNL-15-125, American Society of Mechanical Engineers (ASME) Section XI, Lnservice Inspection (Lsi) and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-272015-06-26026 June 2015 American Society of Mechanical Engineers (ASME) Section XI, Lnservice Inspection (Lsi) and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-27 Project stage: Request CNL-15-236, Revised Response to NRC Request for Additional Information Regarding American Society of Mechanical Engineers Section XI, Inservice Inspection and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-272015-11-18018 November 2015 Revised Response to NRC Request for Additional Information Regarding American Society of Mechanical Engineers Section XI, Inservice Inspection and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-27 Project stage: Response to RAI ML16020A1152016-02-17017 February 2016 Alternative Relief Request 1-ISI-27 for Relief from the Reactor Vessel Circumferential Weld Examination Requirements of the ASME Code Project stage: Approval 2015-06-26
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23054A2902023-03-13013 March 2023 Request for Relief from the Requirements of the ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22329A0762022-12-0101 December 2022 Correction of Error in Authorization of Alternative Request BFN-21-ISI-02 ML22298A2852022-11-14014 November 2022 Request for Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Paragraph IWB-2420(B) and Use of Code Case N-526 ML22010A1952022-01-12012 January 2022 Request to Use Later Edition of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML18323A1722018-12-31031 December 2018 Relief Request No. 1 ISI 29 Regarding Second 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Welds ML18323A0262018-12-0404 December 2018 Relief Request No. 1-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Reactor Vessel Welds ML17261A0362017-10-0606 October 2017 Request for Request 3-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Examination Coverage of Inside Radius and Nozzle-to-Vessel Welds ML17135A1462017-08-18018 August 2017 Browns Ferry Nuclear Plant, Unit 3 - Relief Request No. 3 ISI 29 Regarding Third 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Piping Welds (CAC No. MF9258) ML17145A5522017-08-11011 August 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Alternative Request IST-RR-1 for the Fourth 10-Year Inservice Testing Interval (CAC Nos. MF9087, MF9088, and MF9089) ML17045A7722017-03-14014 March 2017 Browns Ferry Nuclear Plant, Units 2 and 3 - Relief Request 2-ISI-30 and 3-ISI-27 - Relief from ASME Code, Section XI Requirements for Periods of Extended Operation for RPV Circumferential Shell Weld Examinations (CAC Nos. MF7795 and MF7796) ML16225A6332016-09-0202 September 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760) ML16020A1152016-02-17017 February 2016 Alternative Relief Request 1-ISI-27 for Relief from the Reactor Vessel Circumferential Weld Examination Requirements of the ASME Code ML12003A0812012-01-20020 January 2012 Safety Evaluation for Relief Request 3-ISI-25, for the Third 10-Year Inservice Inspection Interval ML0921809542009-08-24024 August 2009 Relief, the Second Ten-Year Interval Inservice Inspection Program Relate to ASME Code Case N-504-3, Alternative Rules for Repair of Classes 1, 2, and 3 Austenitic Stainless Steel Piping ME0155 ML0916703582009-07-0101 July 2009 Withdrawal of Relief Request (2-ISI-22) for Repair of Classes 1, 2, and 3 Austenitic Stainless Steel Piping ML0912000402009-06-16016 June 2009 Safety Evaluation for Relief Request 2-ISI-18R1 Associated with Inservice Inspection Examination Coverage ML0916104992009-06-12012 June 2009 Verbal Relief Related to Instrument Line Weld Overlay (TAC No. ME1319) (2-ISI-21) ML0913906422009-05-18018 May 2009 American Society of Mechanical Engineers Section XI, Inservice Inspection Program - Request for Relief 2-ISI-21, Revision 1 - Examination of Piping Weld Overlays ML0907110772009-04-0202 April 2009 Safety Evaluation for Relief Request 1-ISI-18 Associated with Inspection and Testing of Snubbers ML0833802012008-11-25025 November 2008 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Second Ten-year Inspection Interval - Relief Request for 1-ISI-22 ML0821704212008-07-29029 July 2008 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Third Ten-Year Inspection Interval- Request for Relief 2-ISI-18, Revision 1 ML0800805242008-05-20020 May 2008 Safety Evaluation for Relief Request 3-ISI-22 Limited Examination Coverage for Valve to Pipe Weld GR-3-63 Tac No. MD6748) ML0725600472007-08-24024 August 2007 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Third Ten-Year Inspection Interval Requests for Relief 3-ISI-22 & 3-ISI-23 ML0706504752007-02-21021 February 2007 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Second Ten-Year Inspection Interval - Request for Relief 3-ISI-7, Revision 2 ML0700903492007-02-12012 February 2007 Relief Request, Risk-Informed Inservice Inspection of Piping ML0633306482006-12-22022 December 2006 Relief Request, Request for Relief from American Society of Mechanical Engineers, Section XI Requirements for the Third Inservice Inspection Interval - Snubbers ML0631800372006-11-14014 November 2006 Individual Notice, Low Pressure Coolant Injection Loop Crosstie Valve Position Verification ML0615600902006-08-0303 August 2006 Relief Requests, Revision 3-ISI-12 and 3-ISI-19, Associated with Weld Examination Coverage ML0615902822006-07-0303 July 2006 Letter Withdrawal of Relief Requests Regarding Third Interval Inservice Inspection Requirements of the ASME Code ML0613903032006-06-30030 June 2006 Relief, Relief Request 3-ISI-20 Associated with the Use of ASME Code Case- 700 for the Third Inservice Inspection Interval ML0535403782005-12-20020 December 2005 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Request to Use Subsequent Edition and Addenda of ASME Section XI Code for Repair and Replacement Activities ML0523101262005-08-18018 August 2005 American Society of Mechanical Engineers RPV Welds Withdrawal of Requests ML0517304872005-08-0202 August 2005 Relief, Inservice Inspection Program Relief Request PDI-4 ML0518106792005-07-18018 July 2005 Safety Evaluation for Request for Relief Regarding the Use of ASME Code Case 700 (TACs MC6437, MC6438) ML0506305582005-03-0404 March 2005 American Society of Mechanical Engineers Section XI, Inservice Inspection Program, Second Ten-Year Inspection Interval - Requests for Relief 3-ISI-7, Revision 1, 3-ISI-12, and 3-ISI-19 ML0502504152005-02-15015 February 2005 Relief, Use of ASME and Pressure Vessel (PV) Code for VT-2 ML0433803212004-11-15015 November 2004 American Society of Mechanical Engineers Section XI, in Service Inspection Program ML0432206272004-11-15015 November 2004 American Society of Mechanical Engineers Section XI, Inservice Inspection Program - Requests for Relief 2-ISI-22, and 3-ISI-18 for Examination of Reactor Pressure Vessel Nozzle-To-Vessel Shell Welds and Nozze Blend. ML0421504382004-10-0606 October 2004 Relief, Relief Request Re. Maximum Allowable Flaw Width When Planar Flaw Evaluation Rules May Be Applied ML0410403752004-04-12012 April 2004 Requests for Relief Nos. 2-ISI-18 and 2-ISI-19 for Third 10-Year Interval Inservice Inspection ML0406200482004-03-0101 March 2004 Brown Ferry, Unit 1, Ltr, Relief, Containment Inservice Inspection ML0404203552004-02-11011 February 2004 Relief, Second 10-Year Interval Inservice Inspection Programs ML0335303822003-12-19019 December 2003 Brown Ferry Nuclear Plant, Units 2 and 3, Relief Request, 2-ISI-21 and 3-ISI-17 to Inservice Inspection Program ML0325909292003-09-12012 September 2003 (BFN) - Unit 1 - American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Request for Relief PDI-2 - Clarification and Additional Information ML0316714662003-06-0202 June 2003 Relief, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Third Ten-Year Inspection Interval - Requests for Relief 2-ISI-18, and 2-ISI-19 ML0314107352003-05-0909 May 2003 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Requests for Relief 3-ISI-13, 3 -ISI-14, & 3-ISI-15 ML0313500882003-05-0909 May 2003 (Bfn), Unit 3, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Requests for Relief 3-ISI-13, 3-ISI-14 & 3-ISI-15 2024-06-18
[Table view] Category:Letter
MONTHYEARIR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03
[Table view] Category:Safety Evaluation
MONTHYEARML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23116A2472023-05-23023 May 2023 Issuance of Amendment Nos. 330, 353, and 313 Regarding Adoption of TSTF-478, Revision 2 for Combustible Gas Control ML23101A1102023-05-16016 May 2023 Issuance of Amendment Nos. 329, 352, and 312 Regarding Removal of Site Acreage Description from Technical Specifications ML23073A2902023-05-0202 May 2023 Issuance of Amendment Nos. 328, 351, and 311 Adoption of TSTF-505, Revision 2, for Risk-Informed Completion Times and TSTF-439, Revision 2, to Eliminate Second Completion Times ML23054A2902023-03-13013 March 2023 Request for Relief from the Requirements of the ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22348A0662023-01-13013 January 2023 Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22273A1032022-11-22022 November 2022 Issuance of Amendment Nos. 323, 346, and 306 Regarding Chilled Water Cross-Tie Modification ML22220A2602022-11-21021 November 2022 Issuance of Amendment Nos. 322, 345, and 305 Regarding Adoption of TSTF Traveler TSTF-205-A, Rev. 3, and TSTF-563-A ML22298A2852022-11-14014 November 2022 Request for Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Paragraph IWB-2420(B) and Use of Code Case N-526 ML22138A3252022-06-24024 June 2022 Issuance of Amendment Nos. 321, 344, and 304 Regarding Spent Fuel Pool Criticality Safety Analysis ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22020A2282022-03-16016 March 2022 Issuance of Amendment Nos. 320, 343, and 303 Regarding the Adoption of Approved Technical Specification Task Force Traveler TSTF-568, Revision 2 ML22010A1952022-01-12012 January 2022 Request to Use Later Edition of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21285A0682021-10-28028 October 2021 Issuance of Amendment Nos. 319, 342, and 302 Regarding the Adoption of Technical Specification Task Force Traveler TSTF-582, Revision 2 ML21214A1392021-08-30030 August 2021 Issuance of Amendment Nos. 318, 341, and 301 Regarding Changes to Technical Specification 3.8.6, Battery Cell Parameters ML21173A1772021-07-27027 July 2021 Issuance of Amendment Nos. 317, 340, and 300 Regarding Adoption of Title 10 of the Code of Federal Register Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21075A0762021-04-30030 April 2021 Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis ML21041A4892021-04-0808 April 2021 Issuance of Amendment Nos. 315, 338, and 298 Regarding the Adoption of Technical Specifications Task Force Traveler, TSTF-425, Revision 3 ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20253A1812020-09-23023 September 2020 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code ML20085G8962020-06-26026 June 2020 Issuance of Amendment Nos. 312, 335, and 295 Regarding Request to Revise Emergency Plan Staff Augmentation Times ML19329E3192020-01-0202 January 2020 SE Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC Nos. MF4540, MF4541 and MF4542; EPID No. L-2014-JLD-0044) ML19294A0112019-12-26026 December 2019 Issuance of Amendment Nos. 311, 334, and 294 Adopt Technical Specifications Task Force Traveler, TSTF-542, Revision 2 ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19198A0012019-08-13013 August 2019 Issuance of Amendment Nos. 308, 331, and 291 to Extend Implementation Due Date for Modifications 102 and 106 Related to NFPA 805 (Eid L-2019-LLA-0140) ML19037A1372019-04-0202 April 2019 Revisions to Modifications 85, 102 and 106 Related to National Fire Protection Association 805 Performance-based Standard for Fire Protection of Light Water Reactor Electric Generating Plants ML19010A2742019-03-18018 March 2019 Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report- TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation, Calculation, CDQ0000002016000041 Tennessee Valley Authority ML19016A2152019-02-28028 February 2019 Relief from the Requirements of American Association of Mechanical Engineers Code Section XI Inservice Inspection Program, Request for an Alternative ISI-46 ML18323A1722018-12-31031 December 2018 Relief Request No. 1 ISI 29 Regarding Second 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Welds ML18323A0262018-12-0404 December 2018 Relief Request No. 1-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Reactor Vessel Welds ML18241A3192018-10-0909 October 2018 Issuance of Amendment Nos. 306, 329, and 289 to Revise Approved NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants-Revision ML18251A0032018-09-27027 September 2018 Issuance of Amendment Nos. 305, 328, and 288 to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program (CAC Nos. MG0113, MG0114, and MG0115; EPID L-2017-LLA-0292) ML18236A3312018-09-24024 September 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML18197A3072018-08-30030 August 2018 Issuance of Amendments Regarding Request to Change Technical Specification 3.3.1 and Surveillance Requirement 3.2.4 ML18171A3372018-07-10010 July 2018 Issuance of Amendment to Revise License Condition 2.C(18)(a)3 ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17261A0362017-10-0606 October 2017 Request for Request 3-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Examination Coverage of Inside Radius and Nozzle-to-Vessel Welds ML17215A2432017-10-0202 October 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) ML17032A1202017-08-14014 August 2017 Non-Proprietary Issuance of Amendments Regarding Extended Power Uprate ML17145A5522017-08-11011 August 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Alternative Request IST-RR-1 for the Fourth 10-Year Inservice Testing Interval (CAC Nos. MF9087, MF9088, and MF9089) ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... 2024-01-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 17, 2016 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNIT 1 -ALTERNATIVE RELIEF REQUEST 1-ISl-27 FOR RELIEF FROM THE REACTOR VESSEL CIRCUMFERENTIAL WELD EXAMINATION REQUIREMENTS OF THE ASME CODE (CAC NO. MF6401)
Dear Mr. Shea:
By letter dated June 26, 2015, as supplemented by letters dated October 27, 2015, and November 18, 2015 (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML15181A448, ML15300A472, and ML15338A221 respectively), Tennessee Valley Authority (the licensee) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of alternatives to certain American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code,Section XI reactor vessel (RV) circumferential weld examination requirements at the Browns Ferry Nuclear Plant (BFN), Unit 1.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.55a(z)(1 ), the licensee requested relief from RV circumferential weld examination requirements, as an alternative, on the basis that the alternative provides an acceptable level of quality and safety.
The NRC staff finds that the information submitted by the licensee related to the RV circumferential welds supports the determination that the conditional probability of failure (CPF) at the end of the period of extended operation (PEO) is bounded by the limiting CPF for a Babcock & Wilcox (B&W)-fabricated RV. This finding is based on the projected mean reference nil-ductility transition temperature (RTNDT) of the limiting circumferential weld materials for BFN, Unit 1, which is a function of the chemistry and projected neutron fluence for these materials.
The projected mean RT NDT values are less than the mean RT NDT value associated with the limiting CPF for a B&W RV from the NRC staff's final safety evaluation (SE) of the Boiling Water Reactor (BWR) Vessel and Internals Project (BWRVIP), BWR Reactor Pressure Vessel Shell Weld Inspection Recommendations [BWRVIP-05] report, (ADAMS Legacy Accession No.
9808040037). Additionally, the licensee will continue to implement operator training and procedures to limit the frequency of cold overpressure events to the amount specified in the NRC staff's SE for the BWRVIP-05 report. Therefore, the licensee has met the two plant-specific conditions required to obtain relief from inspection of circumferential RV welds. On this basis, the NRC staff concludes that relief from inspection of RV circumferential welds is approved because the proposed alternative provides an acceptable level of quality and safety.
J. Shea Therefore, pursuant to 10 CFR 50.55a(z)(i), the request for proposed alternative, 1-ISl-27, to the requirements of the ASME Code,Section XI, Table IWB-2500-1 (Inspection Program B),
Examination Category B-A, Item B1 .11, pertaining to RV circumferential shell welds, is authorized for BFN, Unit 1, for the duration of the PEO as defined in Section 3.5 of the enclosed SE.
If you have any questions, please contact the Project Manager, Ms. Farideh E. Saba at 301-415-1447 or Farideh.Saba@nrc.gov.
Sincerely, Benjamin G. Beasley, Chief Plant Licensing Branch 2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259
Enclosure:
Safety Evaluation cc w/enclosure: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF REQUEST NO. 1-ISl-27 FOR THE PERIOD OF EXTENDED OPERATION REGARDING REACTOR VESSEL CIRCUMFERENTIAL WELD EXAMINATIONS FOR TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-259
1.0 INTRODUCTION
By letter dated June 26, 2015, as supplemented by letters dated October 27, 2015, and November 18, 2015 (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML15181A448, ML15300A472, and ML15338A221 respectively), Tennessee Valley Authority (TVA, the licensee) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of alternatives to certain American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI reactor vessel (RV) circumferential weld examination requirements at Browns Ferry Nuclear Plant (BFN), Unit 1.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.55a(z)(1 ), the licensee requested relief from reactor vessel (RV) circumferential weld examination requirements, as an alternative, on the basis that the alternative provides an acceptable level of quality and safety.
The proposed alternative would eliminate the requirement to inspect the circumferential welds except for the areas of intersection with the axial welds. This alternative is consistent with the guidance provided in Generic Letter 98-05, "Boiling Water Reactor Licensees Use of the BWRVIP-05 Report to Request Relief from Augmented Examination Requirements on Reactor Pressure Vessel Circumferential Welds," and the NRC staff's safety evaluation (SE) for Boiling Water Reactor (BWR) Vessel and Internals Project Vessel and Internals Project (BWRVIP),
BWR Reactor Pressure Vessel Shell Weld Inspection Recommendations [BWRVIP-05] report, (ADAMS Legacy Accession No. 9808040037). The proposed alternative satisfies the NRC staff's expectation identified in Section 4.2.6 of the "Safety Evaluation Report Related to the License Renewal of the Browns Ferry Nuclear Plant, Units 1, 2, and 3," dated January 12, 2006 (ADAMS Accession No. ML060120453).
Enclosure
2.0 REGULATORY EVALUATION
lnservice inspection (ISi) of ASME Code Class 1, 2, and 3 components is performed in accordance with Section XI of the ASME Code and applicable addenda as required by 10 CFR 50.55a(g). Section 50.55a(z)(1) of 10 CFR states that alternatives to the requirements of paragraph (g) may be used when authorized by the NRC if the proposed alternatives would provide an acceptable level of quality and safety.
For RV circumferential welds, the NRC staff's final SE of topical report BWRVIP-05, dated July 28, 1998, concluded that elimination of the ISi of the RV circumferential welds for BWRs is justified, since the failure frequency for circumferential welds in BWR plants is significantly below the criterion specified in Regulatory Guide (RG) 1.154, "Format and Content of Plant-Specific Pressurized Thermal Shock Safety Analysis Reports for Pressurized Water Reactors,"
dated January 1987. The NRC staff notes that RG 1.154 was withdrawn on January 14, 2011, (76 FR 2726) for general application to future licensee relief requests. However, the acceptability of the use of BWRVIP-05, specifically for BFN, Unit 1, was previously affirmed by the NRC staff evaluation presented in Section 4.2.6.4 of NUREG-1843. TVA proposed a future inspection activity to seek relief from the NRC regarding the ISi of the RV circumferential welds based on the use of BWRVIP-05.
Generic Letter 98-05, "Boiling Water Reactor Licensees Use of the BWRVIP-05 Report to Request Relief from Augmented Examination Requirements on Reactor Pressure Vessel Circumferential Shell Welds," dated November 10, 1998 (ADAMS Accession No. ML082460066),
provided recommendations for licensees desiring to request permanent relief from the ISi requirements of 10 CFR 50.55a(g) for the volumetric examination of circumferential RV welds (ASME Code,Section XI, Table IWB-2500-1, Examination Category B-A, Item 1.11, Circumferential Shell Welds). The recommendations were based on the NRC staff's final SE of topical report BWRVIP-05 and included the need for licensees to perform their required inspections of "essentially 100 percent" of all axial welds. These recommendations were only applicable to the remaining term of operation under the initial, existing license. However, Section 4.2.6 of NUREG-1843 noted the NRC staff's expectation that relief would be requested for the extended period of operation.
3.0 TECHNICAL EVALUATION
3.1 ASME Code Requirement for Which Relief is Requested The ASME Code,Section XI, 2001 Edition Through 2003 Addenda, Table IWB-2500-1, Examination Category B-A, Item 81 .11 requires a volumetric examination of all (100 percent) of the circumferential shell welds each interval.
3.2 Component(s) for which Relief is Requested Code Class: 1 Weld Numbers: C-4-5, C-3-4, C-2-3, C-1-2, and C-BH-1 Examination Category: B-A
Exam Method: Volumetric Item Number: B1 .11 3.3 Licensee's Proposed Alternative to the ASME Code and Basis for Alternative The proposed alternative is permanent relief from the ISi requirements of 10 CFR 50.55a(g) for the volumetric examination of circumferential RV welds (ASME Code,Section XI, Table IWB-2500-1, Examination Category B-A, Item B1 .11, Circumferential Shell Welds) based on the probabilistic risk analysis of BWRVIP-05, combined with the continued implementation of operator procedures and training to limit the frequency of cold overpressure events in accordance with the recommendations of GL 98-05. The licensee will continue to perform its required inspections of "essentially 100 percent" of all axial welds.
3.4 Reason and Basis for Alternative On May 12, 2004, TVA submitted a relief request to eliminate the circumferential shell welds, which was approved for the second 10-year ISi interval in the NRC letter dated May 31, 2005.
In Section 4.2.6 of the license renewal application, the licensee submitted updated information that reflected the plant-specific values used in the relief request (54 effective full power years or EFPY) as part of a time-limited aging analysis (TLAA). The TLAA for RV circumferential weld examination relief was evaluated and found acceptable in Section 4.2.6.2 of NUREG-1843. The value of the mean reference nil-ductility transition temperature (RTNDT) for the limiting circumferential weld material for BFN, Unit 1, was 124 degrees Fahrenheit (°F). The licensee was still required to request relief for the circumferential weld examination for the period of extended operation (PEO) in accordance with 10 CFR 50.55a.
By letter dated December 18, 2013, TVA submitted updated pressure and temperature (PIT) limits. These revised PIT limit curves were developed based on neutron fluence analyses projected to the end of the PEO as required by 10 CFR 54.21 (c)(1 )(ii). On February 2, 2015, the NRC issued Amendment No. 287 for BFN, Unit 1, approving the use of the revised PIT limit curves (ADAMS Accession No. ML14325A501).
In the June 26, 2015, request for relief, the EFPY for the PEO was revised to reflect the unit's actual operational history (38 rather than 54 EFPY) and the maximum projected neutron fluence value for the PEO from the approved license amendment. The value of the mean RTNDT for the limiting circumferential weld material for BFN, Unit 1, for 38 EFPY was reduced to 92 °F.
Given that the updated mean RTNDT value for BFN, Unit 1, is less than the 64 EFPY value as addressed in the NRC staff SE for a B&W vessel, the licensee concluded the BFN RV CPF is also bounded by the NRC analysis.
As previously evaluated in NUREG-1843, procedures and training to limit cold over-pressure events during the PEO have been implemented. Therefore, as discussed above, and as previously evaluated in NUREG-1843 and supplemented with the analyses performed to support the revised PIT curves, the proposed alternative provides an acceptable level of quality and safety for the PEO.
3.5 Licensee Proposed Duration of Alternative The licensee requested use of the proposed alternative for the entire PEO for BFN, Unit 1, which ends December 20, 2033.
4.0 STAFF EVALUATION As part of the evaluation, the staff compared the material properties for the RV materials in the December 18, 2013, submittal for the revised PIT limits with that in the July 25, 2015, submittal.
The comparison confirmed the properties for the limiting circumferential weld but discovered a discrepancy. The staff noted that the fluence at the clad-to-base metal interface in Table 3 of the submittal does not match that from Table B-5 of the December 18, 2013, license amendment request. To resolve the discrepancy, the staff issued a request for additional information (RAI) asking the licensee to review the basis documents and revise the June 26, 2015, letter, as needed, to accurately assess the fluence on the beltline circumferential (girth) weld.
In its RAI response dated October 27, 2015, the licensee stated that the value of 0.0886E+19 neutrons per square centimeter (n/cm) 2 provided for the fluence at the clad/base metal interface in Table 3 of the request is actually the 38 EFPY fluence value at ~of the wall thickness and not the peak fluence value at the inside diameter of the RV. The discrepancy was entered into the TVA corrective action program. Table 3 of the July 25, 2015, submittal was revised by replacing the fluence value of 0.0886E+19 n/cm 2 with 0.128E+19 n/cm 2 from Table B-5 of Enclosure 2 of the December 18, 2013, submittal. This was the only change made to Table 3.
The staff reviewed the licensee's response to the RAI and discovered that further changes to Table 3 would be required in response to the corrected fluence value. During a followup teleconference with the NRC, the licensee determined that two additional values should have been revised based on the fluence value correction. The enclosure to the November 18, 2015, letter provides TVA' s revised response to the NRC RAI, which supersedes, in its entirety, the response provided in the October 27, 2015, letter.
The staff reviewed the licensee's revised response to the RAI and notes that the neutron fluence in the revised Table 3 agrees with those used in Amendment No. 287 for BFN, Unit 1.
The neutron fluence at the inside diameter will be slightly higher than the value at the clad/base metal interface, which is conservative. Furthermore, the delta RT NDT without margin and the mean RT NDT values in the revised Table 3 are the same as those in the staff's confirmatory calculations. Based on the information in the November 18, 2015, RAI response, the staff confirms that the plant-specific parameters for BFN, Unit 1, satisfy the limiting CPF for RV circumferential welds from B&W fabricated plants in the NRC staffs BWRVIP-05 report SE through the end of the PEO. Based on the plant-specific procedures and training to limit cold over-pressure events, as previously evaluated and approved in NUREG-1843, along with the November 18, 2015, revision to the June 25, 2015, submittal, the staff has determined that the proposed alternative provides an acceptable level of quality and safety for the PEO.
5.0 CONCLUSION
The NRC staff finds the information submitted by the licensee related to the RV circumferential welds supports the determination that the CPF at the end of the PEO is bounded by the limiting CPF for a B&W-fabricated RV. This finding is based on the projected mean RTNDT of the limiting circumferential weld materials for BFN, Unit 1, which is a function of the chemistry and projected neutron fluence for these materials. The projected mean RTNDT value for BFN, Unit 1 is less than the mean RTNDT value associated with the limiting CPF for a B&W RV from the NRC staff's final SE of BWRVIP-05. Additionally, the licensee will continue to implement operator training and procedures to limit the frequency of cold overpressure events to the amount specified in the NRC staff's SE for the BWRVI P-05 report issued on July 28, 1998. The licensee has met the two plant-specific conditions required to obtain relief from inspection of circumferential RV welds. On this basis, the NRC staff concludes that relief from inspection of RV circumferential welds and proposed alternative provides an acceptable level of quality and safety.
Therefore, pursuant to 10 CFR 50.55a(z)(i), the request for proposed alternative, 1-ISl-27, to the requirements of the ASME Code,Section XI, Table IWB-2500-1 (Inspection Program B),
Examination Category B-A, Item 81 .11, pertaining to RV circumferential shell welds, is authorized for BFN, Unit 1, for the duration of the PEO as defined in Section 3.5 of this SE.
All other requirements of the ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: Patrick Purtscher Date: February 17, 201 6
J. Shea Therefore, pursuant to 10 CFR 50.55a(z)(i), the request for proposed alternative, 1-ISl-27, to the requirements of the ASME Code,Section XI, Table IWB-2500-1 (Inspection Program B),
Examination Category B-A, Item B1 .11, pertaining to RV circumferential shell welds, is authorized for BFN, Unit 1, for the duration of the PEO as defined in Section 3.5 of the enclosed SE.
If you have any questions, please contact the Project Manager, Ms. Farideh E. Saba at 301-415-1447 or Farideh.Saba@nrc.gov.
Sincerely, IRA!
Benjamin G. Beasley, Chief Plant Licensing Branch 2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259
Enclosure:
Safety Evaluation cc w/enclosure: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsNrrDorlDpr Resource RidsNrrDorllpl2-2 Resource RidsNrrDeEvib Resource RidsNrrDssSrxb Resource RidsACRS_MailCTR Resource RidsNrrLABClayton Resource RidsNrrPMBrownsFerry Resource RidsRgn2MailCenter Resource CRosales-Cooper, OEDO PPurtscher, NRR JHauser, NRR ADAMS A ccess1on No.: ML16020A115 *b1yema1 OFFICE NRR/DORL/LPLI 11-2/PM NRR/DORL/LPLI 1-2/PM NRR/DORL/LPLll-2/LA NAME JHauser FSaba (LRonewicz for) BClayton DATE 1/29/2016 2/02/2016 1/22/2016 OFFICE NRR/DE/EVIB/BC* NRR/DORL/LPLll-2/BC NAME JMcHale BBeasley DATE 1/18/2016 2/17/2016 OFFICIAL RECORD COPY