Category:Code Relief or Alternative
MONTHYEARML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23054A2902023-03-13013 March 2023 Request for Relief from the Requirements of the ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22329A0762022-12-0101 December 2022 Correction of Error in Authorization of Alternative Request BFN-21-ISI-02 ML22298A2852022-11-14014 November 2022 Request for Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Paragraph IWB-2420(B) and Use of Code Case N-526 ML22010A1952022-01-12012 January 2022 Request to Use Later Edition of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML18323A1722018-12-31031 December 2018 Relief Request No. 1 ISI 29 Regarding Second 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Welds ML18323A0262018-12-0404 December 2018 Relief Request No. 1-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Reactor Vessel Welds ML17261A0362017-10-0606 October 2017 Request for Request 3-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Examination Coverage of Inside Radius and Nozzle-to-Vessel Welds ML17135A1462017-08-18018 August 2017 Browns Ferry Nuclear Plant, Unit 3 - Relief Request No. 3 ISI 29 Regarding Third 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Piping Welds (CAC No. MF9258) ML17145A5522017-08-11011 August 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Alternative Request IST-RR-1 for the Fourth 10-Year Inservice Testing Interval (CAC Nos. MF9087, MF9088, and MF9089) ML17045A7722017-03-14014 March 2017 Browns Ferry Nuclear Plant, Units 2 and 3 - Relief Request 2-ISI-30 and 3-ISI-27 - Relief from ASME Code, Section XI Requirements for Periods of Extended Operation for RPV Circumferential Shell Weld Examinations (CAC Nos. MF7795 and MF7796) ML16225A6332016-09-0202 September 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760) ML16020A1152016-02-17017 February 2016 Alternative Relief Request 1-ISI-27 for Relief from the Reactor Vessel Circumferential Weld Examination Requirements of the ASME Code ML12003A0812012-01-20020 January 2012 Safety Evaluation for Relief Request 3-ISI-25, for the Third 10-Year Inservice Inspection Interval ML0921809542009-08-24024 August 2009 Relief, the Second Ten-Year Interval Inservice Inspection Program Relate to ASME Code Case N-504-3, Alternative Rules for Repair of Classes 1, 2, and 3 Austenitic Stainless Steel Piping ME0155 ML0916703582009-07-0101 July 2009 Withdrawal of Relief Request (2-ISI-22) for Repair of Classes 1, 2, and 3 Austenitic Stainless Steel Piping ML0912000402009-06-16016 June 2009 Safety Evaluation for Relief Request 2-ISI-18R1 Associated with Inservice Inspection Examination Coverage ML0916104992009-06-12012 June 2009 Verbal Relief Related to Instrument Line Weld Overlay (TAC No. ME1319) (2-ISI-21) ML0913906422009-05-18018 May 2009 American Society of Mechanical Engineers Section XI, Inservice Inspection Program - Request for Relief 2-ISI-21, Revision 1 - Examination of Piping Weld Overlays ML0907110772009-04-0202 April 2009 Safety Evaluation for Relief Request 1-ISI-18 Associated with Inspection and Testing of Snubbers ML0833802012008-11-25025 November 2008 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Second Ten-year Inspection Interval - Relief Request for 1-ISI-22 ML0821704212008-07-29029 July 2008 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Third Ten-Year Inspection Interval- Request for Relief 2-ISI-18, Revision 1 ML0800805242008-05-20020 May 2008 Safety Evaluation for Relief Request 3-ISI-22 Limited Examination Coverage for Valve to Pipe Weld GR-3-63 Tac No. MD6748) ML0725600472007-08-24024 August 2007 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Third Ten-Year Inspection Interval Requests for Relief 3-ISI-22 & 3-ISI-23 ML0706504752007-02-21021 February 2007 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Second Ten-Year Inspection Interval - Request for Relief 3-ISI-7, Revision 2 ML0700903492007-02-12012 February 2007 Relief Request, Risk-Informed Inservice Inspection of Piping ML0633306482006-12-22022 December 2006 Relief Request, Request for Relief from American Society of Mechanical Engineers, Section XI Requirements for the Third Inservice Inspection Interval - Snubbers ML0631800372006-11-14014 November 2006 Individual Notice, Low Pressure Coolant Injection Loop Crosstie Valve Position Verification ML0615600902006-08-0303 August 2006 Relief Requests, Revision 3-ISI-12 and 3-ISI-19, Associated with Weld Examination Coverage ML0615902822006-07-0303 July 2006 Letter Withdrawal of Relief Requests Regarding Third Interval Inservice Inspection Requirements of the ASME Code ML0613903032006-06-30030 June 2006 Relief, Relief Request 3-ISI-20 Associated with the Use of ASME Code Case- 700 for the Third Inservice Inspection Interval ML0535403782005-12-20020 December 2005 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Request to Use Subsequent Edition and Addenda of ASME Section XI Code for Repair and Replacement Activities ML0523101262005-08-18018 August 2005 American Society of Mechanical Engineers RPV Welds Withdrawal of Requests ML0517304872005-08-0202 August 2005 Relief, Inservice Inspection Program Relief Request PDI-4 ML0518106792005-07-18018 July 2005 Safety Evaluation for Request for Relief Regarding the Use of ASME Code Case 700 (TACs MC6437, MC6438) ML0506305582005-03-0404 March 2005 American Society of Mechanical Engineers Section XI, Inservice Inspection Program, Second Ten-Year Inspection Interval - Requests for Relief 3-ISI-7, Revision 1, 3-ISI-12, and 3-ISI-19 ML0502504152005-02-15015 February 2005 Relief, Use of ASME and Pressure Vessel (PV) Code for VT-2 ML0433803212004-11-15015 November 2004 American Society of Mechanical Engineers Section XI, in Service Inspection Program ML0432206272004-11-15015 November 2004 American Society of Mechanical Engineers Section XI, Inservice Inspection Program - Requests for Relief 2-ISI-22, and 3-ISI-18 for Examination of Reactor Pressure Vessel Nozzle-To-Vessel Shell Welds and Nozze Blend. ML0421504382004-10-0606 October 2004 Relief, Relief Request Re. Maximum Allowable Flaw Width When Planar Flaw Evaluation Rules May Be Applied ML0410403752004-04-12012 April 2004 Requests for Relief Nos. 2-ISI-18 and 2-ISI-19 for Third 10-Year Interval Inservice Inspection ML0406200482004-03-0101 March 2004 Brown Ferry, Unit 1, Ltr, Relief, Containment Inservice Inspection ML0404203552004-02-11011 February 2004 Relief, Second 10-Year Interval Inservice Inspection Programs ML0335303822003-12-19019 December 2003 Brown Ferry Nuclear Plant, Units 2 and 3, Relief Request, 2-ISI-21 and 3-ISI-17 to Inservice Inspection Program ML0325909292003-09-12012 September 2003 (BFN) - Unit 1 - American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Request for Relief PDI-2 - Clarification and Additional Information ML0316714662003-06-0202 June 2003 Relief, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Third Ten-Year Inspection Interval - Requests for Relief 2-ISI-18, and 2-ISI-19 ML0314107352003-05-0909 May 2003 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Requests for Relief 3-ISI-13, 3 -ISI-14, & 3-ISI-15 ML0313500882003-05-0909 May 2003 (Bfn), Unit 3, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program - Requests for Relief 3-ISI-13, 3-ISI-14 & 3-ISI-15 ML0230202092002-10-25025 October 2002 (Bfn), Unit 2, American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection (ISI) Program, Request for Relief 2-ISI-13, Examination & Testing of Snubbers 2023-07-20
[Table view] Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |