Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML14083A3982014-03-14014 March 2014 Response to RAI Dated January 29, 2014, Regarding R-113 License Amendment Request Project stage: Response to RAI ML14141A6322014-06-12012 June 2014 U.S. Geological Survey - Request for Additional Information Amendment Request to Modify the Source, Byproduct and Special Nuclear Material Possession Limits for Facility Operating License No. R-113 for the U.S. Geological Survey Triga Resea Project stage: RAI ML14205A3002014-07-10010 July 2014 Response to RAI Dated June 19, 2014, Regarding R-113 License Amendment Request Project stage: Response to RAI ML14241A0192014-08-25025 August 2014 Revision to Response to RAI Dated June 19, 2014, Regarding R-113 License Amendment Request Project stage: Response to RAI ML15162A9622015-06-0909 June 2015 Us Geological Survey - Response to Request for Additional Dated June 19, 2014, Regarding R-113 License Amendment Request Project stage: Request ML15226A2772015-08-18018 August 2015 Us Geological Survey - Request for Additional Information License Amendment Request to Modify the Source, Byproduct and Special Nuclear Material Possession Limits for Facility Operating License No. R-113 for the U.S. Geological Survey Triga Project stage: RAI ML15253A4852015-08-28028 August 2015 USGS - Response to RAI Dated August 18, 2015, Regarding R-113 License Amendment Request Project stage: Response to RAI ML15259A7312015-09-21021 September 2015 Request for Additional Information License Amendment Request to Modify the Source, Byproduct and Special Nuclear Material Possession Limits for Facility Operating License No. R-113 for the U.S. Geological Survey Triga Reactor Project stage: RAI ML15323A3162015-11-17017 November 2015 U.S. Geological Survey - Response to RAI Dated September 21, 2015, Regarding R-113 License Amendment Request Project stage: Response to RAI ML16082A1662016-02-0202 February 2016 Us Dept. of Interior, Geological Survey (USGS) Request to Amend Indemnity Agreement D-10 Project stage: Other 2015-11-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24092A1542024-04-0404 April 2024 U.S. Geological Survey - Change of Facility Project Manager ML24092A0422024-03-28028 March 2024 U.S. Geological Survey Triga Reactor Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 for 2023 IR 05000274/20232022023-11-13013 November 2023 U.S. Geological - U.S. Nuclear Regulatory Commission Safety Inpsection Report No. 05000274/2023202 IR 05000274/20232032023-11-0909 November 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000274/2023203 (Public) IR 05000274/20232012023-02-27027 February 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000274/2023201 ML22026A4852022-03-0707 March 2022 Examination Confirmation Letter No. 50-274/OL-22-01, United States Department of Interior Geological Survey ML22053A1872022-02-22022 February 2022 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Administrator Succession IR 05000274/20212022021-10-0101 October 2021 U.S. Geological U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000274/2021202 IR 05000274/20212032021-09-30030 September 2021 United States Geological Survey - Nuclear Regulatory Commission Security Inspection Report No. 05000274/2021203 IR 05000274/20202012021-04-21021 April 2021 United States Geological Survey, U.S. Nuclear Regulatory Commission Routine Inspection Report05000274/2020201 - Cover Letter and Enclosure ML21090A1912021-03-29029 March 2021 U.S. Geological Survey Triga Reactor, Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 ML21082A2822021-03-23023 March 2021 Letter to R. Horton, USGS Denver Federal Center, from B. Smith, NRC, NRC Office of Investigations Report No. 4-2019-014 - Release of OI Synopsis IR 05000274/20212012021-03-12012 March 2021 U.S. Geological Survey NRC Non-Routine Inspection Report 05000274/2021201 ML20314A2922020-12-0303 December 2020 USGS Issuance of Amendment No. 14 to Renewed Facility Operating License No. R-113 for the USGS Triga Research Reactor Increasing the Special Nuclear Material Possession Limit ML20336A0202020-12-0101 December 2020 U.S. Geological Survey Triga Reactor - License Amendment Request LAR 14, Supplemental Information Letter 04 Provided in Response to Phone Call with NRC Project Manager at 0854 Mst on 2020-11-30 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20310A2962020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 03 Provided in Resolution of Comments Presented by the State of Colorado During the Public M ML20310A3352020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Updated Physical Security Plan, Rev. Xxi ML20296A4902020-10-22022 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 02 Provided in Response to Audit Visit on 2020-10-15 ML20318A0882020-10-22022 October 2020 U.S. Geological Survey Trig a Reactor, License Amendment Request LAR 14, Supplemental Information Letter 01 Provided in Response to Audit Visit on 2020-10-15 Purpose ML20295A5102020-10-21021 October 2020 U.S. Geological Survey - Regulatory Audit Report Proposed License Amended No. 14 to Increase the Special Nuclear Material Possession Limit ML20233A9962020-10-0909 October 2020 Us Geological Survey - Issuance of Amendment No. 13 to Renewed Facility Operating License No. R-113 to Amend Technical Specifications 3.1.3 and 4.1 for the Us Geological Survey Triga Research Reactor ML20279A5912020-10-0606 October 2020 U.S. Geological Survey - Regulatory Audit Proposed License Amendment No. 14 Tt Increase the Special Nuclear Material Possession Limit ML20279A3052020-10-0505 October 2020 U.S. Geological Survey - Acceptance of the Application for Proposed License Amendment No. 14 Increase in the Special Nuclear Nuclear Material Possession Limit ML20275A2672020-10-0101 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-02, LAR 14, Rev. 00 ML20199M1672020-07-20020 July 2020 NRC Letter and SER Authorizing USGS to Use an Alternate A2 Value ML20183A1622020-07-0202 July 2020 U.S. Geological Survey - Acceptance of the Application for a License Amendment Exception to TS 3.1.3 and 4.1 to Allow Fewer than 110 Fuel Elements When Either Shutdown or Operating at a Power Level Not Greater than 5 Kilowatts ML20177A6102020-06-25025 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Supplemental Information Provided in Response to ML20176A465 ML20161A1272020-06-0404 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Revision 01 ML20134J1082020-05-13013 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01 ML20157A0752020-05-0707 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Supervisor Appointment ML20136A3362020-04-21021 April 2020 Us Dept. of Interior, Geological Survey (Usgs), Submittal of Corrected 2019 Annual Report ML20134J1162020-04-10010 April 2020 7 of the Emergency Plan for the U.S. Geological Survey Triga Reactor (Gstr) Facility (License R-113, Docket 50-274) ML20087H0192020-03-0202 March 2020 Us Dept of Interior, Geological Survey (USGS) - Submittal of 2019 Annual Report IR 05000274/20192012019-12-23023 December 2019 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-274/2019-201 ML19206A0622019-07-11011 July 2019 Us Dept of the Interior, Us Geological Survey Follow-Up on August 9, 2018 Letter Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 ML19066A0542019-02-25025 February 2019 U.S. Dept of the Interior, Geological Survey, Reply to a Notice of Violation: EA-18-031 and EA-18-111 ML19044A3732019-01-31031 January 2019 Us Dept. of Interior, Geological Survey - Submittal of 2018 Annual Report ML18354B1702018-12-31031 December 2018 U.S Geological Survey-Notice of Violation and Proposed Imposition of Civil Penalty ML18324A5752018-11-16016 November 2018 United States Geological Survey (Usgs), Transfer of Reactor Supervisor Responsibilities. Position of Reactor Supervisor for Triga Facility Has Been Transferred from Mr. Brycen Roy to Mr. Christopher Farwell, Effective October 26, on Interim ML18324A5742018-11-16016 November 2018 United States Department of the Interior - Transfer of Reactor Administrative Responsibilities ML18325A1462018-11-0707 November 2018 U.S. Dept. of Interior, Geological Survey - Response to Apparent Violations Associated with NRC Investigation Reports 4-2017-027 and 4-2018-005; IA-18-038 IR 05000274/20182022018-08-15015 August 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-274/2018-202 ML18236A5512018-08-0909 August 2018 Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 IR 05000274/20182032018-07-17017 July 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report 05000274/2018203 ML18016A0512018-01-11011 January 2018 2017 Annual Report for the U.S. Geological Survey Triga Non-Power Reactor Facility ML17355A1472017-12-18018 December 2017 Establishing a Quality Assurance Program at the U.S. Geological Survey Triga Reactor Facility (License R-113, Docket 50-274) IR 05000274/20172012017-05-17017 May 2017 United States Geological Survey NRC Routine Inspection Report No. 50-274/2017-201 ML17074A6472017-04-19019 April 2017 United States Geological Survey TRIGA Reactor Closure of Confirmatory Action Letter No. NRR-03-005 on Site-Specific Compensatory Measures Implementation Plan ML17067A3942017-03-22022 March 2017 U.S. Geological Survey - Non-Power Reactor Closeout of Generic Letter 2016-01, "Monitoring of Neutron Absorbing Materials in Spent Fuel Pools," for the U.S. Geological Survey Training Reactor And Isotopes Production, General Atomics Research Reactor 2024-04-04
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML20336A0202020-12-0101 December 2020 U.S. Geological Survey Triga Reactor - License Amendment Request LAR 14, Supplemental Information Letter 04 Provided in Response to Phone Call with NRC Project Manager at 0854 Mst on 2020-11-30 ML16273A3042016-09-22022 September 2016 Us Department of the Interior, Geological Survey, Responses to E-Mail Questions ML16277A2162016-09-12012 September 2016 USGS Response to Request for Additional Information Dated 06/28/2016 ML16216A1432016-08-0101 August 2016 Us Dept of Interior, Geological Survey (Usgs), Responses to Request for Additional Information on PSP Questions Raised During a Teleconference on 07/21/2016 ML16221A3892016-07-28028 July 2016 Us Department of the Interior Geological Survey Request for Additional Response Time for RAI Clarifications ML16110A0082016-04-0101 April 2016 U.S. Dept. of the Interior, Geological Survey, Response to NRC Staff Request for Additional Information for License Renewal Review April 1, 2016 ML16042A5752016-01-22022 January 2016 U.S. Geological Survey - Responses to RAI Questions La, Lb, and Lc ML15323A3162015-11-17017 November 2015 U.S. Geological Survey - Response to RAI Dated September 21, 2015, Regarding R-113 License Amendment Request ML15253A4852015-08-28028 August 2015 USGS - Response to RAI Dated August 18, 2015, Regarding R-113 License Amendment Request 2020-12-01
[Table view] |
Text
science for a changingworld Department of the Interior US Geological Survey Box 25046 MS-974 Denver CO, 80225 August 28, 2015 U.S. Nuclear Regulatory Commission ATTIN: Document Control Desk Washington DC 20555 Subj: Response to RAI dated August 18, 2015, regarding R-113 license amendment request (TAC No.
M E9424)
Gentlemen:
The attached pages are submitted in response to your Request for Additional Information dated August 18, 2015. Please contact me if you need additional information.
Sincerely, Tim Degey USGS Reactor Supervisor I declare under penalty of perjury that the foregoing is true and correct.
Executed on 08/28/2015 Copy to:
Vito Nuccio, Reactor Administrator, MS 911 USGS Reactor Operations Committee ADAD)*
Responsereactor research to RAI license dated August 18, ME9424)
(TAC No. 2015 concerning a license amendment to the USGS R-1 13 QUESTION.
- 1. The storage/locationsfor the source, byproduct and SNM to be transferredfrom the materials license to the reactorlicense do not appearto be describedin your license amendment application, as supplemented. In your response to Request for Additional Information (RA/) No. 11, by letter dated March 14, 2014 (ADAMS Accession No. ML14083A398), you provided a description of the source, byproduct and SNM that you proposed to be transferred with the license amendment. However, a description of the storage locations and any transportationmethods between the.storage locations and the locations where the material may be used was not provided.
- a. Provide a description, which includes all of the lcensed materialsprovided in your response to RA/ No. 11 (as referenced above), of the locations where the listed materials are to be stored or used, orjustify why no description is needed.
- b. Describe the transportmethods of any source, byproduct and SNM needed between the storage locations and the locations where the materialmay be used, orjustify why no description is needed.
RESPONSE
l .a. The GSTR licensed area, within which the licensed materials listed in our response to RAI......
No. 11 are located, are described as follows:
Building 15, rooms 149 through 152 and room 154: These rooms are inside the protected area of the USGS reactor facility and they contain the reactor bay, reactor control room, staff offices, sample handling and processing areas, workshop, storage, reactor- -
equipment and supplies, low level radioactive waste being held for decay, and radiation monitoring equipment. These areas are only accessible by reactor staff members. In addition, access to Building 15 is restricted to a limited number of government employees and contractors.
Building 15, rooms 157 and 158: These rooms comprise the gamma spectroscopy lab that is part of the USGS reactor project. They contain the equipment (detectors, electronic instrumentation, and calibration sources) needed to perform high-precision gamma spectroscopy. Access to these rooms is controlled by the reactor staff.
Building 15, rooms BI0, BlOB, and B11: These rooms are storage and calibration areas that are part of the USGS reactor project. They contain equipment, supplies, and a gamma calibration facility. Access to these rooms is jointly controlled by the reactor staff and the USGS Radiation Safety Officer.
Building 10, room 2: This room is a storage area that contains components from reactor experiments, spare TRIGA graphite elements, spare equipment and supplies, and low level
radioactive waste that is waiting for transfer to a disposal site. Access to this room is controlled by the reactor staff.
1.b. All locations described in response to question l .a. are within the controlled area of the Denver Federal Center and on federal government property. Transport of licensed material between the locations described above does not need to comply with DOT and/or IATA regulations since there are no public roads involved in such movements. However, appropriate containment will be used to minimize the potential for spillage or contamination from the materials. Many of the licensed materials listed in our response to RAI No. 11 are orders of magnitude below the associated ALl values in 10 CER 20 Appendix B, as well as being below the labeling requirements of 10 CFR 30 Appendix B and the 10 CFR 30.18 "Exempt Quantities" values given in 10 CER 30 Schedule B. All of the listed materials are solids,.so no special precautions are needed for the transport of liquids or gases. The labeling requirements of 10 CFR 30 will be followed and appropriate shielding will be used, if needed, to protect personnel as required in 10 CER 20.
Q UES TION:
- 2. The USGS technical specifications do not define the Title 10 of the Code of Federal Regulations (10 CFR) Part 50 licensed area of the USGS research reactor.As such, it is not clear if the storage locations are within the 10 CER 50 licensed area of the USGS research reactor. Determine if a USGS technical specification is needed to define the USGS licensed area to include the storage areas for the proposedlicense material is needed. If a technical specification is needed, propose a technical specification. Otherwise, justify why no change to the current technical specificationsis needed.
RESPONSE
- 2. Given the lack of definition of the USGS research reactor licensed area, a technical specification is proposed to provide this definition. The proposed technical specification change is an addition to the license definitions in Section A as follows:
A. Definitions:
- 10. Licensed Area:
Rooms 149-152, 154, 157, 158, Bl0, BlOB, and Bli of Building 1.5 and Room 2 of Building 10.