Letter Sequence Response to RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
|
MONTHYEARML15342A4332013-03-26026 March 2013 NRC-006A - Shine Medical Technologies, Inc., Construction Permit Application, Cover Letter and General and Financial Information (March 26, 2013), ADAMS Accession No. ML13088A192 Project stage: Other ML13172A3612013-05-31031 May 2013 Part Two of the Shine Medical Technologies, Inc. Application for Construction Permit Project stage: Request ML13172A2622013-05-31031 May 2013 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML13218A9842013-08-16016 August 2013 FRN: General Notice. Shine Medical Technologies, Inc. - Acknowledgment of Receipt of Part Two of the Application for Construction Permit Project stage: Other ML13218A9832013-08-16016 August 2013 Shine Medical Technologies, Inc. - Acknowledgement of Receipt of Part Two of the Application for Construction Permit Project stage: Other ML13233A3562013-08-28028 August 2013 Shine Medical Technologies, Inc. - Status of the Acceptance Review of Part Two of the Application for Construction Permit Project stage: Acceptance Review ML13269A3782013-09-25025 September 2013 Shine Medical Technologies, Inc., Submittal of Preliminary Emergency Plan Project stage: Other ML13316B3492013-12-0202 December 2013 FRN: General Notice. Shine Medical Technologies, Inc., Acceptance for Docketing of Part Two of the Application for Construction Permit Project stage: Acceptance Review ML13316B3872013-12-0202 December 2013 Shine Medical Technologies, Inc., Cover Letter for Acceptance for Docketing of Part Two of the Application for Construction Permit Project stage: Acceptance Review ML14119A0432014-03-17017 March 2014 Affidavit for Shine Medical Technologies, Inc. Discussion Notes Associated with March 20, 2014 Meeting Project stage: Request ML14121A5342014-05-0808 May 2014 Shine Medical Technologies, Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML14195A1592014-09-19019 September 2014 Shine Medical Technologies, Inc. - Request for Additional Information Regarding Application for Construction Permit Project stage: RAI ML14356A5282014-12-0303 December 2014 Shine Medical Technologies, Inc. Application for Construction Permit Response to Request for Additional Information Project stage: Response to RAI ML14356A4502014-12-0303 December 2014 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15005A4072015-01-0606 January 2015 Shine Medical Technologies, Inc., Request for Additional Information Regarding Application for Construction Permit Project stage: RAI ML15043A3172015-02-0606 February 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15043A3952015-02-0606 February 2015 Shine Medical Technologies, Inc. - Application for Construction Permit - Response to Request for Additional Information Project stage: Response to RAI ML15037A2492015-03-0303 March 2015 Shine Medical Technologies, Inc., - Proposed Review Schedule, Notice of Hearing, Opportunity to Petition for Leave to Intervene, and Order Imposing Procedures Project stage: Other ML15037A1082015-03-0404 March 2015 Federal Register Notice - Notice of Hearing, Opportunity to Petition for Leave to Intervene, and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information for Contention Preparation on a Construction Permit F Project stage: Request ML15092A3222015-03-23023 March 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15092A4072015-03-23023 March 2015 Shine Medical Technologies, Inc., Application for Construction Permit, Response to Request for Additional Information 11.1-9 Project stage: Response to RAI ML15055A1162015-03-25025 March 2015 Shine Medical Technologies, Inc., - Request for Additional Information Regarding Application for Construction Permit Project stage: RAI ML15120A0922015-04-10010 April 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15120A2412015-04-10010 April 2015 Shine Medical Technologies, Inc., Application for Construction Permit, Response to Request for Additional Information Project stage: Response to RAI ML15099A6072015-04-15015 April 2015 Shine Medical Technologies, Inc., - Request for Additional Information Regarding Application for Construction Permit(Tac Nos. MF2305, MF2307, and MF2308) Project stage: RAI ML15131A1552015-05-0101 May 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15131A4622015-05-0101 May 2015 Shine Medical Technologies, Inc. Application for Construction Permit, Response to Request for Additional Information Project stage: Response to RAI ML15147A1962015-05-14014 May 2015 Enclosure 2 Attachment 1 - PSAR Markups Project stage: Request ML15147A2032015-05-14014 May 2015 Shine Medical Technologies, Inc., Application for Construction Permit, Response to Request for Additional Information Project stage: Response to RAI ML15140A7342015-05-20020 May 2015 Shine Medical Technologies, Inc. Application for Construction Permit, Response to Request for Additional Information 13a2.2-5 Project stage: Response to RAI ML15161A3432015-05-21021 May 2015 Shine Medical Technologies, Inc. Preliminary Safety Analysis Report Revisions Resulting from Request for Additional Information Responses Project stage: Request ML15140A7312015-05-21021 May 2015 Shine Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7262015-05-21021 May 2015 Shine Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7252015-05-21021 May 2015 Shine Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7242015-05-21021 May 2015 Shine Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7232015-05-21021 May 2015 Shine Medical Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7222015-05-21021 May 2015 Shine Medical Technologies, Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15175A1312015-06-16016 June 2015 Shine Medical Technologies, Inc. Application for Construction Permit Revision to Sections 13b.3 and 19.4 of the Preliminary Safety Analysis Report Project stage: Request ML15175A2132015-06-16016 June 2015 Shine Medical Technologies V. 0 - Chapter 06 - Engineered Safety Features Project stage: Request ML15183A2902015-06-19019 June 2015 Shine Medical Technologies, Inc. Application for Construction Permit - Response to Request for Additional Information Project stage: Response to RAI ML15183A2722015-06-19019 June 2015 Enclosure 2 Attachment 1 - ATKINS-NS-DAC-SHN-15-03, Rev. 1 - MCNP 6.1 Validation with Continuous Energy ENDF/B-VII.1 Cross Sections for Shine Medical Technologies Project stage: Request ML15222A2012015-07-23023 July 2015 Shine Medical Technologies, Inc. Application for Construction Permit Response to Request for Additional Information 6b.3-30 Project stage: Response to RAI ML15236A1272015-08-0707 August 2015 Shine Medical Technologies, Inc. Application for Construction Permit Submittal of Atkins-NS-TR-SHN-15-06, Revision 1 Project stage: Request ML15239A1012015-08-26026 August 2015 E-mail Transmitting Draft Request for Additional Information Supporting Shine PSAR Project stage: Draft RAI ML15219A1822015-08-27027 August 2015 Shine Medical Technologies Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15244A5062015-08-27027 August 2015 E-mail from Steven Lynch to Jim Costedio Transmitting Draft Request for Additional Information Supporting Shine PSAR Project stage: Draft RAI ML15244A7712015-08-27027 August 2015 Draft Request for Additional Information Shine Medical Technologies, Inc. Preliminary Safety Analysis Report Supporting a Construction Permit Application Project stage: Draft RAI ML15219A4252015-08-27027 August 2015 Shine Medical Technologies Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15219A3852015-08-27027 August 2015 Shine Medical Technologies Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15219A3352015-08-27027 August 2015 Shine Medical Technologies Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2015-03-25
[Table View] |
Text
- SHINETM Medical Technologies THIS LETTER CONTAINS PROPRIETARY INFORMATION IN ACCORDANCE WITH 10 CFR 2.390 April 10, 2015 SMT-2015-012 10 CFR 50.30 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
(1) SHINE Medical Technologies, Inc. letter to NRC, dated March 26, 2013, Part One of the SHINE Medical Technologies, Inc. Application for Construction Permit (ML130880226)
(2) SHINE Medical Technologies, Inc. letter to NRC, dated May 31, 2013, Part Two of the SHINE Medical Technologies, Inc. Application for Construction Permit (ML13172A324)
(3) NRC letter to SHINE Medical Technologies, Inc., dated March 25, 2015, SHINE Medical Technologies, Inc. - Request for Additional Information Regarding Application for Construction Permit (TAC Nos. MF2305, MF2307, and MF2308) (ML15055A116)
SHINE Medical Technologies, Inc. Application for Construction Permit Response to Request for Additional Information Pursuant to 10 CFR 50.30, SHINE Medical Technologies, Inc. (SHINE) submitted an application for a construction permit to construct a medical isotope facility to be located in Janesville, WI (References 1 and 2). Via Reference (3), the NRC staff determined that additional information was required to enable the staff's continued review of the SHINE construction permit application. provides the SHINE response to a portion of the NRC staff's request for additional information. Enclosure 1 is being provided via optical storage media (OSM) as OSM#1. The remaining SHINE responses to the NRC staff's request for additional information will be provided by April 24, 2015. provides a non-public (proprietary) revision to the SHINE Preliminary Safety Analysis Report (PSAR), incorporating changes based on the SHINE responses to the NRC staff's request for additional information. Enclosure 2 is provided via OSM as OSM#2. In addition to proprietary information, Enclosure 2 contains security-related information which was identified utilizing the guidance contained in Regulatory Information Summary (RIS) 2005-31. SHINE requests that the NRC withhold Enclosure 2 from public disclosure under 10 CFR 2.390. contains both proprietary and security-related information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of Enclosure 2, this letter is uncontrolled.
2555 Industrial Drive I Monona, WI 53713 1 P (608) 210-1060 1 F (608) 210-2504 1 www.shinemed.com
Document Control Desk Page 2 THIS LETTER CONTAINS PROPRIETARY INFORMATION IN ACCORDANCE WITH 10 CFR 2.390 provides a public (non-proprietary) revision to the SHINE PSAR, incorporating changes based on the SHINE responses to the NRC staff's request for additional information. is provided via OSM as OSM#3. provides an affidavit supporting the proprietary treatment of the SHINE proprietary information pursuant to 10 CFR 2.390. Enclosure 2 contains information proprietary to SHINE.
Upon removal of Enclosure 2, this letter is uncontrolled.
If you have any questions, please contact Mr. Jim Costedio, Licensing Manager, at 608/210-1730.
I declare under the penalty of perjury that the foregoing is true and correct.
Executed on April 10, 2015.
Very truly yours, R. Vann Bynum, Ph.D.
Chief Operating Officer SHINE Medical Technologies, Inc.
Docket No. 50-608 Enclosures cc:
Administrator, Region III, USNRC Project Manager, USNRC Environmental Project Manager, USNRC Supervisor, Radioactive Materials Program, Wisconsin Division of Public Health (w/o Enclosure 2) contains both proprietary and security-related information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of Enclosure 2, this letter is uncontrolled.
ENCLOSURE 1 SHINE MEDICAL TECHNOLOGIES, INC.
SHINE MEDICAL TECHNOLOGIES, INC. APPLICATION FOR CONSTRUCTION PERMIT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION SHINE RESPONSE (OSM#1)
ENCLOSURE 2 CONTAINS PROPRIETARY INFORMATION IN ACCORDANCE WITH 10 CFR 2.390 ENCLOSURE 2 SHINE MEDICAL TECHNOLOGIES, INC.
SHINE MEDICAL TECHNOLOGIES, INC. APPLICATION FOR CONSTRUCTION PERMIT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PRELIMINARY SAFETY ANALYSIS REPORT NON-PUBLIC VERSION (OSM#2) contains both proprietary and security-related information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of Enclosure 2, this letter is uncontrolled.
ENCLOSURE 3 SHINE MEDICAL TECHNOLOGIES, INC.
SHINE MEDICAL TECHNOLOGIES, INC. APPLICATION FOR CONSTRUCTION PERMIT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PRELIMINARY SAFETY ANALYSIS REPORT PUBLIC VERSION (OSM#3)
ENCLOSURE 4 SHINE MEDICAL TECHNOLOGIES, INC.
SHINE MEDICAL TECHNOLOGIES, INC. APPLICATION FOR CONSTRUCTION PERMIT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION AFFIDAVIT OF RICHARD VANN BYNUM 2 pages follow
fl SHINE Medical Technologies AFFIDAVIT OF RICHARD VANN BYNUM STATE OF WISCONSIN
)ss.
COUNTY OF DANE
)
I, Richard Vann Bynum, Chief Operating Officer of SHINE Medical Technologies, Inc. (SHINE),
do hereby affirm and state:
- 1.
I am authorized to execute this affidavit on behalf of SHINE. I am authorized to review information submitted to or discussed with the Nuclear Regulatory Commission (NRC) and apply for the withholding of information from public disclosure. The purpose of this affidavit is to provide the information required by 10 CFR 2.390(b) in support of SHINE's request for proprietary treatment of certain confidential commercial and financial information submitted in the SHINE response to the NRC staff's requests for additional information transmitted by letter SMT-2015-012 with enclosures. SHINE requests that the confidential information contained in Enclosure 2 be withheld from public disclosure in its entirety.
- 2.
I have knowledge of the criteria used by SHINE in designating information as sensitive, proprietary, or confidential.
- 3.
Pursuant to the provisions of paragraph (a)(4) of 10 CFR 2.390, the following is furnished for consideration by the NRC in determining whether the information sought to be withheld from public disclosure should be withheld.
- a. The information sought to be withheld from public disclosure contained in of SMT-2015-012 is owned by SHINE, its affiliates, or third parties to whom SHINE has an obligation to maintain its confidentiality. This information is and has been held in confidence by SHINE.
- b. The information sought to be protected in Enclosure 2 is not available to the public to the best of my knowledge and belief.
1
- c. The information contained in Enclosure 2 is of the type that is customarily held in confidence by SHINE, and there is a rational basis for doing so. The information that SHINE is requesting to be withheld from public disclosure includes trade secret, commercial financial information, commercial information, or information that is subject to export controls. SHINE limits access to these elements to those with a "need to know," and subject to maintaining confidentiality.
- d. The proprietary information sought to be withheld from public disclosure in includes, but is not limited to: structural configuration, primary and supporting systems of the medical isotope facility, process and system locations, and process details. This would include information regarding the types, quantities, and locations of materials stored on site as would be referenced in facility configuration drawings. Public disclosure of the information in Enclosure 2 would create substantial harm to SHINE because it would reveal trade secrets owned by SHINE, its affiliates, or third parties to whom SHINE has an obligation to maintain its confidentiality.
- e. The information contained in Enclosure 2 of SMT-2015-012 is transmitted to the NRC in confidence and under the provisions of 10 CFR 2.390; it is to be received in confidence by the NRC. The information is properly marked.
I declare under the penalty of perjury that the foregoing is true and correct.
Executed on April 10, 2015.
Richard Vann y COO - SHINE Medical Technologies, Inc.