Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22279A951 | 6 October 2022 | Shine Technologies, LLC Request to Amend Construction Permit No. CPMIF-001 | |
ML22091A093 | 1 April 2022 | Shine Technologies, LLC Request to Amend Construction Permit No. CPMIF-001 | Pandemic COVID-19 |
ML21232A620 | 20 August 2021 | Shine Medical Technologies, LLC Request to Amend Construction Permit No. CPMIF-001 - Response to Request for Additional Information | |
ML21119A168 | 29 April 2021 | Enclosure 2: Request to Amend Construction Permit No. CPMIF-001 | |
ML18347A215 | 11 December 2018 | Shine Medical Technologies - Application for Order Approving Indirect Transfer of Control of Construction Permit and Conforming Administrative Construction Permit Amendment | |
ML15247A067 | 2 September 2015 | Shine Medical Technologies, Inc. Application for Construction Permit Response to Request for Additional Information | |
ML15258A369 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 01 - the Facility | Tornado Missile Design basis earthquake |
ML15258A430 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.5.2-006 Through 19.5.2-009 | |
ML15258A429 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.5.2-001 Through 19.5.2-005 | |
ML15258A428 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.4.1-001 Through 19.4.13-001 | Environmental Justice |
ML15258A426 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.4-001 Through 19.3.4-008 | |
ML15258A424 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.3-001 Through 19.3.3-007 | |
ML15258A423 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.2-001 Through 19.3.2-036 | |
ML15258A422 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.3.1-007 Through 19.3.1-009 | |
ML15258A420 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Figures 19.2.1-001 Through 19.2.3-001 | |
ML15258A418 | 27 August 2015 | Shine Medical Technologies V. 0 - Section 19.07 - References | Annual Radiological Environmental Operating Report Earthquake Environmental Justice |
ML15258A417 | 27 August 2015 | Shine Medical Technologies V. 0 - Section 19.06 - Conclusions | Environmental Justice |
ML15258A416 | 27 August 2015 | Shine Medical Technologies V. 0 - Section 19.05 - Alternatives | Earthquake Environmental Justice Fatality |
ML15258A415 | 27 August 2015 | Shine Medical Technologies V. 0 - Section 19.04 - Impacts of Proposed Construction, Operations, and Decommissioning | Internal Flooding Earthquake Environmental Justice |
ML15258A414 | 27 August 2015 | Shine Medical Technologies V. 0 - Section 19.03 - Description of the Affected Environment | High winds Grab sample Annual Radiological Environmental Operating Report Earthquake Fatality |
ML15258A413 | 27 August 2015 | Shine Medical Technologies V. 0 - Section 19.02 - Proposed Action | |
ML15258A412 | 27 August 2015 | Shine Medical Technologies V. 0 - Section 19.01 - Introduction to the Environmental Report | |
ML15258A419 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 19 - Environmental Review | Environmental Justice |
ML15258A411 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 12 - Figure 12.1-001 | |
ML15258A410 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 11 - Figures 11.1-001 and 11.1-003 | |
ML15258A409 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 09 - Figures 9b.2-001 Through 9b.7-008 | |
ML15258A408 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 09 - Figures 9a2.1-001 Through 9a2.7-001 | |
ML15258A407 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 08 - Figure 8a2.2-001 | |
ML15258A406 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 08 - Figure 8a2.1-001 | |
ML15258A404 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 07 - Figures 7a2.1-001 Through 7a2.6-002 | |
ML15258A389 | 27 August 2015 | Shine Medical Technologies V. 0 - PSAR Master Table of Contents | |
ML15258A370 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 02 - Site Characteristics | Safe Shutdown High winds Operating Basis Earthquake Frazil ice Earthquake Fatality |
ML15258A390 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 01 - Figures 1.3-001 Through 1.3-006 | |
ML15258A391 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.1-001 Through 2.1-026 | |
ML15258A392 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.2-001 Through 2.2-002 | |
ML15258A393 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.3-001 Through 2.3-036 | |
ML15258A398 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 02 - Figures 2.5-007 Through 2.5-023 | Earthquake |
ML15258A371 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 03 - Design of Structures, Systems, and Components | Safe Shutdown Ultimate heat sink Mission time Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Cyber Security Emergency Lighting Tornado-Generated Missile Abnormal operational transient Design basis earthquake Earthquake Pressure Boundary Leakage Power change |
ML15258A372 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 04 - Irradiation Unit and Radioisotope Production Facility Description | Shutdown Margin Mission time Anticipated operational occurrence Design basis earthquake |
ML15258A373 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 05 - Cooling Systems | Fuel cladding |
ML15258A374 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 06 - Engineered Safety Features | |
ML15258A375 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 07 - Instrument and Control Systems | Safe Shutdown Commercial Grade Dedication Safe Shutdown Earthquake Post Accident Monitoring Operating Basis Earthquake Cyber Security Earthquake |
ML15258A378 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 08 - Electrical Power Systems | Safe Shutdown Emergency Lighting |
ML15258A379 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 09 - Auxiliary Systems | Safe Shutdown Mission time Fire Barrier Hydrostatic Emergency Lighting Fire Protection Program |
ML15258A381 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 11 - Radiation Protection Program and Waste Management | High Radiation Area Anticipated operational occurrence Annual Radiological Environmental Operating Report |
ML15258A405 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 07 - Figure 7b.2-001 | |
ML15258A403 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 05 - Figures 5a2.1-001 Through 5a2.4-001 | |
ML15258A402 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 04 - Figures 4b.3-001 Through 4b.4-007 | |
ML15258A400 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 04 - Figures 4a2.1-001 Through 4a2.8-002 | |
ML15258A399 | 27 August 2015 | Shine Medical Technologies V. 0 - Chapter 03 - Figures 3.4-001 Through 3.4-014 |