Letter Sequence Acceptance Review |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
|
MONTHYEARML15342A4332013-03-26026 March 2013 NRC-006A - Shine Medical Technologies, Inc., Construction Permit Application, Cover Letter and General and Financial Information (March 26, 2013), ADAMS Accession No. ML13088A192 Project stage: Other ML13172A3612013-05-31031 May 2013 Part Two of the Shine Medical Technologies, Inc. Application for Construction Permit Project stage: Request ML13172A2622013-05-31031 May 2013 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML13218A9842013-08-16016 August 2013 FRN: General Notice. Shine Medical Technologies, Inc. - Acknowledgment of Receipt of Part Two of the Application for Construction Permit Project stage: Other ML13218A9832013-08-16016 August 2013 Shine Medical Technologies, Inc. - Acknowledgement of Receipt of Part Two of the Application for Construction Permit Project stage: Other ML13233A3562013-08-28028 August 2013 Shine Medical Technologies, Inc. - Status of the Acceptance Review of Part Two of the Application for Construction Permit Project stage: Acceptance Review ML13269A3782013-09-25025 September 2013 Shine Medical Technologies, Inc., Submittal of Preliminary Emergency Plan Project stage: Other ML13316B3492013-12-0202 December 2013 FRN: General Notice. Shine Medical Technologies, Inc., Acceptance for Docketing of Part Two of the Application for Construction Permit Project stage: Acceptance Review ML13316B3872013-12-0202 December 2013 Shine Medical Technologies, Inc., Cover Letter for Acceptance for Docketing of Part Two of the Application for Construction Permit Project stage: Acceptance Review ML14119A0432014-03-17017 March 2014 Affidavit for Shine Medical Technologies, Inc. Discussion Notes Associated with March 20, 2014 Meeting Project stage: Request ML14121A5342014-05-0808 May 2014 Shine Medical Technologies, Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML14195A1592014-09-19019 September 2014 Shine Medical Technologies, Inc. - Request for Additional Information Regarding Application for Construction Permit Project stage: RAI ML14356A5282014-12-0303 December 2014 Shine Medical Technologies, Inc. Application for Construction Permit Response to Request for Additional Information Project stage: Response to RAI ML14356A4502014-12-0303 December 2014 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15005A4072015-01-0606 January 2015 Shine Medical Technologies, Inc., Request for Additional Information Regarding Application for Construction Permit Project stage: RAI ML15043A3172015-02-0606 February 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15043A3952015-02-0606 February 2015 Shine Medical Technologies, Inc. - Application for Construction Permit - Response to Request for Additional Information Project stage: Response to RAI ML15037A2492015-03-0303 March 2015 Shine Medical Technologies, Inc., - Proposed Review Schedule, Notice of Hearing, Opportunity to Petition for Leave to Intervene, and Order Imposing Procedures Project stage: Other ML15037A1082015-03-0404 March 2015 Federal Register Notice - Notice of Hearing, Opportunity to Petition for Leave to Intervene, and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information for Contention Preparation on a Construction Permit F Project stage: Request ML15092A3222015-03-23023 March 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15092A4072015-03-23023 March 2015 Shine Medical Technologies, Inc., Application for Construction Permit, Response to Request for Additional Information 11.1-9 Project stage: Response to RAI ML15055A1162015-03-25025 March 2015 Shine Medical Technologies, Inc., - Request for Additional Information Regarding Application for Construction Permit Project stage: RAI ML15120A0922015-04-10010 April 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15120A2412015-04-10010 April 2015 Shine Medical Technologies, Inc., Application for Construction Permit, Response to Request for Additional Information Project stage: Response to RAI ML15099A6072015-04-15015 April 2015 Shine Medical Technologies, Inc., - Request for Additional Information Regarding Application for Construction Permit(Tac Nos. MF2305, MF2307, and MF2308) Project stage: RAI ML15131A1552015-05-0101 May 2015 Shine Medical Technologies V. 0 - Chapter 01 - the Facility Project stage: Request ML15131A4622015-05-0101 May 2015 Shine Medical Technologies, Inc. Application for Construction Permit, Response to Request for Additional Information Project stage: Response to RAI ML15147A1962015-05-14014 May 2015 Enclosure 2 Attachment 1 - PSAR Markups Project stage: Request ML15147A2032015-05-14014 May 2015 Shine Medical Technologies, Inc., Application for Construction Permit, Response to Request for Additional Information Project stage: Response to RAI ML15140A7342015-05-20020 May 2015 Shine Medical Technologies, Inc. Application for Construction Permit, Response to Request for Additional Information 13a2.2-5 Project stage: Response to RAI ML15161A3432015-05-21021 May 2015 Shine Medical Technologies, Inc. Preliminary Safety Analysis Report Revisions Resulting from Request for Additional Information Responses Project stage: Request ML15140A7312015-05-21021 May 2015 Shine Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7262015-05-21021 May 2015 Shine Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7252015-05-21021 May 2015 Shine Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7242015-05-21021 May 2015 Shine Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7232015-05-21021 May 2015 Shine Medical Technologies, Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15140A7222015-05-21021 May 2015 Shine Medical Technologies, Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15175A1312015-06-16016 June 2015 Shine Medical Technologies, Inc. Application for Construction Permit Revision to Sections 13b.3 and 19.4 of the Preliminary Safety Analysis Report Project stage: Request ML15175A2132015-06-16016 June 2015 Shine Medical Technologies V. 0 - Chapter 06 - Engineered Safety Features Project stage: Request ML15183A2902015-06-19019 June 2015 Shine Medical Technologies, Inc. Application for Construction Permit - Response to Request for Additional Information Project stage: Response to RAI ML15183A2722015-06-19019 June 2015 Enclosure 2 Attachment 1 - ATKINS-NS-DAC-SHN-15-03, Rev. 1 - MCNP 6.1 Validation with Continuous Energy ENDF/B-VII.1 Cross Sections for Shine Medical Technologies Project stage: Request ML15222A2012015-07-23023 July 2015 Shine Medical Technologies, Inc. Application for Construction Permit Response to Request for Additional Information 6b.3-30 Project stage: Response to RAI ML15236A1272015-08-0707 August 2015 Shine Medical Technologies, Inc. Application for Construction Permit Submittal of Atkins-NS-TR-SHN-15-06, Revision 1 Project stage: Request ML15239A1012015-08-26026 August 2015 E-mail Transmitting Draft Request for Additional Information Supporting Shine PSAR Project stage: Draft RAI ML15219A1822015-08-27027 August 2015 Shine Medical Technologies Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15244A5062015-08-27027 August 2015 E-mail from Steven Lynch to Jim Costedio Transmitting Draft Request for Additional Information Supporting Shine PSAR Project stage: Draft RAI ML15244A7712015-08-27027 August 2015 Draft Request for Additional Information Shine Medical Technologies, Inc. Preliminary Safety Analysis Report Supporting a Construction Permit Application Project stage: Draft RAI ML15219A4252015-08-27027 August 2015 Shine Medical Technologies Inc. - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15219A3852015-08-27027 August 2015 Shine Medical Technologies Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15219A3352015-08-27027 August 2015 Shine Medical Technologies Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2015-03-25
[Table View] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-608; NRC-2013-0053]
SHINE Medical Technologies, Inc.
AGENCY: Nuclear Regulatory Commission.
ACTION: License application; docketing.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the second and final part of the application for a construction permit, submitted by SHINE Medical Technologies, Inc. (SHINE) is acceptable for docketing.
ADDRESSES: Please refer to Docket ID NRC-2013-0053 when contacting the NRC about the availability of information regarding this document. You may access publicly-available information related to this document using any of the following methods:
Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0053. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail: Carol.Gallagher@nrc.gov. For technical questions, contact the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section of this document.
NRCs Agencywide Documents Access and Management System (ADAMS):
You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209,
301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
NRCs PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Steven Lynch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC, 20555-0001; telephone:
301-415-1524; e-mail: Steven.Lynch@nrc.gov.
SUPPLEMENTARY INFORMATION:
By letter dated May 31, 2013 (SMT-2013-023, ADAMS Accession No.), SHINE submitted the second and final part of its two-part application for a construction permit. By letter dated September 25, 2013 (ADAMS Accession No. ML13269A378), SHINE supplemented this submission with a discussion of preliminary plans for coping with emergencies, as required by section 50.34(a)(10) of Title 10 of the Code of Federal Regulations (10 CFR), completing its application for a construction permit. An exemption from certain requirements of 10 CFR 2.101(a)(5) granted by the Commission on March 20, 2013 (ADAMS Accession No. ML13072B195), in response to a letter from SHINE dated February 18, 2013 (ADAMS Accession No. ML13051A007), allowed SHINE to submit its construction permit application in two parts. Specifically, the exemption allowed SHINE to submit a portion of its application for a construction permit up to six months prior to the remainder of the application regardless of whether or not an environmental impact statement or a supplement to an environmental impact
statement is prepared during the review of its application. If granted, the construction permit would allow SHINE to construct a medical radioisotope production facility in Janesville, Wisconsin.
Part one of SHINEs construction permit application was submitted by letter dated March 26, 2013 (ADAMS Accession No. ML13088A192). In accordance with 10 CFR 2.101(a)(5), this partial application submittal contained the following:
the description and safety assessment of the site required by 10 CFR 50.34(a)(1) the environmental report required by 10 CFR 50.30(f) the filing fee information required by 10 CFR 50.30(e) and 10 CFR 170.21 the general information required by 10 CFR 50.33 the agreement limiting access to classified information required by 10 CFR 50.37 The NRC staff acknowledged receipt of this partial application for a construction permit under 10 CFR part 50, Domestic Licensing of Production and Utilization Facilities, in the Federal Register (78 FR 29390) on May 20, 2013. On June 25, 2013, NRC staff determined that part one of SHINEs application for a construction permit was complete and acceptable for docketing (ADAMS Accession No. ML13150A280), assigning the application Docket No. 50-608.
The NRC staff has now completed its acceptance review of part two of SHINEs application for a construction permit and determined that this second and final portion of SHINEs two-part construction permit application, as supplemented, contains the remainder of the preliminary safety analysis report required by 10 CFR 50.34(a) and was submitted in accordance with the requirements of 10 CFR 2.101(a)(5). Therefore, the application is complete and acceptable for docketing. SHINEs construction permit application, in its entirety,
has been placed under Docket No. 50-608. Please reference this docket number in all future correspondence concerning the review of the SHINE construction permit application.
The NRC staff is now prepared to begin a detailed technical review of the SHINE construction permit application. In the coming weeks, a review schedule will be published that identifies significant milestones and an expected review completion date. Docketing of the application does not preclude the NRC from requesting additional information from the applicant as the review proceeds, nor does it predict whether the Commission will grant or deny the requested construction permit. In support of the review of the SHINE construction permit application, a hearing will be conducted by the Commission or a Board designated by the Chief of the Atomic Safety and Licensing Board Panel in accordance with procedures in 10 CFR Part 2, Agency Rules of Practice and Procedure. A copy of the construction permit application will be referred to the Advisory Committee on Reactor Safeguards for a review and report consistent with 10 CFR 50.58, Hearings and report of the Advisory Committee on Reactor Safeguards. A future Federal Register notice will announce the opportunity to petition for leave to intervene in the hearing required for the application by 10 CFR 50.58 as well as the time and place of the hearing. Additionally, in accordance with 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, the Commission will also prepare an environmental impact statement for the proposed action. If the Commission finds that the SHINE construction permit application meets the applicable standards of the Atomic Energy Act and the Commissions regulations, and that required notifications to other agencies and bodies have been made, the Commission will issue a construction permit, in the form and containing conditions and limitations that the Commission finds appropriate and necessary.
This notice of docketing of the construction permit application does not begin a review to determine whether the proposed SHINE facility should operate. A separate application for an operating license must be submitted for NRC review and approval and, if docketed, would be the subject of a separate Federal Register notice.
Dated at Rockville, Maryland, this 2nd day of December, 2013.
For the Nuclear Regulatory Commission.
/RA/
Alexander Adams, Jr., Chief, Research and Test Reactors Licensing Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor Regulation.