ML15089A181
ML15089A181 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 03/30/2015 |
From: | Harris B NRC/OGC |
To: | NRC/OCM |
SECY RAS | |
References | |
50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, CLI-15-2, RAS 27427 | |
Download: ML15089A181 (45) | |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-247-LR/50-286-LR
)
(Indian Point Nuclear Generating )
Units 2 and 3) )
NRC STAFFS RESPONSE TO THE COMMISSIONS MEMORANDUM AND ORDER OF FEBRUARY 18, 2015 (CLI-15-2), REGARDING CONTENTION NYS-12C Brian G. Harris Counsel for NRC Staff March 30, 2015
ii TABLE OF CONTENTS INTRODUCTION ..................................................................................................................... BACKGROUND ....................................................................................................................... LEGAL STANDARDS .............................................................................................................. I. Scope of Commission Review................................................................................ II. NEPA Standards .................................................................................................... III. An Overview of A SAMA Analysis .......................................................................... NRC STAFF RESPONSE TO COMISSION QUESTIONS .................................................... QUESTION 1 ................................................................................................................... STAFF RESPONSE TO QUESTION 1 ................................................................ QUESTION 2 ................................................................................................................... STAFF RESPONSE TO QUESTION 2 ................................................................ QUESTION 3 ................................................................................................................... STAFF RESPONSE TO QUESTION 3 ................................................................ QUESTION 4 ................................................................................................................... STAFF RESPONSE TO QUESTION 4 ................................................................ QUESTION 5 ................................................................................................................... STAFF RESPONSE TO QUESTION 5 ................................................................ QUESTION 6 ................................................................................................................... STAFF RESPONSE TO QUESTION 6 ................................................................ QUESTION 7 ................................................................................................................... STAFF RESPONSE TO QUESTION 7 ................................................................ QUESTION 8 ................................................................................................................... STAFF RESPONSE TO QUESTION 8 ................................................................
iii TABLE OF AUTHORITIES Page STATUTES The National Environmental Policy Act of 1969, 42 U.S.C. § 4321 et seq. ................................. 3 U.S. Supreme Court Baltimore Gas & Elec. Co. v. Nat. Res. Def. Council, 462 U.S. 87 (1983) ................................... 3 Robertson v. Methow Valley Citizens Council, 490 U.S. 332 (1989) .......................................... 34 Sierra Club v. Army Corp of Engineers, 446 F.3d 808 (2006) ...................................................... 3 Winter v. Nat. Res. Def. Council, 555 U.S. 7 (2008) ..................................................................... 4 U.S. Appellate Courts Massachusetts v. NRC, 708 F.3d 63 (1st Cir. 2013) .................................................................5-6 ADMINISTRATIVE DECISIONS Commission:
Carolina Power & Light Co. (Shearon Harris Nuclear Power Plant),
CLI-01-11, 53 NRC 370 (2001) ................................................................................................... 3 Dominion Nuclear Connecticut, Inc. (Millstone Power Station, Unit 3),
CLI-02-22, 56 NRC 213 (2002) ................................................................................................... 3 Entergy Nuclear Generation Company & Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Station),CLI-10-11, 71 NRC 287 (2010) ..................................................... 4, 19 Entergy Nuclear Generation Co. & Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202 (2010) ............................................... 6 Entergy Nuclear Generation Co. & Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station), CLI-12-1, 75 NRC 39 (2012) ......................................... passim Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3),
CLI-15-2, 81 NRC ___ (Feb. 18, 2015) (slip op.) .............................................................. passim Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3),
CLI-15-3, 81 NRC ___ (Feb. 18, 2015) (slip op.) ........................................................................ 2 Exelon Generation Co, LLC (Early Site Permit for Clinton ESP Site),
CLI-05-29, 62 NRC 801 (2005) ................................................................................................... 4 FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit1),
CLI-12-08, 75 NRC 393 (2012) ......................................................................................... 5, 6, 18
iv Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4),
CLI-01-17, 54 NRC 3 (2001) ..................................................................................................... 25 Louisiana Energy Services, L.P. (Clairborne Enrichment Center),
CLI-98-3, 47 NRC 77 (1998) ....................................................................................................3-4 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1),
CLI-12-5, 75 NRC 301 (2012) ......................................................................................... 5, 27, 28 Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site),
CLI-10-5, 71 NRC 90 (2010) ................................................................................................... 2, 3 Atomic Safety and Licensing Board:
Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3),
LBP-13-13, 78 NRC 246 (2013) ................................................................................ 1, 13, 27, 28 Hydro Resources, Inc. (P.O. Box 777, Crownpoint, New Mexico 87313),
LBP-06-19, 64 NRC 53 (2006) .................................................................................................... 4 REGULATIONS 10 C.F.R. § 2.309(f)(1)(iii) ......................................................................................................25-26 10 C.F.R. § 2.335(a) ............................................................................................................. 15, 26 10 C.F.R. § 51.2............................................................................................................................4 10 C.F.R. Pt. 51, Subpt. A, Appendix B, Table B-1 ........................................................ 15, 24, 26 MISCELLANEOUS NUREG-1437, Vols. 1-3, Sup. 38, Final Report, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Units 2 and 3 (Dec. 2010) ............................................. passim NUREG/CR-3673, Economic Risks of Nuclear Power Reactor Accidents (May 1984) ........ 12, 13
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-247-LR/50-286-LR
)
(Indian Point Nuclear Generating )
Units 2 and 3) )
NRC STAFFS RESPONSE TO THE COMMISSIONS MEMORANDUM AND ORDER OF FEBRUARY 18, 2015 (CLI-15-2), REGARDING CONTENTION NYS-12C INTRODUCTION Pursuant to the Commissions Memorandum and Order of February 18, 2015, the Staff of the U.S. Nuclear Regulatory Commission (Staff) hereby responds to the Commissions eight questions regarding the Atomic Safety and Licensing Boards (Boards) resolution of the State of New York (New York) resolution of NYS-12C in favor of the Staff.1 The Commissions questions generally relate to the Boards factual findings, and thus, these findings are entitled to more deference upon review. As more fully set forth below, the Staff submits that the Board correctly resolved NYS-12C in favor of the Staff after carefully weighing the weight of the testimony and credibility of the witnesses during the hearing. On review of the record supporting the Boards decision, there is ample evidence in the record to support the Boards resolution of each issue in the Staffs favor; thus, the Board did not commit clear error. Accordingly, the Boards decision resolving NYS-12C in favor of the Staff should be affirmed.
BACKGROUND On February 18, 2015, the Commission issued an order directing the parties to address 1
Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), LBP-13-13, 78 NRC 246 (2013).
eight questions related to the Boards resolution of contention NYS-12C in favor of the staff.2 Prior to addressing each of the eight questions, in seriatim, below, the Staff provides an overview of the issues raised in the Commissions order and a brief overview of the SAMA process in order to place the two challenged MACCS2 code inputs, TIMDEC and CDNFRM, in perspective.
LEGAL STANDARDS I. Scope of Commission Review Once the Commission, in its discretion, has granted a request for review of a Board decision, the scope of the review and the standard for review is dependent on the issue being reviewed. With respect to conclusions of law, the Commission reviews those issues de novo.3 The Commissions review of a Boards carefully rendered findings of fact more narrowly. The Commission defers to the Boards findings of fact absent clearly erroneous findings.4 Summarizing its standards of review, the Commission stated that the Boards findings must be not even plausible in light of the record viewed in its entirety.5 In other words, it is not sufficient that the Commission would have concluded differently had it been the finder of fact. The review should demonstrate that there is no evidence to support the Boards findings of fact.
In Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-5, 2
Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI-15-2, 81 NRC ___ (Feb. 18, 2015) (slip op. at 3-4). See also Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), CLI-15-3, 81 NRC ___ (Feb. 18, 2015) (slip op.). The Staffs response to New Yorks petition for review contains a more complete description of the procedural background for contention NYS-12C. NRC Staffs Answer to State of New York Petition For Review of Atomic Safety and Licensing Board Decision LBP-13-13 With Respect to Consolidated Contention NYS-12C, at 2-10 (Apr. 28, 2014) (Agencywide Documents Access and Management Systems (ADAMS)
Accession No. ML14119A001).
3 Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-5, 71 NRC 90, 98-99 (2010).
4 Id., quoting Louisiana Energy Services, L.P. (National Enrichment Facility), CLI-06-22, 64 NRC 37 (2006).
5 Id.
71 NRC 90, 98 (2010), the Commission summarized its standards for review as follows:
. . . . We do not exercise our authority to make de novo findings of fact "where a Licensing Board has issued a plausible decision that rests on carefully rendered findings of fact. As we have stated on other occasions, "[w]hile [we have] discretion to review all underlying factual issues de novo, we are disinclined to do so where a Board has weighed arguments presented by experts and rendered reasonable, record-based factual findings." We defer to a board's factual findings and "generally step in only to correct
'clearly erroneous' findings - that is, findings 'not even plausible in light of the record viewed in its entirety'" - where there "is strong reason to believe that . . . a board has overlooked or misunderstood important evidence." "Our standard of 'clear error' for overturning a Board's factual finding is quite high."
Id. at 98-99 (footnotes omitted).6 The Commissions questions concern the Boards findings of fact made after review of considerable testimony proffered by the parties. As such, the standard for review is quite high; the Board must have committed clear error before the Commission would normally reverse. It is not simply enough that another finding might have been made had the Commission been sitting as the finder of fact; in order to reverse the Boards factual findings there must be no support in the record.
II. NEPA Standards The National Environmental Policy Act (NEPA), 42 U.S.C. § 4321 et seq., requires federal agencies, including the NRC, to take a hard look at the environmental impacts of their actions. NEPA, however, does not mandate a specific outcome or a course of action including a decision to mitigate and potential impacts.7 The NRC fulfills its requirements under NEPA, for 6
Under the clearly erroneous standard in 10 C.F.R. § 2.341(b)(4)(i) and former § 2.786(b)(4)(i),
the Commission generally declines to second-guess plausible Board decisions that rest on carefully rendered findings of fact, but will undertake review where the Board decision contains obvious error.
See Dominion Nuclear Connecticut, Inc. (Millstone Power Station, Unit 3), CLI-02-22, 56 NRC 213, 222 (2002); Carolina Power & Light Co. (Shearon Harris Nuclear Power Plant), CLI-01-11, 53 NRC 370, 382 (2001).
7 See, e.g., Baltimore Gas & Elec. Co. v. Nat. Res. Def. Council, 462 U.S. 87, 97 (1983) (quoting Kleppe v. Sierra Club, 427 U.S. 390, 410 n. 21 (1976)) (stating that NEPA requires only that the agency take a hard look at the environmental consequences before taking a major action); Sierra Club v. Army Corp of Engineers, 446 F.3d 808, 815 (2006) (same); Louisiana Energy Services, L.P. (Clairborne
renewal of operating licenses, through the Generic Environmental Impact Statement (GEIS) and the Final Supplemental Environmental Impact Statement (FSEIS), Exs. NYS000131A-I and NYS000133A-J.8 The Commission stated that [t]here is no NEPA requirement to use the best scientific methodology, and NEPA should be construed in light of reason if it is not to demand virtually infinite study and resources.9 The Commission has cautioned that [o]ur boards do not sit to flyspeck environmental documents or to add details or nuances. If the [EIS]
on its face comes to grips with all important considerations nothing more need be done.10 In Pilgrim, the Commission stated:
Ultimately, we hold adjudicatory proceedings on issues that are material to licensing decisions. With respect to a SAMA analysis in particular, unless a contention, submitted with adequate factual, documentary, or expert support, raises a potentially significant deficiency in the SAMA analysisthat is, a deficiency that could credibly render the SAMA analysis altogether unreasonable under NEPA standardsa SAMA-related dispute will not be material to the licensing decision, and is not appropriate for litigation in an NRC proceeding.11 The Commission warned that in a highly predictive analysis such as a [severe accident mitigation alternatives] (SAMA) analysis, there are bound to be significant uncertainties, and therefore an uncertainty analysis is performed.12 The Commission, anticipating the wide Enrichment Center), CLI-98-3, 47 NRC 77, 87-88 (1998) (same); Hydro Resources, Inc. (P.O. Box 777, Crownpoint, New Mexico 87313), LBP-06-19, 64 NRC 53, 63-64 (2006) (same); see also Winter v. Nat.
Res. Def. Council, 555 U.S. 7, 23 (2008) (stating that NEPA imposes only procedural requirements and does not mandate any particular result).
8 10 C.F.R. § 51.2.
9 Entergy Nuclear Generation Company & Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Station), CLI-10-11, 71 NRC 287, 315 (2010) (footnotes omitted).
10 Exelon Generation Co, LLC (Early Site Permit for Clinton ESP Site), CLI-05-29, 62 NRC 801, 811 (2005) (citing Systems Energy Res., Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-05-4, 61 NRC 10, 13 (2005) (footnote omitted)).
11 Entergy Nuclear Generation Co. & Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-12-1, 75 NRC 39, 57-8 (2012) (emphasis added).
12 Id. at 58.
ranging disputes over individual aspects of the SAMA analysis, has said:
It always will be possible to conceive of yet another input or methodology that could have been used in the SAMA computer modeling, and many different inputs and approaches may all be reasonable choices. The SAMA analysis is not a safety review performed under the Atomic Energy Act. The mitigation measures examined are supplemental to those we already require under our safety regulations for reasonable assurance of safe operation.13 In other words, it is not enough to take issue with a particular aspect of the SAMA analysis; an intervenor challenging the SAMA analysis must show that it was unreasonable.14 The Commission recently stressed that the proper question is not whether there are plausible alternative choices for use in the analysis, but whether the analysis that was done is reasonable under NEPA.15 A petitioner may not simply assert a deficiency. Rather to challenge an applicants SAMA analysis a petitioner must point with support to an asserted deficiency that renders the SAMA analysis unreasonable under NEPA.16 Specifically, [a] contention proposing alternative inputs or methodologies must present some factual or expert basis for why the proposed changes in the analysis are warranted.17 Even more, intervenors must show why the inputs or methodology used is unreasonable, and the proposed changes or methodology would be more appropriate.18 Recently, the First Circuit in resolving a challenge to the SAMA analysis at the Pilgrim Nuclear Power Station using the MACCS2 code remarked that [t]he NRC uses a site-specific and plant specific PRA methodology, which answers three questions:
13 Id. at 57.
14 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-5, 75 NRC 301, 323-24 (2012).
15 FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit1), CLI-12-08, 75 NRC 393, 406 (2012)(reversing the admission of contention challenging the costs to clean-up a severe accident) (internal citations omitted).
16 Id. at 406-07.
17 Id., quoting Seabrook, CLI-12-5, 75 NRC at 323.
18 Id. at 407, quoting Seabrook, CLI-12-5, 75 NRC at 323-34.
(1) what can go wrong; (2) how likely is it; and (3) what are the consequences.19 The court emphasized the need to allow agencies to select their own methodology as long as that methodology is reasonable .20 The contention at issue here likewise proposes alternative methodologies and inputs that would require altering the MACCS2 code. The Commission has indicated that alterations to the underlying MACCS2 code are not required.21 Finally, the Commission has previously concluded that [u]ltimately, NEPA requires the NRC to provide a reasonable mitigation alternatives analysis, containing reasonable estimates
.22 The Commission explained that Staffs FSEIS need only explain any known shortcomings in available methodology, incomplete or unavailable information and significant uncertainties, and a reasoned evaluation of whether and to what extent these or other considerations credibly could or would alter the Pilgrim SAMA analysis conclusions .23 III. An Overview of A SAMA Analysis A SAMA analysis is a systemic search for potentially cost-beneficial enhancements that would further reduce nuclear power plant accident risk.24 The SAMA analysis allows for the comparison of benefits derived from particular mitigating strategies with their cost to 19 Massachusetts v. NRC, 708 F.3d 63,75 (1st Cir. 2013) (affirming the NRCs decision to renew the license for Pilgrim Nuclear Power Station).
20 Id. at 76 (citing Town of Winthrop v. FAA, 535 F.3d 1, 13 (2008)).
21 Davis-Besse, CLI-12-08, 75 NRC at 417-18 (Mar. 27, 2012)(reversing the admission of contention challenging the costs to clean-up a severe accident) (internal citations omitted).
22 Entergy Nuclear Generation Co. & Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010).
23 Id. at 208-09.
24 NRC Staff Testimony of Nathan E. Bixler, S. Tina Ghosh, Joseph A. Jones, and Donald G.
Harrison Concerning NYS Contention 12/16, (Staffs Testimony on NYS-12C), Exhibit (Ex.)
NRC000041, at 19 (Mar. 29, 2012); Transcript (Tr.) at 1899-1900; Testimony of Entergy Witnesses Lori Potts, Kevin OKula, and Grant Teagarden on Consolidated Contention NYS-12C (Severe Accident Mitigation Alternatives, (Entergys Testimony on NYS-12C), Ex. ENT000450, at 16-19 (Mar. 30, 2012);
Prefiled Written Testimony of Dr. Francois J. Lemay Regarding Consolidated NYS-12-C (NYS-12/12-A/12-B/12-C) (New Yorks Testimony on NYS-12C), Ex. NYS000241 at 10-11 (Dec. 21, 2011).
implement.25 SAMA analyses are generally conducted through a probabilistic risk assessment (PRA).26 SAMA analyses are different than a severe accident impact analysis.27 A SAMA analysis is used to identify and characterize the contributors to core damage frequency (CDF) and offsite risk based on plant-specific information.28 Analysts identify potential mitigating strategies to address these risks.29 The mitigating strategies could potentially take the form of prevention (i.e., eliminate the accident from causing core damage or reduce the CDF) or mitigation (i.e., reduce the consequences from a particular accident scenario).30 After identifying potential mitigating strategies, the analysts will screen the proposed strategies for whether they could ever be cost-beneficial by comparing the projected cost of implementation with the reduction in all risk to the plant.31 Once these SAMAs that could never be cost-beneficial are eliminated, the remaining strategies are evaluated for the potential benefit that might be achieved from its impact on risk metrics (CDF, population dose risk, and offsite economic cost risk) and a more detailed cost projection is performed.32 25 Staffs Testimony on NYS-12C, Ex. NRC000041, at 19-22; Tr. at 1900-02; Entergys Testimony on NYS-12C; Ex. ENT000450, at 16-19; New Yorks Testimony on NYS-12C, Ex. NYS000241 at 10-11.
26 Staffs Testimony on NYS-12C, Ex. NRC000041, at 19-21; Tr. at 1900-01; Entergys Testimony on NYS-12C; Ex. ENT000450, at 18-19; New Yorks Testimony on NYS-12C, Ex. NYS000241 at 10-11.
27 A severe accident impact analysis, unlike a SAMA analysis, examines only the impacts from an accident at the plant. A SAMA analysis compares the difference in risk of a plant between an unmitigated and mitigated accident with the cost to implement the mitigation measure. Staffs Testimony on NYS-12C, Ex. NRC000041, at 19-41.
28 Staffs Testimony on NYS-12C, Ex. NRC000041, at 19; Tr. at 1908; Entergys Testimony on NYS-12C; Ex. ENT000450, at 18-19.
29 Staffs Testimony on NYS-12C, Ex. NRC000041, at 20; Tr. at 1900-02, 1909-10; Entergys Testimony on NYS-12C; Ex. ENT000450, at 18-19; New Yorks Testimony on NYS-12C, Ex. NYS000241 at 10-11.
30 Tr. at p. 1933-34.
31 Staffs Testimony on NYS-12C, Ex. NRC000041, at 19; Entergys Testimony on NYS-12C; Ex.
ENT000450, at 18-19; Tr. at 2223.
32 Staffs Testimony on NYS-12C, Ex. NRC000041, at 21-23; Tr. at 1911-15; Entergys Testimony on NYS-12C; Ex. ENT000450, at 18-19; New Yorks Testimony on NYS-12C, Ex. NYS000241 at 10-11.
The impact on risk metrics is performed by comparing the baseline PRA with a revised PRA that reflects implementing one mitigation alternative.33 The process is repeated for each of the mitigating strategies that survived the initial screening process.34 Those mitigating strategies for which the monetized reduction in risk is greater than the economic costs of implementation are identified as potentially cost-beneficial.35 These potentially cost-beneficial SAMAs are identified in Entergys environmental report, the Staffs DSEIS, and the FSEIS.36 These potentially cost-beneficial SAMAs are then reviewed by the Staff to determine if they are related to the scope of review for license renewal, in other words do they mitigate against the aging effects for passive long-lived components with safety or safety-related functions.37 Those SAMAs that are not related to the scope of license renewal are then dispositioned as not required for license renewal.38 They are not imposed as part of the license renewal process, although they might be pursued as a cost-justified backfit or implemented as part of the licensees on-going improvement process.39 The PRA, which forms the basis of the SAMA analysis, is divided into three discrete 33 Staffs Testimony on NYS-12C, Ex. NRC000041, at 20-23; Tr. at 1911-15; Entergys Testimony on NYS-12C; Ex. ENT000450, at 18-19; New Yorks Testimony on NYS-12C, Ex. NYS000241 at 10-11.
34 Staffs Testimony on NYS-12C, Ex. NRC000041, at 21-23; Entergys Testimony on NYS-12C; Ex. ENT000450, at 18-19.
35 Staffs Testimony on NYS-12C, Ex. NRC000041, at 23; Tr. at 1910-11; Entergys Testimony on NYS-12C; Ex. ENT000450, at 18-19; New Yorks Testimony on NYS-12C, Ex. NYS000241 at 10-11.
36 See, e.g., NUREG-1437, Vols. 1-3, Sup. 38, Final Report, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Indian Point Nuclear Generating Units 2 and 3(Dec. 2010), (FSEIS), Ex. NYS00033B, at 5 5-9; Ex. NYS00133C, at 5-10; Ex. NYS00133I, at G-36 - G-38, G G-44, G G-49.
37 FSEIS, Ex. NYS00133I, at G G-49.
38 Id.
39 Id.
elements.40 The first portion of a PRA analysis is commonly referred to as Level 1.41 The Level 1 portion of the analysis concentrates on the plants responses to initiating events to identify what combinations of plant failures can lead to core damage and the frequency of each of these accident sequences.42 Level 2 of the analysis concentrates on how each of these accident sequences may progress and lead to containment failure with a potential release into the environment.43 The release, as characterized by timing and magnitude, is referred to as the source term.44 Level 2 has been primarily analyzed using one of two computer codes in the United States - Methods for Estimation of Leakages and Consequences of Releases (MELCOR) and Modular Accident Analysis Program (MAAP).45 Level 3 of the analysis utilizes the source terms determined from the Level 2 analyses along with site specific information, which includes the surrounding population, meteorological data, land use and valuation, to estimate the potential off-site consequences of a particular accident scenario or scenarios.46 The Level 3 analysis is performed with the MELCOR Accident Consequence Code System 2 (MACCS2) in the U.S.47 MACCS2 models the dispersion of radionuclides throughout the 50-mile radius modeled area centered on the Indian Point site.48 It determines the dose incurred by the population and clean-up workers during the emergency and long-term phases of the 40 Staffs Testimony on NYS-12C, Ex. NRC000041, at 21; Tr. at 2341.
41 Id.
42 Id.
43 Id.
44 Tr. at 1901-2, 1949.
45 Staffs Testimony on NYS-12C, Ex. NRC000041, at 24.
46 Id. at 21, 25.
47 Id. at 25; Entergys Testimony on NYS-12C, Ex. ENT000450, at 24-25; New Yorks Testimony on NYS-12C, Ex. NYS000241, at 11-12.
48 Staffs Testimony on NYS-12C, Ex. NRC000041, at 25-26; Tr. at 1935; Entergys Testimony on NYS-12C, Ex. ENT000450, at 31-32; New Yorks Testimony on NYS-12C, Ex. NYS000241, at 10-11.
accident, the contamination deposited, and the clean-up efforts and costs.49 It is important to note that MACCS2 only calculates a portion of the costs associated with an accident.50 The MACCS2 code, itself, is divided into three modules: ATMOS, EARLY, and CHRONC.51 The ATMOS module utilizes the source terms generated from the Level 1 and Level 2 PRA analysis and in combination with site-specific information disperses the contamination within the 50-mile radius modeled area.52 The EARLY module of the MACCS2 code models the radioactive dose and economic consequences during the emergency phase of an accident, typically the first seven days.53 The CHRONC module of the MACCS2 code also uses output of the ATMOS and EARLY modules and, site-specific information to estimate the dose to population and economic costs like clean-up of the contamination, evacuation, and relocation for each meteorological condition.54 The issue that was before the Board and 49 Staffs Testimony on NYS-12C, Ex. NRC000041, at 37-38; Entergys Testimony on NYS-12C, Ex. ENT000450, at 32-33; New Yorks Testimony on NYS-12C, Ex. NYS000241, at 13; Tr. at 1900-02.
50 The SAMA analysis accounts for five types of costs (1) the monetary value of occupational doses to decontamination workers; (2) onsite decontamination costs; (3) the cost to replace lost power; 4) offsite economic costs associated with evacuation and relocation of the population, decontamination of the property, loss of use of property, and condemnation of property; (5) a monetary value associated with doses to members of the public. Staffs Testimony on NYS-12C, Ex. NRC000041, at 35. The first three items are normally referred to as on-site economic costs and are not part of the MACCS2 code analysis.
Id. Items 4 and 5 are off-site economic costs and are directly calculated by the MACCS2 code or are translated into costs by a conversion factor. Id.; Tr. at 2056-57; 2197.
51 Staffs Testimony on NYS-12C, Ex. NRC000041, at 25-26; Entergys Testimony on NYS-12C, Ex. ENT000450, at 28-30; New Yorks Testimony on NYS-12C, Ex. NYS000241, at 13-14.
52 Staffs Testimony on NYS-12C, Ex. NRC000041, at 25-26; Entergys Testimony on NYS-12C, Ex. ENT000450, at 28-30; New Yorks Testimony on NYS-12C, Ex. NYS000241, at 13-14. Although New York had originally raised challenges to the atmospheric modeling portion of SAMA analysis in NYS-16B and sought summary disposition on this issue that was denied by this Board, New York subsequently dropped all challenges to the atmospheric modeling portion of the MACCS2 code by stipulation. State of New York, Entergy Nuclear Operations, Inc., and NRC Staff Joint Stipulation, at 1-2 (Jan. 23, 2012)
(ADAMS Accession No. ML12023A110).
53 Staffs Testimony on NYS-12C, Ex. NRC000041, at 25-26; Entergys Testimony on NYS-12C, Ex. ENT000450, at 28-30; New Yorks Testimony on NYS-12C, Ex. NYS000241, at 13-14.
54 Staffs Testimony on NYS-12C, Ex. NRC000041, at 25-26, 35-37; Entergys Testimony on NYS-12C, Ex. ENT000450, at 28-31; New Yorks Testimony on NYS-12C, Ex. NYS000241, at 13-15.
presented by New York and its witness was a challenge to the selection of two inputs into the MACCS2 code namely, CDNFRM and TIMDEC.55 These are both inputs into the CHRONC module.56 Typically, the external events (e.g., plant fires and seismic events) impact on the SAMA analysis is accounted for by a separate multiplier of the plants current internal events CDF that is typically determined from the ratio between CDF including both internal and external events and a CDF including only internal events from previous risk studies that examined both internal and external events.57 Further, uncertainties are accounted for by a separate multiplier developed from the ratio between the 95th percentile CDF and the mean CDF.58 Sensitivity studies are also typically developed for factors that may alter the SAMA analysis conclusions given small changes in the input.59 After applying the multipliers for external events and uncertainty and accounting for the sensitivity studies performed, mitigating strategies with monetized risk reduction that exceed the costs to implement the mitigating strategy are identified as potentially cost-beneficial. The Staff, then, considers whether the strategy falls within the scope of license renewal and should be imposed.60 In Entergys SAMA analysis, the external events multiplier combined with the uncertainty multiplier was 8 for both plants, and the 55 Tr. at 2054-55. Until New York filed its initial statement of position and Dr. Lemays pre-filed testimony, the challenge articulated by New York was limited to the decontamination costs. New York had not previously raised a challenge to the TIMDEC through any of its previous filings.
56 Id.
57 Staffs Testimony on NYS-12C, Ex. NRC000041, at 22; FSEIS, Ex. NYS000133I, at G-17.
58 Staffs Testimony on NYS-12C, Ex. NRC000041, at 22; FSEIS, Ex. NYS000133I, at G-45; Tr.
at 2219-20, 2230-33; Entergys Testimony on NYS-12C, Ex. ENT000450, at 47-48.
59 FSEIS, Ex. NYS000133I, at G-1; Staffs Testimony on NYS-12C, Ex. NRC000041, at 36; Tr. at 2076-79, 2165, 2308-09, 2311, 2516-18.
60 See, e.g., Tr. at 1923-25.
uncertainty multiplier alone was 2.1 and 1.4 for IP2 and IP3, respectively.61 The combined multiplier added an additional order of magnitude to the potential benefit from any SAMA.62 NRC STAFF RESPONSE TO COMISSION QUESTIONS QUESTION 1 The Board in LBP-13-13 stated that the genesis of the decontamination time values used in the Indian Point SAMA analysis can be traced to a 1984 report (NUREG/CR- 3673) that concluded that a 90-day decontamination time period represents an average time to complete decontamination efforts following the most severe reactor accident.
Address the underlying support and reasoning (if available) behind the reports conclusion that a 90-day time period is an average period of time for completing decontamination for the most severe type of reactor accident.63 STAFF RESPONSE TO QUESTION 1 NUREG/CR-3673 states:
A total of ~11,000 man-years of effort is involved in the decontamination program to reduce population exposure from the accident. Based on a mean time to completion of 90 days for the decontamination efforts, this program would require a work force of ~46,000 men. Clearly, a large decontamination program after a severe reactor accident would have some important beneficial economic impacts in an affected area. However, manpower limitations may force an extended period for completion of the offsite decontamination program after large releases of radioactive material.64 NUREG/CR-3673 was subject to substantial review both internally by staff members and externally by experts and members of the public.65 This conclusion was based on the research 61 Entergys Testimony on NYS-12C, ENT000041, at 47-48.
62 Id.
63 Indian Point, CLI-15-2, 81 NRC __ (Feb. 18, 2015) (slip op. at 3) (footnotes omitted).
64 NUREG/CR-3673, Economic Risks of Nuclear Power Reactor Accidents, Ex. NRC000058 at 6-25 (May 1984).
65 NUREG prior to publishing typically receive internal and external vetting similar to the type of vetting performed for NUREG-1150. See Tr. at 2370-72.
performed by others and available at the time of the NUREGs publishing.66 In order to understand the 90-day mean, the issues and assumptions implicitly embedded in the analysis are important.67 A careful understanding of the MACCS2 code and the use of the mean and its implications provides an explanation, support, and reasoning for the NUREG/CR-3673s conclusion that 90 days was representative of the average clean-up time for a severe accident and the Boards findings of fact.68 The concept of the mean runs through the majority of issues that the Board resolved in NYS-12C. Simply put, the mean, in this case, is a single number that represents a range of values weighted based on their likelihood of occurring.69 NUREG/CR-3673 explains that it is quite possible that a clean-up during an actual severe accident could greatly exceed the 90-day mean.70 The Staffs experts emphasized that the average times used in Indian Points SAMA analysis are not meant to represent any actual accident and could depart significantly from times necessary for decontamination of an actual accident.71 Actual decontamination times could both be significantly greater than the mean value and shorter than the mean value.72 As an example of this phenomenon, Dr. Bixler, one of the Staffs experts, prepared a chart showing the area requiring decontamination for each source term used in the Indian Point SAMA analysis.73 The range of accidents modeled in 66 The lack of the documents availability some 30-plus years later is not sufficient to cast doubt on the careful conclusions made at the time.
67 The Staff provide substantial testimony over three days regarding the methodology for conducting SAMA analysis including the use of probability weighted mean input values. See, e.g. Tr. at 1897-2387; Tr. at 2404-2537 (discussing population inputs in the SAMA analysis).
68 Indian Point, LBP-13-13, 78 NRC at 469.
69 Tr. at 2187-2191, 2359-60; Staffs Testimony on NYS-12C, Ex. NRC000041, at 89-90.
70 NUREG/CR-3673, Ex. NRC000058 at 6-25.
71 Tr. at 2187-2191; Staffs Testimony on NYS-12C, Ex. NRC000041, at 89-90.
72 Tr. at 2187-2191, 2359-60; Staffs Testimony on NYS-12C, Ex. NRC000041, at 89-90.
73 Ex. NRC000060 at 3, 6, 9, 12, 15, 18, 21.
Indian Points SAMA analysis produced a range of mean areas requiring decontamination from 0 square miles to 956 square miles.74 This same type of analysis resulted in NUREG/CR-3673s conclusion that 90 days represented the mean for severe accident decontamination. The most severe type of accident can represent a wide range of decontamination efforts; similar to how the 90-day average identified in NUREG/CR-3673 represents a range of possible decontamination times from 0 days to, potentially, years.75 In addition to understanding the use of a mean, it is also important to understand how this input is used in a SAMA analysis. The risk portion of the SAMA analysis, unlike a severe accident analysis, compares the difference in risk between an accident based on the current PRA model of the plant and an accident crediting the proposed SAMA in the PRA model.76 The same inputs are used in the MACCS2 analysis for each run with the only difference being the reduction in the likelihood of the accident, the reduction in the likelihood of the release, or the reduction in the magnitude and timing of the release.77 Increasing the TIMDEC or any other MACCS2 input variable does not necessarily result in any increased benefit from the mitigation since the altered input variable is applied equally to both the mitigated and unmitigated accident analysis.78 The Staffs experts and Entergys experts provided uncontroverted testimony that altering the input variables does not increase the benefit by a similar amount and may not result in any appreciable change in the benefit.79 In fact, New York and its witness provide no 74 Id.
75 Tr. at 2241-42, 2244, 2249, 2251; Staffs Testimony on NYS-12C, Ex. NRC000041, at 89-90.
76 Tr. at 1899-2233; see generally Staffs Testimony on NYS-12C, Ex. NRC000041, at 19-31.
77 Tr. at 1899-1920; see generally Staffs Testimony on NYS-12C, Ex. NRC000041, at 19-31.
78 Tr. at 2333, 2525-28; see generally Staffs Testimony on NYS-12C, Ex. NRC000041, at 19-31.
79 Tr. at 2333, 2525-28.
evidence in the record regarding how changing the TIMDEC or CDNFRM would impact the SAMA analysis and only testified that the severe accident cost would increase.80 The cost of a severe accident is not litigable in a license renewal proceeding absent a waiver by the Commission.81 QUESTION 2 Identify from the record any peer review or similar vetting of the NUREG-1150 values for the decontamination cost inputs for nonfarm land and property (CDNFRM) and the decontamination time inputs (TIMDEC) used in the MACCS2 computer code.82 STAFF RESPONSE TO QUESTION 2 The Staffs and Entergys experts testified that NUREG-1150 received substantial peer review.83 NUREG-1150 received three independent formal peer reviews on just the first draft of the report.84 Two were done at the behest of the NRC and one was done on behalf of the American Nuclear Society.85 The ACRS reviewed NUREG-1150 on several occasions during its preparation.86 For the second draft of the document, the NRC established a Peer Review Committee under the Federal Advisory Committee Act to review NUREG-1150.87 Witnesses described the level of review and scrutiny of NUREG-1150 as unprecedented.88 80 See NRC Staffs Reply to State of New Yorks Proposed Findings of Fact and Conclusions of Law For Contention NYS-12/12A/12B/12C (NYS-12C), at 16-20, (May 3, 2013) (ADAMS Accession No. ML13123A352).
81 Pilgrim, CLI-12-1, 75 NRC at 57-8; 10 C.F.R. Pt. 51, Subpt. A, Appendix B, Table B-1; 10 C.F.R. § 2.335(a).
82 Indian Point, CLI-15-2, 81 NRC __ (Feb. 18, 2015) (slip op. at 3).
83 Tr. at 2028, 2034-36, and 2370-72.
84 Tr. at 2370-72.
85 Id.
86 Id.
87 Id. at 2371-72.
88 Id.
NUREG-1150 remains the seminal study on reactor accidents including providing source material for follow-on studies including the recently completed SOARCA study.89 NUREG-1150 looked at plants located in similarly dense urban environments to the Indian Point Site including Zion.90 As Mr. Jones testified, the population density for Zion was greater than the area surrounding Indian Point, even though the total population was less due to its location lakeside.91 Mr. Jones and Entergys experts testified that the inputs for TIMDEC and CDNFRM were utilized for each plant studied even though they were located at different locations with different population densities.92 As Dr. Lemay noted and Staffs witnesses explained the use of per capita input values allow for the appropriate scaling of costs based on the population density, which allowed a single input to be used in wide variety of situations with varying population density and valuations.93 New York argued that the Staff should not be able to rely on NUREG-1150 and the pedigree of the SAMA inputs because one document referenced in the Staffs previous analysis that received substantial peer review is no longer available at the NRC or Sandia National Laboratories (Sandia).94 While it is true that the Staff does not have possession of the particular document New York wished to review; 95 it is not clear that the Staff ever had that 89 Tr. at 1950-52, 2047, 2158-61, 2186-87, and 2303.
90 Id. at 2379; see also id. at 2347-48.
91 Id. at 2379.
92 Tr. at 1950-53, 1968-69, and 2019.
93 Tr. at 1949-51 and 2135-36; 94 State of New Yorks Proposed Findings of Fact and Conclusions of Law for Contention NYS-12/12A/12b/12C (NYS-12C) (New Yorks Proposed Findings on NYS-12C) at 60 (Mar. 22, 2015).
95 Id.
document in its possession. 96 To put the missing reference in perspective, NUREG-1150 references NUREG/CR-4551.97 NUREG/CR-4551 references NUREG/CR-3673.98 The missing reference is one of many documents referenced by NUREG/CR-3673.99 New Yorks challenged the analysis and information from NUREG-1150 not because of any dispute with the analysis but because it could not trace the analysis to its original source, even though the other intervening references received their own peer reviews.100 While the issue regarding the availability of one reference is relevant to whether the Staffs analysis was reasonable, it is not dispositive of the issue especially when the scope and number of independent peer reviews of NUREG-1150 is considered.
New York challenged the reliability of NUREG-1150 because the ultimate source of the information can be traced to a decades old paper that is no longer in the possession of the NRC or Sandia. However, that information has formed the basis of multiple public documents that received substantial internal review prior to publishing, substantial peer review, and were often provided to the public in draft form for comment.101 While New York may complain that NUREG-1150 did not anticipate all the issues New York would later seek to raise 24 years after its publishing, that does not render the peer review conducted then ineffective nor does it taint the insights provided by NUREG-1150. NUREG-1150 received a complete peer review at the time it was published.102 Given the nearly unprecedented scrutiny given NUREG-1150 prior to its 96 Email from Brian G. Harris, NRC, to Kathryn M. Liberatore, New York, Ex. NYS000421 (Apr.
25, 2012).
97 Tr. at 2158-61; Staffs Testimony on NYS-12C, Ex. at 89-90.
98 Id.
99 Id.
100 New Yorks Proposed Findings on NYS-12C at 60.
101 Tr. at 2028, 2034-36, 2370-72.
102 Id.
finalization including multiple independent peer reviews, review by the ACRS, and the public, the information in NUREG-1150 provides information that can be reasonably relied upon the Staff in the conduct of its SAMA analysis.103 QUESTION 3 Providing references to the record, discuss the underlying reasons behind the Staff and Entergy experts opinion that the NUREG-1150 CDNFRM and TIMDEC values continue to reflect reasonable estimates for severe accident decontamination times and costs today, including for the heavier (DF of 15) decontamination effort.104 STAFF RESPONSE TO QUESTION 3 The TIMDEC used in Entergys SAMA analysis was 60 and 120 days for a decontamination factor (DF) of 3 and 15, respectively.105 The CDNFRM used was $5,148 per person and $13,824 per person for DFs of 3 and 15, respectively.106 In general, these times and costs can be traced to the analysis done to support the NUREG-1150 studies after adjusting for inflation and other changes in the intervening years.107 As the Staffs witnesses explained the selected values need to fairly represent all the modeled accidents based on their likelihood of occurring. In support of the Staffs testimony, Dr.
Bixler developed a chart showing the source terms modeled in Indian Points SAMA analysis and the mean area contaminated by each source term.
103 Davis-Besse, CLI-12-08, 75 NRC at 417-18.
104 Indian Point, CLI-15-2, 81 NRC __(Feb. 18, 2015) (slip op. at 3).
105 Staffs Testimony on NYS-12C, Ex. NRC000041 at 88-90.
106 Id. at 67-69.
107 For example, NUREG-1150 used 60 days and 120 days. Tr. at 2241. The studies preceding NUREG-1150 used 90 days. Id.
Source Term Probability Percentage of Area (miles2) Percentage of Group (incident/year) Incidents Area 1 1.19X10-5 66.45 0 0 2 6.5X10-7 3.6 956 48.43 3 4.23X10-7 2.3 447 22.64 4 1.11x10-7 0.6 93 4.7 5 6.88x10-7 3.8 363 18.39 6 3.43x10-6 19.16 91 4.6 7 6.43x10-7 3.6 13 0.65 8 5.82x10-8 3.2 11 0.55 As shown in the chart and explained in the testimony, the primary accidents modeled in Indian Points SAMA analysis account for very little contamination.108 Over 85%, based on likelihood, of the modeled accidents account for less than 13 square miles of land requiring decontamination of any kind.109 For these primary, that is most likely but small consequence, accidents approximately 73.9% of the decontamination that has to be done is a DF of 3 or less.110 The decontamination for these accidents is contained within ten miles of the plant.111 With these low levels of contamination and limited areas of contamination, it is not unreasonable to estimate that on average 60 days is a reasonable estimate for the purpose of conducting a SAMA analysis.112 It is important to understand that the 60 days represents an average time and not a bounding estimate.113 NEPA does not require and the Indian Point SAMA analysis did not assert that all clean-up from an actual accident would be completed in less than 60 days.114 The MACCS2 code application of decontamination is an all or nothing format that also lends credibility to the selected TIMDEC. For example when determining decontamination the 108 Ex. NRC000060 at 6, 9, 12, 15, 18, 21.
109 Id.
110 Id.
111 Id.
112 Id.; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041, at 89-90; Tr. at 2241.
113 Tr. at 1907, 1937.
114 See Pilgrim, CLI-10-11, 71 NRC at 310-311 n.121, 315.
code first identifies whether decontamination is required prior to allowing people to return a particular grid location.115 If the levels of contamination are large enough to require decontamination, it applies the first decontamination effort, DF of 3.116 This is done regardless of the level of decontamination required.117 As long as an area does not need more than a DF of 3, the maximum costs are expended even if the contamination would have only required minimal or a minor decontamination effort.118 In other words, the DF of 3 covers all the required decontamination levels up to 3 and conservatively expends the full decontamination effort even when less is required.119 For a DF of 15, if after applying a DF of 3 it determines that additional decontamination is required, the MACCS2 code expends the full cost of a DF of 15.120 It expends this full cost even in places that only required decontamination nominally greater than the DF of 3 effort.121 This results in conservatively expending more resources for decontamination than is actually warranted by the modeled contamination levels. Under actual accident conditions, it would be more likely that only the required decontamination would be done instead of conducting additional unnecessary decontamination; that is the decontamination efforts would be more closely matched to the contamination levels.122 The TIMDEC represents not just the mean time for conducting decontamination up to a DF of 3 but 115 Tr. at 2199-2202; see also id. at 1982-83, 2272-74; Entergys Testimony on NYS-12C, Ex.
ENT000450, at 77-80.
116 Tr. at 1982-83, 2199-2202.
117 Transcript at 2273; see also id. at 1982-83, 2199-2202.
118 Id.
119 Id.
120 Id.
121 Id.
122 See Tr. at 2361-62; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 89-90.
includes all those lesser DF amounts down to slightly greater than zero.123 The DF of 15 TIMDEC represents decontamination efforts from nominally greater than 3 up to 15.124 By having just two levels of decontamination, the MACCS2 code introduces conservatism into the analysis because it expends the full cost of decontamination even when a lesser effort is warranted.
The CDNFRM values are appropriate inputs for Indian Points SAMA analysis. The Staffs experts have confidence in the values used by Entergy for several reasons including the per capita nature of the values, the Staffs independent assessment of New Yorks expert analysis,125 and Staffs own independent look at the values in order to respond to comments on the DSEIS. The primary reason the Staffs experts believe that the CDNFRM values are representative of average clean-up costs is related to their per-capita nature.126 This unique per-capita benefit was recognized by New Yorks own expert.127 The impact of this unique method is that decontamination costs scale linearly with population density.128 This linear no-limit scaling is very conservative because the costs for each level of decontamination are not explicitly tied to the size of the area to be decontaminated or the actual amount of decontamination work.129 As an example, the decontamination costs for an area requiring a DF of 3 is drastically different for 123 Tr. at 1907, 1937.
124 Id.
125 Dr. Lemay admitted to several errors in his analysis techniques including, for example, ignoring fundamental physical principles like the conservation of mass. Tr. at 2306-07, 2310, and 2135-2138.
126 Tr. at 2306-07, 2310, and 2136.
127 Tr. at 2136.
128 Tr. at 2360 (Dr. Lemay discussing how actual events can exceed and be less than the average); see also Tr. at 2361-62.
129 See Tr. at 2136-44.
a single family home for four people than for a high-rise building with 1000 residents.130 The costs would be $20,592 and $5,148,000, respectively.131 Even though the contamination remains the same, the costs to clean-up the area escalate based on population density until they reach the full value of the property, forcing permanent interdiction.132 In reality, the relative impact on the cost of clean-up from adding one additional person living on the contaminated property is less than linear at increasing higher population densities.133 At a certain level of density, the cost for the next person added would not materially increase the clean-up costs.134 Dr. Lemay, New Yorks expert, utilized alternative methods to estimate the CDNFRM inputs. He used several methods to develop alternative inputs to the MACCS2 code. The Staffs and Entergys experts identified several serious flaws in New Yorks analysis that needed to be accounted for and limit the ability to fully compare Dr. Lemays analysis with the selected inputs.135 However after applying very rough and basic corrections to Dr. Lemays analysis, the Staffs experts concluded that New Yorks analysis supported the selected input variables.136 For example, after correcting for conservation of mass, applying appropriate discounts to extended decontamination efforts, and making the other adjustments identified by the Staff and Entergy, the inputs developed by Dr. Lemay are smaller, that is less conservative, than inputs 130 Tr. at 1949, 2136; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 40-41.
131 Id.
132 Id.
133 See Tr. at 2136-44.
134 Id.
135 Tr. at 2160, 2176-77, 2378, 2147-49, 2377-79, 2199-2202; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041, at 71-72, 42-44; Ex. NRC000060, at 3, 6, 9, 12, 15, 18, 21, 24; Entergys Testimony on NYS-12C, Ex. ENT000450, at 15, 73-75, 77-80.
136 Tr. at 2160, 2176-77, 2378, 2147-49, 2377-79, 2199-2202.
selected by Entergy.137 Thus, this independent development of roughly similar inputs further confirms that the selected inputs are reasonable and that the SAMA analysis is reasonable.138 The Staff, in response to comments on the DSEIS, performed an additional analysis comparing the costs identified in various cited references to the costs used in the SAMA analysis.139 As result of that comparison, the Staff concluded that information in the references, when adjusted for the different contaminates, types of accident, and assumptions also confirmed that the selected inputs were reasonable for the SAMA analysis.140 Based on these reinforcing confirmations, the Staff reasonably concluded and remains convinced that Entergy selected reasonable inputs for its analysis. Thus, the Boards order in favor of the Staff should be affirmed.
QUESTION 4 Discuss the appropriateness of performing sensitivity analyses to account for uncertainties in the estimated decontamination times and non-farm decontamination costs, including what might be reasonable CDNFRM and TIMDEC inputs to use in sensitivity analyses for the Indian Point SAMA analysis.141 STAFF RESPONSE TO QUESTION 4 The SAMA analysis accounts for uncertainty by using the ratio of the mean CDF to the 95th percentile CDF as a multiplier.142 In general, uncertainty analyses are conducted to account for unknowns, that is modeling errors, lack of information, and unknown interactions, among 137 Id.
138 Id.
139 FSEIS, Ex. NYS00133, at G G-25.
140 Id.
141 Indian Point, CLI-15-2, 81 NRC __(Feb. 18, 2015) (slip op. at 3).
142 Tr. at 2230-33; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041, at 94.
others.143 In the Indian Point SAMA analysis, uncertainty was estimated by calculating the difference between the mean CDF and the 95th percentile CDF, 2.1 and 1.4 for IP2 and IP3 respectively.144 This factor was then applied to the entire analysis for each plant.145 Sensitivity analyses, alternatively, are designed to determine how the results of a particular model are affected by small changes to the inputs, that is how insensitive the output is to small changes in the input variables.146 In addition, sensitivity analyses typically focus on the effect of one input acting alone, whereas the output of a complex system is influenced by the combined effects of multiple inputs that have interaction effects, some of which can counteract the effects of individual inputs considered alone. In applying an overall uncertainty factor to the model outputs, the Indian Point SAMA analysis accounted for an integrated overall uncertainty, which would also account for contributions to uncertainty from selected input variables.147 While Dr. Lemay performed a sensitivity analysis, his analysis did not look at sensitivity as it related to a SAMA analysis but concentrated on only severe accident analysis.148 New Yorks analysis was not directed at the actual issue before the Board but instead directed at the generic finding in the Commissions GEIS.149 The change in inputs calculated by Dr. Lemay would be applicable to both the mitigated and unmitigated accidents. Any change in the potential impact is not directly applicable to the benefit that would be realized by the mitigation 143 See Tr. at 2230-33.
144 See Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041, at 94.
145 See id.
146 See Tr. at 2103-04.
147 Id.
148 Tr. at 2004, 2103-04.
149 See New Yorks Proposed Findings on NYS-12C at 1. In the GEIS, the Commission determined generically that the environmental consequences of a severe accident at all nuclear power plants was SMALL. GEIS, Ex. NYS000131C, at 5-115 116; 10 C.F.R. Pt. 51, Subpt. A, Appendix B, Table B-1.
implementation.150 New York did not show that the Staffs SAMA analysis might identify additional potentially cost-beneficial mitigation measures if its suggested changes to the input values, TIMDEC and CDNFRM, where made.151 Specifically, New Yorks arguments incorrectly framed the issue. New Yorks arguments and assertions mainly concentrate on a severe accident impact analysis152 instead of a SAMA analysis.153 New York describes the purpose of the Indian Points SAMA analysis as the vehicle by which the []Staff considers the environmental impacts of a severe accident and alternative mitigation measures.154 New York is incorrect. The NRCs GEIS for license renewal generically evaluates severe accident impacts and provides the technical basis for the NRCs conclusion in 10 C.F.R. Part 51 that the probability-weighted consequences of atmospheric releases, fallout onto open bodies of water, releases to groundwater, and societal and economic impacts of severe accidents are of small significance for all plants.155 The GEIS thus addresses the impacts of severe accidents generically in bounding fashion.156 The Commission has limited contentions raising environmental issues in license renewal proceedings to those issues that are affected by license renewal and have not been addressed by rulemaking or on a generic basis.157 While severe accident mitigation alternatives is a 150 Tr. at 2333, 2525-28.
151 NRC Staffs Reply to State of New Yorks Proposed Findings of Fact and Conclusions of Law for Contention NYS-12/12A/12B/12C (NYS-12C) at 14-20.
152 See n. 25, supra.
153 See, e.g., NYS Findings of Fact on NYS-12C at 23.
154 See, e.g., NYS Findings of Fact on NYS-12C at 23.
155 GEIS, Ex. NYS000131A, at xliv; GEIS, Ex. NYS000131C, at 5-115 116; 10 C.F.R. Pt. 51, Subpt. A, Appendix B, Table B-1.
156 Id.
157 Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 11, 16 (2001).
Category 2 issue, New Yorks argument is a direct challenge to the Commissions regulations in 10 C.F.R. Part 51, Table B-1, and is therefore not within the scope of this licensing proceeding.
10 C.F.R. § 2.309(f)(1)(iii).158 The narrow issue raised by the contention is the reasonableness of the cost-benefit analysis. The Commission stated that the impact finding of small for societal, environmental, and economic impacts from severe accidents is a generic determination for all plants.159 This generic finding, codified in NRCs regulations, is not subject to challenge absent a waiver.160 New York has not petitioned the Commission for a waiver. Ultimately, we hold adjudicatory proceedings on issues that are material to licensing decisions. With respect to a SAMA analysis in particular, unless a contention, submitted with adequate factual, documentary, or expert support, raises a potentially significant deficiency in the SAMA analysisthat is, a deficiency that could credibly render the SAMA analysis altogether unreasonable.161 The Commission warned that in a highly predictive analysis such as a SAMA analysis, there are bound to be significant uncertainties, and therefore an uncertainty analysis is 37 performed. The Commission, anticipating the wide ranging disputes over individual aspects of the SAMA analysis, has said:
It always will be possible to conceive of yet another input or methodology that could have been used in the SAMA computer modeling, and many different inputs and approaches may all be reasonable choices. The SAMA analysis is not a safety review performed under the Atomic Energy Act. The mitigation measures examined are supplemental to those we already require under our safety regulations for reasonable assurance of safe operation.162 158 Pilgrim, CLI-12-1, 75 NRC at 56-7 .
159 See 10 C.F.R. Pt. 51, Subpt. A, Appendix B, Table B-1.
160 See 10 C.F.R. § 2.335(a).
161 Pilgrim, CLI-12-1, 75 NRC at 57 (emphasis omitted).
162 Id.
In other words, it is simply not enough to take issue with a particular aspect of the SAMA analysis, an intervenor challenging the SAMA analysis must show that it was unreasonable on the whole.163 The Commission recently stressed that the proper question is not whether there are plausible alternative choices for use in the analysis, but whether the analysis that was done is reasonable under NEPA.164 A petitioner may not simply assert a deficiency. Rather to challenge an applicants SAMA analysis a petitioner must point to a deficiency that renders the SAMA analysis unreasonable under NEPA.165 Specifically, [a] contention proposing alternative inputs or methodologies must present some factual or expert basis for why the proposed changes in the analysis are warranted.166 New York incorrectly claims that Dr. Ghosh testified that as the costs of a severe accident increases the cost-beneficial candidates become more cost-beneficial. During questioning, Dr. Ghosh testified that if the benefit of a SAMA was increased and the cost was held constant, then a mitigation measure would become more cost-beneficial.167 Dr. Ghosh, however, never opined on the impact of an increase in costs of severe accident that would be applicable to both the unmitigated accident and the mitigated accident.168 Quite simply, New York did not address the ultimate issue before the Board and the subject of the contention.169 Even assuming that New Yorks assertions regarding TIMDEC and CDNFRM are true, Entergys experts and the Staffs expert uncontroverted testimony explained that no conclusions 163 Id.
164 Indian Point, LBP-13-13, 78 NRC at 454.
165 Id.
166 Seabrook, CLI-12-5, 75 NRC at 323.
167 Tr. at 2333.
168 See generally Tr. at 2333, 2525-28.
169 NRC Staffs Reply to State of New Yorks Proposed Findings of Fact and Conclusions of Law for Contention NYS-12/12A/12B/12C (NYS-12C) at 14-20.
regarding whether a particular SAMA is potentially cost-beneficial when the impact of severe accident increases for both the mitigated and unmitigated accidents.170 New York and its witness stopped short of challenging the SAMA analysis conclusions.
Putting aside New Yorks failure to address the ultimate issue in the contention, the MACCS2 code has certain hard-coded limitations built into the code. With respect to TIMDEC and CDNFRM, the limitations on the acceptable inputs are 1-year or less and $100,000 per person or less, respectively.171 Without making modifications to the code and performing all the necessary quality checks, those hardcoded limitations represent the limit of alternative inputs that can be reliably entered into the MACCS2 code. As the courts and the Commission have indicated, NEPA does not require the NRC to engage in research in order to satisfy its hard look requirements.172 Nor does NEPA require the Staff to develop new codes and analytical tools to conduct its analysis.173 Utilizing any input outside of the allowed range would require the Staff to engage in just the type of research not required under NEPA and would be inappropriate.174 The Staff maintains that a sensitivity analysis is not necessary or appropriate here. If a sensitivity analysis was to be performed, it should examine the impact of small changes in best estimate of TIMDEC and CDNFRM on the SAMA analysis conclusions rather than the order of magnitude changes suggested by New York.
In this situation, the inputs selected by Entergy for TIMDEC and CDNFRM and reviewed by the Staff do not warrant the need for an additional sensitivity analysis. New Yorks expert independently tried to determine the appropriate inputs. Dr. Lemays calculations once corrected 170 Tr. at 2333, 2525-28.
171 Entergys Testimony on NYS-12C, Ex. ENT000450at 77-80; Tr. at 2199-2202 172 Seabrook, CLI-12-5, 75 NRC at 341.
173 Indian Point, LBP-13-13, 78 NRC at 453-4.
174 See Pilgrim, CLI-12-1, 75 NRC at 57.
for the failure to conserve mass, application of appropriate discount factors to account for extended decontamination, and the impact of natural decay during extended decontamination times, among others are substantially the same as the inputs selected by Entergy.175 In fact, Entergys inputs were slightly more conservative than Dr. Lemays inputs after being corrected for the errors.176 Thus, as the trier of facts including technical matters, the Boards order in favor of the Staff should be affirmed.
QUESTION 5 Would it be appropriate to treat decontamination times and decontamination costs (and related decontamination factors) from an uncertainty analysis standpoint, using a range of valuese.g.,
smaller values for smaller release accident categories and larger values for the larger release categories? Why or why not?177 STAFF RESPONSE TO QUESTION 5 The Staffs method determined a TIMDEC and CDNFRM, per DF category (3 or 15), that would be applicable for the entire analysis.178 In other words, the mean times and costs selected represent the full range of accidents.179 The Staff explained that under certain actual conditions it is overestimating the times and costs and under other actual situations the times and cost may be underestimated.180 The Commissions order contemplates that instead of utilizing universal set of averages for the entire analysis a set of averages could be developed for each accident source term. The method for determining the appropriate average for each source term would 175 Tr. at 2378-79; see also id. at 2115, 2160, 2176-77, 2147-49, 2199-2202; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 44-48, 69-74.
176 Transcript at 2378-79; see also id. at 2115, 2160, 2176-77, 2147-49, 2199-2202; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 44-48, 69-74.
177 Indian Point, CLI-15-2, 81 NRC __ (Feb. 18, 2015) (slip op. at 3).
178 Tr. at 1907-08, 2200-02, 2209; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041, at 16, 30-31, 90.
179 Id.
180 Id.
utilize the same method used to determine an average for all the source terms.181 Once those values are determined for all the release categories, they would be used to calculate the consequences for each release category.182 The consequences of each accident would be multiplied by the likelihood of each accident.183 After accounting for the likelihood of each accident, the average TIMDEC and CDNFRM weighted for likelihood should result in similar values and outcomes. While the additional effort to develop source term specific input values could produce additional granularity, it should not result is substantial differences in the Staffs overall conclusions.
Although Dr. Lemay, New Yorks expert, urges an average be developed for each accident source term, he also urged the Board to essentially ignore the impact from the more likely accidents with lower consequences and utilize only inputs that reflected the high consequence events that are considerably less likely. As discussed above, the lower consequence events account for more than 85% of the modeled accidents.184 Under New Yorks arguments, the values selected for the inputs would only be applicable to the worst of the accidents being modeled.185 Following Dr. Lemays suggestion with respect to weighting the inputs based on the conditional consequences, the analysis would be transformed from one designed to realistically model the potential risks from a severe accident to a worst-case kind of 181 See generally Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 19-31.
182 Id.
183 Id. at 29-31.
184 See Section IV, supra.
185 Dr. Lemay makes these arguments because he is examining the analysis from a safety perspective. Tr. at 2179-80. However, The Commission has indicated that the SAMA analysis is not being performed for safety. The Commissions regulation provide for the appropriate level of safety.
Pilgrim, CLI-12-1, 75 NRC at 57. Under NEPA, the Commission has said: The SAMA analysis is not a safety review performed under the Atomic Energy Act. The mitigation measures examined are supplemental to those we already require under our safety regulations for reasonable assurance of safe operation. Id.
accident scenario that is not required under NEPA or the Commissions precedent.186 Although it is possible to model each accident source term separately with its own inputs, NEPA has no such requirement and the method selected by the Staff is reasonable under NEPA.187 The Commission has explained that the acceptability of the Staffs SAMA analysis is not whether an alternative model might produce different results but whether the analysis performed by the Staff was reasonable.188 The Staff is free to choose its analytical method, as long it is reasonable and any limitations with the chosen technique are disclosed.189 With respect to the SAMA analysis, the Staff has picked a reasonable method, discussed the benefits of the chosen technique, and discussed the limitations of the method.190 Given that the Staff has utilized a reasonable analysis, there is no reason to use an alternative analysis. Thus, it is not necessary to use a range of values to account for uncertainty in TIMDEC and CDNFRM especially when considering the overall uncertainty factor applied to whole analysis and other conservatisms.
QUESTION 6 Discuss whether, and, if so, how, the SAMA analysis should account for the possibility of potential decontamination times longer than one year.191 STAFF RESPONSE TO QUESTION 6 In order to understand how decontamination times greater than 1-year are accounted for in the SAMA analysis, it is important to understand how the MACCS2 code conducts its analysis. A key aspect of the input values used in Entergys SAMA analysis and the MACCS2 186 Pilgrim, CLI-12-1, 75 NRC at 57-8.
187 Davis-Besse, CLI-12-08, 75 NRC at 417-18.
188 Pilgrim, CLI-12-1, 75 NRC at 57.
189 Id.
190 Id.
191 Indian Point, CLI-15-2, 81 NRC __ (Feb. 18, 2015) (slip op. at 3).
code results from its time-weighted, spatially-weighted, probability-weighted analysis.192 Simply, the MACCS2 code and the SAMA analysis are not designed to reflect any actual accident, but represent the smearing of hundreds of accidents modeled over thousands of initial weather conditions.193 The TIMDEC input value, like all averages represents a range of possible TIMDECs, and is weighted based on the likelihood of occurrence.194 Any representative input variable would be expected to reflect the events being modeled, and thus, it should represent the probability-weighted average of all the accidents being modeled.195 These extended decontamination times are accounted for in the input selected for the MACCS2 model by Entergy.196 Dr. Lemays testimony regarding the appropriate method to weight the input values for the MACCS2 code is often inconsistent and contradictory.197 Early in the proceeding, Dr.
Lemay, consistent with the other experts, indicates that averages should be based on their probabilities. Later, Dr. Lemay switches from advocating a probability weighted average to a consequence weighted average as a safety analysis.198 The Commissions question raises two different issues. The first issue is how input values greater than 1 year could be utilized in the MACCS2 code, i.e. probability-weighted 192 Tr. at 1927-28.
193 Tr. at 2187-91.
194 As discussed in Section IV supra, the majority of accidents modeled in the SAMA analysis result in very little contamination, requiring no decontamination or only light decontamination. Tr. at 2242; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 89-90; Ex. NRC000060 at 6, 9, 12, 15, 18, 21.
As a result, in order to properly weight the inputs to account for the likelihood, the decontamination times must be weighted to account for these limited releases as well as the larger releases. Tr. at 2187-91.
195 Tr. at 2187-91.
196 See id. at 2190.
197 Tr. at 2178. But cf. Tr. at 2359-63.
198 Tr. at 2178-79. As discussed, the SAMA analysis is not being performed as a safety analysis and is instead meant to inform the decision maker regarding the expected environmental impacts from license renewal including potential measures that might mitigate any impact. See id. at 2072.
averages greater than one year. The second issue is how selected averages represent the possibility that some decontamination could exceed one year.
With respect to the first issue, the MACCS2 code has explicit hard coded limits that preclude TIMDEC values from exceeding one year. As the Staff explained, changing the MACCS2 code to allow for extended decontamination times would require considerable work, research, and testing to validate any changes to the code for functionality.199 Under the current decontamination methodology implemented in the code, the limit of one year coordinates well with the other decontamination decisions implemented in the code. For example, the one year limit is consistent with the full decontamination effort and expense occurring during the first year of the model.200 Similarly, the MACCS2 code bases the decontamination effort on the contamination present immediately after the accident, which is consistent with the one year decontamination time limit.201 This relationship breaks down as average times are increased beyond 1-year because natural decay begins to impact the amount of decontamination necessary.202 The process of extending the decontamination over multiple years would need to account for the appropriate discount factors for later years, depreciation and interdiction would need to be revisited to ensure that properties being decontaminated are not pre-maturely interdicted, the decision to relocate populations would need to be modified, and the level of decontamination required would need to modified to account for the natural decay of the contaminants over multiple years, among other problems.203 This kind of original research and 199 Entergys Testimony on NYS-12C, Ex. ENT000450at 15, 73-75, 77-80; Tr. at 2199-2202, 2272-74, 1982-83.
200 Tr. at 2199-2203, 2272-74, 1982-83.
201 Id.
202 Id.
203 Id.
development of new tools and new analysis techniques is not required under NEPA.204 With respect to the second issue and as explained above, the TIMDEC input for the MACCS2 code represents a probability weighted average decontamination time for the modeled accident.205 As a probability-weighted average or mean, the TIMDEC values selected represent a range of values that implicitly include longer decontamination including times that may exceed a year.206 As explained above, decontamination times in excess of one year are already accounted for by the Indian Point SAMA analysis. Entergy used 60- and 120-days for probability weighted average decontamination times for DF of 3 and 15.207 As the Staffs and Entergys experts explained, these times are not meant to represent any specific accident and any actual accident would be expected to depart from inputs used for a SAMA analysis.208 As Board concluded and witnesses explained, including New Yorks witness, the values selected should represent all the accidents being modeled. New Yorks arguments would weight the input values to such that they would only represent the highest consequence events. This would result in an overly conservative analysis that would be unreasonable under NEPA. Thus, the Boards ruling in favor of the Staff should be affirmed.
QUESTION 7 Discuss whether the Indian Point analysis contains conservatisms that bound or otherwise compensate for the uncertainty in the decontamination times and non-farm decontamination costs inputs used in the analysis.209 204 See Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 350-51 (1989).
205 Tr. at 1907, 1922, 2359-60; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 89-90.
206 Id.
207 Tr. at 2048.
208 Tr. at 2187-2191; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041, at 89-90.
209 Indian Point, CLI-15-2, 81 NRC __ (Feb. 18, 2015) (slip op. at 4).
STAFF RESPONSE TO QUESTION 7 Even though the SAMA analysis is not meant to be conservatively biased, the SAMA analysis is conservative in that the benefits tend to be maximized within reason and the cost to implement mitigations are minimized. In other words, Indian Points SAMA analysis tends to make the SAMA analysis more likely to identify mitigation measures as potentially cost-beneficial. As the Staffs and Entergys experts testified, Entergys SAMA analysis applied an uncertainty factor of 2.1 and 1.4 for IP2 and IP3, respectively.210 This was based on the ratio between the mean and the 95th percentile CDF.211 In addition to the uncertainty factor, the separate multipliers of 3.8 and 5.5 for IP2 and IP3, respectively, likely overestimate the effects of external events and provide additional conservatism.212 Further, SAMA analysis generally and conservatively assumed that the mitigation completely eliminate the risk from the accident being mitigated or eliminated a substantial portion of the risk. By assuming that the entire risk was eliminated, the benefit from the mitigation is maximized making the likelihood of finding a cost-beneficial mitigation measure more likely. It is very unlikely that any particular mitigation measure is perfectly effective.213 As an additional level of conservatism that maximized the benefit, Entergy assumed the population present during any accident was the maximum population during the modeled time period.214 This served to raise both the population dose risk and the costs to decontaminate each contaminated area. An additional conservatism is the 210 See Entergys Testimony on NYS-12C, Ex. ENT000450 at 47-48; Tr. at 2220, 2230-33; FSEIS, Ex. NYS00133 at G-45.
211 Entergys Testimony on NYS-12C, Ex. ENT000450 at 47-48; Tr. at 2220, 2230-33; FSEIS, Ex.
NYS00133 at G-45.; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 2.
212 FSEIS, Ex. NYS00133 at G-45; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 94.
213 See Tr. at 2163-66; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 22.
214 Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041 at 94-95.
modeling of no evacuation within the 10-mile emergency planning zone, which I 215contrary to emergency planning provisions and results in an overestimate of the population dose risk.
The method Entergy used to calculate its costs for the mitigation measures, prior to the Boards decision on NYS-35/36, minimized the costs used to determine whether any mitigation was cost-beneficial.216 For example, lifetime costs of the new equipment including maintenance and repairs are not included in cost estimates.217 Thus, Entergys SAMA analysis is sufficiently conservative and bounding for the purpose of conducting an adequate mitigation analysis under NEPA.218 Thus, as the trier of facts including technical matters, the Boards decision in favor of the Staff should be affirmed because there is sufficient conservatism for the purposes of a NEPA mitigation analysis.
A SAMA analysis, however, is not meant to be a worst case type of analysis or bounding;219 the SAMA analysis is, instead, ultimately focused on the mean annual consequences (both off-site population dose and economic costs) over the examined 50-mile region.220 The analysis uses the mean values of the accident consequence distributions for each accident category.221 As such, the SAMA analysis is not required to bound all possible 215 FSEIS, Ex. NYS00133, at G-21; Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041, at 36 and 94.
216 Staffs Prefiled Testimony on NYS-12C, Ex. NRC000041, at 20.
217 Id.
218 Some of New Yorks assertions represent a fundamental misunderstanding of the issue before the Board. NRC Staffs Reply to State of New Yorks Proposed Findings of Fact and Conclusions of Law for Contention NYS-12/12A/12B/12C (NYS-12c) at 14-20. New Yorks concern regarding the overall cost estimate of an unmitigated accident rather than the benefit derived from a mitigation measure. Id. As explained above, the impact from changing a selected input variable for the MACCS2 code does not have predictable effects on the mitigation analysis because those input changes are applied to both the unmitigated and mitigated accidents. Tr. at 2333, 2525-28.
219 Pilgrim, CLI-12-1, 75 NRC at 53.
220 Id.
221 Id. at 53-54 (emphasis omitted).
outcomes.222 The SAMA analysis implicitly contemplates that there are both modeled accidents that could result in higher consequences than the model indicates and lower consequences than the model indicates.
QUESTION 8 The Indian Point SAMA analysis states that the methodology for cleaning up a nuclear weapons accident that was described in a 1996 Sandia National Laboratory study is not relevant to clean-up following a nuclear reactor accident. Nonetheless, the SAMA analysis goes on to describe a comparison of decontamination cost values derived from the study with the decontamination cost values used in the Indian Point analysis. Address to what extent (if any) the comparison to the weapons accident study explains or otherwise substantiates the decontamination cost parameters used in the Indian Point analysis.223 STAFF RESPONSE TO QUESTION 8 The Staff has consistently indicated in its testimony and its discussion in the FSEIS that a weapons accident is not a good analogue for developing reactor accident clean-up.224 New Yorks own expert agreed with the staffs experts and Entergys experts that weapons accidents do not provide a good analogue for estimating decontamination costs or times.225 In the FSEIS, the Staff discussed and compared certain studies related to decontamination after a weapons accident because those issues were submitted as comments on the Staffs DSEIS.226 As the Staff explained in the FSEIS and its testimony, the dominant 222 Id., at 57.
223 Indian Point, CLI-15-2, 81 NRC __ (Feb. 18, 2015) (slip op. at 4) (footnotes omitted)..
224 FSEIS, Ex. NYS00133, at G-23; Staffs Testimony on NYS-12C, Ex. NRC000041, at 27-28, 46-49.
225 Tr. at 2102.
226 The comments regarding weapons accidents were submitted by New York and essentially copied the submissions of New Yorks arguments regarding contention admissibility. Many of the issues raised in those submissions were ultimately dropped by the State prior to the hearing. Because the issues were addressed to the decontamination costs after a nuclear reactor accident, the Staff did address this issue under two explanations. First, the Staff indicated that the differences between a weapons accident and nuclear reactor accident were great enough to cause difficulty with direct
contaminant from a weapons accident is plutonium, whereas a nuclear reactor accident produces cesium as the primary contaminant.227 As a result of the differences between cesium and plutonium, the costs for decontaminating plutonium are vastly greater than the costs for a similar amount of cesium.228 For example, plutonium is highly toxic, has different exposure pathways, and produces alpha particles, which are more dangerous when plutonium is inhaled or ingested.229 Even the required decontamination levels for adequate clean-up are significantly greater for plutonium than cesium.230 Concentrating only on the clean-up requirements, plutonium requires 50 times more material be removed prior to releasing the area.231 The clean-up criteria in 10 C.F.R. § 835, Appendix D, requires plutonium to be reduced to 20 disintegrations per minute (dpm) for a transuranic like Pu and allows 1,000 dpm for beta-gamma emitters like Cs. In other words for the same level of activity, plutonium requires 50 times the effort, which is not without additional costs including the additional protective measures required to work around plutonium.232 Further adding to increased clean-up costs for a weapons accident are the vastly comparison. FSEIS, Ex. NYS00133 at G-22-G-29. Second, the Staff and its experts attempted to adjust the estimates from the weapons accident studies to account for the differences. Id. at G-22-G-29. The Staff concluded that after adjusting for the differences between the two different types of accidents the weapons accident studies generally supported the input values selected by Entergy in the SAMA analysis. Id. at 29.
227 See Staffs Testimony on NYS-12C, Ex. NRC000041at 44-48; FSEIS, Ex. NYS00133 at G-22
- G-24.
228 The Site Restoration Study indicated that plutonium inhalation is the dominant exposure pathway for a weapons accident. Staffs Testimony on NYS-12C, Ex. NRC000041at 46-48. Even the author of the Site Restoration Study recognized that his work was not reasonable applicable to a reactor accident due to the material difference in the types of source terms. Staffs Testimony on NYS-12C, Ex.
NRC000041at 46-47; Ex. NYS000249 at 2-3.
229 Staffs Testimony on NYS-12C, Ex. NRC000041, at 27-28, 46-48.
230 Staffs Testimony on NYS-12C, Ex. NRC000041, at 47.
231 Staffs Testimony on NYS-12C, Ex. NRC000041, at 48.
232 Staffs Testimony on NYS-12C, Ex. NRC000041, at 47-48.
different half-lives for the primary contaminate.233 Plutoniums half-life of 24,000 years essentially means that all of the contaminant needs to be removed because natural decay will not result in any decrease in exposure to the public.234 Cesium, unlike plutonium, is not an inhalation risk, has a relatively short half-life of 30 years, and is quickly eliminated from the body when ingested.235 In the FSEIS, the Staff examined the comments submitted on the DSEIS and provided reasoned responses to the comments including trying to adjust the costs for a weapons accident to a reactor accident.236 The Staff explained that in order to compare the cost factor for decontaminating a weapons accident the costs would need to be adjusted to account for types of contaminant, half-life of the contaminants, health and safety effects of the contaminant, the types of decontamination required, and methods used in the Site Restoration Study to develop cost values.237 As previously noted, weapons accidents consist primarily of Pu-239 contaminants which require larger clean-up, have considerably longer half-lives and present radiation safety concerns and toxicity concerns that serve to increase their clean-up costs beyond a reactor accident event.238 Based on these issues, the Staff identified that moderate plutonium clean-up costs were most closely related to the heavy cesium clean-up modeled in the Indian Point SAMA analysis.239 After converting the costs into comparable units, the 233 Staffs Testimony on NYS-12C, Ex. NRC000041at 47-48.
234 Staffs Testimony on NYS-12C, Ex. NRC000041at 47.
235 Staffs Testimony on NYS-12C, Ex. NRC000041, at 27-28, 48.
236 FSEIS, Ex. NYS00133 at G G-29.
237 Id. at G G-24.
238 Id.
239 Id.
moderate plutonium clean-up costs were $14,900 per person.240 Entergys SAMA analysis alternatively used $13,824 per person.241 The roughly comparable costs determined by this alternative method reinforced the Staffs conclusion that costs used by Entergy were reasonable.242 Thus, the Boards ruling in favor of the Staff should be affirmed.
CONCLUSION For the foregoing reasons, the Staff respectfully submits that the Boards findings of fact are well-supported by the record, that the Board did not commit clear error, and the Boards decision in favor of the Staff on NYS-12C should be affirmed.
/Signed (electronically) by/
Brian G. Harris Counsel for NRC Staff Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Dated at Rockville, Maryland this 30th day of March, 2015 240 Id. at G-24.
241 Id.
242 Id.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )
)
ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-247-LR/50-286-LR
)
(Indian Point Nuclear Generating )
Units 2 and 3) )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing NRC STAFFS RESPONSE TO THE COMMISSIONS MEMORANDUM AND ORDER OF FEBRUARY 18, 2015 (CLI-15-2), REGARDING CONTENTION NYS-12C dated March 30, 2015, have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 30th day of March, 2015.
/Signed (electronically) by/
Brian G. Harris Counsel for NRC Staff Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of Signature: March 30, 2015