BYRON 2015-0026, Response to Request for Additional Information Regarding Pressure and Temperature Limits Reports

From kanterella
(Redirected from ML15058A068)
Jump to navigation Jump to search

Response to Request for Additional Information Regarding Pressure and Temperature Limits Reports
ML15058A068
Person / Time
Site: Byron  Constellation icon.png
Issue date: 02/27/2015
From: Kearney F
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
1.10.0101 (5A.101), BYRON 2015-0026
Download: ML15058A068 (3)


Text

Byron Generating Station iE Exeton Generation www.exeloncorp.com February 27, 2015 LTR: BYRON 201 5-0026 File: 1.10.0101 (5A.101)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron tation, units 1 ana Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Response to Request for Additional Information (RAI) Regarding Pressure and Temperature Limits Reports (PTLRs), Byron Station, Units 1 and 2

References:

(1) Letter from F. A. Kearney (Exelon Generation Company, LLC) to U. S. NRC, Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (MUR) Power Uprate, Byron Station, Units 1 and 2 dated February 13, 2014 (2) E-mail from J. S. Wiebe (U. S. NRC) to S. Gackstetter (Exelon Generation Company, LLC), RAI Regarding Pressure and Temperature Limits Reports (PTLRs), Byron Station, Units 1 and 2, dated January 29, 2015 In Reference 1, Exelon Generation Company, LLC, (EGC) provided the document Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (MUR) Power Uprate, Byron Station, Units 1 and 2 to the Nuclear Regulatory Commission (NRC) in accordance with Technical Specifications 5.5.6 for Byron Station, Units 1 and 2.

In Reference 2, the NRC requested that EGC provide additional information to complete their review of the subject PTLR document (i.e., Reference 1). The NRC requested that EGC provide the requested information to the NRC on or before March 2, 2015.

The response to this request is provided in Attachment 1 to this letter. This letter contains no new regulatory commitments.

Should you have any questions concerning this matter, please contact Douglas Spitzer, Byron Regulatory Assurance Manager, at (815) 406-2800.

Respectfully,

/

7.

Fabe. Kea Site Vice President Byron Generating Station Attachment 1: Response to Request for Additional Information cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector, Byron Station

ATTACHMENT 1 Response to Request for Additional Information Regulatory Basis Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix G requires that pressure-temperature (P-T) limits be developed to bound all ferritic materials in the reactor vessel (RV). Further, Sections I and IV.A of 10 CFR Part 50, Appendix G specify that all ferritic reactor coolant pressure boundary (RCPB) components outside of the RV must meet the applicable requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section III, Rules for Construction of Nuclear Facility Components.

As clarified in Regulatory Information Summary (RIS) 2014-11, Information on Licensing Applications for Fracture Toughness Requirements for Ferritic Reactor Coolant Pressure Boundary Components (ADAMS Accession No. ML14149A165), reactor vessel materials with the highest reference temperature may not always produce the most limiting P-T limits because the consideration of stress levels from structural discontinuities (such as nozzles) may produce a lower allowable pressure.

Request for Additional Information (RAI):

Describe how the P-T limit curves for Byron Units 1 and 2 consider all ferritic pressure boundary components of the reactor vessel that are predicted to experience a neutron fluence exposure greater than lxi 017 n/cm2 [n/cm

] (E> 1 MeV) at the end of the licensed operating period.

2 If the current P-T limit curves do not consider all ferritic pressure boundary components of the reactor vessel that are predicted to experience a neutron fluence exposure greater than lxi 017 2 (E> 1 MeV) at the end of the licensed operating period, provide appropriately revised P-T n/cm limit curves to the NRC as required by Technical Specification 5.6.6.

Response to RAI:

The P-T limit curves submitted in Reference 1 for Byron Units 1 and 2 incorporate all reactor vessel materials predicted to achieve projected neutron fluence values greater than lxi 0 2 (E> 1 MeV) prior to the end of the applicability term of the curves. As documented in n/cm Reference 1, the Byron Unit 1 P-T limit curves are applicable through 32 effective full power years (EFPY) and the Byron Unit 2 P-T limit curves are applicable through 30.5 EFPY.

The P-T limit curves contained in Reference 1 used fluence values calculated as part of the Measurement Uncertainty Recapture (MUR) power uprate evaluation. The neutron fluence values calculated at 32 EFPY for Byron Units 1 and 2 are summarized in Tables 1 and 2 of this Attachment, respectively. As shown in Tables 1 and 2, the materials predicted to achieve projected neutron fluence values greater than lxi 17 n/cm 2 at 32 EFPY include the nozzle shell, intermediate shell and lower shell forgings, as well as the nozzle shell to intermediate shell forging circumferential welds and the intermediate to lower shell forging circumferential welds at Byron Units 1 and 2. These materials have been included in the P-T limit curve assessment submitted in Reference 1.

Page 1 of 2

ATTACHMENT 1 Response to Request for Additional Information Table 1 Byron Unit 1 Calculated Neutron Fluence Projections at the Reactor Vessel CladlBase Metal Interface at 32 EFPY uence Reactor Vessel Material (11cm E 1.0_Me Outlet Nozzle to Nozzle Shell Welds (Lowest Extent) 5,OSEtl6 Inlet Nozzle to Nozzle Shell Welds (Lowest Extent) 670E-l6 Nozzle Shell Forging 5.98E+l8 Nozzle Shell to Intermediate Shell Foring (nc umferential Weld 5.98E+lS Intermediate Shell Forine l.7?E+19 Intermediate to Lower Shell Forging Circumferential Weld 1.72E+19 - -

Lower Shell Forging L77E÷19 Lower Shell Forging to Bottom Head Ring Circumferential Weld L72E+15 Table 2 Byron Unit 2 Calculated Neutron Fluence Projections at the Reactor Vessel Clad/Base Metal Interface at 32 EFPY (a)

Reactor Vessel Material Fluence (u/cm ,E-> 1.OMe)

Outlet Nozzle to Nozzle Shell Welds (Lowest Extent) 4,49 E 16 Inlet Nozzle to Nozzle Shell Welds (Lowest Extent) 5.92E16 Nozzle Shell Forging 5.49E18 Nozzle Shell to Intermediate Shell Forging Circumferential Weld 5 ,49E-- 18 Intermediate Shell Forging 1,76E19 Intermediate to Lower Shell Forging Circumferential Weld L7OE19 Lower Shell Forging L76E-19 Lower Shell Forging to Bottom Head Ring Circumferential Weld 1 ,59El 5 Note:

(a) Although the Byron Unit 2 P-T limit curves are only applicable through 30.5 EFPY, the 32 EFPY neutron fluence values can conservatively be used to determine the extent of the lxi 017 n/cm 2

fluence threshold.

References:

(1) Letter from F. A. Kearney (Exelon Generation Company, LLC) to U. S. NRC, Pressure and Temperature Limits Report (PTLR) for Measurement Uncertainty Recapture (MUR) Power Uprate, Byron Station, Units 1 and 2, dated February 13, 2014 (ADAMS Accession No. ML14044A019).

Page 2 of 2